Items with Index Term: schedule compression

Number of items: 21.

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364

Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193

Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988

Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364

Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 0969-9988

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Laufer, A; Shapira, A and Goren, I (1998) Implementing an integrative approach to project schedule compression. Engineering, Construction and Architectural Management, 5(1), pp. 82-92. ISSN 0969-9988

Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.

Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988

Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175