Items with Index Term: schedule growth

Number of items: 44.

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988

Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771

Arabiat, A; Edum-Fotwe, F T and McCaffer, R (2007) Does client behaviour actively induce risk in construction projects? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.

Dunston, P S and Reed, A G (2000) Benefits of small projects team initiative. Journal of Construction Engineering and Management, 126(1), pp. 22-28. ISSN 0733-9364

Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364

Gholami Bavil Olyai, Farshid (2018) A framework for enhancing engineering deliverables to improve construction performance in oil and gas projects. PhD thesis, University of Calgary, Canada.

Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.

Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988

Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364

Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988

Kelly, D and Ilozor, B (2019) A quantitative study of the relationship between project performance and BIM use on commercial construction projects in the USA. International Journal of Construction Education and Research, 15(1), pp. 3-18. ISSN 1557-8771

Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599

Kelly, D J (2015) Investigating the relationships of project performance measures with the use of building information modeling (BIM) and integrated project delivery (IPD). PhD thesis, Eastern Michigan University, USA.

Khalef, R and El-Adaway, I H (2024) Performance of project delivery methods for us airport projects: A holistic quantitative risk-based assessment through perceptions of associated industry experts. Journal of Construction Engineering and Management, 150(10): 04024141, ISSN 0733-9364

Legesse, A; Nejat, A and Ghebrab, T (2025) The coupling of project delivery methods and contract strategies for public building projects in Ethiopia. Construction Innovation, 25(2), pp. 400-418. ISSN 1471-4175

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Maharjan, S; Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(5), pp. 2008-2025. ISSN 0969-9988

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Nguyen, L D; Le-Hoai, L; Tran, D Q; Dang, C N and Nguyen, C V (2019) Effect of project complexity on cost and schedule performance in transportation projects. Construction Management and Economics, 37(7), pp. 384-399. ISSN 01446193

Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193

Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Pocock, J B; Hyun, C T; Liu, L Y and Kim, M K (1996) Relationship between project interaction and performance indicators. Journal of Construction Engineering and Management, 122(2), pp. 165-176. ISSN 0733-9364

Pocock, J B; Liu, L Y and Kim, M K (1997) Impact of management approach on project interaction and performance. Journal of Construction Engineering and Management, 123(4), pp. 411-418. ISSN 0733-9364

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shalwani, A and Lines, B (2022) Using issue logs to improve construction project performance. Engineering, Construction and Architectural Management, 29(2), pp. 896-915. ISSN 0969-9988

Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771

Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364

Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.

Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction. PhD thesis, Oklahoma State University, USA.

Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364

This list was generated on Sun Aug 23 03:21:52 2026 UTC.