Items with Index Term: sample size

Number of items: 235.

Abdallah, A; Doloi, H and Holzer, D (2025) Exploring contextual issues impacting delivery and performance of public sector construction projects in Tanzania. Built Environment Project and Asset Management, 15(2), pp. 228-246. ISSN 2044-124X

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdul-Aziz, A R; Suresh, S and Renukappa, S (2020) The conundrum of professionalising building surveying in Malaysia. International Journal of Building Pathology and Adaptation, 38(5), pp. 621-634. ISSN 23984708

Aboagye-Nimo, E; Piroozfar, P; Wood, H and Madgwick, D (2017) The impact of thermal imaging on users' perception of energy consumption: The round hill project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Aboagye-Nimo, E; Wood, H and Collison, J (2019) Complexity of women's modern-day challenges in construction. Engineering, Construction and Architectural Management, 26(11), pp. 2550-2565. ISSN 0969-9988

Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.

Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531

Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.

Adegun, O B (2023) Climatic disasters within a flood-prone coastal slum in Lagos: Coping capacities and adaptation prospects. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 212-228. ISSN 1759-5916

Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988

Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.

Adjei, K O; Abudu, H D; Nana-Addy, E and Musonda, I (2025) The motivation for occupants’ adoption of hidden emergency exits in buildings. Engineering, Construction and Architectural Management, 32(13), pp. 133-147. ISSN 0969-9988

Agbaxode, P D K; Saghatforoush, E; Dlamini, S and Korsah, J K (2024) Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality. Built Environment Project and Asset Management, 14(6), pp. 817-834. ISSN 2044-124X

Agyekum, A K; Fugar, F D K; Agyekum, K; Akomea-Frimpong, I and Pittri, H (2023) Barriers to stakeholder engagement in sustainable procurement of public works. Engineering, Construction and Architectural Management, 30(9), pp. 3840-3857. ISSN 0969-9988

Agyekum, K; Goodier, C and Oppon, J A (2022) Key drivers for green building project financing in Ghana. Engineering, Construction and Architectural Management, 29(8), pp. 3023-3050. ISSN 0969-9988

Aitken, A and Paton, R A (2016) The 'transaction X-ray': Understanding construction Procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 115-123. ISSN 17514304

Akinrinade, M B (2018) Managing risk in construction projects: A quantitative study. PhD thesis, Northcentral University, USA.

Akomea-Frimpong, I; Jin, X; Osei Kyei, R; Tetteh, P A; Tumpa, R J; Ofori, J N A and Pariafsai, F (2024) A review of circular economy models and success factors on public-private partnership infrastructure development. Built Environment Project and Asset Management, 14(1), pp. 109-126. ISSN 2044-124X

Al-Hajri, S N (2017) Public values and project management practices & processes in the public sector in the case of the State of Qatar. PhD thesis, Bangor University, UK.

Albalawi, R K (2023) Comprehensive analysis of the multiskilling strategy among craft professionals in the construction industry. PhD thesis, University of Colorado at Boulder, USA.

Albattah, M A (2016) A critical analysis of the structural changes related to craft demographics influencing craft supply and demand in the United States across multiple dimensions. PhD thesis, University of Colorado at Boulder, USA.

Albert, A (2013) Strategies for construction hazard recognition. PhD thesis, University of Colorado at Boulder, USA.

Alsehaimi, A O and Sanni-Anibire, M O (2026) Industry 4.0 technologies: An examination of benefits, challenges and critical success factors for implementation in the Saudi construction industry. Construction Innovation, 26(2), pp. 607-630. ISSN 1471-4175

Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements. PhD thesis, University of Florida, USA.

Arambula, E and Gharaibeh, N (2014) Methods for accumulating construction and material quality test results and their effect on acceptance decisions. Journal of Construction Engineering and Management, 140(8): 06014006, ISSN 0733-9364

Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 0969-9988

Attah, Tobenna Vincent (2025) GPA as a predictor of safety practices among U.S. College construction interns. PhD thesis, University of Arizona Global Campus, USA.

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364

Balogun, T B; Awonuga, O O and Abowen-Dake, R (2023) Investigating digital technological competencies amongst black Asian minority ethnic construction students in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1857-1882. ISSN 1726-0531

Barnes, A F (2024) Maximizing the minimum: The advantages of repeated measures in construction management education research. International Journal of Construction Education and Research, 20(4), pp. 405-420. ISSN 1557-8771

Batra, S (2025) Exploring the application of PLS-SEM in construction management research: A bibliometric and meta-analysis approach. Engineering, Construction and Architectural Management, 32(4), pp. 2697-2727. ISSN 0969-9988

Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.

Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193

Bowen, P; Peihua Zhang, R and Edwards, P (2021) An investigation of work-related strain effects and coping mechanisms among South African construction professionals. Construction Management and Economics, 39(4), pp. 298-322. ISSN 01446193

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Chan, A P C; Chiang, Y H; Wong, F K W; Liang, S and Abidoye, F A (2020) Work-life balance for construction manual workers. Journal of Construction Engineering and Management, 146(5): 04020031, ISSN 0733-9364

Chandrasekera, T and Hebert, P (2019) Emergency preparedness in the hospitality industry in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 167-174. ISSN 1759-5916

Chaudhari, R; Goodrum, P; Brady, N; Jones, M; Hallowell, M; Yeh, T and Bhandari, S (2025) Exploring the impact of augmented reality on work performance in a full-scale MEP assembly task: Study of industry and novice populations. Journal of Construction Engineering and Management, 151(12): 04025189, ISSN 0733-9364

Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364

Chileshe, N and Watson, P (1997) TQM: A competitive weapon for the UK construction industry? In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X

Cox, R F; Issa, R R A and Frey, A (2006) Proposed subcontractor-based employee motivational model. Journal of Construction Engineering and Management, 132(2), pp. 152-163. ISSN 0733-9364

Crowley, L G (1997) Robust statistical estimators for use within competitive bid data. Journal of Construction Engineering and Management, 123(1), pp. 53-63. ISSN 0733-9364

Darko, A; Chan, A P C; Ameyaw, E E; Owusu, E K; Pärn, E and Edwards, D J (2019) Review of application of analytic hierarchy process (AHP) in construction. International Journal of Construction Management, 19(5), pp. 436-452. ISSN 1562-3599

Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708

Davis, C (2020) The influence of national culture on conflict in project management: How organizations manage conflict. PhD thesis, Northcentral University, USA.

Dawson, R; Ojiako, U and Hughes, L (2008) Assessing the impact of amended building regulations on the operations of UK construction companies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988

Dogbegah, R; Owusu-Manu, D and Omoteso, K (2011) A principal component analysis of project management competencies for the Ghanaian construction industry. Construction Economics and Building, 11(1), pp. 26-40. ISSN 2204-9029

Edwards, D J and Holt, G D (2008) Construction workers' health and safety knowledge: Initial observations on some test-result data. Journal of Engineering, Design and Technology, 6(1), pp. 65-80. ISSN 1726-0531

Egwim, C N; Alaka, H; Pan, Y; Balogun, H; Ajayi, S; Hye, A and Egunjobi, O O (2025) Ensemble of ensembles for fine particulate matter pollution prediction using big data analytics and IoT emission sensors. Journal of Engineering, Design and Technology, 23(2), pp. 640-665. ISSN 1726-0531

Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones. PhD thesis, University of Florida, USA.

Elliott, J W (2013) Development of the construction training attitudes and intentions scale. PhD thesis, Colorado State University, USA.

Engelen, L; Chau, J; Young, S; Mackey, M; Jeyapalan, D and Bauman, A (2019) Is activity-based working impacting health, work performance and perceptions? A systematic review. Building Research & Information, 47(4), pp. 468-479. ISSN 0961-3218

English, J (2007) The development of women in the South African construction workforce in terms of employment, training and skills acquisition. PhD thesis, Glasgow Caledonian University, UK.

Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708

Enshassi, A; El-Rayyes, Y and Alkilani, S (2015) Job stress, job burnout and safety performance in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 20(2), pp. 170-187. ISSN 1366-4387

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Farrell, P and Gale, A (2003) Career progression path as a determinant of site manager skills. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Foster, J A and Poston, A (2024) Occupant experience of domestic kitchen environments in low-energy social and affordable housing in Scotland. Building Research & Information, 52(7), pp. 799-816. ISSN 0961-3218

Fuentes-Del-Burgo, J and Navarro-Astor, E (2016) What is engineering education for? Listening to the voices of some Spanish building engineers. Journal of Engineering, Design and Technology, 14(4), pp. 897-919.

Gamil, Y; Abdullah, M A; Abdul Rahman, I and Asad, M M (2020) Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), pp. 1091-1102. ISSN 1726-0531

Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.

Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.

Ghalenoei, N; Babaeian Jelodar, M; Paes, D; Sutrisna, M and Rahmani, D (2025) Offsite construction and BIM integration framework across project life cycle. Journal of Construction Engineering and Management, 151(7): 05025002, ISSN 0733-9364

Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099

Gomes Araújo, L and Lucko, G (2022) Best practices for case studies in construction engineering and management research. Journal of Construction Engineering and Management, 148(8): 04022062, ISSN 0733-9364

Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Habtu, T. M.; A. Elsaigh, W. and Musonda, I. (2026) Toward a strategic framework for AI-BIM adoption in Ethiopian road infrastructure management. Engineering, Construction and Architectural Management, 33(15), pp. 564-589. ISSN 0969-9988

Hadizade, S. (2026) Components of children's hospital architecture from the perspective of staff: A mixed-method case study from Iran. Architectural Engineering and Design Management, 22(2), pp. 295-307. ISSN 1745-2007

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Hanna, A S; Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: A guideline for assessing vulnerability of mechanical and electrical projects to productivity loss. Construction Management and Economics, 37(2), pp. 101-111. ISSN 01446193

Hardie, M; Allen, J and Newell, G (2013) Environmentally driven technical innovation by Australian construction SMEs. Smart and Sustainable Built Environment, 2(2), pp. 179-191. ISSN 2046-6099

Hiyasat, R; Sosa, M and Ahmad, L (2023) Use of work-space at home under COVID-19 conditions in the UAE. Engineering, Construction and Architectural Management, 30(8), pp. 3142-3159. ISSN 0969-9988

Ho, P H K (2010) Forecasting construction manpower demand by gray model. Journal of Construction Engineering and Management, 136(12), pp. 1299-1305. ISSN 0733-9364

Hosseini, M R; Chileshe, N; Zuo, J and Baroudi, B (2015) Adopting global virtual engineering teams in AEC projects: A qualitative meta-analysis of innovation diffusion studies. Construction Innovation, 15(2), pp. 151-179. ISSN 1471-4175

Hove, G (2015) Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Howieson, J (2011) Adr for a built environment interdiscipline: Curriculum and practical applications. International Journal of Law in the Built Environment, 3(1), pp. 11-23. ISSN 1756-1450

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Huber, J G (1994) Comparison of formal student outcomes assessment programs in construction education academic units of four-year colleges and universities in the United States and comparison of the attitudes of construction education unit administrators. PhD thesis, University of Kansas, USA.

Hwang, B-G; Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(3), pp. 327-346. ISSN 0969-9988

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),

Ijaola, I A (2017) Training practices and task performance of professionals in construction firms in Lagos and Abuja, Nigeria. PhD thesis, University of Lagos, Nigeria.

Invernizzi, D C (2019) Benchmarking nuclear decommissioning. PhD thesis, University of Leeds, UK.

Izzudin Mohd Ali, M Y (1994) Critical investigation of joint ventures by UK contractors with other European partners. PhD thesis, Loughborough University, UK.

Jones, G M (2017) A correlational study of the relationship between organizational objectives alignment and North American construction project success. PhD thesis, Northcentral University, USA.

Kang, J; Cheah, C Y J and Chew, D A S (2005) Strategic analysis of large chinese construction enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kang, Y; O'Brien, W J; Dai, J; Mulva, S P; Thomas, S P; Chapman, R E and Butry, D (2013) Interaction effects of information technologies and best practices on construction project performance. Journal of Construction Engineering and Management, 139(4), pp. 361-371. ISSN 0733-9364

Kempton, J; Nicol, S; Anumba, C J and Dickens, J (2000) Analysis of surveyor variability from data obtained from surveys of dwellings represented on video film. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kenley, R (2001) The predictive ability of bromilow's time-cost model: A comment. Construction Management and Economics, 19(8), pp. 759-764. ISSN 01446193

Khattak, S B (2020) Evaluation of the construction industry from sustainability perspective. PhD thesis, University of Engineering & Technology Peshawar, Pakistan.

Kikwasi, G (2016) Risk handling options: Is insurance a fair option to transfer construction risks in Tanzanian construction industry? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364

Kima, O.; Urlainis, A.; Wang, K. C. and Shohet, I. M. (2026) Safety climate in small and medium construction enterprises. Smart and Sustainable Built Environment, 15(2), pp. 508-532. ISSN 2046-6099

King Lewis, A and Shan, Y (2024) Persistence of women in the construction industry. Journal of Construction Engineering and Management, 150(7): 04024061, ISSN 0733-9364

Kirby, M; Rotimi, F E and Naismith, N (2025) Factors for improving productivity in the New Zealand residential construction sector. Journal of Engineering, Design and Technology, 23(5), pp. 1712-1728. ISSN 1726-0531

Korkmaz, S; Riley, D and Horman, M (2011) Assessing project delivery for sustainable, high-performance buildings through mixed methods. Architectural Engineering and Design Management, 7(4), pp. 266-274. ISSN 1745-2007

Kululanga, G (2012) Capacity building of construction industries in Sub-Saharan developing countries: A case for Malawi. Engineering, Construction and Architectural Management, 19(1), pp. 86-100. ISSN 0969-9988

Kumar, G and Nayak, J K (2024) Moderating effect of subsidy policy on intention to purchase residential rooftop solar panel systems. Built Environment Project and Asset Management, 14(4), pp. 626-643. ISSN 2044-124X

Kumar, V; Hundal, B S and Kaur, K (2019) Factors affecting consumer buying behaviour of solar water pumping system. Smart and Sustainable Built Environment, 8(4), pp. 351-364. ISSN 2046-6099

Kumar, V; Syan, A S and Kaur, K (2022) A structural equation modeling analysis of factors driving customer purchase intention towards solar water heater. Smart and Sustainable Built Environment, 11(1), pp. 65-78. ISSN 2046-6099

Lam, P T I; Wong, F K W and Wong, F W H (2007) Building features and site-specific factors affecting buildability in Hong Kong. Journal of Engineering, Design and Technology, 5(2), pp. 129-147. ISSN 1726-0531

Le, Thi Thanh Xuan (2013) Managers' perceptions of corporate social responsibility : The construction industry in Vietnam. PhD thesis, University of Western Sydney, Australia.

Leathem, T and Burt, R (2024) Leveraging qualitative analysis software to complement traditional qualitative research approaches for curriculum design: Results of a needs assessment study. International Journal of Construction Education and Research, 20(4), pp. 544-561. ISSN 1557-8771

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Lee, K (1994) Software options for support of three-dimensional CAD in the architectural design process: A critical evaluation by practitioners and educators. PhD thesis, Texas A&M University, USA.

Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers. PhD thesis, University of Washington, USA.

Lekan, A; Aigbavboa, C; Babatunde, O; Olabosipo, F and Christiana, A (2022) Disruptive technological innovations in construction field and fourth industrial revolution intervention in the achievement of the sustainable development goal 9. International Journal of Construction Management, 22(14), pp. 2647-2658. ISSN 1562-3599

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, X; Liu, Y; Wilkinson, S and Liu, T (2019) Driving forces influencing the uptake of sustainable housing in New Zealand. Engineering, Construction and Architectural Management, 26(1), pp. 46-65. ISSN 0969-9988

Lim, L J W and Ling, F Y Y (2012) Human resource practices of contractors that lead to job satisfaction of professional staff. Engineering, Construction and Architectural Management, 19(1), pp. 101-118. ISSN 0969-9988

Lin, Y H; Han, W; Kim, C J; Jiang, L and Xia, N (2023) Effect of commitment on the link between organizational culture and international project performance: A comparison between China and Korea. Engineering, Construction and Architectural Management, 30(9), pp. 4518-4539. ISSN 0969-9988

Lin, Y H; Niu, D; Guo, Y and Zeng, N (2024) The effects of project uncertainty on guanxi governance and contractual governance. Engineering, Construction and Architectural Management, 31(12), pp. 4726-4753. ISSN 0969-9988

Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(3), pp. 281-292. ISSN 2044-124X

Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X

Ling, F Y Y and Nguyen, D S A (2013) Strategies for construction waste management in Ho Chi Minh City, Vietnam. Built Environment Project and Asset Management, 3(1), pp. 141-156. ISSN 2044-124X

Ling, F Y Y; Ning, Y; Chang, Y H and Zhang, Z (2018) Human resource management practices to improve project managers' job satisfaction. Engineering, Construction and Architectural Management, 25(5), pp. 654-669. ISSN 0969-9988

Ling, F Y Y and Tran, H B T (2012) Ingredients to engender trust in construction project teams in Vietnam. Construction Innovation, 12(1), pp. 43-61. ISSN 1471-4175

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(4), pp. 428-447. ISSN 0969-9988

Lundula, N (2024) Influence of leaders’ conflict management skills on multicultural team management. PhD thesis, Walden University, USA.

Lynch, W (2021) A qualitative exploration of the impact of leadership style on organizational performance in the construction industry. DM thesis, Colorado Technical University, USA.

Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X

Mahamood, S Z H and Fathi, M S (2022) Seismic building design work process using building information modeling (BIM) technology for Malaysian government projects. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 211-232. ISSN 1759-5916

Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.

McMahon, E; Spillane, J P and Bradley, J G (2024) Insights into apprenticeship completion: Perspectives from apprentice experiences. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Meng, K (2021) Performance measurement for UK construction projects. PhD thesis, University of Manchester, UK.

Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988

Mireku, E. K.; Kissi, E.; Ikuabe, M.; Arkoh-Clayman, E. and Musah, L. (2026) Encumbrances of integrating sustainability concepts and practices in rural community buildings: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(5), pp. 1232-1245. ISSN 2398-4708

Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation, 19(4), pp. 653-671. ISSN 1471-4175

Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175

Mohd Ishak, Siti Salwa Binti (2014) Resistance factors to technology innovation in construction organisations. PhD thesis, University of New South Wales, Australia.

Montoya, R E (2019) Exploring the strategies, ODC managers need to improve knowledge management in a multigenerational construction organization. DM thesis, Colorado Technical University, USA.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Musonda, I; Zulu, S L; Zulu, E and Kavishe, N (2025) Understanding clients' role in community stakeholder participation and influence on infrastructure sustainability—a stakeholder theory lens. International Journal of Construction Management, 25(4), pp. 419-427. ISSN 1562-3599

Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.

Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.

Nyqvist, R; Peltokorpi, A; Lavikka, R and Ainamo, A (2025) Artificial intelligence driven platforms in the construction industry: Implications for companies' business models. Construction Innovation, 25(7), pp. 409-443. ISSN 1471-4175

Ochieng, J A and Chileshe, N (2016) Engagement strategies and challenges for adoption of stakeholder management approaches (SMA) in South Australian construction industry: Preliminary observations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Oke, A E; Ogunsami, D R and Ogunlana, S (2012) Establishing a common ground for the use of structural equation modelling for construction related research studies. Construction Economics and Building, 12(3), pp. 89-94. ISSN 2204-9029

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.

Oladimeji, O (2022) Influence of COVID-19 pandemic on local construction firms' viability. Journal of Engineering, Design and Technology, 20(1), pp. 201-221. ISSN 1726-0531

Oladinrin, O T; Arif, M; Rana, M Q and Gyoh, L (2023) Interrelations between construction ethics and innovation: A bibliometric analysis using vosviewer. Construction Innovation, 23(3), pp. 505-523. ISSN 1471-4175

Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235-251. ISSN 1366-4387

Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531

Olanrewaju, O I; Bello, A O; Semiu, M A and Mudashiru, S A (2025) Critical barriers to effective communication in the construction industry: evidence from Nigeria. International Journal of Construction Management, 25(7), pp. 783-801. ISSN 1562-3599

Omollo, W O (2019) Barriers to the effective regulation of the building construction industry: An empirical analysis. Journal of Construction Business and Management, 3(2), pp. 49-58. ISSN 2521-0165

Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.

Ortega Quintana, S A (2024) Relationship between project manager’s emotional intelligence and their performance: A quantitative correlational study. DBA thesis, University of Phoenix, USA.

Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Owusu-Manu, D G; Babon-Ayeng, P; Kissi, E; Edwards, D J; Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: An assessment framework. Smart and Sustainable Built Environment, 12(3), pp. 565-583. ISSN 2046-6099

Pamulu, Muhammad Sapri (2010) Strategic management practices in the construction industry: A study of Indonesian enterprises. PhD thesis, Queensland University of Technology, Australia.

Park, H S; Thomas, S R and Tucker, R L (2005) Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772-778. ISSN 0733-9364

Park, H-S (2002) Development of a construction productivity metrics system (CPMS). PhD thesis, University of Texas at Austin, USA.

Perera, C; Jayasooriya, D; Jayasiri, G; Randil, C; Bandara, C; Siriwardana, C; Dissanayake, R; Hippola, S; Sylva, K; Kamalrathne, T and Kulatunga, A (2020) Evaluation of gaps in early warning mechanisms and evacuation procedures for coastal communities in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 415-433. ISSN 1759-5916

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Pheng, L S and Hongbin, J (2006) Analysing ownership, locational and internalization advantages of Chinese construction mncs using rough sets analysis. Construction Management and Economics, 24(11), pp. 1149-1165. ISSN 1466433X

Pim-Wusu, M; Aigbavboa, C and Thwala, W D (2023) Adaptability capacity framework for sustainable practices in the Ghanaian construction industry. Built Environment Project and Asset Management, 13(1), pp. 89-104. ISSN 2044-124X

Pim-Wusu, M; Simpeh, E K and Simberi, J N N (2025) Ascertaining adequacy of fire suppression systems: The perspective of Accra central of Ghana. Journal of Engineering, Design and Technology, 23(3), pp. 917-934. ISSN 1726-0531

Price Jr., L R (2019) Causal-comparative analysis: Leadership efficacy of construction and manufacturing continuous improvement practitioners. PhD thesis, Grand Canyon University, USA.

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Pérez, D; Lagos, C and Fernando Alarcón, L (2022) Key last planner system metrics to assess project performance in high-rise building and industrial construction projects. Journal of Construction Engineering and Management, 148(1): 04021179, ISSN 0733-9364

Qi, L; Wong, P S P and Holdsworth, S (2024) Towards understanding the impact of the perceptions about construction innovation on advanced technology adoption. International Journal of Construction Management, 24(14), pp. 1521-1529. ISSN 1562-3599

Raoufi, M and Fayek, A R (2018) Framework for identification of factors affecting construction crew motivation and performance. Journal of Construction Engineering and Management, 144(9): 04018080, ISSN 0733-9364

Raphael, A O; Samuel, O S and Dipeolu, A A (2022) Evaluation of service quality gaps in construction professional service firms in Nigeria. Journal of Construction in Developing Countries, 27(1), pp. 25-40. ISSN 1823-6499

Rasheed, E O and Rotimi, J O B (2024) The green office environment: New Zealand workers' perception of IEQ. Smart and Sustainable Built Environment, 13(5), pp. 1240-1259. ISSN 2046-6099

Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364

Rodgers, C; Hosseini, M R; Chileshe, N and Rameezdeen, R (2015) Building information modelling (BIM) within the Australian construction related small and medium sized enterprises: Awareness, practices and drivers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Root, D and Blismas, N G (2003) Increasing questionnaire responses from industry: Practices surrounding the use of postal questionnaires. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract. PhD thesis, University of Bath, UK.

Rosayuru, H D R R; Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(5), pp. 769-783. ISSN 1562-3599

Saad, A M; Badran, H D; Ajayi, S and Sarhan, S (2026) Have we reached a technological plateau? A situational awareness approach to overcome the barriers limiting the development of BIM-based plugins. Construction Innovation, 26(1), pp. 219-235. ISSN 1471-4175

Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364

Safour, A and Egbu, C (2010) City centre road user charging; real schemes and field-based experimental studies: State of art. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sang, K J C; Ison, S G and Dainty, A R J (2009) The job satisfaction of UK architects and relationships with work-life balance and turnover intentions. Engineering, Construction and Architectural Management, 16(3), pp. 288-300. ISSN 0969-9988

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Serne, J N (2024) Attributing cause for occupational accidents in construction: A descriptive single case study. PhD thesis, Grand Canyon University, USA.

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shari, Z and Soebarto, V (2014) Investigating sustainable practices in the Malaysian office building developments. Construction Innovation, 14(1), pp. 17-37. ISSN 1471-4175

Sharma, R K (2018) Factors affecting financial leveraging for BSE listed real estate development companies in India. Journal of Financial Management of Property and Construction, 23(3), pp. 274-294. ISSN 1366-4387

Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364

Shrestha, K J; Jeong, H D and Gransberg, D D (2017) Multidimensional highway construction cost indexes using dynamic item basket. Journal of Construction Engineering and Management, 143(8): 04017036, ISSN 0733-9364

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: Executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(7), pp. 2665-2688. ISSN 0969-9988

Singla, H. K. and Phadtare, M. (2026) Measuring construction contractor satisfaction from the lens of client performance: Empirical investigation in India. Journal of Construction Engineering and Management, 152(9): 04026133, ISSN 0733-9364

Singla, H K and Chammanam, S S (2024) Development of a financial performance measurement model for real estate business: An exploratory study in India. Journal of Financial Management of Property and Construction, 29(2), pp. 295-313. ISSN 1366-4387

Singla, H K and Samanta, P K (2022) Identification of critical success factors (CSFs) for real estate developers (reds) in India. Journal of Financial Management of Property and Construction, 27(1), pp. 76-90. ISSN 1366-4387

Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.

Spearman, P (2015) Using sustainable development as a competitive strategy. DBA thesis, Walden University, USA.

Sudarsan, J S; Rajprasad, J; V. Gedam, V; A. Abhyankar, A; S. Sriram, N and Dharaskar, S (2026) Resilient and sustainable construction industry: Leveraging crisis and lean management. International Journal of Construction Management, 26(2), pp. 219-233. ISSN 1562-3599

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Tam, V. W. Y.; Fung, I. W. H.; Evangelista, A. C. J.; Zhou, Y.; Liu, L. and Chan, W. Y. (2026) Sustainable employability assessment of construction workers in Hong Kong: Challenges and improvement strategies. International Journal of Construction Management, 26(10), pp. 2205-2227. ISSN 1562-3599

Tam, G C K (2018) Managing project sustainability: a study of the construction industry in Hong Kong. PhD thesis, London South Bank University, UK.

Tan, R R (1996) Information technology and perceived competitive advantage: An empirical study of engineering consulting firms in Taiwan. Construction Management and Economics, 14(3), pp. 227-240. ISSN 01446193

Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175

Tente, P; Misheng'u Mwanaumo, E and Didibhukut Thwala, W (2023) Sources and control measures of crystalline silica dust in a road and building project in Zambia. Journal of Construction Business and Management, 6(1), pp. 43-52. ISSN 2521-0165

Thomas, H R (1992) Effects of scheduled overtime on labor productivity. Journal of Construction Engineering and Management, 118(1), pp. 60-76. ISSN 0733-9364

Ting Sham, H; Foo Sing, T and Tsai, I C (2009) Are there efficiency gains for larger Asian REITS? Journal of Financial Management of Property and Construction, 14(3), pp. 231-247. ISSN 1366-4387

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Tsado, A J (2019) Innovation: its impact on the success of construction micro, small, and medium enterprises in Northern Nigeria. PhD thesis, Nelson Mandela University, South Africa.

Tucker, G C; Windapo, A and Cattell, K S (2015) Exploring the use of financial capacity as a predictor of construction company corporate performance: Evidence from South Africa. Journal of Engineering, Design and Technology, 13(4), pp. 596-611.

Wang, K; Guo, F; Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: A bibliometric literature review and a case study from China. Construction Innovation, 24(4), pp. 1085-1116. ISSN 1471-4175

Wang, X; Yang, Y; Chan, A P C; Chi, H L and Yung, E H K (2024) A regulatory framework for the use of small unmanned aircrafts (SUAs) in the construction industry. Engineering, Construction and Architectural Management, 31(8), pp. 3024-3049. ISSN 0969-9988

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.

Weber, J R (2023) Commercial construction ethical decision making: Authentic case studies. PhD thesis, Colorado State University, USA.

Williams, J; Fugar, F and Adinyira, E (2020) Assessment of health and safety culture maturity in the construction industry in developing economies: A case of Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(4), pp. 865-881. ISSN 1726-0531

Windapo, A and Oladapo, A (2012) Determinants of construction firms' compliance with health and safety regulations in South Africa. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(4), pp. 585-601. ISSN 2044-124X

Wing, C K (1997) The ranking of construction management journals. Construction Management and Economics, 15(4), pp. 387-398. ISSN 01446193

Wu, Z.; Park, A.; Awada, M. and Assaad, R. H. (2026) School building conditions and chronic absenteeism within socioeconomic contexts: A component-level statistical analysis in New York state. Engineering, Construction and Architectural Management, 33(15), pp. 432-457. ISSN 0969-9988

Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988

Wuni, I Y and Shen, G Q (2023) Exploring the critical success determinants for supply chain management in modular integrated construction projects. Smart and Sustainable Built Environment, 12(2), pp. 258-276. ISSN 2046-6099

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Xiao, C (2015) Comparative analysis of entropy algorithms to determine the most effective technique for measuring complexity in building construction. PhD thesis, Texas A&M University, USA.

Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364

Yue, H; Wang, Q; Cui, L; Li, C; Fang, H and Cheng, J C P (2026) Transfer learning for deep learning-based point cloud tasks in construction scenes. Journal of Construction Engineering and Management, 152(6): 04026058, ISSN 0733-9364

Zhang, Y.; Chang, R. D.; Omrany, H.; Zuo, J.; Li, L.; Bamborough, C. E. and Haeusler, H. M. (2026) Exploring professional attitudes on automated construction progress monitoring: A q methodology approach. Engineering, Construction and Architectural Management, 33(15), pp. 386-413. ISSN 0969-9988

Zhang, S (2004) An organizational cultural analysis of the effectiveness of Chinese construction enterprises. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, Y; Oo, B L and Lim, B T H (2023) Factors affecting contractors' bid or no-bid and mark-up decisions: A case of the jilin province, China. Construction Innovation, 23(5), pp. 1232-1254. ISSN 1471-4175

Zhao, T and Dungan, J M (2014) Improved baseline method to calculate lost construction productivity. Journal of Construction Engineering and Management, 140(2): 06013006, ISSN 0733-9364

Zhao, X; Hwang, B G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(3), pp. 347-366. ISSN 0969-9988

Zhao, Y (2023) Sustainability, acceptance risk analysis and machine learning in assessing mechanical properties and the impact of highway materials in transportation infrastructure. PhD thesis, University of Maryland, College Park, USA.

Zhao, Y; Sun, Y; Zhou, Q; Cui, C and Liu, Y (2023) How A/E/C professionals accept BIM technologies in China: A technology acceptance model perspective. Engineering, Construction and Architectural Management, 30(10), pp. 4569-4589. ISSN 0969-9988

Zhong, Y; Chen, Z; Ye, J and Zhang, N (2025) Exploring critical success factors for digital transformation in construction industry-based on TOE framework. Engineering, Construction and Architectural Management, 32(6), pp. 4227-4249. ISSN 0969-9988

Zhong, Y; Chen, Z; Ye, J and Zhang, N (2025) Exploring critical success factors for digital transformation in construction industry-based on TOE framework. Engineering, Construction and Architectural Management, 32(6), pp. 4227-4249. ISSN 0969-9988

Zolkafli, U K; Zakaria, N; Mohammad Mazlan, A and Ali, A S (2019) Maintenance work for heritage buildings in Malaysia: Owners' perspectives. International Journal of Building Pathology and Adaptation, 37(1), pp. 186-195. ISSN 23984708

Zuo, J; Zhao, X; Nguyen, Q B M; Ma, T and Gao, S (2018) Soft skills of construction project management professionals and project success factors: A structural equation model. Engineering, Construction and Architectural Management, 25(3), pp. 425-442. ISSN 0969-9988

This list was generated on Sat Aug 22 01:57:32 2026 UTC.