Items with Index Term: public construction
Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.
Abduh, M; Sukardi, S N; Wirahadikusumah, R D; Oktaviani, C Z and Bahagia, S N (2023) Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), pp. 2171-2184. ISSN 1562-3599
Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.
Adam, A; Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(3), pp. 393-406. ISSN 0969-9988
Adam, A and Lindahl, G (2017) Applying the dynamic capabilities framework in the case of a large public construction client. Construction Management and Economics, 35(7), pp. 420-431. ISSN 01446193
Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.
Ahmad, H S; Ayoush, M D and Al-Alwan, M S (2020) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(1), pp. 153-179. ISSN 2044-124X
Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.
Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.
Al-Atawi, S (2005) An ICT framework to improve the tendering process in the governmental construction sector in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007
Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), pp. 3-23. ISSN 1466433X
Al-Otaibi, M (2011) Evaluation of contractor performance for pre-selection in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.
Al-Otaibi, S (2010) A framework for improving the performance of standard design models in the Saudi Ministry of Interior projects. PhD thesis, Loughborough University, UK.
AlMunifi, A A and Almutairi, S (2021) Lessons learned framework for efficient delivery of construction projects in Saudi Arabia. Construction Economics and Building, 21(4), pp. 115-141. ISSN 2204-9029
Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively. PhD thesis, University of Strathclyde, UK.
Alhammadi, Y (2017) Developing and evaluation the implementation of construction management research in the Saudi construction industry. PhD thesis, Arizona State University, USA.
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.
Alkatheeri, A (2018) An investigative study on the relationship between organizational factors and knowledge management effectiveness in UAE public organizations: the case study of Abu Dhabi. PhD thesis, University of Wolverhampton, UK.
Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction. PhD thesis, Heriot-Watt University, UK.
Alkhateeb, A M; Hyari, K H and Hiyassat, M A (2021) Analyzing bidding competitiveness and success rate of contractors competing for public construction projects. Construction Innovation, 21(4), pp. 576-591. ISSN 1471-4175
Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364
Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599
Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.
Ameyaw, C; Mensah, S; Abaitey, B A and Asamoah-Duodu, A (2026) Adequacy of defects liability periods for public construction projects in Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 55-69. ISSN 2398-4708
Assaf, S; Al Musallami, A I and Al Sughaiyer, M (1996) Value engineering in public construction projects in Saudi Arabia. Building Research & Information, 24(3), pp. 152-159. ISSN 0961-3218
Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.
Badger, W W and Mulligan, D E (1995) Rationale and benefits associated with international alliances. Journal of Construction Engineering and Management, 121(1), pp. 100-111. ISSN 0733-9364
Badger, W W and Mulligan, D E (1995) An implementation model of an alliance. Journal of Construction Procurement, 1(1), pp. 21-37. ISSN 1358-9180
Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556. ISSN 1726-0531
Balgheeth, Y (2016) Enhancing existing health and safety processes in public sector construction projects within Saudi Arabia using building information modelling approaches. PhD thesis, University of Salford, UK.
Barajei, C; Appiah-Kubi, E; Kheni, N A; Yalley, P P K and Iddrisu, W (2024) Success factors of pre-construction stages of Ghanaian public road construction project life cycle. International Journal of Construction Management, 24(13), pp. 1444-1453. ISSN 1562-3599
Barajei, C; Kusi, E; Ackon, F; Osman, A M; Mohammed, A M Z; Simpeh, F and Gyimah, F (2024) Success factors of the consultant selection stage of the Ghanaian public construction projects: The road sector’s perspective. Construction Economics and Building, 24(1-2), pp. 144-162. ISSN 2204-9029
Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.
Beltrão, L M P and Carvalho, M T M (2019) Prioritizing construction risks using fuzzy AHP in Brazilian public enterprises. Journal of Construction Engineering and Management, 145(2): 05018018, ISSN 0733-9364
Betts, M (1987) British public expenditure on construction less than claimed? Construction Management and Economics, 5(1), pp. 13-20. ISSN 01446193
Betts, M F (1985) The employment implications of public construction investment. PhD thesis, University of Reading, UK.
Bhagat, G and Jha, K N (2023) Stage-wise evaluation of integrity risks in public works procurement in India. International Journal of Construction Management, 23(16), pp. 2818-2829. ISSN 1562-3599
Boadu, E F; Sunindijo, R Y; Wang, C C and Frimpong, S Y (2022) Health and safety integration into the procurement stages of public construction projects in developing countries: A case of Ghana. Construction Economics and Building, 22(3), pp. 43-64. ISSN 2204-9029
Boadu, Elijah Frimpong (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana. PhD thesis, University of New South Wales, Australia.
Bolier, I (2025) From tinkering to transitioning: Cultivating innovation within public agencies operating in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Brandão, R; Hosseini, M R; Macêdo, A N; Melo, A C and Martek, I (2022) Public administration strategies that stimulate reverse logistics within the construction industry: A conceptual typology. Engineering, Construction and Architectural Management, 29(8), pp. 2924-2949. ISSN 0969-9988
Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait. PhD thesis, Ohio State University, USA.
Bygballe, L E; Endresen, M and Fålun, S (2018) The role of formal and informal mechanisms in implementing lean principles in construction projects. Engineering, Construction and Architectural Management, 25(10), pp. 1322-1338. ISSN 0969-9988
Chang, Y P (2020) Construction worker safety and accident prevention in Taiwan. PhD thesis, University of Bristol, UK.
Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(2), pp. 175-182. ISSN 01446193
Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.
Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193
Ebekozien, A; Aigbavboa, C; Nwaole, A N C; Dako, E O and Awo-Osagie, A I (2023) Quantity surveyor's ethical responsiveness on construction projects: Issues and solutions. International Journal of Building Pathology and Adaptation, 41(5), pp. 1049-1066. ISSN 23984708
Eikelenboom, M; van Uden, M; Coenen, T B J and Vosman, L (2025) Strategic programmes for circular construction: Lessons from three public clients. Construction Management and Economics, 43(11), pp. 901-921. ISSN 0144-6193
Eisma, P and Volker, L (2014) Exploring the field of public construction clients by a graphical network analysis. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.
Ellis, L; Martin, H and Ramcharitar, S (2019) Factors influencing triple constraints in public sector projects in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 157-169. ISSN 17514304
Fan, C L (2020) Defect risk assessment using a hybrid machine learning method. Journal of Construction Engineering and Management, 146(9): 04020102, ISSN 0733-9364
Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.
Fehan, H and Aigbogun, O (2021) Influence of internal organizational factors and institutional pressures on construction firms' performance. Construction Economics and Building, 21(2), pp. 81-99. ISSN 2204-9029
Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988
Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Gluch, P and Svensson, I (2016) The organizational nexus of changing management practices for sustainable renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Gluch, P and Svensson, I (2018) On the nexus of changing public facilities management practices: Purposive and co-creative actions across multiple levels. Construction Management and Economics, 36(5), pp. 259-275. ISSN 01446193
Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364
Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.
Gurevich, U; Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(6), pp. 610-630. ISSN 0961-3218
Harvey, J (1979) Competitive bidding on Canadian public construction contracts: Stochastic analysis for optimization. PhD thesis, University of Western Ontario, Canada.
Hermans, M; van Zoest, S and Volker, L (2016) Assessing the maturity of public construction client organisations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Houlihan, T J (1994) The New York City building trades, 1890-1910. PhD thesis, State University of New York at Binghamton, USA.
Huang, Y L (2009) Prediction of contractor default probability using structural models of credit risk: An empirical investigation. Construction Management and Economics, 27(6), pp. 581-596. ISSN 1466433X
Hussain, S; Fangwei, Z and Ali, Z (2019) Examining influence of construction projects' quality factors on client satisfaction using partial least squares structural equation modeling. Journal of Construction Engineering and Management, 145(5): 05019006, ISSN 0733-9364
Hyari, K H and Thneibat, M (2026) Assessing the adequacy of competition in public construction projects. Construction Innovation, 26(2), pp. 421-439. ISSN 1471-4175
Jones, D W and Harris, F C (1982) Company acquisitions and business performance in the construction industry. Construction Papers, 1(3), pp. 5-19. ISSN 0144-8587
Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531
Kakoto, T; Skibnlewski, M J and Hancher, D E (1989) Comparison of U.S. And Japanese practices in public construction. Journal of Construction Engineering and Management, 115(4), pp. 499-516. ISSN 0733-9364
Ke, Y; Ling, F Y Y; Ning, Y and Zhang, Z (2019) Managing relationships in large public projects: Comparative study of China and Singapore. Built Environment Project and Asset Management, 9(3), pp. 348-363. ISSN 2044-124X
Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.
Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(4), pp. 315-321. ISSN 01446193
Kugonza, S (2010) Influence of formal and informal institutions on outsourcing of public construction projects in Uganda. PhD thesis, University of Birmingham, UK.
Kuitert, L; Volker, L and Hermans, M (2018) The impact of shifting values on the role and responsibilities of the construction client in delivering public goods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kuitert, L; Volker, L and Hermans, M H (2019) Taking on a wider view: Public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(5), pp. 257-277. ISSN 01446193
Kuitert, L; Volker, L and Hermans, M H (2020) The public construction client of the future: Network-based collaborator in a traditional public administrative system. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kuitert, Lizet (2021) The balancing act: How public construction clients safeguard public values in a changing construction industry. PhD thesis, Delft University of Technology, Netherlands.
Kussl, S and Wald, A (2025) The role of construction clients in digital innovation: Insights from scenario analysis. Construction Management and Economics, 43(5), pp. 381-404. ISSN 0144-6193
Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.
Le, Y; Shan, M; Chan, A P C and Hu, Y (2014) Investigating the causal relationships between causes of and vulnerabilities to corruption in the Chinese public construction sector. Journal of Construction Engineering and Management, 140(9): 05014007, ISSN 0733-9364
Lebunu Hewage, U W A; Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 296-311. ISSN 2044-124X
Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499
Lindblad, H and Karrbom Gustavsson, T (2017) Receptiveness for change: The case of a public client. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Ling, F Y Y; Ke, Y; Kumaraswamy, M M and Wang, S (2014) Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1): 04013034, ISSN 0733-9364
Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X
Ludvig, K and Stenberg, A (2012) The actors and their roles in the meaning making process of an energy target. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Luong Hai, N and Tuan, N A (2023) Modeling of planning function management in Vietnam's public construction works. Built Environment Project and Asset Management, 13(2), pp. 201-216. ISSN 2044-124X
McArdle, G and Gunning, J G (2018) Enhancing value for money in public procurement of Northern Ireland construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 207-219. ISSN 17514304
Meifrinaldi, S R C P (2024) Stakeholder readiness for integrated project delivery in public sector construction: The role of maturity models. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Messah, Y; Wirahadikusumah, R and Abduh, M (2023) Structural equation model (SEM) of the factors affecting sustainable procurement for construction work. International Journal of Construction Management, 23(13), pp. 2221-2229. ISSN 1562-3599
Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs. PhD thesis, Massachusetts Institute of Technology, USA.
Mok, K Y; Shen, G Q and Yang, R J (2017) A network theory-based analysis of stakeholder issues and their interrelationships in large construction projects: A case study. International Journal of Construction Management, 17(3), pp. 210-227. ISSN 1562-3599
Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.
Murguia, D; Vasquez, C; Demian, P and Soetanto, R (2023) BIM adoption among contractors: A longitudinal study in Peru. Journal of Construction Engineering and Management, 149(1): 04022140, ISSN 0733-9364
Nam, C H and Tatum, C B (1992) Government-industry cooperation: Fast-track concrete innovation. Journal of Construction Engineering and Management, 118(3), pp. 454-471. ISSN 0733-9364
Ning, Y (2013) Boosting public construction project outcomes through relational transactions in Singapore. PhD thesis, National University of Singapore, Singapore.
Ning, Y and Ling, F Y Y (2013) Reducing hindrances to adoption of relational behaviors in public construction projects. Journal of Construction Engineering and Management, 139(11): 4013017, ISSN 0733-9364
Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.
Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.
Oke, A E; Kineber, A F; Akindele, O and Ekundayo, D (2024) Determining the stationary barriers to the implementation of radio frequency identification (RFID) technology in an emerging construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1894-1912. ISSN 1726-0531
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Onsarigo, L; Duncan, K and Atalah, A (2020) The effect of prevailing wages on building costs, bid competition, and bidder behaviour: Evidence from Ohio school construction. Construction Management and Economics, 38(10), pp. 917-933. ISSN 01446193
Opoku, A and Ibrahim-Adam, R (2018) Early contractor involvement in government construction projects in Ghana. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Osei-Kyei, R. and Chan, A. P. C. (2017) Implementing public–private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599
Osei-Kyei, R and Chan, A P C (2017) Implementing public-private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599
Oyemomi, B; Hare, B and Tong, M (2018) Exploring public-private partnership challenges and the effects on the construction workforce: A Scotland study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Park, J (2011) Best-value in Korean public building construction. PhD thesis, University of Southampton, UK.
Petersen, D and Kadefors, A (2016) Social procurement and employment requirements in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Price, M (2005) State prevailing wage laws and construction labor markets. PhD thesis, University of Utah, USA.
Robin, R O A (2023) Building information modelling (BIM) performance evaluation model in the Malaysian construction industry. PhD thesis, Universiti Tun Hussein Onn, Malaysia.
Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364
Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193
Saad, A M; Dulaimi, M; Arogundade, S; Zulu, S L and Gorse, C (2024) Modern methods of construction (MMC) and innovation negativism in the UK public sector. Built Environment Project and Asset Management, 14(2), pp. 147-163. ISSN 2044-124X
Saad, A M; Dulaimi, M; Zulu, S L and Gorse, C (2025) Are the characteristics of public clients influencing their uptake of the modern methods of construction? A thematic analysis. Smart and Sustainable Built Environment, 14(1), pp. 190-209. ISSN 2046-6099
Sabow, H (2011) The impact of organisational culture on the dimensions of pay satisfaction in private and public construction firms in Libya. PhD thesis, University of Salford, UK.
Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387
Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X
Sidney, E E (2019) Evaluating the adoption of project management tools and techniques in private construction companies in Nigeria. PhD thesis, University of Bedfordshire, UK.
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Sinesilassie, E G; Tabish, S Z S and Jha, K N (2017) Critical factors affecting schedule performance: A case of Ethiopian public construction projects: Engineers' perspective. Engineering, Construction and Architectural Management, 24(5), pp. 757-773. ISSN 0969-9988
Sinesilassie, E G; Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108-119. ISSN 1562-3599
Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988
Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988
Soltanifar, M (2020) A framework to improve the performance of public tender evaluation procedures in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Ssegawa-Kaggwa, J; Ngowi, A B and Ntshwene, K (2013) Using a situation analysis to identify the construction industry deficiencies in Botswana. Journal of Construction in Developing Countries, 18(1), pp. 1-18. ISSN 1823-6499
Sunday, O A (2010) Impact of variation orders on public construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Tabish, S Z S and Jha, K N (2018) Beyond the iron triangle in public construction projects. Journal of Construction Engineering and Management, 144(8): 04018067, ISSN 0733-9364
Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364
Tembo, M; Kahanji, C and Mwanaumo, E M (2025) Socio-Political and Macro-Economic Impact of Tender Price Inflation in Zambian Public Construction Projects. Journal of Construction Business and Management, 7(2), pp. 67-97.
Tembo, M; Mwanaumo, E M u and Kahanji, C (2023) An investigation into construction tender-price inflation. Journal of Construction Business and Management, 6(1), pp. 17-32. ISSN 2521-0165
Torkanfar, N; Azar, E R and McCabe, B (2023) Bidchain: A blockchain-based decentralized application for transparent and secure competitive tendering in public construction projects. Journal of Construction Engineering and Management, 149(7): 04023050, ISSN 0733-9364
Troje, D and Sloot, R (2023) Technology adoption in public client organisations: Institutional perspectives from Sweden and the Netherlands. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Wang, C H; Tsai, C H and Cheng, Y Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(2), pp. 129-142. ISSN 1466433X
Wang, W C (2002) Sim-utility: Model for project ceiling price determination. Journal of Construction Engineering and Management, 128(1), pp. 76-84. ISSN 0733-9364
Weisheng, L; Liu, A M M; Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(6), pp. 543-562. ISSN 0969-9988
Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.
Wubet, W A; Burrow, M and Ghataora, G (2023) Risks affecting the performance of Ethiopian domestic road construction contractors. International Journal of Construction Management, 23(4), pp. 639-647. ISSN 1562-3599
Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988
Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988
Zhan, W; Pan, W and Hao, G (2022) Productivity measurement and improvement for public construction projects. Journal of Construction Engineering and Management, 148(6): 04022035, ISSN 0733-9364
ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387
Up a level