Items with Index Term: project procurement

Number of items: 107.

Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X

Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.

Akintoye, A and Fitzgerald, E (1995) Design and build: A survey of architects' views. Engineering, Construction and Architectural Management, 2(1), pp. 27-44. ISSN 0969-9988

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.

Alcaraz Carrillo de Albornoz, V; Ke, Y and Molina Millán, J (2024) Public-private partnerships: Pro-cyclical or counter-cyclical? An empirical study. International Journal of Construction Management, 24(1), pp. 97-107. ISSN 1562-3599

Alhazmi, T and McCaffer, R (2000) Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184. ISSN 0733-9364

Alhusban, M; Elghaish, F; Hosseini, M R and Mayouf, M (2025) Revamping established project procurement approaches to support BIM implementation. Smart and Sustainable Built Environment, 14(3), pp. 672-695. ISSN 2046-6099

Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Awuzie, B; McDermott, P and Farag, F (2018) Achieving social value through construction frameworks: the effect of client attributes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 25-31. ISSN 17514304

Ball, D and Fortune, C (2000) Building project procurement processes and the development of environmentally friendly housing schemes. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364

Boadu, E F; Sunindijo, R Y; Wang, C C and Frimpong, S (2023) Factors constraining the promotion of health and safety in public works procurement in developing countries. International Journal of Construction Management, 23(9), pp. 1611-1621. ISSN 1562-3599

Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.

Bullen, P A and Davis, P R (2003) Explorations in sustainable construction and procurement in western Australia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Büsch, M P (2013) The role of procurement professionals in industrial projects: organisation, roles, and tasks for professional project procurement. PhD thesis, University of Gloucestershire, UK.

Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180

Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33(6), pp. 523-535. ISSN 0961-3218

Connaughton, J N and Collinge, W H (2021) Trialling a new approach to interdisciplinary collaboration in UK construction: A projects-as-practice analysis. Construction Management and Economics, 39(7), pp. 595-616. ISSN 01446193

Dada, M O (2012) Predictors of procurement selection: An investigation of traditional and integrated methods in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 71-85. ISSN 1823-6499

Davies, P J (2015) Assessing initial embodied energy in UK non-domestic construction projects. EngD thesis, Loughborough University, UK.

Davies, P J; Emmitt, S and Firth, S K (2013) On-site energy management challenges and opportunities: A contractor's perspective. Building Research & Information, 41(4), pp. 450-468. ISSN 0961-3218

De Blois, M; Herazo-Cueto, B; Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: Structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(1), pp. 3-22. ISSN 1745-2007

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599

Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029

Dowd, V G (1996) The effect of economic cycles on the development and use of alternative procurement systems in the UK construction industry during the period 1965-1995. Journal of Construction Procurement, 2(1), pp. 11-29. ISSN 1358-9180

Du, H; Han, Q; Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: Agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(4), pp. 1697-1725. ISSN 0969-9988

Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175

Ershadi, M.; Jefferies, M.; Davis, P. and Mojtahedi, M. (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(1), pp. 45-64. ISSN 2204-9029

Fang, Z (2002) Behavioral analysis of project team performance in China. PhD thesis, University of Hong Kong, Hong Kong.

Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.

Fernando, P G; Kulatunga, U; Thayaparan, M and Hadiwattege, C (2025) Reforming legal and regulatory structure of public–private partnerships in Sri Lanka. Built Environment Project and Asset Management, 15(2), pp. 211-227. ISSN 2044-124X

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Halder, A and Batra, S (2024) Navigating the ethical discourse in construction: A state-of-the-art review of relevant literature. Journal of Construction Engineering and Management, 150(3): 03124001, ISSN 0733-9364

Harris Sr., C E (2023) Public private partnerships in infrastructure: A study on performance and equity improvement. DBA thesis, National University, USA.

Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: A grounded theory study. International Journal of Construction Education and Research, 18(3), pp. 270-292. ISSN 1557-8771

Ho, S P (2006) Model for financial renegotiation in public-private partnership projects and its policy implications: Game theoretic view. Journal of Construction Engineering and Management, 132(7), pp. 678-688. ISSN 0733-9364

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.

Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X

Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Larsson, J; Eriksson, P E; Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1-2), pp. 83-96. ISSN 01446193

Li, B; Akintoye, A; Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387

Li, H; Su, L; Zuo, J; An, X; Dong, G; Wang, L and Zhang, C (2023) The framework of data-driven and multi-criteria decision-making for detecting unbalanced bidding. Engineering, Construction and Architectural Management, 30(2), pp. 598-622. ISSN 0969-9988

Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, A M M and Fellows, R (2001) An eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(1), pp. 1-19. ISSN 0969-9988

Lopez, R; Mascione, D and Liu, H J (2017) Management of issues in the delivery of airport infrastructure within Western Australia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 207-217. ISSN 17514304

Lord, W; Liu, A; Tuuli, M M and Zhang, S (2010) A modern contract: Developments in the UK and China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 151-159. ISSN 17514312

Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364

Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations. PhD thesis, Pennsylvania State University, USA.

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.

Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364

Mosley, J C and Bubshait, A A (2021) Investigative study of project procurement methods and project performance indicators in Saudi Arabia. International Journal of Construction Management, 21(8), pp. 845-857. ISSN 1562-3599

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Murphy, M; Heaney, G and Perera, S (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Construction Innovation, 11(4), pp. 416-440. ISSN 1471-4175

Naoum, S G and Langford, D (1987) Management contracting: the client's view. Journal of Construction Engineering and Management, 113(3), pp. 369-384. ISSN 0733-9364

Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Fragmentation of capital development projects: A tool for job creation and skill development. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ojo, L. D.; Chan, A. P. C.; Sing, M. C. P. and Kazeem, K. O. (2026) Impact of integrity-based approach to ethics management on project performance. Journal of Engineering, Design and Technology, ISSN 1726-0531

Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387

Oladiran, O J; Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), pp. 17-27. ISSN 2521-0165

Osaily, Y; Copping, A and Lo, S (2018) Critical success factors: The development of a conceptual framework for demolition projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988

Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387

Pu, W; Xu, F; Chen, R and Marques, R C (2020) PPP project procurement model selection in China: Does it matter? Construction Management and Economics, 38(2), pp. 126-139. ISSN 01446193

Regan, M; Smith, J and Love, P (2014) Government institutions and infrastructure skills development. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Salama, M; Aziz, H A E; Sawah, H E and Samadony, A E (2006) Investigating the criteria for contractors' selection and bid evaluation in Egypt. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Sha, K (2011) Vertical governance of construction projects: An information cost perspective. Construction Management and Economics, 29(11), pp. 1137-1147. ISSN 1466433X

Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364

Shukor, A S A; Mohammad, M F; Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029

Smith, P (2001) Information technology and the QS practice. Construction Economics and Building, 1(1), pp. 1-21. ISSN 2204-9029

Songer, A D and Molenaar, K R (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), pp. 34-40. ISSN 0733-9364

Strahorn, S; Gajendran, T and Brewer, G (2015) The influence of trust in traditional contracting: Investigating the "lived experience" of stakeholders. Construction Economics and Building, 15(2), pp. 81-101. ISSN 2204-9029

Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.

Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.

Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(4), pp. 421-443. ISSN 0969-9988

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988

Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Walker, D H T; Harley, J and Mills, A (2015) Performance of project alliancing in Australasia: A digest of infrastructure development from 2008 to 2013. Construction Economics and Building, 15(1), pp. 1-18. ISSN 2204-9029

Wamuziri, S (2009) Using electronic reverse auctions in project procurement: Perceptions of construction contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Wang, D (2004) The Chinese construction industry from the perspective of industrial organization. PhD thesis, Northwestern University, USA.

Weddikkara, C and Devapriya, K (2001) Demand and supply trends and construction industry development: A case study in the Sri Lankan construction industry. Construction Economics and Building, 1(1), pp. 91-105. ISSN 2204-9029

Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599

Willar, D; Estrellita Varina Yanti, W; Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(1), pp. 106-124. ISSN 2046-6099

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Wilson, O D and Kenley, R (1987) Estimates given and tenders received: A comparison. Construction Management and Economics, 5(3), pp. 211-226. ISSN 01446193

Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193

Windapo, A; Adediran, A and Olugboyega, O (2019) Procurement strategies influencing small and medium contractor development in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 253-263. ISSN 17514304

Windapo, A and Moghayedi, A (2018) Building material price differentiation across geographic locations in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 243-254. ISSN 17514304

Xiong, B; Skitmore, M; Xia, P; Ballesteros-Pérez, P; Ye, K and Zhang, X (2019) Impact of corporate credit scoring on construction contractors in China. Journal of Construction Engineering and Management, 145(4): 05019002, ISSN 0733-9364

Yan, C (2006) Risk management strategy of construction projects in China. PhD thesis, University of Bedfordshire, UK.

Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499

Yevu, S K and Yu, A T W (2020) The ecosystem of drivers for electronic procurement adoption for construction project procurement: A systematic review and future research directions. Engineering, Construction and Architectural Management, 27(2), pp. 411-440. ISSN 0969-9988

Ying, F J; Zhao, N and Tookey, J (2022) Achieving construction innovation in best value procurement projects: New Zealand mega projects study. Construction Innovation, 22(2), pp. 388-403. ISSN 1471-4175

Zhang, X Q and Kumaraswamy, M M (2001) Procurement protocols for public-private partnered projects. Journal of Construction Engineering and Management, 127(5), pp. 351-358. ISSN 0733-9364

ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387

This list was generated on Sat Aug 22 01:46:41 2026 UTC.