Items with Index Term: pull production
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.
Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X
Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.
Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364
Up a level