Items with Index Term: sampling

Number of items: 491.

AbdelRazig, Y A (1999) Construction quality assessment: A hybrid decision support model using image processing and neural learning for intelligent defects recognition. PhD thesis, Purdue University, USA.

Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599

AbdulAzeez, A D; Etubi, U and Umar, B (2019) An assessment of multi-skilling in addressing skills shortage in Nigerian construction firms. African Journal of Built Environment Research, 3(1), pp. 1-13. ISSN 2414-0236

Abdullahi, I (2000) Development of a funding model for allocating capital grants to the federal universities in Nigeria. PhD thesis, Abertay University, UK.

Abdulsalam, R S; Chan, M; Masrom, M A N and Nawawi, A H (2024) Benefits and challenges of implementing green building development in Nigeria. Built Environment Project and Asset Management, 14(3), pp. 399-413. ISSN 2044-124X

Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908

Acheampong, A; Owusu-Manu, D G; Kissi, E and Tetteh, P A (2023) Assessing the influence of emotional intelligence (EI) on project performance in developing countries: The case of Ghana. International Journal of Construction Management, 23(7), pp. 1163-1173. ISSN 1562-3599

Adafin, J; Wilkinson, S; Rotimi, J O B; MacGregor, C; Tookey, J and Potangaroa, R (2022) Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation, 22(1), pp. 185-204. ISSN 1471-4175

Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.

Addy, M N; Kwofie, T E E; Agbonani, D M and Essegbey, A E (2024) Using the TOE theoretical framework to study the adoption of BIM-AR in a developing country: the case of Ghana. Journal of Engineering, Design and Technology, 22(6), pp. 1913-1935. ISSN 1726-0531

Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Adesi, M; Owusu-Manu, D G and Boateng, F (2019) Segmentation of quantity surveying professional services for focus strategy and diversification. Journal of Financial Management of Property and Construction, 24(3), pp. 294-308. ISSN 1366-4387

Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988

Adetooto, J; Windapo, A and Pomponi, F (2024) The use of alternative building technologies as a sustainable affordable housing solution: Perspectives from South Africa. Journal of Engineering, Design and Technology, 22(5), pp. 1447-1463. ISSN 1726-0531

Adjei, K O; Abudu, H D; Nana-Addy, E and Musonda, I (2025) The motivation for occupants’ adoption of hidden emergency exits in buildings. Engineering, Construction and Architectural Management, 32(13), pp. 133-147. ISSN 0969-9988

Adu, E T; Lamptey-Puddicombe, A D and Opawole, A (2020) Consultants' perspectives of survival strategies for small and medium construction firms at infancy stage. Journal of Construction Business and Management, 4(1), pp. 34-47. ISSN 2521-0165

Adu-Amankwa, N. A. N. and Rahimian, F. (2026) Harnessing blockchain-enabled digital twins for building commissioning: Examining practitioners' perspectives. Engineering, Construction and Architectural Management, 33(3), pp. 1891-1906. ISSN 0969-9988

Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.

Afolabi, A; Ibem, E; Aduwo, E and Tunji-Olayeni, P (2022) Digitizing the grey areas in the Nigerian public procurement system using e-procurement technologies. International Journal of Construction Management, 22(12), pp. 2215-2224. ISSN 1562-3599

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmad, H S; Ayoush, M D and Al-Alwan, M S (2020) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(1), pp. 153-179. ISSN 2044-124X

Ahmed, S and El-Sayegh, S (2024) Relevant criteria for selecting project delivery methods in sustainable construction. International Journal of Construction Management, 24(5), pp. 512-520. ISSN 1562-3599

Aiyetan, O A (2019) Influence of the management styles and quality of management on project delivery. Journal of Construction Business and Management, 3(1), pp. 38-44. ISSN 2521-0165

Ajayi, O O; Koleoso, H; Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in Southwestern Nigeria. Journal of Construction Business and Management, 3(2), pp. 26-34. ISSN 2521-0165

Akinradewo, O I; Aigbavboa, C O; Edwards, D J and Oke, A E (2022) A principal component analysis of barriers to the implementation of blockchain technology in the South African built environment. Journal of Engineering, Design and Technology, 20(4), pp. 914-934. ISSN 1726-0531

Al-Fadhali, N (2024) An amos-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(2), pp. 638-661. ISSN 0969-9988

Al-Harbi, K M; Johnston, D W and Fayadh, H (1994) Building construction detailed estimating practices in saudi arabia. Journal of Construction Engineering and Management, 120(4), pp. 774-784. ISSN 0733-9364

Al-Qayoudhi, S. A. S.; Kamal, E. M. and Said, I. (2026) Improving total quality management implementation at the University of Technology and Applied Sciences in the Sultanate of Oman. Journal of Construction in Developing Countries, 30(Supp.), pp. 15-37. ISSN 1823-6499

Al-Saleh, H A (1991) A program to improve construction productivity in the construction industry in Saudi Arabia. DEngr thesis, University of Kansas, USA.

Alamoudi, A K; Abidoye, R B and Lam, T Y M (2024) An evaluation of stakeholders' participation process in developing smart sustainable cities in Saudi Arabia. Smart and Sustainable Built Environment, 13(5), pp. 1074-1095. ISSN 2046-6099

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities. PhD thesis, Brunel University, UK.

Alhamoudi, A. M. and Osunsanmi, T. O. (2026) Modelling the training strategies for reskilling UK construction workers in the Fourth Industrial Revolution era: A structural equation model approach. Smart and Sustainable Built Environment, 15(5), pp. 1967-1990. ISSN 2046-6099

Allan, B; Sweis, R and Sweis, G (2026) Assessing the challenges affecting blockchain adoption in the Jordanian construction industry: Pestel framework approach. Built Environment Project and Asset Management, 16(2), pp. 357-376. ISSN 2044-124X

Alsharif, M A (2017) Improving sustainability on university campuses in Saudi Arabia: An assessment of organisational and decision-related opportunities and barriers. PhD thesis, University of Reading, UK.

Amadi, A and Adeniyi, O (2025) Living with water: Quantitative assessment of property-level resilience to urban flooding. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 72-86. ISSN 1759-5908

Ameh, O J and Odusami, K T (2014) Nigerian construction professional's education and deficiencies in the area of project management. Journal of Construction in Developing Countries, 19(1), pp. 1-14. ISSN 1823-6499

Amida, A; Chang, I and Yearwood, D (2020) Designing a practical lab-based assessment: a case study. Journal of Engineering, Design and Technology, 18(3), pp. 567-581. ISSN 1726-0531

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Amini, M; Mahdavinejad, M and Bemanian, M (2019) Future of interactive architecture in developing countries: Challenges and opportunities in case of Tehran. Journal of Construction in Developing Countries, 24(1), pp. 163-184. ISSN 1823-6499

Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165

Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.

Anakor, C A; Harper, C M and Taylor, T R B (2026) Training and job search preferences among male and female craft workers in US construction. Journal of Construction Engineering and Management, 152(3): 04025267, ISSN 0733-9364

Anand, K B and Ramamurthy, K (2003) Laboratory-based productivity study on alternative masonry systems. Journal of Construction Engineering and Management, 129(3), pp. 237-242. ISSN 0733-9364

Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements. PhD thesis, University of Florida, USA.

Anugwo, I C; Appau, M W; Simpeh, F and Attakora-Amaniampong, E (2025) Critical drivers of changes in energy-saving behaviours in student housing in Northern Ghana. Journal of Engineering, Design and Technology, 23(6), pp. 2023-2041. ISSN 1726-0531

Anzagira, L F; Duah, D; Badu, E; Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: The case of Ghana. Journal of Engineering, Design and Technology, 22(3), pp. 1012-1029. ISSN 1726-0531

Arambula, E and Gharaibeh, N (2014) Methods for accumulating construction and material quality test results and their effect on acceptance decisions. Journal of Construction Engineering and Management, 140(8): 06014006, ISSN 0733-9364

Arhinful, R; Attabra, F K; Mensah, L and Obeng, H A (2026) The mediating role of talent management in the relationship between project manager competencies and sustainable competitive advantage in the Ghanaian construction industry. Construction Management and Economics, 44(2), pp. 119-142. ISSN 0144-6193

Arijeloye, B T (2025) Impact of project risk allocation on PPP housing project delivery in Nigeria: Partial least square structural equation modeling approach. Journal of Engineering, Design and Technology, 23(3), pp. 812-829. ISSN 1726-0531

Arijeloye, B T; Aje, I O and Oke, A E (2024) Evaluating the key risk factors in PPP-procured mass housing projects in Nigeria: A Delphi study of industry experts. Journal of Engineering, Design and Technology, 22(1), pp. 60-76. ISSN 1726-0531

Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599

Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.

Asare, E; Owusu-Manu, D G; Ayarkwa, J; Martek, I and Edwards, D J (2026) Empirical perspective of working capital management practices among large building construction firms in Ghana. Construction Innovation, 26(3), pp. 768-785. ISSN 1471-4175

Asgary, A and Azimi, N (2019) Choice of emergency shelter: Valuing key attributes of emergency shelters. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 130-150. ISSN 1759-5916

Asianoah, R; Ayitey, A F and Brink, B (2025) Assessing financial and professional risks on commercial property development and investment in the Accra, Ghana enclave. Construction Economics and Building, 25(2), pp. 215-234. ISSN 2204-9029

Atukpa, D J (2021) Managerial support strategies to minimize job insecurity among Nigerian private firms. PhD thesis, Walden University, USA.

Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499

Aye, S. Y.; Santoso, D. S. and Dodanwala, T. C. (2026) Bridging the gap: How generational work values influence job satisfaction and turnover intention in the construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 920-942. ISSN 1726-0531

Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387

Azila-Gbettor, E M; Novieto, D T; Tulasi, E E; Ahiabu, M K and Adzivor, E K (2024) Citizenship fatigue and employee commitment: Moderating role of psychological ownership among artisans of family-owned construction firms. International Journal of Construction Management, 24(9), pp. 975-985. ISSN 1562-3599

Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099

Badamasi, A A; Aryal, K R; Makarfi, U U and Dodo, M (2022) Drivers and barriers of virtual reality adoption in UK AEC industry. Engineering, Construction and Architectural Management, 29(3), pp. 1307-1318. ISSN 0969-9988

Badi, S; Ochieng, E; Nasaj, M and Papadaki, M (2021) Technological, organisational and environmental determinants of smart contracts adoption: UK construction sector viewpoint. Construction Management and Economics, 39(1), pp. 36-54. ISSN 01446193

Batista Silveira Dos Santos, L F (2020) Efficient modeling strategies for performance-based building design supported by daylight and building energy simulations. PhD thesis, University of California, Berkeley, USA.

Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.

Bello, A O; Isa, R B; Oke, A E; Arogundade, S and Lewis, J M O (2026) Circular economy implementation in the construction industry: An examination of the barriers in a developing country. International Journal of Building Pathology and Adaptation, 44(1), pp. 143-162. ISSN 2398-4708

Bello, A O; Okanlawon, T T; Gbenga, P O; Abdulraheem, A A and Olagoke, O T (2026) Critical success factors (csfs) for the implementation of distributed ledger technology (dlt) in the Nigerian construction industry. Construction Innovation, 26(2), pp. 531-550. ISSN 1471-4175

Bilbo, D; Bigelow, B F; Rybkowski, Z and Kamranzadeh, A (2014) Effects of family-related factors on female project managers' salaries in the construction industry in the United States. International Journal of Construction Education and Research, 10(4), pp. 255-267. ISSN 1557-8771

Blamah, N V; Magidimisha-Chipungu, H; Dayomi, M and Popoola, A A (2023) Intrinsic mode choice determinants based on a descriptive analysis of the perceptions of Abuja commuters: Towards refocusing the societal mind-set on environmentally sustainable modes choice. Smart and Sustainable Built Environment, 12(1), pp. 1-26. ISSN 2046-6099

Blaylock, B (2009) Learning and knowing construction: A phenomenological study of construction leaders. PhD thesis, University of Idaho, USA.

Boamah, F A; Zhang, J; Shehzad, M U; Sherani, S and Wen, D (2024) Exploring the impact of social capitals and knowledge creation on construction firms performance in the COVID-19 era. Journal of Engineering, Design and Technology, 22(2), pp. 404-421. ISSN 1726-0531

Bond, S (2015) Residents' perceptions of risk towards residential property in Canterbury NZ subsequent to the earthquakes. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 234-267. ISSN 1759-5916

Bortey, L; Edwards, D J; Roberts, C and Rillie, I (2025) Unravelling incipient accidents: A machine learning prediction of incident risks in highway operations. Smart and Sustainable Built Environment, 14(6), pp. 1991-2022. ISSN 2046-6099

Brown, J and Loosemore, M (2015) Behavioural factors influencing corrupt action in the Australian construction industry. Engineering, Construction and Architectural Management, 22(4), pp. 372-389. ISSN 0969-9988

Brown, N; Wright, A J; Shukla, A and Stuart, G (2010) Longitudinal analysis of energy metering data from non-domestic buildings. Building Research & Information, 38(1), pp. 80-91. ISSN 0961-3218

Bryde, D J (2000) Project management: uses, structures, systems and influences. PhD thesis, Liverpool John Moores University, UK.

Bulut, M; Wilkinson, S; Khan, A; Jin, X H and Lee, C L (2021) Perceived benefits of retrofitted residential secondary glazing: An exploratory Australian study. International Journal of Building Pathology and Adaptation, 39(5), pp. 720-733. ISSN 23984708

Bweupe, A S and Mwiya, B (2024) Quality management in ready-mix concrete production in Zambia. Journal of Construction Business and Management, 7(1), pp. 1-15. ISSN 2521-0165

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Cao, T.; Zhang, L. and Qian, Q. (2026) For a rainy day: Preventing the escalation of threats into interorganizational relationship conflict through emotional regulation and boundary-spanning roles. Journal of Construction Engineering and Management, 152(7): 04026096, ISSN 0733-9364

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Cha, H S; Kim, K H and Kim, C K (2012) Case study on selective demolition method for refurbishing deteriorated residential apartments. Journal of Construction Engineering and Management, 138(2), pp. 294-303. ISSN 0733-9364

Chan, D W M; Olawumi, T O; Saka, A B and Ekundayo, D (2024) Comparative analysis of the barriers to smart sustainable practices adoption in the construction industry between Hong Kong and Nigeria. International Journal of Construction Management, 24(14), pp. 1499-1509. ISSN 1562-3599

Chandrasekara, C M K N K; Weerasinghe, K D N; Pathirana, S and Piyadasa, R U K (2018) Stresses over surface water sources in a human dominated environment: A case study in Hamilton canal, Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 184-197. ISSN 1759-5916

Chang, H-P (2010) Relationships among supply chain management, strategic alliances, and organizational performance with implications for the construction industry. PhD thesis, Lynn University, USA.

Chang, L M (1986) Inferential statistics for craftsman questionnaire. Journal of Construction Engineering and Management, 112(4), pp. 492-499. ISSN 0733-9364

Chang, L M and Borcherding, J D (1985) Evaluation of craftsman questionnaire. Journal of Construction Engineering and Management, 111(4), pp. 426-437. ISSN 0733-9364

Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364

Chang, L M and Hsie, M (1995) Developing acceptance-sampling methods for quality construction. Journal of Construction Engineering and Management, 121(2), pp. 246-253. ISSN 0733-9364

Chang, L-M (1983) Evaluation and improvement of craftsman questionnaire in measuring construction productivity. PhD thesis, University of Texas at Austin, USA.

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), pp. 138-163. ISSN 1471-4175

Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. PhD thesis, Cranfield University, UK.

Chen, X (2019) Big data in construction project management: prospects and challenges. PhD thesis, University of Hong Kong, Hong Kong.

Chen, Y; Cai, X; Li, J; Lin, P; Song, H; Liu, G; Cao, D and Ma, X (2023) The values and barriers of BIM implementation combination evaluation based on stakeholder theory: A study in China. Engineering, Construction and Architectural Management, 30(7), pp. 2814-2836. ISSN 0969-9988

Chen, Y; Yang, Z; Liu, B; Wang, D; Xiao, Y and Wang, A (2024) How cultural intelligence affects expatriate effectiveness in international construction projects. Engineering, Construction and Architectural Management, 31(4), pp. 1696-1714. ISSN 0969-9988

Chinyio, E; Suresh, S and Salisu, J B (2018) The impacts of monetary rewards on public sector employees in construction: A case of Jigawa State in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 125-142.

Cho, Sung Eun (2025) Machine learning approaches for improving construction materials and pavement systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chong, H Y; Fan, S L; Sutrisna, M; Hsieh, S H and Tsai, C M (2017) Preliminary contractual framework for BIM-enabled projects. Journal of Construction Engineering and Management, 143(7): 04017025, ISSN 0733-9364

Clark, R D (2002) Components of selected public -private partnerships to build new schools in California. EdD thesis, University of La Verne, USA.

Cleveland Jr, A B (2011) Emerging tools to enable construction engineering. Journal of Construction Engineering and Management, 137(10), pp. 836-842. ISSN 0733-9364

Coffie, G H; Novieto, D T and Yankah, J E (2025) Stakeholder views of prevalent unethical practices in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 32(2), pp. 1010-1031. ISSN 0969-9988

Cooney, J P; Oloke, D and Gyoh, L (2023) A novel heritage BIM (HBIM) framework development for heritage buildings refurbishment based on an investigative study of microorganisms. Journal of Engineering, Design and Technology, 21(4), pp. 1046-1082. ISSN 1726-0531

Cothern, E J (2021) Exposure to respirable crystalline silica during five OSHA Table 1 tasks and the effectiveness of dust controls, the contribution of background silica dust to personal exposures, and the use of a photometric instrument to assess silica dust exposure in real time. PhD thesis, Colorado State University, USA.

Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364

Dabok, M M (2022) A training and skills development conceptual framework for construction technicians in Nigeria. PhD thesis, University of Central Lancashire, UK.

Dada, J O and Musa, N A (2016) Key factors affecting the competence of quantity surveyors: Evidence from construction industry stakeholders in Nigeria. Journal of Engineering, Design and Technology, 14(3), pp. 461-474.

Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(1), pp. 76-94. ISSN 1366-4387

Danforth, E M; Weidman, J E and Farnsworth, C B (2017) Strategies employed and lessons learned by commercial construction companies during economic recession and recovery. Journal of Construction Engineering and Management, 143(7): 04017027, ISSN 0733-9364

Dang, C N; Wipulanusat, W; Nuaklong, P and Witchayangkoon, B (2025) Assessing green innovation practices in construction firms: A developing-country perspective. Engineering, Construction and Architectural Management, 32(5), pp. 3104-3131. ISSN 0969-9988

Darlow, G; Rotimi, J O B and Wajiha Mohsin, S (2022) Automation in New Zealand's offsite construction: A status update. Built Environment Project and Asset Management, 12(1), pp. 38-52. ISSN 2044-124X

Dash, A (2021) Determinants of evs adoption: A study on green behavior of consumers. Smart and Sustainable Built Environment, 10(1), pp. 125-137. ISSN 2046-6099

Deep, S; Bhoola, V; Verma, S and Ranasinghe, U (2022) Identifying the risk factors in real estate construction projects: An analytical study to propose a control structure for decision-making. Journal of Financial Management of Property and Construction, 27(2), pp. 220-238. ISSN 1366-4387

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Dithebe, K; Thwala, W D D; Aigbavboa, C O; Edwards, D J; Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(2), pp. 325-342. ISSN 1726-0531

Dosumu, O and Aigbavboa, C O (2018) Adoption of light steel (LS) for building projects in South Africa. Journal of Engineering, Design and Technology, 16(5), pp. 711-733. ISSN 1726-0531

Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029

Dosumu, O S; Mahame, C; Niyitegeka, S and Hahiirwuwambaza, J A (2023) Applications and challenges of adopting the internet of things (IoT) in the Rwandan construction industry. Journal of Construction in Developing Countries, 28(2), pp. 81-100. ISSN 1823-6499

Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988

Durdyev, S; Mohandes, S R; Mahdiyar, A and Ismail, S (2022) What drives clients to purchase green building? The cybernetic fuzzy analytic hierarchy process approach. Engineering, Construction and Architectural Management, 29(10), pp. 4015-4039. ISSN 0969-9988

Durham, J and White, R (2015) Collective resilience following mine clearance in Kurdish Iraq. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 156-167. ISSN 1759-5916

Ebekozien, A.; Ebekozien, E. O.; Hafez, M. A.; Aigbavboa, C.; Nwaole, A. N. C.; Adekunle, S. A.; Samsurijan, M. S. and Ayo-Odifiri, S. O. (2026) Identifying the barriers facing indigenous developers in achieving sustainable low-cost housing projects in Nigeria: Stakeholders' perspective. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Ebekozien, A.; Thwala, W. D. and Samsurijan, M. S. (2026) Appraising circular economy business model adoption in construction projects to achieving Sustainable Development Goal 11. International Journal of Building Pathology and Adaptation, 44(3), pp. 685-703. ISSN 2398-4708

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2021) Low-cost housing policies and squatters struggles in Nigeria: The Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11), pp. 1088-1098. ISSN 1562-3599

Edison, J C and Singla, H K (2020) Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), pp. 36-55. ISSN 2204-9029

Edwards, D J and Holt, G D (2010) Cost-effective risk assessment of hand-arm vibration exposure. Journal of Financial Management of Property and Construction, 15(2), pp. 158-175. ISSN 1366-4387

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

Ehsani Far, H; Nayyeri Fallah, S and Khalili, A (2024) Relationship between physical environment and neuropsychological perception in children with asperger's disorder. International Journal of Building Pathology and Adaptation, 42(6), pp. 1282-1303. ISSN 2398-4708

Ekemode, B G; Adegoke, O J and Aderibigbe, A (2017) Factors influencing land title registration practice in Osun state, Nigeria. International Journal of Law in the Built Environment, 9(3), pp. 240-255. ISSN 1756-1450

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

Elsonoki, M M (2022) Towards enhancing value engineering practice in the Libyan construction industry. PhD thesis, Universiti Tun Hussein Onn, Malaysia.

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708

Evarist, C; Luvara, V G M and Chileshe, N (2023) Perception on constraining factors impacting recruitment and selection practices of building contractors in Dar es Salaam, Tanzania. International Journal of Construction Management, 23(12), pp. 2012-2023. ISSN 1562-3599

Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175

Eze, E C; Sofolahan, O; Uzoma, C N; Ameyaw, E E and Omoboye, O (2025) Impediments to building information modelling-enabled construction waste management in Nigeria. Built Environment Project and Asset Management, 15(3), pp. 500-517. ISSN 2044-124X

Ezeoke, G C (2021) Duration, control, and success factors of Nigerian public infrastructure projects. PhD thesis, Walden University, USA.

Faheem Haider, M.; Aslam, M.; Khan, R. W. A. and Malik, M. S. A. (2026) Exploring the factors to improve complaint management system in building management through a case study. International Journal of Construction Management, 26(9), pp. 1777-1798. ISSN 1562-3599

Feng, K; Wang, S; Lu, W; Liu, C and Wang, Y (2022) Planning construction projects in deep uncertainty: A data-driven uncertainty analysis approach. Journal of Construction Engineering and Management, 148(8): 04022060, ISSN 0733-9364

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fox, S; Marsh, L and Cockerham, G (2003) Assessing the capability of construction processes to realize building designs. Construction Management and Economics, 21(1), pp. 7-10. ISSN 01446193

Franks, M S (2024) Managing complexity and uncertainty in megaprojects: A case study of Fort Friendly’s transformational megaprogram. DBA thesis, National University, USA.

French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Gambo, N; Inuwa, I I; Usman, N; Said, I and Shuaibu, U S (2021) Factors affecting budget implementation for successful delivery of primary health care building facilities within Nigerian health sector. International Journal of Construction Management, 21(5), pp. 476-489. ISSN 1562-3599

Gambo, N and Musonda, I (2021) Effect of the fourth industrial revolution on road transport asset management practice in Nigeria. Journal of Construction in Developing Countries, 26(1), pp. 19-43. ISSN 1823-6499

Gambo, N; Said, I and Ismail, R (2016) Influences of cost factors affecting technical performance of local government projects in Nigeria: A partial least square-structural equation modeling approach. Journal of Construction in Developing Countries, 21(1), pp. 85-111. ISSN 1823-6499

Gambo, N; Said, I and Ismail, R (2016) Comparing the levels of performance of small scale local government contractors in Northern Nigeria with international practice. Engineering, Construction and Architectural Management, 23(5), pp. 588-609. ISSN 0969-9988

Gambo, N; Said, I and Ismail, R (2017) Mediation model for improving cost factors that affect performance of small-scale building construction contract business in Nigeria: A PLS-SEM approach. International Journal of Construction Education and Research, 13(1), pp. 24-46. ISSN 1557-8771

Gamil, Y; Abdullah, M A; Abdul Rahman, I and Asad, M M (2020) Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), pp. 1091-1102. ISSN 1726-0531

Gao, S; Low, S P and Nair, K (2018) Design for manufacturing and assembly (DFMA): A preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), pp. 440-456. ISSN 1745-2007

Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236

Gatti, U C (2012) Measuring and evaluating physical strain to improve construction workforce productivity. PhD thesis, University of New Mexico, USA.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(6), pp. 950-967. ISSN 0969-9988

Gogo, S E (2021) The role of leadership in the transformation of health and safety culture in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Gong, J; Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction. Construction Management and Economics, 29(7), pp. 737-751. ISSN 1466433X

Gouett, M C; Haas, C T; Goodrum, P M and Caldas, C H (2011) Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117-1124. ISSN 0733-9364

Graham, B and Thomas, K (2008) Learning from experience: Aligning continuing professional development with knowledge management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Grahn, Karin (2023) Occupational exposure to particles in relation to chronic obstructive pulmonary disease and cardiovascular disease. PhD thesis, Karolinska Institutet, Sweden.

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.

Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Habtu, T. M.; A. Elsaigh, W. and Musonda, I. (2026) Toward a strategic framework for AI-BIM adoption in Ethiopian road infrastructure management. Engineering, Construction and Architectural Management, 33(15), pp. 564-589. ISSN 0969-9988

Haji Karimian, S; Mbachu, J; Egbelakin, T and Shahzad, W (2019) Improving efficiency in roading projects: A New Zealand study. Engineering, Construction and Architectural Management, 26(5), pp. 827-849. ISSN 0969-9988

Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Han, Y; Li, J; Cao, X and Jin, R (2020) Structural equation modeling approach to studying the relationships among safety investment, construction employees' safety cognition, and behavioral performance. Journal of Construction Engineering and Management, 146(7): 04020065, ISSN 0733-9364

Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364

Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916

Hove, G (2015) Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Hoxha, V (2026) Examining the nexus of building regulations, urban planning, and housing prices and affordability: Insights from prishtina, Kosovo. International Journal of Building Pathology and Adaptation, 44(1), pp. 126-142. ISSN 2398-4708

Hoxha, V and Pallaska, F (2025) Role of sustainable refurbishment in the perception of quality of life of residential building occupants in Prishtina, Kosovo. International Journal of Building Pathology and Adaptation, 43(3), pp. 548-565. ISSN 2398-4708

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(2), pp. 157-169. ISSN 1466433X

Hughes, A J (2022) On risk-based decision-making for structural health monitoring. PhD thesis, University of Sheffield, UK.

Idoro, G (2009) Evaluating levels of project planning and their effects on performance in the Nigerian construction industry. Construction Economics and Building, 9(2), pp. 39-50. ISSN 2204-9029

Idoro, G I (2011) Influence of in-sourcing and outsourcing of consultants on construction project performance in Nigeria. Construction Economics and Building, 11(4), pp. 45-58. ISSN 2204-9029

Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499

Idoro, G I (2012) Influence of the monitoring and control strategies of indigenous and expatriate Nigerian contractors on project outcome. Journal of Construction in Developing Countries, 17(1), pp. 51-69. ISSN 1823-6499

Ijaola, I A (2017) Training practices and task performance of professionals in construction firms in Lagos and Abuja, Nigeria. PhD thesis, University of Lagos, Nigeria.

Ilter, A T (2011) Evaluation of contracting firms' innovation approaches. PhD thesis, Istanbul Technical University, Turkey.

Ilyas, M; Shaojun, C; Li, Y; Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(5), pp. 551-560. ISSN 1562-3599

Inuwa, I I (2018) Unethical professional practices in tendering of public building procurement in Bauchi Metropolis, Nigeria. African Journal of Built Environment Research, 2(1), pp. 55-73. ISSN 2414-0236

Isaacs, N and Hills, A (2014) Understanding the newzealand non-domestic building stock. Building Research & Information, 42(1), pp. 95-108. ISSN 0961-3218

Issa, D (2016) Understanding performance measurement in private prisons: A complexity perspective approach. PhD thesis, University of Manchester, UK.

Jalali, A; Hidzir, N I; Jaafar, M and Dahalan, N (2020) Factors that trigger bullying amongst subcontractors toward intention to quit in the construction projects. Built Environment Project and Asset Management, 10(1), pp. 140-152. ISSN 2044-124X

Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218

Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.

Jiang, Y and Bai, Y (2020) Estimation of construction site elevations using drone-based orthoimagery and deep learning. Journal of Construction Engineering and Management, 146(8): 04020086, ISSN 0733-9364

Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (aac) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), pp. 1-10. ISSN 2521-0165

Josephson, P E and Bjorkman, L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(6), pp. 589-603. ISSN 0969-9988

K.Bala, B A K B A B S A (2009) Factors inhibiting the growth of local construction firms in Nigeria. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Kabirifar, Kamyar (2022) Effective construction and demolition waste management assessment: A case of Australian large construction companies. PhD thesis, University of New South Wales, Australia.

Kaewsri, N and Tongthong, T (2011) An investigation of women engineers in non-traditional occupations in the Thai construction industry. Construction Economics and Building, 11(2), pp. 1-21. ISSN 2204-9029

Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. DSc thesis, University of Massachusetts Lowell, USA.

Kam, C; Song, M H and Senaratna, D (2017) VDC scorecard: Formulation, application, and validation. Journal of Construction Engineering and Management, 143(3): 04016100, ISSN 0733-9364

Kamani-Fard, A; Ahmad, M H and Ossen, D R (2012) The sense of place in the new homes of post-Bam earthquake reconstruction. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 220-236. ISSN 1759-5916

Kaming, P F (1996) A productivity audit system for construction management in Indonesia. PhD thesis, University of Wolverhampton, UK.

Kamma, R C and Jha, K N (2026) Significant causes of construction waste in road projects. International Journal of Construction Management, 26(6), pp. 944-959. ISSN 1562-3599

Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364

Kapoor, P (2022) Exploratory study of the SMES of manufacturers of construction products in Uttar Pradesh. PhD thesis, Amity University, Noida, India.

Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.

Kasimu, S; Chodokufa, K; Ntshabeleng, B M and Sophia, N (2025) Participative leadership and success of government construction projects in Uganda: Testing the participative leadership dimensions. Journal of Construction Business and Management, 7(2), pp. 33-44.

Khanh, H D; Minh, N V and Tu, N T (2026) Measuring the overall impact of barriers to BIM adoption in prefabricated construction using a fuzzy synthetic evaluation approach. Construction Economics and Building, 26(1), ISSN 2204-9029

Khanh, H D and Kim, S Y (2015) Development of waste occurrence level indicator in Vietnam construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 715-731. ISSN 0969-9988

Khanh, H D; Kim, S Y; Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(4), pp. 596-605. ISSN 1562-3599

Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988

Kheni, N A; Dainty, A R J and Gibb, A (2008) Health and safety management in developing countries: A study of construction SMEs in Ghana. Construction Management and Economics, 26(11), pp. 1159-1169. ISSN 1466433X

Kikwasi, G (2016) Risk handling options: Is insurance a fair option to transfer construction risks in Tanzanian construction industry? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kim, J H (2003) An approach to facilitate knowledge streams of occasional individual building industry clients at the pre-project stage. PhD thesis, University of Reading, UK.

Kissi, E; Eluerkeh, K; Aigbavboa, C; Addy, M and Babon-Ayeng, P (2025) Project managers' competencies in the era of digitalization: The case of the construction industry. Built Environment Project and Asset Management, 15(1), pp. 165-189. ISSN 2044-124X

Klocko, Barbara A (2009) Superintendents as sensemakers in the design of sustainable schools. PhD thesis, Oakland University, USA.

Koc, K; Ekmekcioğlu, Ö and Gurgun, A P (2023) Prediction of construction accident outcomes based on an imbalanced dataset through integrated resampling techniques and machine learning methods. Engineering, Construction and Architectural Management, 30(9), pp. 4486-4517. ISSN 0969-9988

Kukah, A S K; Owusu-Manu, D G; Badu, E and Asamoah, E (2024) Structural equation model (SEM) for evaluating interrelationships among risks inherent in Ghanaian public-private partnership (PPP) power projects. Engineering, Construction and Architectural Management, 31(6), pp. 2327-2352. ISSN 0969-9988

Kumar, V; Hundal, B S and Kaur, K (2019) Factors affecting consumer buying behaviour of solar water pumping system. Smart and Sustainable Built Environment, 8(4), pp. 351-364. ISSN 2046-6099

Kumar, V; Syan, A S and Kaur, K (2022) A structural equation modeling analysis of factors driving customer purchase intention towards solar water heater. Smart and Sustainable Built Environment, 11(1), pp. 65-78. ISSN 2046-6099

Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531

Kwaghsende, F K (2020) Assessment of social networks in informal solid waste recycling activities and sustainable solid waste management, North Central Nigeria. African Journal of Built Environment Research, 4(1), pp. 21-35. ISSN 2414-0236

Kwofie, T E; Botchway, E A and Amos-Abanyie, S (2018) Examining the performance level of project management competencies of architects in Ghana using gap analysis approach. Journal of Construction in Developing Countries, 23(1), pp. 125-147. ISSN 1823-6499

Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.

Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988

Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599

Lawani, K; Hare, B; Cameron, I and Soto, L M I (2020) Exploring the impact of alcohol abuse on construction sites in Santo Domingo, Dominican Republic. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Lawani, K; McKenzie-Govan, S; Hare, B; Sherratt, F and Cameron, I (2022) Skill shortage of bricklayers in Scotland. Journal of Engineering, Design and Technology, 20(1), pp. 321-338. ISSN 1726-0531

Le, D. T. and Nguyen, M. V. (2026) Development of the construction employee's workplace mental health questionnaire: The two continua model approach. Journal of Engineering, Design and Technology, 24(6), pp. 1387-1411. ISSN 1726-0531

Le, D. T.; Nguyen, M. V.; Tran, V. T.; Le-Hoai, L. and Nguyen Pham, N. D. (2026) Applying Maslow's hierarchy of needs in assessing mental ill-health risk factors of construction employees: A case study in Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1435-1459. ISSN 1726-0531

Le, Thi Thanh Xuan (2013) Managers' perceptions of corporate social responsibility : The construction industry in Vietnam. PhD thesis, University of Western Sydney, Australia.

Lebunu Hewage, U W A; Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 296-311. ISSN 2044-124X

Lee, W and Migliaccio, G C (2018) Temporal effect of construction workforce physical strain on diminishing marginal productivity at the task level. Journal of Construction Engineering and Management, 144(9): 04018083, ISSN 0733-9364

Lekan, A; Aigbavboa, C; Babatunde, O; Olabosipo, F and Christiana, A (2022) Disruptive technological innovations in construction field and fourth industrial revolution intervention in the achievement of the sustainable development goal 9. International Journal of Construction Management, 22(14), pp. 2647-2658. ISSN 1562-3599

Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599

Li, J; Zuo, J; Jiang, W; Zhong, X; Li, J and Pan, Y (2020) Policy instrument choice for construction and demolition waste management: The case study of Shenzhen, China. Engineering, Construction and Architectural Management, 27(6), pp. 1283-1297. ISSN 0969-9988

Li, S and Ling, F Y Y (2012) Critical strategies for Chinese architectural, engineering and construction firms to achieve profitability. Engineering, Construction and Architectural Management, 19(5), pp. 495-511. ISSN 0969-9988

Liem, Christina (2023) A stakeholder approach to develop a women's empowerment framework in the Indonesian construction industry. PhD thesis, University of New South Wales, Australia.

Lim, L J W and Ling, F Y Y (2012) Human resource practices of contractors that lead to job satisfaction of professional staff. Engineering, Construction and Architectural Management, 19(1), pp. 101-118. ISSN 0969-9988

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599

Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(2), pp. 211-225. ISSN 2044-124X

Ling, F Y Y; Ning, Y; Chang, Y H and Zhang, Z (2018) Human resource management practices to improve project managers' job satisfaction. Engineering, Construction and Architectural Management, 25(5), pp. 654-669. ISSN 0969-9988

Ling, Y Y; Khee, H Y and Lim, K S G (2000) The reasons why clients prefer to procure more projects based on design-bid-build than design-and-build. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Liou, F S and Borcherding, J D (1986) Work sampling can predict unit rate productivity. Journal of Construction Engineering and Management, 112(1), pp. 90-103. ISSN 0733-9364

Lisk, D R (2014) Equal opportunities for women in construction trades: Issues of education, training and employment in northern Ireland. PhD thesis, Queen's University Belfast, UK.

Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364

Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364

Lucko, G and Rojas, E M (2010) Research validation: Challenges and opportunities in the construction domain. Journal of Construction Engineering and Management, 136(1), pp. 127-135. ISSN 0733-9364

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193

Ma, J; Jiang, X; Zheng, D; Liao, X; Lu, J and Zhao, Y (2024) Transwallnet: High-performance semantic segmentation of large-scale and multifeatured point clouds of building gables. Journal of Construction Engineering and Management, 150(8): 04024092, ISSN 0733-9364

Madziva, T J (2018) The effect of partnering, infrastructure gaps and currency weakness on the cost of an infrastructure-building nonmarket strategy in emerging markets. PhD thesis, University of Pretoria, South Africa.

Mahmoud, A S; Hamdan Ahmad, M; Mohd Yatim, Y and Aminu Dodo, Y (2022) Safety performance framework at construction site for self-regulation by building developers. Engineering, Construction and Architectural Management, 29(9), pp. 3394-3414. ISSN 0969-9988

Makoye, M (2025) Assessment of the influence of macroeconomic factors on participation of indigenous firms in Tanzania construction industry. International Journal of Construction Management, 25(12), pp. 1477-1487. ISSN 1562-3599

Makoye, M; Mlinga, R S and Ndanshau, M O A (2023) Impact of macroeconomic factors on performance of construction industry in Tanzania. International Journal of Construction Management, 23(15), pp. 2625-2636. ISSN 1562-3599

Makulsawatudom, A (2003) Construction productivity measurement and improvement in Thailand by improved work-sampling. PhD thesis, University of Strathclyde, UK.

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Maqbool, R and Shaji, A (2026) Quantifying the social loafing led productivity issues in architecture, engineering and construction project teams. Engineering, Construction and Architectural Management, 33(1), pp. 620-640. ISSN 0969-9988

Marcellus-Zamora, K A (2015) An evaluation of material stocks and flows found during construction and demolition activities in the Philadelphia region of the United States. PhD thesis, Drexel University, USA.

Mashi, I H (2023) Emotional intelligence among Nigerian construction project leaders during periods of uncertainty. PhD thesis, Walden University, USA.

Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.

Mat Isa, C M; Mohd Saman, H and Preece, C N (2014) Entry location and entry timing (ELET) decision model for international construction firms. Construction Economics and Building, 14(3), pp. 34-57. ISSN 2204-9029

Mat Isa, C M; Saman, H M and Preece, C N (2015) Determining significant factors influencing Malaysian construction business performance in international markets. Journal of Construction in Developing Countries, 20(2), pp. 1-23. ISSN 1823-6499

Mat Isa, C M B; Saman, H M and Preece, C N (2017) Development of OLI+S entry decision model for construction firms in international markets. Construction Economics and Building, 17(4), pp. 66-91. ISSN 2204-9029

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods. PhD thesis, Aston University, UK.

Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.

Mintah, Kwabena (2019) Is there value in waiting? An empirical study of real options application to Australian property developments. PhD thesis, RMIT University, Australia.

Moeti, M; Jacques, E; Feng, W and North, C (2021) Modelling the effect of computation sampling on insight error in computational fluid dynamics scientific simulation. Journal of Engineering, Design and Technology, 19(1), pp. 263-290. ISSN 1726-0531

Mohamed, I F; Edwards, D J; Mateo-Garcia, M; Costin, G and Thwala, W D D (2020) An investigation into the construction industry's view on fire prevention in high-rise buildings post Grenfell. International Journal of Building Pathology and Adaptation, 38(3), pp. 451-471. ISSN 23984708

Mohammed, A. S.; Pim-Wusu, M.; Amoah, C. and Nyagblormase, G. (2025) Examining technology-driven facilities management practices in campus mosques on muslim student well-being for academic success. International Journal of Building Pathology and Adaptation, 44(4), pp. 976-994. ISSN 2398-4708

Mohd Zin, I N (2014) Knowledge sharing approaches in Malaysian construction organisations for improved performance. PhD thesis, University of Salford, UK.

Mohseni, H; Setunge, S; Zhang, G and Wakefield, R (2017) Markov process for deterioration modeling and asset management of community buildings. Journal of Construction Engineering and Management, 143(6): 04017003, ISSN 0733-9364

Mok, K Y; Shen, G Q and Yang, R (2018) Stakeholder complexity in large scale green building projects: A holistic analysis towards a better understanding. Engineering, Construction and Architectural Management, 25(11), pp. 1454-1474. ISSN 0969-9988

Mollaoglu, S; Chergia, C; Ergen, E and Syal, M (2016) Diffusion of green building guidelines as innovation in developing countries. Construction Innovation, 16(1), pp. 11-29. ISSN 1471-4175

Moore, J D (2006) Women in construction management: Creating a theory of career choice and development. PhD thesis, Colorado State University, USA.

Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(3), pp. 454-467. ISSN 2044-124X

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Mwanaumo, E M and Mambwe, M (2019) Effect of management strategies in entrenching organisational safety culture in the electricity industry of Zambia. Journal of Construction Business and Management, 3(1), pp. 27-37. ISSN 2521-0165

Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.

Narain, V (2021) Building the resilience of periurban communities to the impacts of climate change and urbanization. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 115-125. ISSN 1759-5916

Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099

Navabian, N (2020) Development of an automated structural health monitoring system based on wireless sensor network for civil structures. PhD thesis, Auckland University of Technology, New Zealand.

Neve, H H; Wandahl, S; Lindhard, S; Teizer, J and Lerche, J (2020) Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights. Journal of Construction Engineering and Management, 146(9): 04020110, ISSN 0733-9364

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry. DSc thesis, George Washington University, USA.

Nguyen, M V; Ha, K D and Nguyen, K V (2026) Linking corporate social responsibility and project performance: Role of collaboration and trust. International Journal of Construction Management, 26(6), pp. 960-973. ISSN 1562-3599

Nguyen, M. V.; Khanh, H. D.; Phan, C. T. and Thuc, L. D. (2026) Investigating the impacts of psychological safety climate on mental ill health in the Vietnamese construction industry. Engineering, Construction and Architectural Management, 33(4), pp. 3240-3263. ISSN 0969-9988

Nguyen, T T N; Do, S T; Nguyen, V T and Nguyen, T A (2024) Interrelationships among enabling factors for BIM adoption in construction enterprises. Engineering, Construction and Architectural Management, 31(2), pp. 891-918. ISSN 0969-9988

Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.

Novieto, D T and Kportufe, G S (2022) Work-family conflict and project performance of construction professionals in a developing country: Testing the mediating–moderating effect of project management self-efficacy. Engineering, Construction and Architectural Management, 29(9), pp. 3331-3344. ISSN 0969-9988

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

Obasa, A J; Akinradewo, O F and Olanipekun, A O (2024) Impact of technologies towards addressing stress-related problems among practicing quantity surveyors in Lagos, Nigeria. International Journal of Construction Management, 24(6), pp. 623-632. ISSN 1562-3599

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Odongo, N H and Motari, W O (2022) Consumers' perceptiveness towards store brands within supermarkets. International Journal of Construction Management, 22(13), pp. 2459-2468. ISSN 1562-3599

Oechler, E; Molenaar, K R; Hallowell, M and Scott, S (2018) State-of-practice for risk-based quality assurance in state departments of transportation. Engineering, Construction and Architectural Management, 25(7), pp. 958-970. ISSN 0969-9988

Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.

Ohueri, C C; Enegbuma, W I and Kenley, R (2018) Energy efficiency practices for Malaysian green office building occupants. Built Environment Project and Asset Management, 8(2), pp. 134-146. ISSN 2044-124X

Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531

Okanlawon, T T; Oyewobi, L O and Jimoh, R A (2023) Evaluation of the drivers to the implementation of blockchain technology in the construction supply chain management in Nigeria. Journal of Financial Management of Property and Construction, 28(3), pp. 459-476. ISSN 1366-4387

Oke, A E; Aliu, J; Ehiosun, L U; Kineber, A F and Stephen, S S (2025) Adoption of distributed ledger technology for construction projects: A study of the challenges in a developing country. Journal of Engineering, Design and Technology, 23(5), pp. 1364-1383. ISSN 1726-0531

Oke, A E; Aigbavboa, C O and Raphiri, M M (2017) Students' satisfaction with hostel accommodations in higher education institutions. Journal of Engineering, Design and Technology, 15(5), pp. 652-666.

Oke, A E; Aliu, J; Ifedolapo Babalola, H; Jamir Singh, P S; Tunji-Olayeni, P and Ukaha Onyeukwu, S (2025) From building blocks to digital networks: Analyzing critical drivers for social media adoption in the construction sector. International Journal of Construction Management, 25(9), pp. 1047-1057. ISSN 1562-3599

Oke, A E; Aliu, J; Mwanaumo, E M M; Abayomi, T and Kahanji, C (2023) Leveraging gamification to enhance productivity and employee engagement in the Nigerian construction industry. Built Environment Project and Asset Management, 13(6), pp. 813-829. ISSN 2044-124X

Oke, A E; Aliu, J; Oni, S B and Ilesanmi, O O (2025) The complexities of embracing mechatronics in the Nigerian construction industry. Construction Innovation, 25(4), pp. 1188-1209. ISSN 1471-4175

Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099

Oke, A E; Arowoiya, V A; Chan, M and Oyediran, A (2025) Digital twin technology (DTT) in a developing construction industry: Evaluation of the awareness and usage among professionals in Nigeria. International Journal of Construction Management, 25(11), pp. 1313-1323. ISSN 1562-3599

Oke, A E; Kineber, A F; Al-Bukhari, I; Famakin, I and Kingsley, C (2023) Exploring the benefits of cloud computing for sustainable construction in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 973-990. ISSN 1726-0531

Oke, A E; Akintola, O A; Oluwatobiloba, O M; Aliu, J and Omoyajowo, N I (2025) Study on the awareness and practice of circular economy principles among construction stakeholders in Nigeria. Construction Economics and Building, 25(2), pp. 24-42. ISSN 2204-9029

Okoro, C S; Musonda, I and Agumba, J N (2019) Validity and reliability of a transportation infrastructure sustainable performance framework: A study of transport projects in South Africa. Construction Economics and Building, 19(2), pp. 126-143. ISSN 2204-9029

Okoyeh, I. I. and Ezezue, A. M. (2026) Assessment of noise levels in architectural design studios in universities in South-East Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 704-719. ISSN 2398-4708

Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988

Okunola, O H (2020) Residents vulnerability analysis and explanation of development-induced disasters in a Sub-Saharan African city. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 71-84. ISSN 1759-5916

Oladiran, O J (2009) Innovative waste management through the use of waste management plans on construction projects in Nigeria. Architectural Engineering and Design Management, 5(3), pp. 165-176. ISSN 1745-2007

Oladiran, O J; Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), pp. 17-27. ISSN 2521-0165

Olatunde, N. A.; Gento, A. M.; Awodele, I. A.; Adebayo, B. O.; Makanjuola, S. S. and Oyewo, O. W. (2026) Extent of specialized software usage in the delivery of quantity surveying services in South West Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 740-756. ISSN 2398-4708

Olatunde, N A; Awodele, I A; Adebayo, B O and Makanjuola, S S (2025) Assessment of factors inhibiting engagement of quantity surveyors on private residential building projects in Ado-Ekiti, Nigeria. Journal of Financial Management of Property and Construction, 30(2), pp. 318-334. ISSN 1366-4387

Olatunji, O. A.; Lee, J. J. S.; Chong, H. Y. and Akanmu, A. A. (2021) Building information modelling (BIM) penetration in quantity surveying (qs) practice. Built Environment Project and Asset Management, 11(5), pp. 888-902. ISSN 2044-124X

Olawumi, T O and Chan, D W M (2022) Developing project evaluation models for smart sustainable practices implementation in construction projects: A comparative study between Nigeria and Hong Kong. Engineering, Construction and Architectural Management, 29(3), pp. 1522-1552. ISSN 0969-9988

Olojede, B O; Opawole, A; Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(2), pp. 495-511. ISSN 23984708

Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.

Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), pp. 1-14. ISSN 2521-0165

Oluwole, A O; Jane Jia Suen, L; Heap-Yih, C and Akanmu, A A (2021) Building information modelling penetration in quantity surveying practice. Built Environment Project and Asset Management, 11(5), pp. 888-902. ISSN 2044-124X

Omollo, W O (2019) Barriers to the effective regulation of the building construction industry: An empirical analysis. Journal of Construction Business and Management, 3(2), pp. 49-58. ISSN 2521-0165

Onubi, H O; Harun, N A and Hassan, A S (2026) Leadership for sustainability: Understanding how top management's green commitment shapes organizational culture and construction project environmental performance. Journal of Construction Engineering and Management, 152(2): 04025258, ISSN 0733-9364

Onukwube, H N (2008) Construction professionals motivation and job performance: A comparison of indigenous and expatriate construction contractors in Nigeria. PhD thesis, University of Lagos, Nigeria.

Onukwube, H N (2012) Correlates of job satisfaction amongst quantity surveyors in consulting firms in Lagos, Nigeria. Construction Economics and Building, 12(2), pp. 43-54. ISSN 2204-9029

Onungwa, I O and Uduma-Olugu, N (2017) Building information modelling and collaboration in the Nigerian construction industry. Journal of Construction Business and Management, 1(2), pp. 1-10. ISSN 2521-0165

Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.

Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708

Orhan, E; Kahraman, Z E and Güngördü, N (2020) Building a framework for analysing the quality of life at neighbourhood level: An empirical case from Ankara. Journal of Construction in Developing Countries, 25(1), pp. 63-82. ISSN 1823-6499

Osmani, M (2015) Integration of waste minimisation strategies into the design process of buildings. PhD thesis, Loughborough University, UK.

Osuizugbo, I C and Nnodu, C V (2023) Barriers to environmental impact assessment implementation for construction projects in Nigeria. Built Environment Project and Asset Management, 13(5), pp. 719-737. ISSN 2044-124X

Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Lawani, A O and Onokwai, A O (2025) Barriers to adoption of work–life balance practices amongst construction companies in Lagos, Nigeria: An exploratory factor analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1643-1669. ISSN 0969-9988

Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Yohanna, H S and Edike, U E (2025) Implementation of work-life balance strategies among construction companies in Lagos, Nigeria: Construction workers' perspectives. Journal of Engineering, Design and Technology, 23(3), pp. 998-1016. ISSN 1726-0531

Osunsanmi, T O; Aigbavboa, C O; Emmanuel Oke, A and Liphadzi, M (2020) Appraisal of stakeholders' willingness to adopt construction 4.0 technologies for construction projects. Built Environment Project and Asset Management, 10(4), pp. 547-565. ISSN 2044-124X

Osunsanmi, T O; Aigbavboa, C O; Oke, A and Onyia, M E (2022) Making a case for smart buildings in preventing corona-virus: Focus on maintenance management challenges. International Journal of Construction Management, 22(16), pp. 3109-3118. ISSN 1562-3599

Othman, A A; Rahman, S A; Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 644-668. ISSN 0969-9988

Othman, N L and Jaafar, M (2013) Personal competency of selected women construction project managers in Malaysia. Journal of Engineering, Design and Technology, 11(3), pp. 276-287. ISSN 1726-0531

Owusu-Manu, D; Quaigrain, R and Edwards, D J (2015) Barriers constraining management innovation (mi) adoption in the Ghanaian construction consulting sector: A case study. Journal of Engineering, Design and Technology, 13(4), pp. 612-631.

Owusu-Manu, D G; Ghansah, F A A; Kuoribo, E and Edwards, D J (2023) Factors determining retirement decisions of construction workers in Ghana. Journal of Engineering, Design and Technology, 21(5), pp. 1501-1519. ISSN 1726-0531

Owusu-Manu, D G; John Edwards, D; Pärn, E A; Antwi-Afari, M F and Aigbavboa, C (2018) The knowledge enablers of knowledge transfer: A study in the construction industries in Ghana. Journal of Engineering, Design and Technology, 16(2), pp. 194-210. ISSN 1726-0531

Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599

Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988

Palaniappan, K; Natarajan, R and Dasgupta, C (2023) Prevalence and risk factors for depression, anxiety and stress among foreign construction workers in Singapore–a cross-sectional study. International Journal of Construction Management, 23(14), pp. 2479-2487. ISSN 1562-3599

Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175

Park, Y I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195-216. ISSN 2044-124X

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Pathuri, R T; Killingsworth, J and Mehany, M S H M (2022) Knowledge, skills, and abilities for senior-level construction managers: A U.S. Industry-based Delphi study. International Journal of Construction Education and Research, 18(3), pp. 234-250. ISSN 1557-8771

Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(2), pp. 151-159. ISSN 01446193

Pelsmakers, S; Vereecken, E; Airaksinen, M and Elwell, C C A (2019) Void conditions and potential for mould growth in insulated and uninsulated suspended timber ground floors. International Journal of Building Pathology and Adaptation, 37(4), pp. 395-425. ISSN 23984708

Perera, C. S. R.; Francis, V. and Gao, S. (2026) Uptake of industry 4.0 technologies in Australian construction firms. Engineering, Construction and Architectural Management, 33(3), pp. 2071-2088. ISSN 0969-9988

Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599

Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531

Pim-Wusu, M; Simpeh, E K and Simberi, J N N (2025) Ascertaining adequacy of fire suppression systems: The perspective of Accra central of Ghana. Journal of Engineering, Design and Technology, 23(3), pp. 917-934. ISSN 1726-0531

Pittri, H; Agyekum, K; Salgin, B; Dompey, A M A; Gasue, R and Anderson, S A (2025) The fourth industrial revolution technologies and the construction industry in Ghana. Construction Economics and Building, 25(3-4), pp. 231-253. ISSN 2204-9029

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Posillico, J J; Edwards, D J; Roberts, C and Shelbourn, M (2023) A conceptual construction management curriculum model grounded in scientometric analysis. Engineering, Construction and Architectural Management, 30(9), pp. 4143-4170. ISSN 0969-9988

Prakash, A and Phadtare, M (2018) Service quality for architects: Scale development and validation. Engineering, Construction and Architectural Management, 25(5), pp. 670-686. ISSN 0969-9988

Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ramdav, T and Harinarain, N (2020) A strategic framework for the survival of the quantity surveying profession. Journal of Engineering, Design and Technology, 18(6), pp. 1487-1518.

Rantsatsi, N P (2021) Improving construction health and safety agent collaboration and health and safety performance in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Rathnayaka, L S D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Applicability of electronic document management system (EDMS) for the cost management of mega construction projects in Sri Lanka. Journal of Financial Management of Property and Construction, 29(2), pp. 314-330. ISSN 1366-4387

Rathnayake, A; Murguia, D and Middleton, C (2024) Measuring activity-level construction productivity. Journal of Construction Engineering and Management, 150(8): 04024099, ISSN 0733-9364

Reyes Veras, P (2023) Adoption of the big data concept in the construction industry. PhD thesis, University of Wolverhampton, UK.

Rosayuru, H D R R; Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(5), pp. 769-783. ISSN 1562-3599

Roskams, M J and Haynes, B P (2021) Testing the relationship between objective indoor environment quality and subjective experiences of comfort. Building Research & Information, 49(4), pp. 387-398. ISSN 0961-3218

Rosli, M F; Muhammad Tamyez, P F and Zahari, A R (2023) The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance. International Journal of Construction Management, 23(1), pp. 114-125. ISSN 1562-3599

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Volker, L and Dorée, A (2025) Sustainability transitions in infrastructure: Understanding causal dynamics in the Dutch asphalt paving sector. Construction Management and Economics, 43(10), pp. 794-822. ISSN 0144-6193

Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), pp. 127-146. ISSN 1823-6499

Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916

Sa'eed, A; Gambo, N; Inuwa, I I and Musonda, I (2020) Effects of financial management practices on technical performance of building contractors in Northeast Nigeria. Journal of Financial Management of Property and Construction, 25(2), pp. 201-223. ISSN 1366-4387

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) Predicting the trends and cost impact of COVID-19 OSHA citations on US construction contractors using machine learning and simulation. Engineering, Construction and Architectural Management, 30(8), pp. 3461-3479. ISSN 0969-9988

Saha, S; Greville, C J and Mullins, T A (2001) Optimisation of construction process inspection rates using a learning approach. Construction Economics and Building, 1(2), pp. 1-13. ISSN 2204-9029

Saha, S; Hazra, S and Ghosh, T (2022) How embankment influences coastal livelihood in the context of climate adaptation: a case study of Indian sundarban delta. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 327-350. ISSN 1759-5916

Saka, A B; Chan, D W M and Ajayi, S O (2024) Institutional isomorphism and adoption of building information modelling (BIM) in small and medium-sized enterprises (SMEs) of the Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 179-199. ISSN 0969-9988

Salas, R; Hallowell, M; Balaji, R and Bhandari, S (2020) Safety risk tolerance in the construction industry: Cross-cultural analysis. Journal of Construction Engineering and Management, 146(4): 04020022, ISSN 0733-9364

Saleem, M (2024) Internal damage detection in reinforced concrete member using ultrasonic pulse velocity nondestructive testing. Journal of Construction Engineering and Management, 150(8): 04024084, ISSN 0733-9364

Salleh, A G and Badarulzaman, N (2012) Quality of life of residents in urban neighbourhoods of Pulau Pinang, Malaysia. Journal of Construction in Developing Countries, 17(2), pp. 117-123. ISSN 1823-6499

Salman, B and Gursoy, B (2022) Markov chain pavement deterioration prediction models for local street networks. Built Environment Project and Asset Management, 12(6), pp. 853-870. ISSN 2044-124X

Sampath, D; De Silva, N and Withanage, K T (2020) Entrepreneurial potentials in Sri Lankan quantity surveyors. International Journal of Construction Management, 23(1), pp. 48-57. ISSN 1562-3599

Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. PhD thesis, University of Wisconsin - Madison, USA.

Seed, L (2015) The dynamics of BIM adoption: a mixed methods study of BIM as an innovation within the United Kingdom construction industry. PhD thesis, University of Huddersfield, UK.

Sengupta Dasgupta, P (2013) Interventions to reduce ergonomic exposures during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.

Sharma, K and Trivedi, M K (2022) Latin hypercube sampling-based nsga-iii optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects. International Journal of Construction Management, 22(16), pp. 3158-3168. ISSN 1562-3599

Sharma, R (1998) Organizational role stress:focus on executives of construction industry. PhD thesis, Indian Institute of Technology Delhi, India.

Sharmila Devi, R and Perumandla, S (2026) Beyond blueprints: Unveiling sustainable housing ambitions – a TAM and emgb fusion among paraprofessionals in urban construction landscape. Engineering, Construction and Architectural Management, 33(1), pp. 229-257. ISSN 0969-9988

Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.

Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.

Shroff, R P and Sridhar, S (2011) Study of motivators and demotivators affecting the performance of employees in the construction industry: An exploratory study. International Journal of Construction Management, 11(3), pp. 49-66. ISSN 1562-3599

Shuang, Q; Liu, X; Wang, Z and Xu, X (2024) Automatically categorizing construction accident narratives using the deep-learning model with a class-imbalance treatment technique. Journal of Construction Engineering and Management, 150(9): 04024107, ISSN 0733-9364

Simpeh, E K (2018) The adoption of green building in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Simpeh, F; Bamfo-Agyei, E and Amoah, C (2022) Barriers to the implementation of COVID-19 safety regulations: Insight from Ghanaian construction sites. Journal of Engineering, Design and Technology, 20(1), pp. 47-65. ISSN 1726-0531

Simpson, K B and Sam, A (2020) Strategies for health and safety management in Ghana. Journal of Engineering, Design and Technology, 18(2), pp. 431-450. ISSN 1726-0531

Singh, E and Singh, D P (2017) Architectural profession in India: Perception towards service marketing. Journal of Engineering, Design and Technology, 15(5), pp. 574-590.

Singh, S (2021) Stakeholder management within BIM implemented projects in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Singh, S; Chinyio, E and Suresh, S (2023) The key enablers, techniques and benefits of managing stakeholders within BIM supported projects. Journal of Engineering, Design and Technology, 21(2), pp. 469-485. ISSN 1726-0531

Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988

Slater, M B (2022) A modified e-Delphi study of project scope creep in the engineering construction industry. PhD thesis, Northcentral University, USA.

Sleymann, A A (2006) A study on perceptions of civil engineers regarding mandatory continuing education. PhD thesis, Western Michigan University, USA.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.

Sompolgrunk, A; Banihashemi, S; Hosseini, M R; Golzad, H and Hajirasouli, A (2023) An integrated model of BIM return on investment for Australian small- and medium-sized enterprises (SMEs). Engineering, Construction and Architectural Management, 30(5), pp. 2048-2074. ISSN 0969-9988

Soni, M S M and Smallwood, J (2024) Understanding corruption in the South African construction industry. Journal of Construction Business and Management, 7(1), pp. 45-56. ISSN 2521-0165

Soomro, M. A. and Khan, A. N. (2026) Leadership in times of crisis: Cultivating crisis management through digital transformation and organizational agility. Engineering, Construction and Architectural Management, 33(7), pp. 5400-5417. ISSN 0969-9988

Soomro, B A and Shah, N (2022) Environmental concerns among the entrepreneurs: A disaster resilience and environment building during the second wave of the COVID-19. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 516-530. ISSN 1759-5916

Soon, J L (2021) CSR logics of owner-managers in SMEs: the case of Malaysia. PhD thesis, Kingston University, UK.

Sospeter, N G; Chang'ah, A and Rwelamila, P D (2024) Re-imagining the factors influencing the choice of project management tools and techniques in Tanzanian infrastructure projects: Elicitation of practitioners' perspectives. Journal of Construction Business and Management, 7(1), pp. 34-45. ISSN 2521-0165

Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Stundon, D; Spillane, J; Lim, J P B; Tansey, P and Tracey, M (2015) Building information modelling energy performance assessment on domestic dwellings: A comparative study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Suchocki, C; Błaszczak-Bąk, W; Janicka, J and Dumalski, A (2021) Detection of defects in building walls using modified optd method for down-sampling of point clouds. Building Research & Information, 49(2), pp. 197-215. ISSN 0961-3218

Sung, W-K (2017) Factors motivating construction safety knowledge sharing in online social media. PhD thesis, University of Hong Kong, Hong Kong.

Swallow, M and Zulu, S L (2025) Investigating the implementation of immersive technologies within on-site construction safety processes. Journal of Engineering, Design and Technology, 23(1), pp. 323-343. ISSN 1726-0531

Syed Abu Bakar, S P; Jaafar, M and Muhibudin, M (2020) Intensifying business success of Malaysian housing development firms through entrepreneurial learning. Journal of Engineering, Design and Technology, 18(1), pp. 190-210. ISSN 1726-0531

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tan, S Y and Zainon, N (2023) Impact of COVID-19 pandemic on the quantity surveying practices in Malaysia. Engineering, Construction and Architectural Management, 30(8), pp. 3480-3508. ISSN 0969-9988

Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531

Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X

Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599

Tembo, M; Kahanji, C and Mwanaumo, E M (2025) Socio-Political and Macro-Economic Impact of Tender Price Inflation in Zambian Public Construction Projects. Journal of Construction Business and Management, 7(2), pp. 67-97.

Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531

Thakore, A Y; Iyer, M; Mishra, G and Doshi, S (2024) Resilient WASH development for urban poor: The case of Ahmedabad slums. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 19-44. ISSN 1759-5916

Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364

Thomas, H R and Daily, J (1983) Crew performance measurement via activity sampling. Journal of Construction Engineering and Management, 109(3), pp. 309-320. ISSN 0733-9364

Thomas, H R; Guevara, J M and Gustenhoven, C T (1984) Improving productivity estimates by work sampling. Journal of Construction Engineering and Management, 110(2), pp. 178-188. ISSN 0733-9364

Thompson, D E (2014) A study of building information modeling usage through the perceived utilization of facilities management training, building information modeling technical specifications, and a quality building information model for facilities management at higher educational institutions in Texas. PhD thesis, Texas A&M University, USA.

Thompson, R F (2002) Management of architects within architectural businesses. PhD thesis, University of Salford, UK.

Thompson, R F and McDermott, P (2001) The management of architects within architectural businesses: A case study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Tilley, M (2016) What elements are required to achieve sustainable business change using health and safety as a lens? DProf thesis, Middlesex University, UK.

Toh, S C L; Wong, S Y and Ding, C S (2026) The impact of artificial intelligence on the quantity surveying profession in sarawak, Malaysia. Journal of Engineering, Design and Technology, 24(1), pp. 171-192. ISSN 1726-0531

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.

Tsado, A J (2019) Innovation: its impact on the success of construction micro, small, and medium enterprises in Northern Nigeria. PhD thesis, Nelson Mandela University, South Africa.

Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Tucker, G C; Windapo, A and Cattell, K S (2015) Exploring the use of financial capacity as a predictor of construction company corporate performance: Evidence from South Africa. Journal of Engineering, Design and Technology, 13(4), pp. 596-611.

Turner, P L (2017) A realist exploration of small firm tendering for public sector contracts: a micro-foundational study of capability. PhD thesis, Manchester Metropolitan University, UK.

Turner, T (2024) Strategies to engage multigenerational workforces, with a focus on millennials. PhD thesis, Walden University, USA.

Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.

Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X

Vibhakar, N N; Johari, S; Tripathi, K K and Jha, K N (2023) Development of financial performance evaluation framework for the Indian construction companies. International Journal of Construction Management, 23(9), pp. 1527-1539. ISSN 1562-3599

Vibhakar, N N; Tripathi, K K; Johari, S and Jha, K N (2023) Identification of significant financial performance indicators for the Indian construction companies. International Journal of Construction Management, 23(1), pp. 13-23. ISSN 1562-3599

Votto, R; Lee Ho, L and Berssaneti, F (2021) Earned duration management control charts: Role of control limit width definition for construction project duration monitoring. Journal of Construction Engineering and Management, 147(9): 04021108, ISSN 0733-9364

Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193

Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364

Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.

Wanninayake, S B; Nianthi, R and Dayarathne Banda, O (2025) Development of convenient flood risk assessment method to community level: The case in the Deduru Oya basin in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 20-37. ISSN 1759-5908

Wanninayake, S B; Nianthi, R and Dayarathne Banda, O G (2024) Roles and responsibilities of stakeholders involved in local-level flood risk management: A study in the Deduru Oya basin in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 680-698. ISSN 1759-5916

Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599

Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.

West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.

Wiewiora, Anna (2011) The role of organisational culture, trust and mechanisms in inter-project knowledge sharing. PhD thesis, Queensland University of Technology, Australia.

Williams, J; Fugar, F and Adinyira, E (2020) Assessment of health and safety culture maturity in the construction industry in developing economies: A case of Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(4), pp. 865-881. ISSN 1726-0531

Williams, J; Fugar, F and Adinyira, E (2023) Exploring enablers of health and safety knowledge transfer from construction companies to project host communities. International Journal of Construction Management, 23(10), pp. 1737-1745. ISSN 1562-3599

Williams, N M (2021) An investigation of client loyalty in the construction professional services sector. PhD thesis, University of Wolverhampton, UK.

Winch, G and Carr, B (2001) Benchmarking on-site productivity in France and the UK: A CALIBRE approach. Construction Management and Economics, 19(6), pp. 577-590. ISSN 01446193

Windapo, A O and Cattell, K (2013) The South African construction industry: Perceptions of key challenges facing its performance, development and growth. Journal of Construction in Developing Countries, 18(2), pp. 65-79. ISSN 1823-6499

Wu, C; Hu, X; Guo, X and Han, Y (2026) Discretionary control over safety resources: Examining workers' safety territorial behaviors in construction projects. Journal of Construction Engineering and Management, 152(3): 04025275, ISSN 0733-9364

Wurthmann, K A (2023) Designing photovoltaic arrays for groundwater pumping for remote agriculture using synthetically generated daily rainfall and irrigation needs. Journal of Engineering, Design and Technology, 21(6), pp. 1803-1826. ISSN 1726-0531

Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599

Yakubu, S (2019) Determinants of non-compliance with structural building code standards in Nigeria. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 47-59. ISSN 17514304

Yalçınkaya Çalışkan, F and Acar, E (2016) An exploratory analysis of continuing professional development perspectives of Turkish architects according to career stages. Architectural Engineering and Design Management, 12(5), pp. 381-406. ISSN 1745-2007

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988

Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X

Yu, A T W; Mok, K S H and Wong, I (2023) Minimisation and management strategies for refurbishment and renovation waste in Hong Kong. Engineering, Construction and Architectural Management, 30(2), pp. 869-888. ISSN 0969-9988

Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.

Yuan, L (2006) Biomechanical analysis of the physical loads on the low back and shoulder during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.

Yun, L; Wan, J; Wang, G; Bai, J and Zhang, B (2020) Exploring the missing link between top management team characteristics and megaproject performance. Engineering, Construction and Architectural Management, 27(5), pp. 1039-1064. ISSN 0969-9988

Yusof, N A; Ishak, S S M and Doheim, R (2018) Identifying factors for incorporating spatial data into BIM using the Delphi method. Construction Economics and Building, 18(3), pp. 1-17. ISSN 2204-9029

Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499

Zaman, A A U and Abdelaty, A (2025) Effects of uav imagery overlap on photogrammetric data quality for construction applications. International Journal of Construction Management, 25(16), pp. 1901-1916. ISSN 1562-3599

Zhang, J; Li, H; Xia, B; Skitmore, M; Pu, S; Deng, Q and Jin, W (2021) Development of a market-oriented efqm excellence model for analyzing the implementation of quality management in developing countries. International Journal of Construction Management, 21(9), pp. 884-909. ISSN 1562-3599

Zhang, N; Hwang, B G; Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 919-938. ISSN 0969-9988

Zhang, S (2017) Pavement surface distress detection, assessment, and modeling using geospatial techniques. PhD thesis, University of New Mexico, USA.

Zhang, Y; Wang, Y and Yao, H (2022) How does the embeddedness of relational behaviours in contractual relations influence inter-organisational trust in construction projects? Engineering, Construction and Architectural Management, 29(1), pp. 222-244. ISSN 0969-9988

Zhao, N; Liu, Q; Li, H; Siamuzwe-Manase, V and Skitmore, M (2026) How does mindful leadership affect individual innovative behavior in megaprojects?–a cross-level study. International Journal of Construction Management, 26(2), pp. 349-364. ISSN 1562-3599

Zheng, X; Qin, Y; Xue, H; Hu, X and Skitmore, M (2026) How formal control fosters relational behavior for innovation performance in infrastructure megaprojects. Journal of Construction Engineering and Management, 152(3): 04025269, ISSN 0733-9364

Zheng, J; Zhang, Z; Wu, G; Yang, Y; Xia, N and Liu, B (2021) Daily self-efficacy, work engagement, and deviance behavior among construction professionals and workers: Cross-level moderating role of job control. Journal of Construction Engineering and Management, 147(4): 04021018, ISSN 0733-9364

Zolkafli, U K; Zakaria, N; Mohammad Mazlan, A and Ali, A S (2019) Maintenance work for heritage buildings in Malaysia: Owners' perspectives. International Journal of Building Pathology and Adaptation, 37(1), pp. 186-195. ISSN 23984708

de Smedt, E; Mollaert, M; Van Craenenbroeck, M; Caspeele, R and Pyl, L (2021) Reliability-based analysis of a cable-net structure and membrane structure designed using partial factors. Architectural Engineering and Design Management, 17(3-4), pp. 316-325. ISSN 1745-2007

van Nguyen, M V and Duy Ha, K (2025) Investigation of factors affecting the readiness for the adoption of sustainable building materials. Engineering, Construction and Architectural Management, 32(8), pp. 5578-5608. ISSN 0969-9988

van der Kuil, P A v d (2023) Investorenarchitektur. The planning, organisation and control of architectural quality in commercial real estate. PhD thesis, Technische Universitaet Berlin, Germany.

Şevik, S; Koçer, A; İnce, H and Tombuş, F E (2022) Determination of optimum tilt angle of the solar collector and evaluation of the position of the existing buildings in terms of solar potential. Architectural Engineering and Design Management, 18(6), pp. 812-828. ISSN 1745-2007

This list was generated on Sat Aug 22 02:13:27 2026 UTC.