Items with Index Term: rebar
Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599
Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.
Antwi-Afari, M F; Li, H; Edwards, D J; Pärn, E A; Owusu-Manu, D G; Seo, J and Wong, A Y L (2018) Identification of potential biomechanical risk factors for low back disorders during repetitive rebar lifting. Construction Innovation, 18(2), pp. 206-226. ISSN 1471-4175
Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364
Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007
Badawy, M; Hussein, A; Elseufy, S M and Alnaas, K (2021) How to predict the rebar labours' production rate by using ANN model. International Journal of Construction Management, 21(4), pp. 427-438. ISSN 1562-3599
Barbachyn, S M; Devine, R D; Thrall, A P and Kurama, Y C (2017) Economic evaluation of high-strength materials in stocky reinforced concrete shear walls. Journal of Construction Engineering and Management, 143(10): 04017074, ISSN 0733-9364
Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364
Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007
Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.
Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988
Choi, J; Hong, D H; Lee, S H; Lee, H Y; Hong, T; Lee, D E and Park, H S (2023) Multi-objective green design model for prestressed concrete slabs in long-span buildings. Architectural Engineering and Design Management, 19(5), pp. 531-549. ISSN 1745-2007
David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.
Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364
Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364
Gonsalves, N; Ogunseiju, O R and Akanmu, A A (2024) Activity recognition from trunk muscle activations for wearable and non-wearable robot conditions. Smart and Sustainable Built Environment, 13(6), pp. 1370-1385. ISSN 2046-6099
Hayette, F; Abadou, Y and Ghrieb, A (2021) Bio-waste influence on air lime mortar performance corrosion: optimization using the surface response method. Journal of Engineering, Design and Technology, 19(5), pp. 1124-1137. ISSN 1726-0531
Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364
Jalaei, F; Zhang, J; McNeil- Ayuk, N and McLeod, C (2025) Environmental life cycle assessment (LCA) for design of climate-resilient bridges-a comprehensive review and a case study. International Journal of Construction Management, 25(1), pp. 99-114. ISSN 1562-3599
Jalaei, F; Zhang, J; McNeil- Ayuk, N and McLeod, C (2025) Environmental life cycle assessment (LCA) for design of climate-resilient bridges: A comprehensive review and a case study. International Journal of Construction Management, 25(1), pp. 99-114. ISSN 1562-3599
Jarkas, A M (2010) Critical investigation into the applicability of the learning curve theory to rebar fixing labor productivity. Journal of Construction Engineering and Management, 136(12), pp. 1279-1288. ISSN 0733-9364
Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531
Jarkas, A M (2010) The effects of buildability factors on rebar fixing labour productivity of isolated foundations. International Journal of Construction Management, 10(2), pp. 33-51. ISSN 1562-3599
Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X
Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364
Jiang, S; Wang, S; Sun, H; Liu, W; Xiao, B; Cha, H S and Zhang, J (2025) Enhancing quality management: Lightweight detection and risk warning of concrete cracks and rebar exposure using improved YOLOv8. Journal of Construction Engineering and Management, 151(8): 04025087, ISSN 0733-9364
Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X
Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Li, Y; Wang, J; Cao, L; Wei, D and Wang, Y (2022) Three-step mathematical model for optimizing rebar cutting-stock with practical application. Journal of Construction Engineering and Management, 148(7): 04022043, ISSN 0733-9364
Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364
Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029
Ma, J; Li, H; Yu, X; Fang, X; Fang, B; Zhao, Z; Huang, X; Anwer, S and Xing, X (2023) Sweat analysis-based fatigue monitoring during construction rebar bending tasks. Journal of Construction Engineering and Management, 149(9): 04023072, ISSN 0733-9364
Mahdi, H S and Afshar, E (2024) Performance of electronic devices for bridging existing information gaps at construction sites: The case of a developing country. International Journal of Construction Management, 24(14), pp. 1510-1520. ISSN 1562-3599
Mishra, S P; Parbat, D K and Modak, J P (2014) Field data-based mathematical simulation of manual rebar cutting. Journal of Construction in Developing Countries, 19(1), pp. 111-126. ISSN 1823-6499
Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(3), pp. 366-378. ISSN 1562-3599
Moon, S; Zekavat, P R and Bernold, L E (2015) Dynamic control of construction supply chain to improve labor performance. Journal of Construction Engineering and Management, 141(6): 05015002, ISSN 0733-9364
Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.
Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193
Navon, R; Rubinovitz, Y and Coffler, M (1996) Fully automated rebar CAD/CAM system: Economic evaluation and field implementation. Journal of Construction Engineering and Management, 122(2), pp. 101-108. ISSN 0733-9364
Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364
Nepal, Jaya (2015) Reliability-based performance assessment and optimum maintenance of corroded reinforced concrete structures. PhD thesis, University of Greenwich, UK.
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364
Nzabonimpa, J D and Hong, W K (2018) Novel precast erection method of interlocking mechanical joints using couplers. Journal of Construction Engineering and Management, 144(6): 04018036, ISSN 0733-9364
Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.
Pinky Devi, L and Palaniappan, S (2019) Life cycle energy analysis of a low-cost house in India. International Journal of Construction Education and Research, 15(4), pp. 256-275. ISSN 1557-8771
Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175
Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X
Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364
Porwal, A and Hewage, K N (2012) Building information modeling-based analysis to minimize waste rate of structural reinforcement. Journal of Construction Engineering and Management, 138(8), pp. 943-954. ISSN 0733-9364
Prego, F J; Solla, M; Núñez-Nieto, X and Arias, P (2016) Assessing the applicability of ground-penetrating radar to quality control in tunneling construction. Journal of Construction Engineering and Management, 142(5): 06015006, ISSN 0733-9364
Qatawna, A; Allouzi, R and Qaqish, S (2024) Experimental and analytical behavior of one-way fiber foamed concrete slabs reinforced with/without glass fiber grid under 4-point flexural test. International Journal of Building Pathology and Adaptation, 42(6), pp. 1169-1184. ISSN 2398-4708
Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364
Qureshi, A H; Alaloul, W S; Murtiyoso, A; Hussain, S J; Saad, S and Musarat, M A (2024) Automated scaling of point cloud rebar model via aruco-supported controlled markers. Journal of Construction Engineering and Management, 150(3): 04023170, ISSN 0733-9364
Qureshi, A H; Alaloul, W S; Wing, W K; Saad, S; Alzubi, K M and Musarat, M A (2024) Factors affecting the implementation of automated progress monitoring of rebar using vision-based technologies. Construction Innovation, 24(3), pp. 770-789. ISSN 1471-4175
Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.
Rajak, S and Vimal, V (2024) LSTM-CNN architecture for construction activity recognition using optimal positioning of wearables. Journal of Construction Engineering and Management, 150(12): 04024179, ISSN 0733-9364
Saade, M R M; da Silva, M G; Gomes, V; Franco, H G; Schwamback, D and Lavor, B (2014) Material eco-efficiency indicators for Brazilian buildings. Smart and Sustainable Built Environment, 3(1), pp. 54-71. ISSN 2046-6099
Salem, O; Shahin, A and Khalifa, Y (2007) Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. Journal of Construction Engineering and Management, 133(12), pp. 982-992. ISSN 0733-9364
Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.
Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Sohail, M G; Salih, M; Al Nuaimi, N and Kahraman, R (2019) Corrosion performance of mild steel and epoxy coated rebar in concrete under simulated harsh environment. International Journal of Building Pathology and Adaptation, 37(5), pp. 657-678. ISSN 23984708
Subchan, B R; Tayeh, B A; Widayanto, E and Wiswamitra, K A (2024) Bamboo's evolution as a sustainable material: A comprehensive exploration and practical integration as a structural element in concrete, bridge frameworks, and architectural perspectives. Architectural Engineering and Design Management, 20(6), pp. 1566-1588. ISSN 1745-2007
Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364
Turkan, Y; Bosché, F; Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(2), pp. 145-167. ISSN 1471-4175
Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2017) Identification of biomechanical risk factors for the development of lower-back disorders during manual rebar tying. Journal of Construction Engineering and Management, 143(1): 04016080, ISSN 0733-9364
Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2017) Low-cost ergonomic intervention for mitigating physical and subjective discomfort during manual rebar tying. Journal of Construction Engineering and Management, 143(10): 04017075, ISSN 0733-9364
Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2018) Proactive safety measures: Quantifying the upright standing stability after sustained rebar tying postures. Journal of Construction Engineering and Management, 144(4): 04018010, ISSN 0733-9364
Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988
Wan, R H J; Jia, A Y and Goh, Y M (2021) Managing climatic heat stress in Singapore: State of the practice and wearables on site. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Wang, S; Kim, M; Hae, H; Cao, M and Kim, J (2023) The development of a rebar-counting model for reinforced concrete columns: Using an unmanned aerial vehicle and deep-learning approach. Journal of Construction Engineering and Management, 149(11): 04023111, ISSN 0733-9364
Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364
Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599
Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.
Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364
Yavuz, Z B (2012) Impacts of participant related factors on rebar supply chain performance in SMEs. PhD thesis, Middle East Technical University, Turkey.
Zhang, K; Li, D; Shen, X; Hou, W; Li, Y and Xue, X (2023) Research on strengthening stone arch bridge with CFRP rebars. International Journal of Building Pathology and Adaptation, 41(5), pp. 1014-1028. ISSN 23984708
Zhou, L; Wang, C; Niu, P; Zhang, H; Zhang, N; Xie, Q; Wang, J; Zhang, X and Liu, J (2025) A morphology-euclidean-linear recognition method for rebar point clouds of highway tunnel linings during the construction phase. Engineering, Construction and Architectural Management, 32(10), pp. 6509-6535. ISSN 0969-9988
Up a level