Items with Index Term: resource constraint
Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364
Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599
Ahmed, I (2016) Housing and resilience: Case studies from the Cook Islands. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 489-500. ISSN 1759-5916
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
Barlow, C (2012) The Code for Sustainable Homes: what are the innovation implications for the social housing development sector? PhD thesis, University of Salford, UK.
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364
Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2014) Economic development and construction productivity in Malaysia. Construction Management and Economics, 32(9), pp. 874-887. ISSN 01446193
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X
Dainty, A R J; Bagilhole, B M and Neale, R H (2000) Computer aided analysis of qualitative data in construction management research. Building Research & Information, 28(4), pp. 226-233. ISSN 0961-3218
Dauda, J A; Chavan, N N; Saka, A B; Ajayi, S O and Oyegoke, A S (2025) An appraisal of barriers to digitalisation of construction industry in developing countries: perspective from India. International Journal of Construction Management, 25(7), pp. 770-782. ISSN 1562-3599
Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988
Eames, M; Dixon, T; May, T and Hunt, M (2013) City futures: Exploring urban retrofit and sustainable transitions. Building Research & Information, 41(5), pp. 504-516. ISSN 0961-3218
Edirisinghe, R; Stranieri, A and Blismas, N (2016) Information visualisation for the wicked problem of safe construction design. Architectural Engineering and Design Management, 12(4), pp. 296-310. ISSN 1745-2007
Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.
Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193
Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.
Jayasena, N S; Chan, D W M; Kumaraswamy, M M and Saka, A B (2023) Applicability of public-private partnerships in smart infrastructure development: The case of Hong Kong. International Journal of Construction Management, 23(11), pp. 1932-1944. ISSN 1562-3599
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531
Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.
Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.
Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
Mattar, S G (1983) Segmental post-tensioned dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(3), pp. 276-285. ISSN 0733-9364
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364
Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364
Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.
Nicholas, J (2000) A risk analysis system for evaluating construction contractors by potential creditors. PhD thesis, University of Wolverhampton, UK.
Patil, K; Ayer, S K; Bhandari, S; Hallowell, M R and Perry, L A (2025) Bringing reality to virtual reality: The role of environmental richness in improving construction practitioners' VR experience. Construction Innovation, 25(7), pp. 358-383. ISSN 1471-4175
Rokooei, S (2016) Project management education research excellence within cyber-infrastructure environment. PhD thesis, University of Nebraska - Lincoln, USA.
Sahin, C. and Yildirim, N. (2026) Revisiting digital technology adoption in the construction industry: Practice-informed, context-specific validation of existing knowledge. Smart and Sustainable Built Environment, pp. 1-29. ISSN 2046-6099
Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.
Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Sezer, A A and Bröchner, J (2014) The construction productivity debate and the measurement of service qualities. Construction Management and Economics, 32(6), pp. 565-574. ISSN 01446193
Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599
Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.
Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.
Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.
Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
Xiao, L.; Fan, P.; Shen, G. Q.; Ma, G.; Jia, J. and Zheng, X. (2026) Leveraging deep reinforcement learning to facilitate the transition from knowledge diversity to knowledge creation in construction project teams. Journal of Construction Engineering and Management, 152(10): 04026175, ISSN 0733-9364
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364
Zheng, W.; Huang, Y. and Huang, W. (2026) Data-driven analysis of key factors in building fire risk. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988
Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988
Zulu, S L; Saad, A M; Ajayi, S O; Dulaimi, M and Unuigbe, M (2024) Digital leadership enactment in the construction industry: Barriers undermining effective transformation. Engineering, Construction and Architectural Management, 31(10), pp. 4062-4078. ISSN 0969-9988
Up a level