Items with Index Term: project party
Abbasian-Hosseini, S A (2015) Social and engineering aspects of construction site management using simulation and social network analysis. PhD thesis, North Carolina State University, USA.
Abdirad, H; Dossick, C S; Johnson, B R and Migliaccio, G (2021) Disruptive information exchange requirements in construction projects: Perception and response patterns. Building Research & Information, 49(2), pp. 161-178. ISSN 0961-3218
Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X
Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.
Abu-Khader, W (2023) Barriers to the adoption of digitalization in the construction industry: Perspectives of owners, contractors, and contractors. Construction Economics and Building, 23(3-4), pp. 878-106. ISSN 2204-9029
Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.
Al Nasseri, H and Aulin, R (2016) Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(1), pp. 1-18. ISSN 1823-6499
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364
Algahtany, M (2018) Assessment and development of contractors' mitigation practices towards risks out of contractors' control in the Saudi construction industry. PhD thesis, Arizona State University, USA.
Alhasan, S; Amoudi, O; Tong, M and Kumar, B (2019) Effectiveness of adopting BIM on quantity surveying profession during the project life cycle. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction. PhD thesis, Heriot-Watt University, UK.
Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.
Alshehri, A M (2013) Conflict in architectural projects: diagnosis and avoidance: a study based on Saudi Arabian construction industry. PhD thesis, University of Manchester, UK.
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Antoniadis, D (2009) Managing complexity in project teams. PhD thesis, Loughborough University, UK.
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) The common causes of rework in construction contracts: A diagnostic approach. Journal of Engineering, Design and Technology, 21(4), pp. 1107-1133. ISSN 1726-0531
Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364
Athanasakis, D (2007) Has multiparty arbitration failed in construction disputes? Legal and practical issues in drafting joinder provisions. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Banihashemi S Y, L L (2013) A socio-economic framework for adopting governance mechanisms in large construction projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.
Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599
Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364
Ceric, A (2014) Communication risk and trust in construction projects: A framework for interdisciplinary research. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chan, A P C; Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), pp. 523-533. ISSN 01446193
Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(8), pp. 1777-1800. ISSN 0969-9988
Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988
Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.
Chen, H (2006) Exploring the relationships between influencing factors and performance for construction joint ventures. PhD thesis, University of Hong Kong, Hong Kong.
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Chiponde, D B (2023) Learning from project-related failures in UK construction project based organisations: an examination of actor approaches, intentions and behaviours. PhD thesis, Northumbria University, UK.
Chiponde, D B; Gledson, B and Greenwood, D (2024) Challenges and opportunities of learning from failure: Looking backwards to move forward using vignettes. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.
De Filippi, Giancarlo Azevedo (2017) Method for production planning and management of time in real estate projects. PhD thesis, Universidade de São Paulo, Brazil.
Elbashbishy, T S; Ali, G G and El-adaway, I H (2022) Blockchain technology in the construction industry: Mapping current research trends using social network analysis and clustering. Construction Management and Economics, 40(5), pp. 406-427. ISSN 01446193
Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988
Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599
Elsayegh, A and El-Adaway, I H (2021) Holistic study and analysis of factors affecting collaborative planning in construction. Journal of Construction Engineering and Management, 147(4): 04021023, ISSN 0733-9364
Filippi, Giancarlo Azevedo de (2017) Method for production planning and deadline management of real estate ventures. PhD thesis, Universidade de São Paulo, Brazil.
Gan, C E (1998) Organizational interactions in the management of development projects. PhD thesis, National University of Singapore, Singapore.
Gunduz, M; Abumoza, A M and Aly, A A (2023) A structural equation model to assess the effects of strategic and project related potential risks on project delivery in qatar. Engineering, Construction and Architectural Management, 30(10), pp. 4782-4820. ISSN 0969-9988
Gyampoh-Vidogah, R; Moreton, R and Proverbs, D (2003) Implementing information management in construction: Establishing problems, concepts and practice. Construction Innovation, 3(3), pp. 157-173. ISSN 1471-4175
Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects. PhD thesis, University of Leeds, UK.
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Hossain, M A; Raiymbekov, D; Nadeem, A and Kim, J R (2022) Delay causes in Kazakhstan's construction projects and remedial measures. International Journal of Construction Management, 22(5), pp. 801-819. ISSN 1562-3599
Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), pp. 2089-2097. ISSN 1562-3599
Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364
Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599
Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988
Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 0969-9988
Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175
Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.
Koo, H J and O’Connor, J T (2022) Building information modeling as a tool for prevention ofdesign defects. Construction Innovation, 22(4), pp. 870-890. ISSN 1471-4175
Le, Nguyen Tran Khoi (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries. PhD thesis, Arizona State University, USA.
Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499
Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Musenero, L; Baroudi, B and Gunawan, I (2021) Application of dual concern theory in elucidating conflict behavior in infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 147(7): 04021061, ISSN 0733-9364
Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.
Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531
Osei-Kyei, R; Chan, A P C; Yao, Y and Mazher, K M (2019) Conflict prevention measures for public-private partnerships in developing countries. Journal of Financial Management of Property and Construction, 24(1), pp. 39-57. ISSN 1366-4387
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007
Sadek, S M A (2016) Managing standard construction contractual forms modifications in the Middle East: overview and recommendations. PhD thesis, University of Salford, UK.
Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304
Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X
Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.
Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.
Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531
Toosi, H; Ghaaderi, M A and Shokrani, Z (2022) Comparative study of academic research on project management in Iran and the world with text mining approach and tf–idf method. Engineering, Construction and Architectural Management, 29(3), pp. 1553-1583. ISSN 0969-9988
Uusitalo, P; Lappalainen, E; Seppänen, O; Pikas, E; Peltokorpi, A; Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: Is trust a prerequisite for solving design quality problems? Construction Management and Economics, 39(4), pp. 279-297. ISSN 01446193
Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Yang, Y; Zhang, S; Oti-Sarpong, K and Chow, V (2024) A conceptual framework of building information modelling capabilities: An infrastructure owner perspective. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Yeh, H H; Hsieh, T Y and Chen, J H (2017) Managing complex engineering interfaces of urban mass rapid transit projects. Journal of Construction Engineering and Management, 143(6): 05017001, ISSN 0733-9364
Zhang, L; Cheng, J and Fan, W (2016) Party selection for integrated project delivery based on interorganizational transactive memory system. Journal of Construction Engineering and Management, 142(3): 04015089, ISSN 0733-9364
Zhang, L; He, J and Zhou, S (2013) Sharing tacit knowledge for integrated project team flexibility: Case study of integrated project delivery. Journal of Construction Engineering and Management, 139(7), pp. 795-804. ISSN 0733-9364
Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.
Up a level