Items with Index Term: resource management

Number of items: 111.

Adu, E T; Lamptey-Puddicombe, A D and Opawole, A (2020) Consultants' perspectives of survival strategies for small and medium construction firms at infancy stage. Journal of Construction Business and Management, 4(1), pp. 34-47. ISSN 2521-0165

Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531

Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers. PhD thesis, University of Florida, USA.

Aiyetan, Ayodeji; Das, Kumar Dillip and Ayodabo, Blessing (2026) Factors influencing procurement in construction: The role of clients and construction machinery in KwaZulu-Natal. Journal of Construction Business and Management, 8(S1), pp. 72-87. ISSN 2521-0165

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193

Andersson, R and Buser, M (2022) From waste to resource management? Construction and demolition waste management through the lens of institutional work. Construction Management and Economics, 40(6), pp. 477-496. ISSN 01446193

Asgari, S; Afshar, A and Madani, K (2014) Cooperative game theoretic framework for joint resource management in construction. Journal of Construction Engineering and Management, 140(3): 04013066, ISSN 0733-9364

Azcarate Aguerre, J F (2023) Facades-as-a-service: A cross-disciplinary model for the (re)development of circular building envelopes. PhD thesis, Delft University of Technology, Netherlands.

Banks, M S (2012) Understanding information technology enabled social action networks: Construction, sustainability and user participation. PhD thesis, University of Memphis, USA.

Bello, A O and Ayegba, C (2025) Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian aeco industry. Journal of Financial Management of Property and Construction, 30(1), pp. 137-153. ISSN 1366-4387

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2010) Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research & Information, 38(3), pp. 247-264. ISSN 0961-3218

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2012) Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(5), pp. 557-580. ISSN 0969-9988

Charles, S H; Chang-Richards, A Y and Yiu, T W (2022) A systematic review of factors affecting post-disaster reconstruction projects resilience. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 113-132. ISSN 1759-5916

Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988

Chowdhury, S; Ren, Z; Rouhana, F; Wang, J and Zhu, J (2024) Exploring sustainability in resource management: Implementation of a water-energy-human nexus framework at a university campus. Journal of Construction Engineering and Management, 150(10): 04024140, ISSN 0733-9364

Crespo Vallejo, L G (2018) Project manager strategies to improve the delivery of construction projects. PhD thesis, Walden University, USA.

De Jorge Moreno, J; De Jorge Huertas, V and Rojas Carrasco, O (2016) Assessment of the efficiency of the Spanish construction industry using parametric methods: Case study. Journal of Construction Engineering and Management, 142(9): 05016008, ISSN 0733-9364

Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.

Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364

Du, J; Liu, C and Picken, D (2007) A preliminary study on human resources management in international construction. Construction Economics and Building, 7(2), pp. 1-11. ISSN 2204-9029

East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364

El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364

Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X

Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.

Gunning, J G (2004) An analysis of the impact of the revised: Bs en ISO 9001:2000 upon the ready mixed concrete industry of the United Kingdom. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988

Hatayama, H and Tahara, K (2016) Using decomposition analysis to forecast metal usage in the building stock. Building Research & Information, 44(1), pp. 63-72. ISSN 0961-3218

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364

Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364

Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Horsthuis, C; Thomson, D S and Fernie, S (2012) The case for slack to promote innovative behaviour in construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Huang, N; Du, Q; Bai, L and Chen, Q (2025) Optimizing collaborative decision-making of multi-agent resources for large-scale projects: From a matching perspective. Engineering, Construction and Architectural Management, 32(1), pp. 16-37. ISSN 0969-9988

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364

Ikediashi, D I (2024) Facilities management strategic roles and services quality performance in Nigeria’s banking sector. Journal of Engineering, Design and Technology, 22(5), pp. 1591-1615. ISSN 1726-0531

Imbeah, W and Guikema, S (2009) Managing construction projects using the advanced programmatic risk analysis and management model. Journal of Construction Engineering and Management, 135(8), pp. 772-781. ISSN 0733-9364

Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364

Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.

Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Kanagasabapathi, B and Ananthanarayanan, K (2005) A simulation model for resource constrained scheduling of multiple projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364

Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988

Kim, C; Kim, H; Ryu, J and Kim, C (2011) Ubiquitous sensor network for construction material monitoring. Journal of Construction Engineering and Management, 137(2), pp. 158-165. ISSN 0733-9364

Kissi, E; Aigbavboa, C; Eluerkeh, K; Karikari, V A and Danquah, E S (2025) Establishing the nexus between green human resource management and construction project environmental performance. International Journal of Construction Education and Research, 21(2), pp. 230-255. ISSN 1557-8771

Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.

Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Sustainability concepts in global high-rise residential buildings: A scientometric and systematic review. Smart and Sustainable Built Environment, 13(2), pp. 425-443. ISSN 2046-6099

Lew, Y L; Hassim, S; Muniandy, R and Hua, L T (2018) Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7), pp. 835-860. ISSN 0969-9988

Lim, B T H; Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(4), pp. 387-403. ISSN 0969-9988

Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.

Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364

Mai, T P A; Doan, D T and Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4): 04025014, ISSN 0733-9364

Manzoor, B; Antwi-Afari, M F; Alotaibi, K S; Edwards, D J and Posillico, J J (2025) Critical success factors for implementing digital twin technology in construction projects: A systematic and bibliometric approach. Journal of Construction Engineering and Management, 151(12): 03125008, ISSN 0733-9364

Marcellus-Zamora, K A (2015) An evaluation of material stocks and flows found during construction and demolition activities in the Philadelphia region of the United States. PhD thesis, Drexel University, USA.

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175

Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771

Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988

Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364

Nguyen, V. T. and Khuc, T. Q. (2026) How structural modelling of R-principles reveals their interactions and guides circular economy implementation in Vietnam. Engineering, Construction and Architectural Management, pp. 1-30. ISSN 0969-9988

Ofori, G (1989) Housing in Singapore: Determinants of success and lessons for the developing countries. Construction Management and Economics, 7(2), pp. 137-153. ISSN 01446193

Oke, A. E.; Aliu, J.; Ukaha Onyeukwu, S.; Jamir Singh, P. S.; Azura Ramli, R. and Shaharudin Samsurijan, M. (2026) An empirical study on the implications of social media for sustainable construction and productivity in Lagos state, Nigeria. Construction Innovation, 26(3), pp. 720-744. ISSN 1471-4175

Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988

Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities. Unpublished PhD thesis, Universidade Estadual de Campinas, Brazil.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities: Focus on the city of Campinas – SP. PhD thesis, Universidade Estadual de Campinas, Brazil.

Rajak, S and Vimal, V (2024) LSTM-CNN architecture for construction activity recognition using optimal positioning of wearables. Journal of Construction Engineering and Management, 150(12): 04024179, ISSN 0733-9364

Robinson, H S (2000) A critical systems approach to infrastructure investment and resource management in developing countries. PhD thesis, London South Bank University, UK.

Rotimi, J O B and Wilkinson, S (2014) Improving environmental management legislation to facilitate post-disaster reconstruction. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 23-37. ISSN 1759-5916

Rouhparvar, M; Babaei, F and Navidi, H (2025) Cooperative game theory approach towards capital equipment procurement in construction projects: a concrete batch plant case study. International Journal of Construction Management, 25(8), pp. 899-910. ISSN 1562-3599

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X

Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(6), pp. 600-615. ISSN 0969-9988

Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599

Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364

Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364

Seneviratne, K; Amaratunga, D and Haigh, R (2015) Post-conflict housing reconstruction: Exploring the challenges of addressing housing needs in Sri Lanka. Built Environment Project and Asset Management, 5(4), pp. 432-445. ISSN 2044-124X

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364

Tan, Y; Shen, L and Langston, C (2012) Competition environment, strategy, and performance in the Hong Kong construction industry. Journal of Construction Engineering and Management, 138(3), pp. 352-360. ISSN 0733-9364

Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.

Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364

Tran, C N N; Pham, P T; Tran, T T M; Tam, V W Y and Illankoon, I M C S (2025) A practical approach to promoting sustainable development in the construction industry through the use of the LOTUS-Vietnamese green-building assessment tool. International Journal of Construction Management, 25(11), pp. 1288-1299. ISSN 1562-3599

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Tufte, E A (1986) Construction project resource management system. PhD thesis, North Dakota State University, USA.

Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599

Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.

Vaziri, K; Carr, P G and Nozick, L K (2007) Project planning for construction under uncertainty with limited resources. Journal of Construction Engineering and Management, 133(4), pp. 268-276. ISSN 0733-9364

Victar, H C and Waidyasekara, A S (2025) Optimising construction waste management in Sri Lanka through Circular economy strategies: A focus on construction and renovation and use and operate stages. Engineering, Construction and Architectural Management, 32(7), pp. 4275-4309. ISSN 0969-9988

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Wang, Z; Zhou, Y; Jin, X; Zhao, N and Sun, J (2023) Risk allocation and benefit distribution of PPP projects for construction waste recycling: A case study of China. Engineering, Construction and Architectural Management, 30(9), pp. 3927-3956. ISSN 0969-9988

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wolters, R S and Burleson, R C (1996) Merit shop recruitment and selection practices in Alabama. Journal of Construction Engineering and Management, 122(2), pp. 152-157. ISSN 0733-9364

Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.

Yorston, N and Chileshe, N (2014) Lessons learned from building the education revolution (BER) program by the South Australia construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Yu, Yifei (2024) Circular construction ecosystems: Designing a circularity information platform for the built environment. PhD thesis, University of Twente, Netherlands.

Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364

Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364

Zeni, K S and Kikwasi, G J (2023) Factors affecting maintenance cost of public buildings: Case study of Tanzania buildings agency and national housing corporation. International Journal of Building Pathology and Adaptation, 41(5), pp. 926-941. ISSN 23984708

Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364

This list was generated on Sat Aug 22 02:08:23 2026 UTC.