Items with Index Term: qualitative factor

Number of items: 24.

Abdul Majid, M Z (1997) Non-excusable delays in construction. PhD thesis, Loughborough University, UK.

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Alaka, H A; Oyedele, L O; Owolabi, H A; Oyedele, A A; Akinade, O O; Bilal, M and Ajayi, S O (2017) Critical factors for insolvency prediction: Towards a theoretical model for the construction industry. International Journal of Construction Management, 17(1), pp. 25-49. ISSN 1562-3599

Christodoulou, S E (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neural networks. PhD thesis, Columbia University, USA.

Chung, S (2024) Potential issue identification for country risks in international construction projects from news articles. PhD thesis, Seoul National University, Republic of Korea.

Croffi, J; Kroll, D; Soebarto, V; Barrie, H and McDougall, K (2023) Wellbeing fostered by design: A framework for evaluating indoor environment performance. Buildings & Cities, 4(1), pp. 507-523. ISSN 2632-6655

El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364

El-Kholy, A M (2022) A new technique for subcontractor selection by adopting choosing by advantages. International Journal of Construction Management, 22(7), pp. 1171-1193. ISSN 1562-3599

Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364

Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(4), pp. 228-236. ISSN 0961-3218

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364

Kumar, V S S; Hanna, A S and Adams, T (2000) Assessment of working capital requirements by fuzzy set theory. Engineering, Construction and Architectural Management, 7(1), pp. 93-103. ISSN 0969-9988

Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193

Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988

Martinez, L H (2001) A neuro-fuzzy decision support system for risk analysis of revenue-dependent infrastructure projects. PhD thesis, Purdue University, USA.

McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218

McIntyre, C (1996) A decision support system for the residential land development site selection process. PhD thesis, Pennsylvania State University, USA.

Mohamed, E; Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(6), pp. 2328-2357. ISSN 0969-9988

Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387

Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193

This list was generated on Sat Aug 22 01:37:14 2026 UTC.