Items with Index Term: scheduler
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Bettemir, O H (2025) Analysis of existing resource distribution metrics and suggestion of new metrics. Journal of Construction Engineering and Management, 151(2): 04024195, ISSN 0733-9364
Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364
Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364
Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364
Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364
Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364
Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364
Hazrati, A (2016) Predicting construction labor productivity with Bayesian belief networks. PhD thesis, University of Nebraska - Lincoln, USA.
Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364
Kong, F and Dou, D (2020) RCPSP with combined precedence relations and resource calendars. Journal of Construction Engineering and Management, 146(12): 04020133, ISSN 0733-9364
Kong, F; Guo, J and Lv, X (2021) Project resource input optimization problem with combined time constraints based on node network diagram and constraint programming. Journal of Construction Engineering and Management, 147(12): 2192, ISSN 0733-9364
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988
Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.
Naizghi, M S (2021) Factors affecting implementation of earned value management (EVM) in construction projects. PhD thesis, Wayne State University, USA.
Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364
Noorian Talouki, R; Hosseini Shirvani, M and Motameni, H (2022) A hybrid meta-heuristic scheduler algorithm for optimization of workflow scheduling in cloud heterogeneous computing environment. Journal of Engineering, Design and Technology, 20(6), pp. 1581-1605. ISSN 1726-0531
O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.
Tang, P (2013) Assessing decision making strategies in construction management by using a schedule-based simulation framework. PhD thesis, Michigan Technological University, USA.
Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.
Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988
Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.