Items with Index Term: project risk analysis
Carmichael, D G and Balatbat, M C A (2010) A contractor's analysis of the likelihood of payment of claims. Journal of Financial Management of Property and Construction, 15(2), pp. 102-117. ISSN 1366-4387
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.
Firouzi, A and Khayyati, M (2020) Bayesian updating of Copula-based probabilistic project-duration model. Journal of Construction Engineering and Management, 146(5): 04020046, ISSN 0733-9364
Gashaw, T and Jilcha, K (2023) Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), pp. 2488-2498. ISSN 1562-3599
Govan, P B (2014) Causal network methods for integrated project portfolio risk analysis. PhD thesis, Texas A&M University, USA.
Guan, Li (2022) An integrated decision support system for project risk assessment and treatment decision making considering risk interdependencies. PhD thesis, University of New South Wales, Australia.
Kristinsdottir, A (2012) Risks and decision making in development of new power plant projects. PhD thesis, Massachusetts Institute of Technology, USA.
Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Payne, B (1998) Project risk analysis. PhD thesis, Nottingham Trent University, UK.
Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(2), pp. 107-119. ISSN 0969-9988
Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364
Up a level