Items with Index Term: resource utilization
Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599
Abdul-Aziz, A-R (1998) Adapting procurement practices to suit a host country as a probable localization tactic. Journal of Construction Procurement, 4(1), pp. 45-58. ISSN 1358-9180
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.
Amarasinghe, Sam (2025) Performance optimizing for precast concrete construction. PhD thesis, Queensland University of Technology, Australia.
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364
Auradkar, P K; Raykar, A; Agarwal, I; Sitaram, D and Manavalan R (2022) Accuracy assessment and performance analysis of raster to vector conversions on lulc data: India. Journal of Engineering, Design and Technology, 20(6), pp. 1787-1809. ISSN 1726-0531
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.
Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.
Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Chen, R (2025) Investigation of mechanical and thermal performances and masonry quality for new raw soil-based insulating hollow bricks. Architectural Engineering and Design Management, 21(3), pp. 533-552. ISSN 1745-2007
Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180
Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Dania, A A (2017) Sustainable construction at the firm level: case studies from Nigeria. PhD thesis, University of Reading, UK.
Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193
East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364
El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364
El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364
El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Fore, S and Mbohwa, C T (2010) Cleaner production for environmental conscious manufacturing in the foundry industry. Journal of Engineering, Design and Technology, 8(3), pp. 314-333. ISSN 1726-0531
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassan, N M; Al Maazmi, T; Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(1), pp. 67-80. ISSN 1471-4175
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Hillebrandt, P M and Meikle, J L (1985) Resource planning for construction. Construction Management and Economics, 3(3), pp. 249-263. ISSN 01446193
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364
Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364
Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kumar Dhar, T; Sk. Maruf Hossain, M and Rubayet Rahaman, K (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(2), pp. 140-157. ISSN 2046-6099
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.
Li, Y.; Tai, S. and Tai, Z. (2024) Development of ANP-based greenness evaluation model of construction technologies in China. Journal of Engineering, Design and Technology, 24(2), pp. 602-630. ISSN 1726-0531
Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.
Lu, M; Shen, X and Chen, W (2009) Automated collection of mixer truck operations data in highly dense urban areas. Journal of Construction Engineering and Management, 135(1), pp. 17-23. ISSN 0733-9364
Luo, Z; Jiang, Y; Li, X; Wu, R and Pan, H (2026) Financing mode selection and key success factors in area comprehensive development projects based on if-multimoora. Journal of Construction Engineering and Management, 152(4): 04026032, ISSN 0733-9364
Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.
Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364
Mwelu, N; Davis, P; Ke, Y and Watundu, S (2018) Compliance within a regulatory framework in implementing public road construction projects. Construction Economics and Building, 18(4), pp. 1-23. ISSN 2204-9029
Na, L J (2014) The government as marketer of innovation. Engineering, Construction and Architectural Management, 21(5), pp. 551-570. ISSN 0969-9988
Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175
Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Olatunde, N A; Fidelis, I M; Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 881-892. ISSN 2398-4708
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
O’Connor, J T (1985) Impacts of constructability improvement. Journal of Construction Engineering and Management, 111(4), pp. 404-410. ISSN 0733-9364
Perera, S (1983) Resource sharing in linear construction. Journal of Construction Engineering and Management, 109(1), pp. 102-111. ISSN 0733-9364
Pourrahimian, E; Salhab, D; Hamzeh, F and Abourizk, S (2024) The need for a multidimensional project control perspective. Journal of Construction Engineering and Management, 150(12): 04024169, ISSN 0733-9364
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193
Purushothaman, M B and Seadon, J (2024) System-wide construction waste and their connectivity to construction phases, impacting 5m factors and effects: A systematic review. Smart and Sustainable Built Environment, 13(2), pp. 354-369. ISSN 2046-6099
Rathnayake, I; Ochoa, J J; Gu, N; Rameezdeen, R; Statsenko, L and Sandhu, S (2024) Building the future: Fostering circularity through the new dawn of sharing economy practices in the construction industry. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Exploring the barriers for implementing waste trading practices in the construction industry in Australia. Built Environment Project and Asset Management, 11(4), pp. 559-576. ISSN 2044-124X
Salari, M; Ghanbari, M; Skitmore, M and Alipour, M (2026) Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm. Construction Innovation, 26(3), pp. 745-767. ISSN 1471-4175
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364
Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.
Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364
Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Teng, Y; Li, Z; Cai, J and Ju, M (2023) Sustainability evaluation of the prefabricated medical emergency buildings' renovation scheme after the COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3390-3415. ISSN 0969-9988
Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599
Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599
Victar, H C and Waidyasekara, A S (2025) Optimising construction waste management in Sri Lanka through Circular economy strategies: A focus on construction and renovation and use and operate stages. Engineering, Construction and Architectural Management, 32(7), pp. 4275-4309. ISSN 0969-9988
Wong, S S Y (2018) A review on the execution method for building information modelling projects in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 100-110. ISSN 17514304
Xie, H; Abourizk, S and Zou, J (2012) Quantitative method for updating cost contingency throughout project execution. Journal of Construction Engineering and Management, 138(6), pp. 759-766. ISSN 0733-9364
Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364
Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364
Zuofa, T; Ochieng, E G and Ode-Ichakpa, I (2023) An evaluation of determinants influencing the adoption of circular economy principles in Nigerian construction SMEs. Building Research & Information, 51(1), pp. 69-84. ISSN 0961-3218
Up a level