Items with Index Term: refurbishment project

Number of items: 67.

Aikivuori, A (1996) Periods and demand for private sector housing refurbishment. Construction Management and Economics, 14(1), pp. 3-12. ISSN 01446193

Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.

Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Alzahrani, H; Arif, M; Kaushik, A; Goulding, J and Heesom, D (2021) Artificial neural network analysis of teachers' performance against thermal comfort. International Journal of Building Pathology and Adaptation, 39(1), pp. 20-32. ISSN 23984708

Babangida, I (2014) Hierarchical structuring and evaluation of risks, uncertainties and technical challenges faced by building refurbishment contractors. PhD thesis, University of Bolton, UK.

Bishop, E (2014) The use of Department of Health standards and guidance: effects on, and benefits to, healthcare accommodation. PhD thesis, Loughborough University, UK.

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X

Cha, H S; Kim, K H and Kim, C K (2012) Case study on selective demolition method for refurbishing deteriorated residential apartments. Journal of Construction Engineering and Management, 138(2), pp. 294-303. ISSN 0733-9364

Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364

Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.

Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.

Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Fernando, M H V; Costa, D D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 244-259. ISSN 2044-124X

Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Hardie, M; Khan, S; O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(2), pp. 26-36. ISSN 2204-9029

Hirbod, S (2018) The application of EnerPHit standard to residential tower blocks in the UK. PhD thesis, University of Kent, UK.

Ikedi, C U; Okoroh, M I; Dean, A and Omer, S A (2010) Impact assessment for building integrated photovoltaic (BIPV). In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kemmer, S (2018) Development of a method for construction management in refurbishment projects. PhD thesis, University of Huddersfield, UK.

Koolwijk, J; van Oel, C; Vrijhoef, R and Wamelink, J W F (2015) Partnering in construction: A field study to further develop the framework of supply chain integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Krystallis I, D P P A D F (2013) Supporting future-proof healthcare design by narrowing the design space of solutions using building information modelling. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works. PhD thesis, Glasgow Caledonian University, UK.

Leblanc, H; Nitithamyong, P and Thomson, C (2010) Developing a knowledge management framework to promote sustainable social housing refurbishment practices. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lee, C C (2007) Developing an appropriate methodology for matching project team's knowledge with client's project requirements in refurbishment projects. PhD thesis, Glasgow Caledonian University, UK.

Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X

Lundberg, M and Lidelöw, H (2016) Testing a proposition for a knowledge management method for refurbishment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Mansfield, J R (2009) The use of formalised risk management approaches by UK design consultants in conservation refurbishment projects. Engineering, Construction and Architectural Management, 16(3), pp. 273-287. ISSN 0969-9988

Mayouf, M.; Kay, K. and Ashayeri, I. (2026) Building performance in refurbishment projects: A hybrid framework for holistic performance delivery. International Journal of Building Pathology and Adaptation, 44(4), pp. 1121-1137. ISSN 2398-4708

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007

Okakpu, A; GhaffarianHoseini, A; Tookey, J; Haar, J and Ghaffarianhoseini, A (2020) Exploring the environmental influence on BIM adoption for refurbishment project using structural equation modelling. Architectural Engineering and Design Management, 16(1), pp. 41-57. ISSN 1745-2007

Okakpu, A; Ghaffarianhoseini, A; Tookey, J; Haar, J; Ghaffarianhoseini, A and Rehman, A U (2022) Risk factors that influence adoption of building information modelling (BIM) for refurbishment of complex building projects: Stakeholders perceptions. International Journal of Construction Management, 22(13), pp. 2446-2458. ISSN 1562-3599

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Okoroh, M I (1992) Knowledge based decision support system for the selection and appointment of sub-contractors for building refurbishment contracts. PhD thesis, Loughborough University, UK.

Okoroh, M I and Torrance, V B (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17(3), pp. 315-327. ISSN 01446193

Organ, S (2020) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(2), pp. 329-355. ISSN 23984708

Painting, N J; Piroozfar, P A E and Farr, E R P (2014) Refurbishment of higher education premises: Stakeholder engagement in the process and product. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.

Rahmat, I; Torrance, V B and Young, B A (1998) The planning and control process of refurbishment projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Rahmat, I B (1997) The planning and control process of refurbishment projects. PhD thesis, University College London, UK.

Ranasinghe, U; Jefferies, M; Davis, P and Pillay, M (2023) Enabling a resilient work environment: An analysis of causal relationships between resilience engineering factors in construction refurbishment projects. Journal of Construction Engineering and Management, 149(9): 04023078, ISSN 0733-9364

Rathnayake, I; Sridarran, P; Abeynayake, M and Jayakodi, S (2023) Enhancing building performance of post-fire refurbished apparel manufacturing buildings in sri lanka. Built Environment Project and Asset Management, 13(3), pp. 375-393. ISSN 2044-124X

Ritter, V (2012) Optimizing the combination of active and passive building components in refurbishment projects to allow for net-zero emission architecture. DSc thesis, ETH Zürich, Switzerland.

Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 0969-9988

Sezer, A (2012) Environmental assessment tools and efficiency in housing and office refurbishment. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sezer, A A (2016) Construction performance measurement: Site managers in refurbishment projects. PhD thesis, Chalmers University of Technology, Sweden.

Sezer, A A and Bosch-Sijtsema, P (2022) Actor-to-actor tensions influencing waste management in building refurbishment projects: A service ecosystem perspective. International Journal of Construction Management, 22(9), pp. 1690-1699. ISSN 1562-3599

Sezer, A A and Bröchner, J (2020) Site managers' ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management, 27(1), pp. 109-127. ISSN 0969-9988

Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X

Sheth, A Z; Price, A D F and Glass, J (2010) BIM and refurbishment of existing healthcare facilities. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ströbele, B and Lützkendorf, T (2019) Communicating environmental information: Rethinking options for construction products. Building Research & Information, 47(6), pp. 681-696. ISSN 0961-3218

Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Thomas, L E (2010) Evaluating design strategies, performance and occupant satisfaction: A low carbon office refurbishment. Building Research & Information, 38(6), pp. 610-624. ISSN 0961-3218

Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(1), pp. 69-82. ISSN 1466433X

Troje, D (2020) Constructing social procurement: An institutional perspective on working with employment requirements. PhD thesis, Chalmers University of Technology, Sweden.

Tsai, Y (2009) Understanding aesthetic appreciation as an aid to the development of sustainable urban environment. PhD thesis, Cranfield University, UK.

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193

Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.

Woodward, A and Heesom, D (2021) Implementing HBIM on conservation heritage projects: Lessons from renovation case studies. International Journal of Building Pathology and Adaptation, 39(1), pp. 96-114. ISSN 23984708

This list was generated on Sat Aug 22 01:51:33 2026 UTC.