Items with Index Term: project documentation
Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.
Alencastro, J; Fuertes, A and de Wilde, P (2024) Investigating the influence of quality management on building thermal performance. Engineering, Construction and Architectural Management, 31(8), pp. 3356-3376. ISSN 0969-9988
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.
Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.
Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708
Anvuur, A M and Kumaraswamy, M K (2010) Promises, pitfalls and shortfalls of the guaranteed maximum price approach: A comparative case study. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Baby, S.; Talebi, S.; Lai, J. H. K.; Tien, P. W. and Kagioglou, M. M. (2026) Mitigating cost estimation challenges in bahrain's construction industry: A problem-solving approach. Built Environment Project and Asset Management, 16(3), pp. 542-560. ISSN 2044-124X
Baharuddin, H E A; Ibrahim, C K I C; Costello, S B and Wilkinson, S (2017) Managing stakeholders through alliances: A case study of a megaproject in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 151-160. ISSN 17514304
Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X
Chan, D W M; Lam, P T I; Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: A case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(2), pp. 188-205. ISSN 0969-9988
Dib, H; Adamo-Villani, N and Issa, R R A (2013) A GIS-based visual information model for buildng construction project management. International Journal of Construction Management, 13(1), pp. 1-18. ISSN 1562-3599
Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.
Gerbov, A; Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(1), pp. 2-20. ISSN 0969-9988
Govender, N.; Laryea, S. and Watermeyer, R. (2026) Through the client's lens: Factors impacting project document quality in the South African construction industry. Engineering, Construction and Architectural Management, 33(15), pp. 345-361. ISSN 0969-9988
Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations. PhD thesis, Heriot-Watt University, UK.
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.
Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988
Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.
Kangari, R (1995) Construction documentation in arbitration. Journal of Construction Engineering and Management, 121(2), pp. 201-208. ISSN 0733-9364
Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364
Louw, M P (2016) The adaptive reuse of industrial structures: Revisiting the Thesen Islands power station project in South Africa. Journal of Engineering, Design and Technology, 14(4), pp. 920-940.
MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988
Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Nitithamyong, P (2003) Analysis of success and failure factors in application of web-based project management systems in construction. PhD thesis, Purdue University, USA.
Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099
Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193
Philips-Ryder, M; Zuo, J and Jin, X H (2013) Evaluating document quality in construction projects: subcontractors' perspective. International Journal of Construction Management, 13(3), pp. 77-94. ISSN 1562-3599
Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.
Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.
Snippert, T; Witteveen, W; Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), pp. 569-586. ISSN 01446193
Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: A case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(5), pp. 1789-1806. ISSN 0969-9988
Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165
Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(4), pp. 1278-1294. ISSN 0969-9988
Vilasini, N; Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study. Construction Management and Economics, 32(6), pp. 625-640. ISSN 01446193
Wilkinson, R; Sherratt, F and Farrell, P (2015) Knowledge management on site: A case study project. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 99-109. ISSN 17514304
Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988
van Heel, L; van Oel, C J; Chan, P and Burdorf, A (2025) Engaging heterogeneity in stakeholders and stakeholder relationships in a hospital planning and design project. Construction Management and Economics, 43(12), pp. 999-1021. ISSN 0144-6193
Up a level