Items with Index Term: schedule planning
Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364
Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.
Taghaddos, M; Pereira, E; Osorio-Sandoval, C; Hermann, U and Abourizk, S (2023) A data-driven approach for deploying safety policies for schedule planning in industrial construction projects: A case study. Journal of Construction Engineering and Management, 149(12): 05023013, ISSN 0733-9364
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Yin, X; Bouferguene, A and Al-Hussein, M (2020) Data-driven sewer pipe data random generation and validation. Journal of Construction Engineering and Management, 146(12): 04020131, ISSN 0733-9364
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599
Up a level