Items with Index Term: resource optimization
Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Dhawan, K (2023) Supply chain management driven logistics efficiency in the New Zealand construction sector. PhD thesis, Auckland University of Technology, New Zealand.
Ershadi, M; Jefferies, M; Davis, P and Mojtahedi, M (2021) Enhancing productivity in infrastructure development: The key role of project management offices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175
Fernando, L. S.; Kulatunga, U.; Ranadewa, T. and Keraminiyage, K. P. (2026) Accelerating disaster recovery: An agile approach to enhancing community disaster resilience. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 181-202. ISSN 1759-5908
Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099
Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364
Huang, N; Du, Q; Bai, L and Chen, Q (2025) Optimizing collaborative decision-making of multi-agent resources for large-scale projects: From a matching perspective. Engineering, Construction and Architectural Management, 32(1), pp. 16-37. ISSN 0969-9988
Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599
John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364
Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364
Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X
Ogunmakinde, O E (2025) Achieving zero waste: Circular economy strategies in Australian higher education. Construction Economics and Building, 25(2), pp. 1-23. ISSN 2204-9029
Rathnayake, I; Ochoa, J J; Gu, N; Rameezdeen, R; Statsenko, L and Sandhu, S (2025) Facilitating circularity through sharing economy practices in the construction industry: Potential shareable resources. Construction Innovation, 25(7), pp. 292-330. ISSN 1471-4175
Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599
Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029
Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Ugwu, O O; Tah, J and Howes, R (1998) Optimizing construction method selection strategies in an integrated decision support environment: Results of application to earthworks operations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Zafar, M. B. and Mehmood, U. (2026) Understanding maintenance cost drivers in higher education: A multi-model econometric study. Built Environment Project and Asset Management, 16(3), pp. 520-541. ISSN 2044-124X
de Villiers, A J (1988) Procurement of rural primary schools in southern Africa: An approach to resource optimization. PhD thesis, University of Pretoria, South Africa.
Up a level