Items with Index Term: project network

Number of items: 78.

Abadi, M; Huang, J; Yeow, J; Mohandes, S R and Zhang, L (2025) Towards a complex push-to-pull dynamics in circular construction supply chains: A systematic literature review. Engineering, Construction and Architectural Management, 32(2), pp. 912-938. ISSN 0969-9988

Adami, V S; Verschoore, J R and Antunes, J A V (2019) Effect of relational characteristics on management of wind farm interorganizational construction projects. Journal of Construction Engineering and Management, 145(3): 05018019, ISSN 0733-9364

Almadhoob, Huda Mohamed Ali Hasan Husain (2020) Self-organising networks in complex infrastructure projects: the case of London Bank Station Capacity Upgrade Project. PhD thesis, University College London, UK.

Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599

Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599

Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364

Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599

Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988

Bashir, H A (2010) Removal of redundant relationships in an AON project network for evaluating schedule complexity. Journal of Construction Engineering and Management, 136(7), pp. 787-793. ISSN 0733-9364

Batselier, J and Vanhoucke, M (2015) Empirical evaluation of earned value management forecasting accuracy for time and cost. Journal of Construction Engineering and Management, 141(11): 05015010, ISSN 0733-9364

Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.

Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bevan, W; Lu, S L and Sexton, M (2020) Skills required to deliver energy efficient school retrofit buildings. Engineering, Construction and Architectural Management, 27(10), pp. 3051-3073. ISSN 0969-9988

Biersteker, E and Marrewijk, A V (2023) Integrating knowledge in infrastructure projects: The interplay between formal and informal knowledge governance mechanisms. Construction Management and Economics, 41(10), pp. 859-874. ISSN 01446193

Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(2), pp. 205-218. ISSN 01446193

Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364

Cheng, M Y; Su, C W and You, H Y (2003) Optimal project organizational structure for construction management. Journal of Construction Engineering and Management, 129(1), pp. 70-79. ISSN 0733-9364

Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988

Chinowsky, P; Diekmann, J and Galotti, V (2008) Social network model of construction. Journal of Construction Engineering and Management, 134(10), pp. 804-812. ISSN 0733-9364

Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Comu, S; Iorio, J; Taylor, J E and Dossick, C S (2013) Quantifying the impact of facilitation on transactive memory system formation in global virtual project networks. Journal of Construction Engineering and Management, 139(3), pp. 294-303. ISSN 0733-9364

Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364

Crespin-Mazet, F (2007) Co-Development as an alternative to competitive bidding in project business. PhD thesis, University of Manchester, UK.

Deng, J; Zhao, Y; Li, X; Wang, Y and Zhou, Y (2023) Network embeddedness, relationship norms, and cooperative behavior: Analysis based on evolution of construction project network. Journal of Construction Engineering and Management, 149(9): 04023070, ISSN 0733-9364

Di Marco, M K (2011) The roles and impacts of boundary spanners and boundary objects in global project networks. PhD thesis, Columbia University, USA.

Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.

Duva, M (2022) A multi-level and in-depth analysis of AEC project networks: Topology, social influence, and intervention. PhD thesis, Michigan State University, USA.

Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.

Han, Y; Li, Y; Taylor, J E and Zhong, J (2018) Characteristics and evolution of innovative collaboration networks in architecture, engineering, and construction: Study of national prize-winning projects in China. Journal of Construction Engineering and Management, 144(6): 04018038, ISSN 0733-9364

Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.

Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364

Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364

Hällström, A A F (2023) Collaborative project delivery models in infrastructure construction. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Keung, C and Shen, L (2017) Network strategy for contractors' business competitiveness. Construction Management and Economics, 35(8-9), pp. 482-497. ISSN 01446193

Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.

Kurul, E (2015) Influences of social capital on knowledge creation: An exploration in the UK built environment sector. Architectural Engineering and Design Management, 11(2), pp. 83-104. ISSN 1745-2007

Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.

Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364

Lingard, H; Pirzadeh, P; Blismas, N; Wakefield, R and Kleiner, B (2014) Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control. Construction Management and Economics, 32(9), pp. 918-931. ISSN 01446193

Liu, C; Cao, J; Duan, K and Wu, G (2023) Effect of network position on inter-team conflict and project success in megaprojects. Engineering, Construction and Architectural Management, 30(10), pp. 4955-4977. ISSN 0969-9988

Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364

Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364

Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364

Luo, Y.; Li, J.; Feng, W.; Li, H. and Zhou, Y. (2026) The impact of incentive mechanisms on innovation performance in engineering project networks: The mediating role of knowledge sharing. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988

Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Moussourakis, J and Haksever, C (2007) Models for accurate computation of earliest and latest start times and optimal compression in project networks. Journal of Construction Engineering and Management, 133(8), pp. 600-608. ISSN 0733-9364

Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364

Pemsel, S (2012) Knowledge processes and capabilities in project-based organizations. PhD thesis, Lund University, Sweden.

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Pryke, S D; Zagkli, G and Kougia, I (2011) Resource provision ego-networks in small Greek construction firms. Building Research & Information, 39(6), pp. 616-636. ISSN 0961-3218

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Shi, Q; Chen, X; Xiao, C and Han, Y (2022) Network perspective in megaproject management: A systematic review. Journal of Construction Engineering and Management, 148(7): 03122002, ISSN 0733-9364

Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599

Taylor, J E; Levitt, R and Villarroel, J A (2009) Simulating learning dynamics in project networks. Journal of Construction Engineering and Management, 135(10), pp. 1009-1015. ISSN 0733-9364

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Unsal, H I and Taylor, J E (2011) Absorptive capacity of project networks. Journal of Construction Engineering and Management, 137(11), pp. 994-1002. ISSN 0733-9364

Unsal, H I and Taylor, J E (2011) Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks. Journal of Construction Engineering and Management, 137(4), pp. 284-293. ISSN 0733-9364

Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.

Wong, K; Unsal, H; Taylor, J E and Levitt, R E (2010) Global dimension of robust project network design. Journal of Construction Engineering and Management, 136(4), pp. 442-451. ISSN 0733-9364

Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 0969-9988

Yan, L; Chen, Y and Cao, T (2024) Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: A configurational analysis. Engineering, Construction and Architectural Management, 31(11), pp. 4462-4481. ISSN 0969-9988

Yuventi, J; Levitt, R and Robertson, H (2013) Organizational barriers to productivity and innovation in large-scale, U.S.-based photovoltaic system construction projects. Journal of Construction Engineering and Management, 139(10): 06013003, ISSN 0733-9364

Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364

af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

af Hällström, A and Bosch-Sijtsema, P (2021) The dark side of collaboration: The risks of strong ties in collaborative project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

af Hällström, A and Bosch-Sijtsema, P (2021) Creating collaboration: The use of collaborative space in large-scale infrastructure development. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

af Hällström, A; Bosch-Sijtsema, P and Poblete, L (2025) Challenges with collaboration: The interaction of formal and informal ties in infrastructure construction. Construction Management and Economics, 43(1), pp. 7-25. ISSN 0144-6193

af Hällström, A; Bosch-Sijtsema, P; Poblete, L; Rempling, R and Karlsson, M (2021) The role of social ties in collaborative project networks: A tale of two construction cases. Construction Management and Economics, 39(9), pp. 723-738. ISSN 01446193

This list was generated on Sat Aug 22 02:14:21 2026 UTC.