Items with Index Term: root cause analysis

Number of items: 21.

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988

Ayinla, K; Cheung, F and Skitmore, M (2022) Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production. Journal of Construction Engineering and Management, 148(1): 05021011, ISSN 0733-9364

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364

Cameron, I (1999) A goal setting approach to the practice of safety management in the construction industry: Three case studies. PhD thesis, University of Manchester, UK.

Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.

Correia, Marcia Castilho (2019) Assessment of the quality of architectural projects for public health research laboratories: Sustainability and biosafety. PhD thesis, Universidade Federal do Rio de Janeiro, Brazil.

Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.

Emuze, F; Linake, M and Seboka, L (2016) Construction work and the housekeeping challenge in Lesotho. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Enshassi, A; Saleh, N and Mohamed, S (2019) Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction, 24(3), pp. 274-293. ISSN 1366-4387

Hall, M A (2001) 'Root' cause analysis: A tool for closer supply chain integration in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Jayasinghe, H M; Sandanayake, Y G and Jayasinghe, R (2026) Managing conflicts in joint venture contracts in infrastructure construction projects in Sri Lanka. Built Environment Project and Asset Management, 16(2), pp. 415-436. ISSN 2044-124X

Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364

Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364

Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Talebi, S (2019) Improvement of dimensional tolerance management in construction. PhD thesis, University of Huddersfield, UK.

Velikova, M; Baker, H and Smith, S D (2018) The meaning of failure: Establishing a taxonomy of failure in the construction industry to improve organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

This list was generated on Sat Aug 22 01:59:13 2026 UTC.