Items with Index Term: schedule acceleration
Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364
Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364
Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988
Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364
Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Up a level