Items with Index Term: regression model

Number of items: 289.

Abdel Aziz, A M (2023) Statistical analysis and representation models of working-days liquidated damages. Journal of Construction Engineering and Management, 149(7): 04023054, ISSN 0733-9364

Abdel-Hamid, M.; Abdelhaleem, H. M. and Abd El-Razek Fathy, A. E. (2025) Assessing the implementation of BIM for enhancing green building certification evaluations. Architectural Engineering and Design Management, 21(5), pp. 1040-1056. ISSN 1745-2007

Abdel-Salam, A N (2018) Corporate social responsibility of construction and real estate development companies in developing countries: An assessment model. PhD thesis, Purdue University, USA.

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdulhadi, M A M E (2012) IT adoption in the construction sector in Libya. PhD thesis, University of Glamorgan, UK.

Abhulimen, P E (2024) The influence of information-sharing and trust on competitiveness and organizational performance in construction supply chain management. DBA thesis, Keiser University, USA.

Abuhishmeh, K S K (2023) Risk assessment of reinforced concrete sewer pipes under external loading and adverse environmental conditions using an adaptive neuro-fuzzy system. PhD thesis, University of Texas at Arlington, USA.

Aghimien, D; Aigbavboa, C O; Chan, D W M and Aghimien, E I (2024) Determinants of cloud computing deployment in South African construction organisations using structural equation modelling and machine learning technique. Engineering, Construction and Architectural Management, 31(3), pp. 1037-1060. ISSN 0969-9988

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Aiyetan, A O and Das, D K (2023) Use of drones for construction in developing countries: Barriers and strategic interventions. International Journal of Construction Management, 23(16), pp. 2888-2897. ISSN 1562-3599

Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.

Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531

Albert, A; Hallowell, M R and Kleiner, B M (2014) Experimental field testing of a real-time construction hazard identification and transmission technique. Construction Management and Economics, 32(10), pp. 1000-1016. ISSN 01446193

Albert, A; Hallowell, M R and Kleiner, B M (2014) Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study. Journal of Construction Engineering and Management, 140(2): 04013042, ISSN 0733-9364

Aldaghi, T and Javanmard, S (2023) The evaluation of wastewater treatment plant performance: A data mining approach. Journal of Engineering, Design and Technology, 21(6), pp. 1785-1802. ISSN 1726-0531

Alemayehu, S; Nejat, A; Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(7), pp. 2635-2664. ISSN 0969-9988

Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Alnaqbi, A; Al-Khateeb, G G and Zeiada, W (2025) Machine learning applications for predicting longitudinal cracking in continuously reinforced concrete pavement. Construction Economics and Building, 25(1), pp. 143-170. ISSN 2204-9029

Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.

Amadi, A (2023) Integration in a mixed-method case study of construction phenomena: From data to theory. Engineering, Construction and Architectural Management, 30(1), pp. 210-237. ISSN 0969-9988

Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599

Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.

Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599

Anwar, Waqas (2019) Development of multiple linear regression model and rule based decision support system to improve supply chain management of road construction projects in disaster regions. PhD thesis, University of Bradford, UK.

Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364

Artmann, N; Gyalistras, D; Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(2), pp. 111-128. ISSN 0961-3218

Atin, A (2016) Project risk propagation modeling of engineering, procurement and construction. PhD thesis, Wayne State University, USA.

Au-Yong, C P; Chua, S J L; Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(8), pp. 1593-1607. ISSN 0969-9988

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Ayat, M; Qureshi, S M and Kang, C (2025) The moderating role of emerging technologies on the impact of coronavirus disease 2019 and the performance of construction projects: The case of Pakistan. Journal of Engineering, Design and Technology, 23(1), pp. 21-50. ISSN 1726-0531

Baharfar, Y; Mohammadyan, M; Moattar, F; Nassiri, P and Behzadi, M H (2022) Indoor pm2.5 concentrations of pre-schools; determining the effective factors and model for prediction. Smart and Sustainable Built Environment, 11(4), pp. 1042-1059. ISSN 2046-6099

Bates, A J (2008) The owner's role in project success. PhD thesis, Polytechnic University, USA.

Bau, Z (2022) Developing circularity of construction waste in emerging economies: an environmental Kuznets curve approach. PhD thesis, University of Hong Kong, Hong Kong.

Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bilbo, D; Bigelow, B F; Rybkowski, Z and Kamranzadeh, A (2014) Effects of family-related factors on female project managers' salaries in the construction industry in the United States. International Journal of Construction Education and Research, 10(4), pp. 255-267. ISSN 1557-8771

Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364

Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 0969-9988

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The Batalha Monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The batalha monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Buhamizo, I; Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), pp. 221-241. ISSN 1823-6499

Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193

Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531

Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988

Chang, R; He, T; Han, Y; Xue, R and Zhang, W E (2023) Geographical imbalance and influential characteristics of the green building market. Journal of Construction Engineering and Management, 149(10): 04023093, ISSN 0733-9364

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.

Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304

Chen, R (2025) Investigation of mechanical and thermal performances and masonry quality for new raw soil-based insulating hollow bricks. Architectural Engineering and Design Management, 21(3), pp. 533-552. ISSN 1745-2007

Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X

Chew, M Y L and Tan, S S (2004) A multivariate approach to maintenance prediction of wet areas. Construction Management and Economics, 22(4), pp. 395-407. ISSN 01446193

Cho, Y K; Haas, C T; Sreenivasan, S V and Liapi, K (2004) Position error modeling for automated construction manipulators. Journal of Construction Engineering and Management, 130(1), pp. 50-58. ISSN 0733-9364

Chotibhongs, R and Arditi, D (2012) Detection of collusive behavior. Journal of Construction Engineering and Management, 138(11), pp. 1251-1258. ISSN 0733-9364

Cirilovic, J; Vajdic, N; Mladenovic, G and Queiroz, C (2014) Developing cost estimation models for road rehabilitation and reconstruction: Case study of projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(3): 4013065, ISSN 0733-9364

Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Darragh, A J R (2001) Patterns of injury among residential construction workers before and after a safety intervention program, 1994-1998. PhD thesis, Colorado State University, USA.

Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X

Drew, D and Skitmore, M (1997) The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(5), pp. 469-489. ISSN 01446193

Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.

Du, X.; Liu, J.; Chen, Y. and Wang, Z. (2026) Millennial executives: Effects of the age-inverse relationship in ceo-top management team on corporate misconduct in China's construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2448-2470. ISSN 0969-9988

Dyer, B D (2010) Construction industry productivity: Examining the effects of omitted variable bias in the census construction price index models. PhD thesis, University of Kentucky, USA.

Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364

Economou, G S (1973) Sales forecasting in a sector of the construction industry: A statistical and econometric approach. PhD thesis, University of Manchester, UK.

Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2008) The impact of multiskilling on UK's construction manpower. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 25-30. ISSN 17514312

Elasu, J; Kimuli, B R and Adaramola, M S (2022) Cooking fuel choices of households in urban areas in Uganda: A multinomial probit regression analysis. International Journal of Building Pathology and Adaptation, 40(2), pp. 283-298. ISSN 23984708

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Ercan, T (2019) New three-part model of innovation activity in construction companies. Journal of Construction Engineering and Management, 145(5): 04019022, ISSN 0733-9364

Eromobor, S O; Das, D K and Emuze, F (2020) Influence of building and indoor environmental parameters on designing energy-efficient buildings. International Journal of Building Pathology and Adaptation, 39(3), pp. 507-524. ISSN 23984708

Ezeoke, G C (2021) Duration, control, and success factors of Nigerian public infrastructure projects. PhD thesis, Walden University, USA.

Fang, D; Fong, P S W and Li, M (2004) Risk assessment model of tendering for Chinese building projects. Journal of Construction Engineering and Management, 130(6), pp. 862-868. ISSN 0733-9364

Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.

Ferenchak, N N (2025) Us road safety during COVID-19: Motorist, pedestrian and bicyclist fatality trends. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 193-208. ISSN 1759-5908

Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.

Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Gatti, U C (2012) Measuring and evaluating physical strain to improve construction workforce productivity. PhD thesis, University of New Mexico, USA.

Gatti, U C; Migliaccio, G C; Bogus, S M and Schneider, S (2014) An exploratory study of the relationship between construction workforce physical strain and task level productivity. Construction Management and Economics, 32(6), pp. 548-564. ISSN 01446193

Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.

Gillen, M E (1996) Nonfatal falls in construction workers: Predictors of injury severity. PhD thesis, University of California, San Francisco, USA.

Godoy-Shimizu, D; Steadman, P; Hamilton, I; Donn, M; Evans, S; Moreno, G and Shayesteh, H (2018) Energy use and height in office buildings. Building Research & Information, 46(8), pp. 845-863. ISSN 0961-3218

Goh, B H (1998) Forecasting residential construction demand in Singapore: A comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(3), pp. 261-275. ISSN 0969-9988

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Guo, X; Wu, H; Chen, Y; Chang, Y and Ao, Y (2023) Gauging the impact of personal lifestyle, indoor environmental quality and work-related factors on occupant productivity when working from home. Engineering, Construction and Architectural Management, 30(8), pp. 3713-3730. ISSN 0969-9988

Gurmu, A.; Galluzzo, A. and Kite, J. (2021) Modelling customers' perception of the quality of services provided by builders: A case of Victoria, Australia. Construction Economics and Building, 21(1), pp. 100-124. ISSN 2204-9029

Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175

Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364

Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193

Hanus, V P (2025) Predicting critical management-controlled factors to increase productivity within the construction industry. DEngr thesis, George Washington University, USA.

Hartog, L; Weijs-Perrée, M and Appel-Meulenbroek, R (2018) The influence of personality on user satisfaction: Multi-tenant offices. Building Research & Information, 46(4), pp. 402-416. ISSN 0961-3218

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, X and Hinze, J (2006) Owner's role in construction safety: Guidance model. Journal of Construction Engineering and Management, 132(2), pp. 174-181. ISSN 0733-9364

Hussein, D; Sarkar, S and Armstrong, P (2018) Mapping preferences for the number of built elements. Smart and Sustainable Built Environment, 7(1), pp. 53-67. ISSN 2046-6099

Hwang, S (2009) Dynamic regression models for prediction of construction costs. Journal of Construction Engineering and Management, 135(5), pp. 360-367. ISSN 0733-9364

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hwee Lim, E N G and Yean Yng Ling, F (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(5-6), pp. 388-395. ISSN 0969-9988

Ibraheem, Y; Piroozfar, P A E; Farr, E R P and Ravenscroft, N (2020) Methodological evaluation of integrated façade systems: Sensitivity analysis of net energy in a base-case model. International Journal of Building Pathology and Adaptation, 38(1), pp. 107-126. ISSN 23984708

Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364

Ikediashi, D I; Ansa, O A; Ujene, A O and Akoh, S R (2025) Barriers to BIM for facilities management adoption in Nigeria: A multivariate analysis. International Journal of Building Pathology and Adaptation, 43(3), pp. 391-413. ISSN 2398-4708

Ikediashi, D I and Ogwueleka, A C (2016) Assessing the use of ICT systems and their impact on construction project performance in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(2), pp. 252-276.

Irfan, M; Khalid, R A; Kaka Khel, S S U H; Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(1), pp. 154-171. ISSN 0969-9988

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Jafari, A and Akhavian, R (2019) Driving forces for the US residential housing price: A predictive analysis. Built Environment Project and Asset Management, 9(4), pp. 515-529. ISSN 2044-124X

Jafarzadeh, R; Wilkinson, S; González, V; Ingham, J M and Amiri, G G (2014) Predicting seismic retrofit construction cost for buildings with framed structures using multilinear regression analysis. Journal of Construction Engineering and Management, 140(3): 4013062, ISSN 0733-9364

Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988

Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.

Jin, X H (2011) Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques. Journal of Construction Engineering and Management, 137(11), pp. 1003-1014. ISSN 0733-9364

Johari, S (2021) Effect of socioemotional cognitive, and technical competencies of workers on construction labor productivity. PhD thesis, Indian Institute of Technology Delhi, India.

Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. DSc thesis, University of Massachusetts Lowell, USA.

Kamath, M V; Prashanth, S; Kumar, M and Tantri, A (2024) Machine-learning-algorithm to predict the high-performance concrete compressive strength using multiple data. Journal of Engineering, Design and Technology, 22(2), pp. 532-560. ISSN 1726-0531

Kang, L (2025) Examining the relationship between construction fatalities and the construction economy in China: A three-decade analysis. Engineering, Construction and Architectural Management, 32(8), pp. 5558-5577. ISSN 0969-9988

Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B; Goodrum, P M and Srinivasan, C (2016) Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation, 16(3), pp. 307-322. ISSN 1471-4175

Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.

Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599

Kim, J and Philips, P (2012) Determinants of quits and dismissals on a long-lasting unionized industrial construction project. Journal of Construction Engineering and Management, 138(5), pp. 661-669. ISSN 0733-9364

Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.

Konchar, M and Sanvido, V (1998) Comparison of U.S. Project delivery systems. Journal of Construction Engineering and Management, 124(6), pp. 435-444. ISSN 0733-9364

Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.

Kumar, A; Srivastava, V; Tabash, M I and Chawda, D (2022) Profitability determinants of infrastructure public private partnerships (PPPs): Empirical evidence from Indian data. Journal of Financial Management of Property and Construction, 27(1), pp. 91-111. ISSN 1366-4387

Kumar Singla, H (2019) A comparative analysis of long-term performance of construction and non-construction IPOs in India: A panel data investigation. Engineering, Construction and Architectural Management, 26(10), pp. 2447-2473. ISSN 0969-9988

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, T S (1990) Detection of collusion in highway construction contract bidding. PhD thesis, University of Wisconsin - Madison, USA.

Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364

Li, H.; Lyu, R.; Sheng, J.; Menadue, V. and Skitmore, M. (2026) Enhancing eco-efficiency in china's construction industry: Measurement, drivers, and policy implications using an ebm-tobit approach. International Journal of Construction Management, 26(9), pp. 1727-1745. ISSN 1562-3599

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, S (2006) Three essays on bidding in the construction industry. PhD thesis, University of Utah, USA.

Lin, J; Li, Q; Zhang, K and Zhang, C (2026) Autonomous and intervention-based trust calibration in construction robots: Impact on unsafe behavior. Journal of Construction Engineering and Management, 152(1): 04025218, ISSN 0733-9364

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Lingard, H; Pirzadeh, P and Oswald, D (2019) Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups. Journal of Construction Engineering and Management, 145(5): 04019029, ISSN 0733-9364

Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364

Liu, J; Wang, Y and Du, X (2025) The impact of autonomy on sustainable performance in foreign subsidiaries: An empirical study from Chinese construction industry. Engineering, Construction and Architectural Management, 32(2), pp. 1370-1391. ISSN 0969-9988

Liu, S (2016) An investigation of how information processing impacts boundary spanning activities in managing construction design changes from the perspective of contractors. PhD thesis, University of Hong Kong, Hong Kong.

Liu, X; Song, Y; Yi, W; Wang, X and Zhu, J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. Journal of Construction Engineering and Management, 144(6): 04018037, ISSN 0733-9364

Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364

Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364

Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364

Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387

Lowe, J G (1997) Insolvency in the UK construction industry. Journal of Financial Management of Property and Construction, 2(1), pp. 83-112. ISSN 1366-4387

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364

Lucko, G and Mitchell, Z W (2010) Quantitative research: Preparation of incongruous economic data sets for archival data analysis. Journal of Construction Engineering and Management, 136(1), pp. 49-57. ISSN 0733-9364

Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364

Maaith, N. and Sharmin, T. (2026) Socio-technical drivers of energy use in low-income housing in Jordan: Insights from a regression-based study. Building Research & Information, 54(4), pp. 510-533. ISSN 0961-3218

Mahamid, I (2011) Early cost estimating for road construction projects using multiple regression techniques. Construction Economics and Building, 11(4), pp. 87-101. ISSN 2204-9029

Mahamid, I (2022) Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), pp. 1500-1507. ISSN 1562-3599

Mahamid, I and Bruland, A (2012) Cost deviation in road construction projects: The case of Palestine. Construction Economics and Building, 12(1), pp. 58-71. ISSN 2204-9029

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Martin, H and Lewis, T M (2014) Pinpointing safety leadership factors for safe construction sites in Trinidad and Tobago. Journal of Construction Engineering and Management, 140(2): 04013046, ISSN 0733-9364

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

McCluskey, W; Davis, P; Haran, M; McCord, M and McIlhatton, D (2012) The potential of artificial neural networks in mass appraisal: The case revisited. Journal of Financial Management of Property and Construction, 17(3), pp. 274-292. ISSN 1366-4387

McCord, M; Davis, P; McCord, J; Haran, M and Davison, K (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: A polytomous universal model approach. Journal of Financial Management of Property and Construction, 25(2), pp. 247-271. ISSN 1366-4387

Minooei, F; Goodrum, P M and Taylor, T R B (2020) Young talent motivations to pursue craft careers in construction: The theory of planned behavior. Journal of Construction Engineering and Management, 146(7): 04020082, ISSN 0733-9364

Mirzaei, J; Amiri Hanzaei, H; Khaleghi, H and Kashani, H (2024) Cost estimation models for seismic retrofit of masonry school buildings. International Journal of Construction Management, 24(8), pp. 843-853. ISSN 1562-3599

Mitchell Jr., Z W (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Mitchell Jr., Zane Windsor (1998) A statistical analysis of construction equipment repair costs using field data & the cumulative cost model. PhD thesis, Virginia Tech, USA.

Mogaji, L (2019) Examining the impact of earned value management on construction project outcomes in Nigeria. PhD thesis, Capella University, USA.

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Moschandreas, D J; Yoon, S H and Demirev, D (2006) Validation of the indoor environmental quality conceptual model. Building Research & Information, 34(5), pp. 483-495. ISSN 0961-3218

Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.

Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X

Nelson, T N T (2024) Using socio-technical water systems in construction engineering to address water insecurity after hurricanes maria and fiona. PhD thesis, Iowa State University, USA.

Nguyen, L D; Le-Hoai, L; Tran, D Q; Dang, C N and Nguyen, C V (2019) Effect of project complexity on cost and schedule performance in transportation projects. Construction Management and Economics, 37(7), pp. 384-399. ISSN 01446193

Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387

Oluseye, R; Odeyinka, H and Leo-Olagbaye, F (2024) The effect of leadership style on the survival of quantity surveying firms. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Onukwube, H N (2008) Construction professionals motivation and job performance: A comparison of indigenous and expatriate construction contractors in Nigeria. PhD thesis, University of Lagos, Nigeria.

Onyali, A (2017) Correlates of project success in the Nigerian real estate construction sector. PhD thesis, Walden University, USA.

Oo, B L; Nguyen, A T; Ahn, Y and Lim, B T H (2025) Predicting the number of bidders in construction competitive bidding using explainable machine learning models. Construction Innovation, 25(7), pp. 158-188. ISSN 1471-4175

Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007

Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007

Oshidero, D. F. O. and Coley, D. A. (2026) Talking carbon: A lexical approach to predictive embodied carbon analysis via machine learning. Architectural Engineering and Design Management, 22(1), pp. 235-268. ISSN 1745-2007

Osman, K K; Claveria, J B; Faust, K M and Hernandez, S (2019) Temporal dynamics of willingness to pay for alternatives that increase the reliability of water and wastewater service. Journal of Construction Engineering and Management, 145(7): 04019041, ISSN 0733-9364

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499

Owusu, M D and Badu, E (2009) Determinants of contractors' capital investment finance strategy in Ghana. Journal of Financial Management of Property and Construction, 14(1), pp. 21-33. ISSN 1366-4387

Owusu-Manu, D G; Babon-Ayeng, P; Kissi, E; Edwards, D J; Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: An assessment framework. Smart and Sustainable Built Environment, 12(3), pp. 565-583. ISSN 2046-6099

Parvar, J (2003) Neural networks decision support system (decision to bid). PhD thesis, University of Manchester, UK.

Pellicer, T M; Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 573-597. ISSN 0969-9988

Pereira, E; Han, S; Abourizk, S and Hermann, U (2017) Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level. Journal of Construction Engineering and Management, 143(6): 05017004, ISSN 0733-9364

Pirzadeh, P; Lingard, H and Zhang, R P (2022) Job quality and construction workers' mental health: Life course perspective. Journal of Construction Engineering and Management, 148(12): 04022132, ISSN 0733-9364

Pulugurta, H (2007) Development of pavement condition forecasting models. PhD thesis, University of Toledo, USA.

Qi, F; Jiang, L; Chen, Y; Zhu, L and Jiang, Y (2024) Identifying Chinese students' perceptions of smart classrooms and their relationships with design features. Building Research & Information, 52(7), pp. 781-798. ISSN 0961-3218

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rajan Annamalai, T and Jain, N (2013) Project finance and investments in risky environments: Evidence from the infrastructure sector. Journal of Financial Management of Property and Construction, 18(3), pp. 251-267. ISSN 1366-4387

Ran, X (2025) Research on the relationship between core competitiveness of interior design companies and its performance under the circumstance of decline. DBA thesis, Arizona State University, USA.

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599

Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content. PhD thesis, Indiana State University, USA.

Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) Predicting the trends and cost impact of COVID-19 OSHA citations on US construction contractors using machine learning and simulation. Engineering, Construction and Architectural Management, 30(8), pp. 3461-3479. ISSN 0969-9988

Saka, N (2013) The impact of foreign direct investment on the construction sectors of Africa. PhD thesis, Glasgow Caledonian University, UK.

Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.

Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364

Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531

Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.

Schwatka, N V (2014) Managing through measurement: Occupational health and safety in the construction industry. PhD thesis, Colorado State University, USA.

Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364

Sharma, R K (2018) Factors affecting financial leveraging for BSE listed real estate development companies in India. Journal of Financial Management of Property and Construction, 23(3), pp. 274-294. ISSN 1366-4387

Shook, S R (1997) Innovation and the United States residential construction industry: An integrated model of determinants of firm innovativeness for engineered wood products. PhD thesis, University of Washington, USA.

Simmons, K M; Czajkowski, J and Kovacs, P (2021) Building code effectiveness grading schedule participation analysis. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 67-83. ISSN 1759-5916

Simpeh, E K (2018) The adoption of green building in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364

Singla, H K (2020) Does ownership structure and market sentiment affect the performance of IPOs in India in short run? A dynamic panel data analysis. Journal of Financial Management of Property and Construction, 26(1), pp. 1-22. ISSN 1366-4387

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: A panel data analysis. Journal of Financial Management of Property and Construction, 24(1), pp. 19-38. ISSN 1366-4387

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364

Steemers, K and Yun, G Y (2009) Household energy consumption: A study of the role of occupants. Building Research & Information, 37(5-6), pp. 625-637. ISSN 0961-3218

Stoy, C; Dreier, F and Schalcher, H R (2007) Construction duration of residential building projects in Germany. Engineering, Construction and Architectural Management, 14(1), pp. 52-64. ISSN 0969-9988

Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364

Su, X; Li, S; Yuan, C; Cai, H and Kamat, V R (2014) Enhanced boundary condition-based approach for construction location sensing using RFID and RTK GPS. Journal of Construction Engineering and Management, 140(10): 04014048, ISSN 0733-9364

Suhomlinova, O O (1996) Organizational transformation in the post-Soviet economy: The case of the Russian construction industry, 1985-1993. PhD thesis, Duke University, USA.

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364

Swei, O (2018) Long-run construction cost trends: Baumol's cost disease and a disaggregate look at building material price dynamics. Journal of Construction Engineering and Management, 144(7): 04018058, ISSN 0733-9364

Tanratanawong, S (2001) A neural network model to forecast construction output in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.

Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387

Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364

Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364

Trinh, Hoang T (2021) Optimisation framework for sustainable design of concrete buildings. PhD thesis, Griffith University, Australia.

Tsolas, I E (2013) Modeling profitability and stock market performance of listed construction firms on the athens exchange: Two-stage DEA approach. Journal of Construction Engineering and Management, 139(1), pp. 111-119. ISSN 0733-9364

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences. PhD thesis, University of Hong Kong, Hong Kong.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: A multilevel examination of the job performance implications. Construction Management and Economics, 27(5), pp. 473-498. ISSN 1466433X

Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.

Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.

Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, G; Xia, C and Cao, D (2020) State and determinants of inter-regional market entry practices in the Chinese construction industry: Evidence from national quality award projects. Engineering, Construction and Architectural Management, 27(7), pp. 1461-1477. ISSN 0969-9988

Wang, R; Lee, C J; Hsu, S C and Chen, J H (2021) Preventing or encouraging illegal activities by construction firms: Effects of top management team compensation and aspiration-performance discrepancies. Engineering, Construction and Architectural Management, 28(6), pp. 1739-1760. ISSN 0969-9988

Wang, Y; Shi, G and Zhang, Y (2025) How did polycentric spatial structure affect carbon emissions of the construction industry? A case study of 10 Chinese urban clusters. Engineering, Construction and Architectural Management, 32(2), pp. 1186-1210. ISSN 0969-9988

Wang, Y; Yao, Y; Zhang, Y; Su, B and Wu, T (2023) Impact of industrial agglomeration on total factor productivity in the construction industry: Evidence from China. Construction Management and Economics, 41(4), pp. 322-337. ISSN 01446193

Wanigarathna, N; Xie, Y; Henjewele, C; Morga, M and Jones, K (2025) Machine learning application to disaster damage repair cost modelling of residential buildings. Construction Management and Economics, 43(4), pp. 302-322. ISSN 0144-6193

Whang, S W; Flanagan, R and Kim, K P (2025) An analysis of the optimal research and development investment level of contractor using the panel threshold regression model. International Journal of Construction Management, 25(16), pp. 2007-2019. ISSN 1562-3599

Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193

Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988

Wong, C H (2004) Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364

Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X

Xia, X; Xiang, P; Khanmohammadi, S; Gao, T and Arashpour, M (2024) Predicting safety accident costs in construction projects using ensemble data-driven models. Journal of Construction Engineering and Management, 150(7): 04024054, ISSN 0733-9364

Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988

Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364

Yeh, H H H (2018) How the capital structure of firms is determined over business cycles: Further evidence from the construction industry of Taiwan. Construction Management and Economics, 36(8), pp. 459-471. ISSN 01446193

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364

Zhang, W; Ding, N; Xue, R; Han, Y and Liu, C (2025) Building success: The impact of talent recruitment on the growth of the construction industry. Engineering, Construction and Architectural Management, 32(9), pp. 5989-6005. ISSN 0969-9988

Zhang, L; Shi, L and Ma, L (2024) Effect of public–private partnership features on contractual complexity: Evidence from China. Engineering, Construction and Architectural Management, 31(10), pp. 3876-3894. ISSN 0969-9988

Zhang, L; Yuan, J; Ning, Y; Xia, N and Zhang, G (2022) Enhancing the impacts of absorptive capacity on interorganizational collaboration in BIM-enabled construction projects: an slt perspective. Engineering, Construction and Architectural Management, 29(10), pp. 4215-4240. ISSN 0969-9988

Zhang, S B; Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(9), pp. 2477-2500. ISSN 0969-9988

Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364

Zheng, X; Hu, X; Wu, C and Bai, J (2025) Does owners' leadership matter to relational behavior in mega construction projects? A role orientation perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3608-3629. ISSN 0969-9988

Zheng, Y; Tang, L and Chau, K W (2025) BIM investment decision model (BIDM): Evaluation of features and proposal of a regression model based on the LASSO method. Journal of Financial Management of Property and Construction, 30(2), pp. 232-255. ISSN 1366-4387

Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.

This list was generated on Sat Aug 22 01:42:12 2026 UTC.