Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599
Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Banihashemi, S A and Khalilzadeh, M (2021) Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, 28(7), pp. 1979-2004. ISSN 0969-9988
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.
Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988
Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193
Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364
Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364
Chand, Shelvin (2018) Automated design of heuristics for the resource constrained project scheduling problem. PhD thesis, University of New South Wales, Australia.
Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364
Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364
El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.
Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.
Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X
Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364
Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364
Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364
Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193
Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghasemi, M; Chakrabortty, R K; Shahabi-Shahmiri, R and Mirnezami, S A (2024) A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem. International Journal of Construction Management, 24(10), pp. 1090-1106. ISSN 1562-3599
Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.
Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.
Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: A case study in construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 321-363. ISSN 0969-9988
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kammouh, O; Nogal, M; Binnekamp, R and Wolfert, A R M (2021) Mitigation controller: Adaptive simulation approach for planning control measures in large construction projects. Journal of Construction Engineering and Management, 147(8): 04021093, ISSN 0733-9364
Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988
Kannimuthu, M; Raphael, B; Palaneeswaran, E and Kuppuswamy, A (2019) Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Built Environment Project and Asset Management, 9(1), pp. 44-63. ISSN 2044-124X
Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193
Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.
Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988
Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.
Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X
Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364
Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364
Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.
Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364
Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X
Kong, F and Dou, D (2020) RCPSP with combined precedence relations and resource calendars. Journal of Construction Engineering and Management, 146(12): 04020133, ISSN 0733-9364
Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364
Kong, F; Guo, J and Lv, X (2021) Project resource input optimization problem with combined time constraints based on node network diagram and constraint programming. Journal of Construction Engineering and Management, 147(12): 2192, ISSN 0733-9364
Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364
Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364
Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364
Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Li, Q; Sun, Q; Tao, S and Gao, X (2020) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(8), pp. 2023-2045. ISSN 0969-9988
Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364
Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364
Liu, D; Hu, C; Guo, S and Yu, J (2022) Z -number-based quantitative expression of activity information in uncertain project scheduling. Journal of Construction Engineering and Management, 148(9): 04022098, ISSN 0733-9364
Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364
Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364
Ma, H; Zhang, H and Chang, P (2020) 4D-based workspace conflict detection in prefabricated building constructions. Journal of Construction Engineering and Management, 146(9): 04020112, ISSN 0733-9364
Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
Mirzaei, A; Nasirzadeh, F; Parchami Jalal, M and Zamani, Y (2018) 4D-BIM dynamic time-space conflict detection and quantification system for building construction projects. Journal of Construction Engineering and Management, 144(7): 04018056, ISSN 0733-9364
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364
Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Parsi, M; Baradaran, V and Hosseinian, A H (2025) Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: Multiagent optimization methodology. Engineering, Construction and Architectural Management, 32(4), pp. 2614-2645. ISSN 0969-9988
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364
Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Pinto Langoni, C R (1987) A decomposition approach for the project scheduling problem (network analysis). PhD thesis, Texas A&M University, USA.
Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364
Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099
Ramanayaka, C D E; Olatunji, O A and Rotimi, J O (2023) Critical success factors of strategy-led planning of high-profile projects. International Journal of Construction Management, 23(1), pp. 75-88. ISSN 1562-3599
Rezakhani, P (2022) Project scheduling and performance prediction: A fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(6), pp. 2233-2244. ISSN 0969-9988
Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Roghanian, E; Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), pp. 1-13. ISSN 1562-3599
Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: Some false benefits and inherent drawbacks. Construction Management and Economics, 9(5), pp. 481-490. ISSN 01446193
Russell, A D (1993) Computerized daily site reporting. Journal of Construction Engineering and Management, 119(2), pp. 385-402. ISSN 0733-9364
Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364
Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.
Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364
Shikhrobat, M B; Kabiri, S and Flanagan, R (2019) Project planning and scheduling using system dynamics for dealing with complexity on construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shu-Shun, L and Shih, K C (2009) A framework of critical resource chain for project schedule analysis. Construction Management and Economics, 27(9), pp. 857-869. ISSN 1466433X
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Su, C T; Santoro, M C and Mendes, A B (2018) Constructive heuristics for project scheduling resource availability cost problem with tardiness. Journal of Construction Engineering and Management, 144(8): 04018074, ISSN 0733-9364
Su, Z X; Wei, H Y; Zou, X and Qi, J X (2019) Zero-one formulation for a partial resource-constrained project scheduling problem with generalized precedence relations. Journal of Construction Engineering and Management, 145(3): 04018142, ISSN 0733-9364
Tayebi, A; Abbasianjahromi, H and Aghakarimi, M (2025) Using a hybrid method to assess the consequence of hazards on the project success factors. Engineering, Construction and Architectural Management, 32(12), pp. 8273-8303. ISSN 0969-9988
Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364
Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364
Vaziri, K; Carr, P G and Nozick, L K (2007) Project planning for construction under uncertainty with limited resources. Journal of Construction Engineering and Management, 133(4), pp. 268-276. ISSN 0733-9364
Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.
Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhang, H; Li, L; Demeulemeester, E; Bai, S and Zhang, J (2025) Heuristic methods for dynamic multiproject scheduling problems with stochastic transfer times. Journal of Construction Engineering and Management, 151(2): 04024207, ISSN 0733-9364
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.
Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771
Zohrehvandi, S; Vanhoucke, M; Khalilzadeh, M; Amiri, M and Shadrokh, S (2023) A fuzzy project buffer management algorithm: A case study in the construction of a renewable project. International Journal of Construction Management, 23(12), pp. 2134-2143. ISSN 1562-3599
Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599
Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599
Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364