Items with Index Term: schedule control

Number of items: 25.

Abudayyeh, O Y (1991) An automated data acquisition and data storage model for improving cost and schedule control. PhD thesis, North Carolina State University, USA.

Abudayyeh, O Y and Rasdorf, W J (1991) Design of construction industry information management systems. Journal of Construction Engineering and Management, 117(4), pp. 698-715. ISSN 0733-9364

Al Nasseri, H and Aulin, R (2016) Enablers and barriers to project planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(2), pp. 1-20. ISSN 1823-6499

Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.

Bosché, F; Turkan, Y; Haas, C T and Haas, R (2010) Fusing 4D modelling and laser scanning for construction schedule control. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Bowen, P and Zhang, R P (2020) Cross-boundary contact, work-family conflict, antecedents, and consequences: Testing an integrated model for construction professionals. Journal of Construction Engineering and Management, 146(3): 04020005, ISSN 0733-9364

Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364

Dong, S.; Xu, S. and Zhang, Y. (2026) Understanding the factors influencing work-life conflict in construction practitioners: A meta-analysis study. International Journal of Building Pathology and Adaptation, 44(3), pp. 567-582. ISSN 2398-4708

El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.

Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364

Khesal, T; Saghaei, A; Khalilzadeh, M; Rahiminezhad Galankashi, M and Soltani, R (2019) Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design and Technology, 17(1), pp. 183-203. ISSN 1726-0531

Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.

Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.

Rasdorf, W J and Abudayyeh, O Y (1991) Cost-and schedule-control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), pp. 486-502. ISSN 0733-9364

Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.

Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364

Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364

Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.

Wu, Z and Ma, G (2023) Automatic generation of BIM-based construction schedule: Combining an ontology constraint rule and a genetic algorithm. Engineering, Construction and Architectural Management, 30(10), pp. 5253-5279. ISSN 0969-9988

Zeng, R; Shi, J J S; Wang, C and Lu, T (2024) Integrating as-built BIM model from point cloud data in construction projects. Engineering, Construction and Architectural Management, 31(9), pp. 3557-3574. ISSN 0969-9988

Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364

This list was generated on Sat Aug 22 02:19:11 2026 UTC.