Items with Index Term: reconfiguration
Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.
Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.
Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.
Cai, W.; Hua, D.; Li, S.; Xue, S. and Xu, Z. (2026) 3D reconstruction of building interiors based on scan-to-BIM and generative design for as-built building. Engineering, Construction and Architectural Management, 33(3), pp. 1959-1979. ISSN 0969-9988
Chen, K W; Teitelbaum, E; Meggers, F; Pantelic, J and Rysanek, A (2021) Exploring membrane-assisted radiant cooling for designing comfortable naturally ventilated spaces in the tropics. Building Research & Information, 49(5), pp. 483-495. ISSN 0961-3218
Davis, M C (2011) Psychological and organisational issues in the design of buildings and workplaces. PhD thesis, University of Leeds, UK.
Dhawan, K; Tookey, J; Fredriksson, A and Tetik, M (2026) Decarbonising construction logistics: The role of supplier-led distribution and integrated warehousing. Construction Innovation, 26(9), pp. 21-48. ISSN 1471-4175
Dowsett, R (2016) Assessing the success of BIM implementation. DEng thesis, University of Reading, UK.
Dowsett, R and Harty, C (2016) Making the link between bim's benefits and implementation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Druker, J and Croucher, R (1999) Human resource management in European construction companies. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Li, Y; Maxwell, D W and Moehler, R (2025) Facilitating platform-based business model innovation in construction start-ups: A dynamic capability perspective. Construction Management and Economics, 43(10), pp. 864-881. ISSN 0144-6193
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Mattaraia, L; Fabricio, M M and Codinhoto, R (2023) Structure for the classification of disassembly applied to BIM models. Architectural Engineering and Design Management, 19(1), pp. 56-73. ISSN 1745-2007
Mekid, S and Shang, M (2015) Concept of dependent joints in functional reconfigurable robots. Journal of Engineering, Design and Technology, 13(3), pp. 400-418.
Pamulu, Muhammad Sapri (2010) Strategic management practices in the construction industry: A study of Indonesian enterprises. PhD thesis, Queensland University of Technology, Australia.
Pulhez, Magaly Marques (2014) The management arrangement: State, engineering companies and architects in the daily management of the housing policy in São Paulo. PhD thesis, Universidade de São Paulo, Brazil.
Robertson, Aaron D (2026) Towards a new housebuilding paradigm: A systems theory approach to supply chain reconfiguration. PhD thesis, University of Salford, UK.
Sibanda, V; Mpofu, K and Trimble, J (2021) Methodology for the design of a reconfigurable guillotine shear and bending press machine (rgs&BPM). Journal of Engineering, Design and Technology, 19(6), pp. 1317-1343. ISSN 1726-0531
Sibanda, V; Mpofu, K; Trimble, J and Kanganga, M (2020) Development of part families for a reconfigurable machine. Journal of Engineering, Design and Technology, 18(5), pp. 991-1014. ISSN 1726-0531
Stehn, L; Engström, S; Uusitalo, P and Lavikka, R (2021) Understanding industrialised house building as a company’s dynamic capabilities. Construction Innovation, 21(1), pp. 5-21. ISSN 1471-4175
Tan, T; Mills, G; Papadonikolaki, E; Li, B and Huang, J (2023) Digital-enabled design for manufacture and assembly (dfma) in offsite construction: A modularity perspective for the product and process integration. Architectural Engineering and Design Management, 19(3), pp. 267-282. ISSN 1745-2007
Van Uden, M; Wamelink, H; Van Bueren, E and Heurkens, E (2025) Circular building hubs as intermediate step for the transition towards a circular economy. Construction Management and Economics, 43(6), pp. 446-464. ISSN 0144-6193
Winkler, C; Perez Vico, E and Widén, K (2024) Challenges to business ecosystem alignment when implementing solar photovoltaic systems in the Swedish built environment. Building Research & Information, 52(5), pp. 497-514. ISSN 0961-3218
Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X
van Uden, M; Wamelink, H; van Bueren, E and Heurkens, E (2025) Aligning practices towards a circular economy in the architecture, engineering, and construction sector: Seven transitions in different stages of reconfiguration. Construction Management and Economics, 43(2), pp. 153-174. ISSN 0144-6193
van Uden, M F M (2025) Reconfiguration of practices towards a circular economy in the architecture, engineering, and construction sector: Change throughout a persistent system. PhD thesis, Delft University of Technology, Netherlands.
Up a level