Items with Index Term: resource scheduling
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364
Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hübner, F; Volk, R; Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(2), pp. 212-226. ISSN 2044-124X
John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364
Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.
Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364
Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.
Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771