Items with Index Term: repetitive construction

Number of items: 67.

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abourizk, S M and Halpin, D W (1990) Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), pp. 575-594. ISSN 0733-9364

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364

Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X

Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988

Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.

Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364

Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193

Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

Everett, J G and Farghal, S (1994) Learning curve predictors for construction field operations. Journal of Construction Engineering and Management, 120(3), pp. 603-616. ISSN 0733-9364

Everett, J G and Farghal, S H (1997) Data representation for predicting performance with learning curves. Journal of Construction Engineering and Management, 123(1), pp. 46-52. ISSN 0733-9364

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Gonzalez-Quevedo, A A; Abourizk, S M; Iseley, D T and Halpin, D W (1993) Comparison of two simulation methodologies in construction. Journal of Construction Engineering and Management, 119(3), pp. 573-589. ISSN 0733-9364

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193

Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988

Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193

Hijazi, A M; Abourizk, S M and Halpin, D W (1992) Modeling and simulating learning development in construction. Journal of Construction Engineering and Management, 118(4), pp. 685-700. ISSN 0733-9364

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364

Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364

Kavanagh, D P (1985) SIREN: A repetitive construction simulation model. Journal of Construction Engineering and Management, 111(3), pp. 308-323. ISSN 0733-9364

Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(3), pp. 342-357. ISSN 0969-9988

Perera, S (1983) Sharing of resources between non-repetitive construction activity. Construction Papers, 2(2), pp. 61-69. ISSN 0144-8587

Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499

Reda, R M (1990) RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2), pp. 316-330. ISSN 0733-9364

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.

Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Saha, Swapan Kumar (2002) Predicting realistic performance rate and optimum inspection rate in construction. PhD thesis, University of Western Sydney, Australia.

Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771

Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.

Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X

Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364

Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599

Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364

Wall, J; Carney, M; McNamee, F; Madden, D; Hurst, A; Vrasidas, C; Chanquoy, L; Baccino, T; Acar, E; Önwy-Yazici, E and Jordan, A (2007) The delivery of health and safety training applying multiple intelligences using virtual classes. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193

Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364

Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988

This list was generated on Sat Aug 22 02:14:46 2026 UTC.