Items with Index Term: risk prioritization
Beltrão, L M P and Carvalho, M T M (2019) Prioritizing construction risks using fuzzy AHP in Brazilian public enterprises. Journal of Construction Engineering and Management, 145(2): 05018018, ISSN 0733-9364
Ehsanifar, M and Hemesy, M (2021) A new hybrid multi-criteria decision-making model to prioritize risks in the construction process under fuzzy environment (case study: The Valiasr Street Underpass Project). International Journal of Construction Management, 21(5), pp. 508-523. ISSN 1562-3599
Ghazali, F E M (2007) A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals. PhD thesis, University of Leeds, UK.
Gogate, N G; Shelake, A G and Band, P (2024) Selection of most significant risk factors for Indian tunnel projects: An integrated fuzzy-based MCDM approach. International Journal of Construction Management, 24(2), pp. 161-176. ISSN 1562-3599
Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364
Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2661-2686. ISSN 0969-9988
Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.
Low, W W; Wong, K S and Lee, J L (2022) Cost-influencing risk factors in infrastructure projects on soft soils. International Journal of Construction Management, 22(2), pp. 229-241. ISSN 1562-3599
May, Christopher Alan (2026) Development of a benchmark building condition index utilizing discrete facility subsets for use in risk prioritization analysis. PhD thesis, Old Dominion University, USA.
Muneeswaran, G; Manoharan, P; Awoyera, P O and Adesina, A (2020) A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management, 20(5), pp. 450-461. ISSN 1562-3599
Nguyen, T; Tran, Q P; Chileshe, N; Thao Huynh, T Y and Hallo, L (2024) Risk prioritization using analytic process network for metro rail implementation projects in developing countries: A typical case study of Vietnam. International Journal of Construction Management, 24(10), pp. 1077-1089. ISSN 1562-3599
Okoye, P U (2018) Occupational health and safety risk levels of building construction trades in Nigeria. Construction Economics and Building, 18(2), pp. 92-109. ISSN 2204-9029
Okoye, P U; Okolie, K C and Odesola, I A (2022) Risks of implementing sustainable construction practices in the Nigerian building industry. Construction Economics and Building, 22(1), pp. 21-46. ISSN 2204-9029
Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988
Youssefi, I and Celik, T (2024) Comparative analysis between different risk score calculation approaches. Engineering, Construction and Architectural Management, 31(10), pp. 4099-4124. ISSN 0969-9988