Items with Index Term: schedule overrun
Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.
Abotaleb, I S and El-Adaway, I H (2018) First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9): 04018084, ISSN 0733-9364
Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2026) Predicting construction schedule overruns during COVID-19 using ordinal logistic regression. International Journal of Building Pathology and Adaptation, 44(1), pp. 110-125. ISSN 2398-4708
Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.
Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X
Akuhe, G; Tutesigensi, A and Kayondo, M (2023) Consequences of poor management of acculturation on large infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
AlHamouri, K; Caldas, C H; Hwang, B G; Krishnankutty, P and de Oliveira, D P (2021) Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities: A case study. International Journal of Construction Management, 21(11), pp. 1115-1129. ISSN 1562-3599
Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.
Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364
Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.
Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.
Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599
Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.
Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364
Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599
Ekambaram, P; Love, P E D; Kumaraswamy, M M and Ng, T S T (2014) Causal ascription of rework in building and civil engineering projects: A multivariate exploration. Engineering, Construction and Architectural Management, 21(1), pp. 111-126. ISSN 0969-9988
El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364
Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.
Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.
Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304
Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988
Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.
Karimi, H; Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6), pp. 368-380. ISSN 01446193
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.
Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.
Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Konior, J and Szóstak, M (2023) Course of planned, actual and earned cost curves of diverse construction investments. International Journal of Construction Management, 23(5), pp. 865-876. ISSN 1562-3599
Lambers, R; Lamari, F; Skitmore, M and Rajendra, D (2024) Key residential construction defects: A framework for their identification and correlated causes. Construction Innovation, 24(6), pp. 1425-1459. ISSN 1471-4175
Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(3), pp. 281-292. ISSN 2044-124X
Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: A case study of Vietnam. Construction Economics and Building, 14(2), pp. 73-86. ISSN 2204-9029
Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.
Love, P; Smith, J and Han, S (2011) Systemic rework risk classification for offshore projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Love, P E D; Davis, P R; Lopez, R and Jasper, T (2008) It’s not just about bricks and mortar: Procedural failures in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364
Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X
Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364
Mogaji, L (2019) Examining the impact of earned value management on construction project outcomes in Nigeria. PhD thesis, Capella University, USA.
Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499
Nickdoost, N; Choi, J; Abdelrazig, Y A and Sobanjo, J (2022) A project life-cycle approach to managing procrastination in construction projects: State-of-the-art review. Journal of Construction Engineering and Management, 148(5): 03122001, ISSN 0733-9364
Osadare, A F (2022) Relationship between cost, schedule overruns, and project success in the nuclear construction industry in the United Kingdom. PhD thesis, Walden University, USA.
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.
Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.
Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599
Robles, J (2023) Fast-track projects with cost and schedule overruns: A supply chain management perspective. DBA thesis, Capella University, USA.
Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364
Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599
Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988
Taylor, T R B; Ford, D N and Reinschmidt, K F (2012) Impact of public policy and societal risk perception on US civilian nuclear power plant construction. Journal of Construction Engineering and Management, 138(8), pp. 972-981. ISSN 0733-9364
Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.