Items with Index Term: quality assurance

Number of items: 166.

AbdelRazig, Y A (1999) Construction quality assessment: A hybrid decision support model using image processing and neural learning for intelligent defects recognition. PhD thesis, Purdue University, USA.

Abdullahi, U; Bustani, S A; Hassan, A and Rotimi, F E (2019) Assessing quality management practice in Nigerian construction industry. Journal of Construction Business and Management, 3(2), pp. 17-25. ISSN 2521-0165

Ainoo, F N Y (2025) Leveraging big data in AEC decision-making: A governance framework. PhD thesis, Capella University, USA.

Al-Nakeeb, A A R (2000) An assessment of the effectiveness of quality assurance systems in the construction industry. PhD thesis, University of South Wales, UK.

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Alencastro, J; Fuertes, A and de Wilde, P (2016) Improving the quality management systems for energy-efficient social housing projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Alshboul, O; Shehadeh, A and Saleh, E (2025) Advancing construction quality management: An integrated evidential reasoning and belief functions framework. Journal of Construction Engineering and Management, 151(8): 04025093, ISSN 0733-9364

Amaratunga, D and Senaratne, S (2009) Principles of integrating research into teaching in higher education: Built environment perspective. International Journal of Construction Education and Research, 5(3), pp. 220-232. ISSN 1557-8771

Amponsah, Richard (2011) Improving project management practice in Ghana with focus on agriculture, banking and construction sectors of the Ghanaian economy. PhD thesis, RMIT University, Australia.

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Arditi, D and Lee, D E (2003) Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), pp. 175-185. ISSN 01446193

Atkinson, E; Spillane, J; Bradley, J and Brooks, T (2022) Challenges in the adoption of mobile information communication technology (m-ICT) in the construction phase of infrastructure projects in the UK. International Journal of Building Pathology and Adaptation, 40(3), pp. 327-344. ISSN 23984708

Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364

Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599

Bell, M R (2019) Home is where the heart(ache) is: Building a regulatory regime for residential construction which more effectively meets community expectations for occupant health and safety. PhD thesis, King's College London, UK.

Bennett, J and Ferry, D (1990) Specialist contractors: A review of issues raised by their new role in building. Construction Management and Economics, 8(3), pp. 259-283. ISSN 01446193

Bishop, J (2009) Managing technical knowledge to enhance organisational best practice. PhD thesis, Loughborough University, UK.

Brocklehurst, F; Morgan, E; Greer, K; Wade, J and Killip, G (2021) Domestic retrofit supply chain initiatives and business innovations: An international review. Buildings & Cities, 2(1), pp. 533-549. ISSN 2632-6655

Burrell, P A (2017) Structural errors and failures in construction: is knowledge hidden? PhD thesis, Anglia Ruskin University, UK.

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.

Bweupe, A S and Mwiya, B (2024) Quality management in ready-mix concrete production in Zambia. Journal of Construction Business and Management, 7(1), pp. 1-15. ISSN 2521-0165

Cai, H; Kuczek, T; Dunston, P S and Li, S (2017) Correlating intelligent compaction data to in situ soil compaction quality measurements. Journal of Construction Engineering and Management, 143(8): 04017038, ISSN 0733-9364

Chan, E H W and Chan, A T S (1999) Imposing ISO 9000 quality assurance system on statutory agents in Hong Kong. Journal of Construction Engineering and Management, 125(4), pp. 285-291. ISSN 0733-9364

Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364

Cohen, R; Standeven, M; Bordass, B and Leaman, A (2001) Assessing building performance in use 1: The Probe process. Building Research & Information, 29(2), pp. 85-102. ISSN 0961-3218

Cusumano, L; Farmakis, O; Granath, M; Olsson, N; Jockwer, R and Rempling, R (2025) Current benefits and future possibilities with digital field reporting. International Journal of Construction Management, 25(5), pp. 572-583. ISSN 1562-3599

Dawson, S and Osborne, A (2020) Re-shaping built environment higher education: The impact of degree apprenticeships in England. International Journal of Construction Education and Research, 16(2), pp. 102-116. ISSN 1557-8771

De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364

Dib, H; Adamo-Villani, N and Issa, R R A (2013) A GIS-based visual information model for buildng construction project management. International Journal of Construction Management, 13(1), pp. 1-18. ISSN 1562-3599

Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.

Donato, V; Lo Turco, M and Bocconcino, M M (2018) BIM-QA/QC in the architectural design process. Architectural Engineering and Design Management, 14(3), pp. 239-254. ISSN 1745-2007

Donn, M (2025) Simulation and the building performance gap. Buildings & Cities, 6(1), pp. 713-728. ISSN 2632-6655

Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: A review and future directions for research. Engineering, Construction and Architectural Management, 5(4), pp. 339-349. ISSN 0969-9988

Ellis L, P A L T (2013) Assessing learning and teaching strategies of a post-graduate capstone course: Students' perspective. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Escamilla, E (2011) Investigation of project management planning practices for renovation of historical buildings in urban contexts located in Texas. PhD thesis, Texas A&M University, USA.

Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.

Faulkner, A J (1996) Achieving exemplary quality in the UK construction professions. PhD thesis, University of Salford, UK.

Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.

Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.

Gasue, R; Aklashie, S; Dompey, A M A; Agyekum, K and Opoku, D (2026) Implementing materials passports in the construction industry: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 15-35. ISSN 2398-4708

George, M and Sekpe, V (2010) Inspection of insulated concrete form walls using ground penetrating radar. International Journal of Construction Education and Research, 6(4), pp. 303-317. ISSN 1557-8771

Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175

Ghansah, F A and Lu, W (2025) Evaluating the critical resultant impacts of the COVID-19 pandemic on quality assurance of cross-border construction logistics and supply chain. Engineering, Construction and Architectural Management, 32(10), pp. 6665-6689. ISSN 0969-9988

Ghansah, F A and Lu, W (2025) Managerial framework for quality assurance of cross-border construction logistics and supply chain during pandemic and post-pandemic: Lessons from COVID-19 in the world’s factory. Engineering, Construction and Architectural Management, 32(5), pp. 3007-3056. ISSN 0969-9988

Ghansah, F A; Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(5), pp. 2128-2150. ISSN 0969-9988

Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.

Glew, D; Smith, M B; Miles-Shenton, D and Gorse, C (2017) Assessing the quality of retrofits in solid wall dwellings. International Journal of Building Pathology and Adaptation, 35(5), pp. 501-518.

Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.

Gunning, J G (2004) An analysis of the impact of the revised: Bs en ISO 9001:2000 upon the ready mixed concrete industry of the United Kingdom. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gurmu, A.; Galluzzo, A. and Kite, J. (2021) Modelling customers' perception of the quality of services provided by builders: A case of Victoria, Australia. Construction Economics and Building, 21(1), pp. 100-124. ISSN 2204-9029

Hassanain, M A; Aljuhani, M; Sanni-Anibire, M O and Abdallah, A (2019) Interdisciplinary design checklists for mechanical, electrical and plumbing coordination in building projects. Built Environment Project and Asset Management, 9(1), pp. 29-43. ISSN 2044-124X

Hernandez, W (2017) Development of a sustainable quality assurance program for transporation infrastructure. PhD thesis, University of Rhode Island, USA.

Hijazi, A A; Das, P; Li, Y; Moehler, R C and Maxwell, D W (2026) A contingency approach to platform implementation: Platform types, attributes, and value chain integration. Building Research & Information, 54(1), pp. 4-23. ISSN 0961-3218

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(4), pp. 679-685. ISSN 1562-3599

Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.

Ikuabe, M; Clinton, C; Ebekozien, A and Mambane, S (2025) Contextualising the challenges of the built environment programme accreditation in HEIs in South Africa. International Journal of Building Pathology and Adaptation, 43(8), pp. 108-123. ISSN 2398-4708

Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kamari, M and Ham, Y (2025) Advancing 3D object detection and segmentation in construction jobsites using an open vocabulary approach. Journal of Construction Engineering and Management, 151(10): 04025141, ISSN 0733-9364

Kantola, M and Saari, A (2014) Commissioning for nearly zero-energy building projects. Construction Innovation, 14(3), pp. 370-382. ISSN 1471-4175

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.

Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.

Killip, G (2020) A reform agenda for UK construction education and practice. Buildings & Cities, 1(1), pp. 525-537. ISSN 2632-6655

Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Landin, A (2000) Impact of quality management in the Swedish construction process. PhD thesis, Lund University, Sweden.

Lawrence, D J (1983) Real-time concrete quality assurance. Construction Papers, 2(2), pp. 71-77. ISSN 0144-8587

Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(2), pp. 139-149. ISSN 01446193

Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988

Ma, B; Cai, Y; Zhang, H; Fan, Y; Wang, F; Wang, P; Lyu, Z and Zhao, Z (2025) Evaluating construction risks of ultralarge diameter bored pile in deep water using combination weighting with two-dimensional cloud optimization. Journal of Construction Engineering and Management, 151(8): 05025007, ISSN 0733-9364

Manthe, M F and Smallwood, J J (2008) An overview of the appropriateness of tertiary built environment education in South Africa. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364

McCabe, S and Boyd, D (2004) Quality management 25 years on: What can we learn about initiatives in construction? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

McCabe, S; Crook, D; Rooke, J and Seymour, D (1997) Construction's experiences of attempting to become world class: The role of academics in assisting practitioners. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McCabe, S and Robertson, H (2000) Striving to be the best: A case study of construction benchmarking world class organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

McCabe, S; Rooke, J; Seymour, D and Brown, P (1998) Quality managers, authority and leadership. Construction Management and Economics, 16(4), pp. 447-457. ISSN 01446193

McElroy, L B (2009) Embedding integrated building performance assessment in design practice. PhD thesis, University of Strathclyde, UK.

Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655

Mills, G R W; Phiri, M; Erskine, J and Price, A D F (2015) Rethinking healthcare building design quality: An evidence-based strategy. Building Research & Information, 43(4), pp. 499-515. ISSN 0961-3218

Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X

Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364

Mlecnik, E (2013) Improving passive house certification: Recommendations based on end-user experiences. Architectural Engineering and Design Management, 9(4), pp. 250-264. ISSN 1745-2007

Mlecnik, E (2013) Innovation development for highly energy-efficient housing: Opportunities and challenges related to the adoption of passive houses. PhD thesis, Delft University of Technology, Netherlands.

Moatazed-Keivani, R; Ghanbari-Parsa, A R and Kagaya, S (1999) ISO 9000 standards: Perceptions and experiences in the UK construction industry. Construction Management and Economics, 17(1), pp. 107-119. ISSN 01446193

Mock, B and O'Connor, J (2022) Taxonomic categories for commissioning and startup hot spot strategies. Construction Innovation, 22(1), pp. 120-140. ISSN 1471-4175

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.

Mohamed, M and Tran, D Q (2021) Risk-based inspection model for hot mix asphalt pavement construction projects. Journal of Construction Engineering and Management, 147(6): 78622053, ISSN 0733-9364

Morrissey, D; Goodier, C and Demian, P (2024) Offsite construction in ireland’s hospitals: Unveiling the complexities of OSC adoption. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Myers, H; Wade, F and Webb, J (2019) Mapping emerging subcontracting networks for the energy efficiency retrofit of hard-to-treat buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

Oechler, E; Molenaar, K R; Hallowell, M and Scott, S (2018) State-of-practice for risk-based quality assurance in state departments of transportation. Engineering, Construction and Architectural Management, 25(7), pp. 958-970. ISSN 0969-9988

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.

Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988

Omollo, W O (2019) Barriers to the effective regulation of the building construction industry: An empirical analysis. Journal of Construction Business and Management, 3(2), pp. 49-58. ISSN 2521-0165

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Pan, W; Chen, L and Zhan, W (2021) Positioning construction workers' vocational training of guangdong in the global political-economic spectrum of skill formation. Engineering, Construction and Architectural Management, 28(9), pp. 2489-2515. ISSN 0969-9988

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Peacock, W S (1990) Site investigation procedures and risk analysis. PhD thesis, University of Manchester, UK.

Pheng, L S (1993) The rationalization of quality in the construction industry: Some empirical findings. Construction Management and Economics, 11(4), pp. 247-259. ISSN 01446193

Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and ohsas 18001 for construction. Journal of Construction Engineering and Management, 129(3), pp. 338-347. ISSN 0733-9364

Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988

Poirier, E; Staub-French, S; Pilon, A; Fallahi, A; Teshnizi, Z; Tannert, T and Froese, T (2022) Design process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 23-40. ISSN 1471-4175

Praticò, F G (2013) New road surfaces: Logical bases for simple quality-related pay adjustments. Journal of Construction Engineering and Management, 139(11): 4013020, ISSN 0733-9364

Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364

Raidén, A B and Räisänen, C (2018) Conceptualising behavioural ambidexterity and the effects on individual well-being. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007

Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.

Ribeiro, F L (2000) The applicability of the quality assurance requirements of the ISO 9000 conformance standards in construction. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364

Rivera, A O (2017) Shifting from management to leadership: A procurement model adaptation to project management. PhD thesis, Arizona State University, USA.

Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: The crucial balance. Construction Management and Economics, 27(2), pp. 107-117. ISSN 1466433X

Salah Eldeen Ismaeel Elsayed Ahmed, Walaa (2014) Developing a systemic framework for applying LEED system: Managing energy and materials credits. PhD thesis, Politecnico di Milano, Italy.

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Samasoni, J C (2017) Evaluating the feasibility of implementing a risk-based inspection scheme by building consent authorities in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Sawan, R; Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(8), pp. 974-988. ISSN 0969-9988

Schmidt, J Q (2024) Overcoming barriers to adoption of smart stormwater technologies. PhD thesis, University of Michigan, USA.

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. PhD thesis, University of Wisconsin - Madison, USA.

Senaratne, S and Pasqual, Y S (2011) Learning, teaching and research for construction undergraduate programmes: An exploratory case study in Sri Lanka. International Journal of Construction Management, 11(3), pp. 35-48. ISSN 1562-3599

Seymour, D and Low, S P (1990) The quality debate. Construction Management and Economics, 8(1), pp. 13-29. ISSN 01446193

Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.

Sharma, N and Laishram, B (2025) Understanding the relevance and impact of the cost of quality in the construction industry: A systematic literature review using prisma. Construction Innovation, 25(6), pp. 1707-1726. ISSN 1471-4175

Shooshtarian, S; Maqsood, T; Wong, P S P; Caldera, S; Ryley, T; Zaman, A and Cáceres Ruiz, A M (2024) Circular economy in action: The application of products with recycled content in construction projects: a multiple case study approach. Smart and Sustainable Built Environment, 13(2), pp. 370-394. ISSN 2046-6099

Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

So, C (2017) Intuitive design: Framing a software test system as a status reporting tool for business. Journal of Engineering, Design and Technology, 15(2), pp. 149-165.

Staab, G E (1989) Construction of port and facilities on horn of Africa: lessons learned. Journal of Construction Engineering and Management, 115(1), pp. 53-69. ISSN 0733-9364

Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Sturk, R (1998) Engineering geological information: Its value and impact on tunnelling. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531

Taneja, S; Akinci, B; Garrett, J H; Soibelman, L; Ergen, E; Pradhan, A; Tang, P; Berges, M; Atasoy, G; Liu, X; Shahandashti, S M and Anil, E B (2011) Sensing and field data capture for construction and facility operations. Journal of Construction Engineering and Management, 137, pp. 870-881. ISSN 0733-9364

Tatum, C B (1983) Innovations in nuclear concrete construction. Journal of Construction Engineering and Management, 109(2), pp. 131-145. ISSN 0733-9364

Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364

Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.

Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction. PhD thesis, University of Florida, USA.

Vyčítal, M (2019) On BIM based automatized nD modelling for construction management. PhD thesis, Czech Technical University, Czech Republic.

Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.

White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(4), pp. 632-643. ISSN 1562-3599

Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2025) Integrating quality into the reverse logistics in construction: An empirical study in South Australia. Built Environment Project and Asset Management, 15(3), pp. 483-499. ISSN 2044-124X

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2025) Information processing model for quality assurance in reverse logistics supply chains of demolition waste. Engineering, Construction and Architectural Management, 32(13), pp. 193-212. ISSN 0969-9988

Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.

Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193

Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.

Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364

Zaray, A H; Hasan, A; Johari, S; Hashmat, P A and Jha, K N (2023) Client and contractor perspectives on attributes affecting construction quality in a war-affected region. Engineering, Construction and Architectural Management, 30(10), pp. 4762-4781. ISSN 0969-9988

Zhao, Y (2023) Sustainability, acceptance risk analysis and machine learning in assessing mechanical properties and the impact of highway materials in transportation infrastructure. PhD thesis, University of Maryland, College Park, USA.

Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364

This list was generated on Sat Aug 22 01:37:18 2026 UTC.