Items with Index Term: rough set

Number of items: 13.

Akbari, S; Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(4), pp. 534-558. ISSN 0969-9988

Akbari, S; Pour Rahimian, F; Sheikhkhoshkar, M; Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation, 20(4), pp. 545-567. ISSN 1471-4175

Attoh-Okine, N O (2003) Rule induction in productivity analysis: A rough set approach. Engineering, Construction and Architectural Management, 10(6), pp. 413-417. ISSN 0969-9988

Choi, S; Kim, D Y; Han, S H and Kwak, Y H (2014) Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning. Journal of Construction Engineering and Management, 140(1): 04013026, ISSN 0733-9364

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(2), pp. 96-108. ISSN 0144-6193

Pheng, L S and Hongbin, J (2006) Analysing ownership, locational and internalization advantages of Chinese construction mncs using rough sets analysis. Construction Management and Economics, 24(11), pp. 1149-1165. ISSN 1466433X

Sen, M K; Dutta, S and Kabir, G (2021) Evaluation of interaction between housing infrastructure resilience factors against flood hazard based on rough DEMATEL approach. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 555-575. ISSN 1759-5916

Shojaei, P and bolvardizadeh, A (2020) Rough MCDM model for green supplier selection in Iran: A case of university construction project. Built Environment Project and Asset Management, 10(3), pp. 437-452. ISSN 2044-124X

Singh, A; Kumar, V and Verma, P (2025) Sustainable supplier selection in a construction company: A new MCDM method based on dominance-based rough set analysis. Construction Innovation, 25(2), pp. 328-362. ISSN 1471-4175

Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Yu, H; Deng, X and Zhang, N (2025) To what extent can smart contracts replace traditional contracts in construction project? Engineering, Construction and Architectural Management, 32(3), pp. 1393-1410. ISSN 0969-9988

Zhang, X; Wang, M; Zhou, B and Wang, X (2018) Influence of factors on collapse risk of loess tunnel: A multi-index assessment model. Journal of Engineering, Design and Technology, 16(5), pp. 734-749. ISSN 1726-0531

This list was generated on Sat Aug 22 01:51:44 2026 UTC.