Abdelgawad, M A M and Fayek, A R (2011) Fuzzy reliability analyzer: Quantitative assessment of risk events in the construction industry using fuzzy fault-tree analysis. Journal of Construction Engineering and Management, 137(4), pp. 294-302. ISSN 0733-9364
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.
Alashwal, A M and Al-Sabahi, M H (2018) Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2), pp. 43-62. ISSN 1823-6499
Bai, L; Zhao, X; Kang, S; Ma, Y and Zhang, B (2025) Dynamic assessment of stakeholder conflict risk for R&D project portfolios. Engineering, Construction and Architectural Management, 32(4), pp. 2342-2368. ISSN 0969-9988
Han, Y; Shen, J; Zhu, X; An, B and Bao, X (2024) Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: An association rule mining-based modeling framework. Engineering, Construction and Architectural Management, 31(5), pp. 2101-2127. ISSN 0969-9988
Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387
Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988
Krechowicz, M (2020) Comprehensive risk management in horizontal directional drilling projects. Journal of Construction Engineering and Management, 146(5): 04020034, ISSN 0733-9364
Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531
Rahimi, Y; Tavakkoli-Moghaddam, R; Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid approach to construction project risk management with simultaneous FMEA/ISO 31000/evolutionary algorithms: Empirical optimization study. Journal of Construction Engineering and Management, 144(6): 04018043, ISSN 0733-9364
Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364
Tiwari, A; Singh, S; Routroy, S; Gopinath, A and Sahu, P K (2025) Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach. International Journal of Construction Management, 25(4), pp. 469-480. ISSN 1562-3599
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364
Yan, P; Liu, J; Zhao, X and Skitmore, M (2022) Risk response incorporating risk preferences in international construction projects. Engineering, Construction and Architectural Management, 29(9), pp. 3499-3519. ISSN 0969-9988