Items with Index Term: project development

Number of items: 140.

Afieroho, P (2024) Project management by the people, for the people, and of the people: Context, challenges, and prospects for adoption of e-government tools to monitor execution of public infrastructure projects in Nigeria. PhD thesis, University of Alaska Fairbanks, USA.

Ahmad, Tayyab (2020) An inquiry of conditions and criteria associated with Green Building project success. PhD thesis, University of Melbourne, Australia.

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Allport, R J (2015) Pre-implementation planning: The weak link in rail projects 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 205-212. ISSN 17514304

Allport, R J and Ward, S (2010) Operational risk: The focus for major infrastructure? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 121-127. ISSN 17514312

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.

Anderson, S D; Fisher, D J and Rahman, S P (2000) Integrating constructability into project development: A process approach. Journal of Construction Engineering and Management, 126(2), pp. 81-88. ISSN 0733-9364

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Arafa, E A B (2015) The impact of knowledge management on project success. PhD thesis, University of Portsmouth, UK.

Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Boateng, P; Omotayo, T; Osunsanmi, T and Ekundayo, D (2025) Socio-ecological risks management dynamic simulation in megaproject development of the edinburgh tram network. International Journal of Building Pathology and Adaptation, 43(1), pp. 75-92. ISSN 2398-4708

Boonyanan, A; Robinson, H; Fong, D and Naoum, S (2008) Relationship and knowledge management among construction development project members in Thailand: The clients' perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(6), pp. 920-934. ISSN 0969-9988

Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Cerić, A and Ivić, I (2025) Communication challenges and blockchain in building energy efficiency retrofits: Croatia case. Engineering, Construction and Architectural Management, 32(1), pp. 1-15. ISSN 0969-9988

Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193

Chan, D W M; Olawumi, T O and Ho, A M L (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(9), pp. 1838-1854. ISSN 0969-9988

Chen, X B and Kim, T W (2017) Automated mapping of user activities onto flexible space in space-use analysis. Journal of Construction Engineering and Management, 143(8): 04017034, ISSN 0733-9364

Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.

Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.

Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.

De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364

Devkar, G A and Kalidindi, S N (2013) External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1), pp. 58-73. ISSN 2044-124X

Dias Jr, A and Ioannou, P G (1996) Company and project evaluation model for privately promoted infrastructure projects. Journal of Construction Engineering and Management, 122(1), pp. 71-82. ISSN 0733-9364

Ding, Grace K C (2004) The development of a multi-criteria approach for the measurement of sustainable performance for built projects and facilities. PhD thesis, University of Technology Sydney, Australia.

Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation. PhD thesis, Northumbria University, UK.

El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: Supporting semantic exchange of project risk information. Construction Management and Economics, 24(3), pp. 271-285. ISSN 01446193

El-Gohary, N M and El-Diraby, T E (2010) Domain ontology for processes in infrastructure and construction. Journal of Construction Engineering and Management, 136(7), pp. 730-744. ISSN 0733-9364

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Fillingham, V L (2018) Assessing information management as a tool for the ongoing maintenance of built assets. EngD thesis, University of Reading, UK.

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process. PhD thesis, Iowa State University, USA.

Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. PhD thesis, Colorado State University, USA.

Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gilmour D, B D F R I J T A (2013) A knowledge map of sustainability for urban redevelopment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Gunning, J G (2008) Towards a more playful approach to construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Hecht, H R (2001) Development of major transportation projects in California. PhD thesis, University of California, Davis, USA.

Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Idoro, G I (2011) Influence of in-sourcing and outsourcing of consultants on construction project performance in Nigeria. Construction Economics and Building, 11(4), pp. 45-58. ISSN 2204-9029

Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.

Ismail, S (2013) Factors attracting the use of public private partnership in Malaysia. Journal of Construction in Developing Countries, 18(1), pp. 95-108. ISSN 1823-6499

Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kahvandi, Z; Saghatforoush, E; Ravasan, A Z and Viana, M L (2020) A review and classification of integrated project delivery implementation enablers. Journal of Construction in Developing Countries, 25(2), pp. 219-236. ISSN 1823-6499

Kamara, J M (2012) Integration in the project development process of a private finance initiative (PFI) project. Architectural Engineering and Design Management, 8(4), pp. 228-245. ISSN 1745-2007

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029

Kibwami, N and Tutesigensi, A (2015) Exploring the potential of accounting for embodied carbon emissions in building projects in Uganda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Lamirande, M (2023) Exploring practices and understandings of designing inclusively. PhD thesis, Open University, UK.

Latorre, V and Riley, M (2010) Utilizing analytical hierarchy process to prioritize critical success factors in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Le, T (2009) Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors. PhD thesis, University of Texas at Austin, USA.

Le, T; Caldas, C H; Gibson, G E and Thole, M (2009) Assessing scope and managing risk in the highway project development process. Journal of Construction Engineering and Management, 135(9), pp. 900-910. ISSN 0733-9364

Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liu, Jiani (2014) Developing a life cycle assessment model for measuring sustainable performance of buildings in China. PhD thesis, University of Technology Sydney, Australia.

London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007

Lopes, Carmen Silvia Gonçalves (2016) Active learning in training engineer: The influence of the use of learning strategies for skills based on a systemic view. PhD thesis, Universidade de São Paulo, Brazil.

Ma, Q; Cheung, S O and Li, S (2023) Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Construction Management and Economics, 41(6), pp. 519-535. ISSN 01446193

Makarfi, U and Udeaja, C (2019) To formulate a conceptual model for innovation: Reframing theoretical constructs of BIM adoption within SME organisations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Marcos, Micheline Helen Cot (2015) Method of obtaining environmental impact data, during the design development process through use of BIM tool. PhD thesis, Universidade de São Paulo, Brazil.

Matipa, W M; Kelliher, D and Keane, M (2004) Contending with the challenges of deploying building product models in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(1), pp. 39-54. ISSN 1466433X

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Mengistu, D G and Mahesh, G (2020) Dimensions for improvement of construction management practice in Ethiopian construction industry. Journal of Engineering, Design and Technology, 18(1), pp. 21-39. ISSN 1726-0531

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. PhD thesis, University of Maryland, College Park, USA.

Moradi, S; Hirvonen, J and Sormunen, P (2026) Collaborative and life cycle-based project delivery for environmentally sustainable building construction: Views of Finnish project professionals and building operation and maintenance experts. Smart and Sustainable Built Environment, 15(1), pp. 407-430. ISSN 2046-6099

Nascimento, C R S M S; Almeida-Filho, A T and Perez Palha, R (2025) A TOPSIS-based framework for construction projects' portfolio selection in the public sector. Engineering, Construction and Architectural Management, 32(4), pp. 2553-2570. ISSN 0969-9988

Nguyen, H D; Dang, C N; Le-Hoai, L and Luu, Q T (2023) Exploratory analysis of legal risk causes in tourism real estate projects in emerging economies: Empirical study from Vietnam. International Journal of Construction Management, 23(5), pp. 830-842. ISSN 1562-3599

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.

Opoku, A and Ibrahim-Adam, R (2018) Early contractor involvement in government construction projects in Ghana. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.

Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.

Pena-Mora, F and Park, M (2001) Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management, 127(6), pp. 445-456. ISSN 0733-9364

Petkov, I (2022) Optimal decarbonization conditions for buildings & districts: A model-based techno-economic perspective. DSc thesis, ETH Zürich, Switzerland.

Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Rafaat, R; Osman, H; Georgy, M and Elsaid, M (2020) Preferred risk allocation in egypt's water sector PPPs. International Journal of Construction Management, 20(6), pp. 585-597. ISSN 1562-3599

Rajan Annamalai, T and Jain, N (2013) Project finance and investments in risky environments: Evidence from the infrastructure sector. Journal of Financial Management of Property and Construction, 18(3), pp. 251-267. ISSN 1366-4387

Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364

Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.

Rodriguez Bernal, C M (2017) Student-centred strategies to integrate theoretical knowledge into project development within architectural technology lecture-based modules. Architectural Engineering and Design Management, 13(3), pp. 223-242. ISSN 1745-2007

Roy, N C and Roy, N G (2022) Sustainable hydroelectric power project planning under socio-economic and environmental concerns using index based approach. Built Environment Project and Asset Management, 12(3), pp. 401-432. ISSN 2044-124X

Safari, M (2019) A regenerative approach to development and construction of building energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364

Scott, D and Yang, J (1991) Setting the pace with paces: A new concept of using an expert system for project analysis and control. Construction Management and Economics, 9(6), pp. 529-541. ISSN 01446193

Shane, J S (2006) A fundamental study of scope definition in early highway project development. PhD thesis, University of Colorado at Boulder, USA.

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.

Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.

Singhaputtangkul, N and Zhao, X (2016) Applying a fuzzy consensus scheme to enhance the group decision making of a building envelope design team. Journal of Construction Engineering and Management, 142(8): 4016025, ISSN 0733-9364

Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.

Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects. PhD thesis, University of Maryland, College Park, USA.

Suraji, A (2001) Development and validation of a theory of construction accident causation. PhD thesis, University of Manchester, UK.

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Syal, M G; Grobler, F; Willenbrock, J H and Parfitt, M K (1992) Construction project planning process model for small-medium builders. Journal of Construction Engineering and Management, 118(4), pp. 651-666. ISSN 0733-9364

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Thomson, C and El-Haram, M (2014) Potential and implications of sustainability action plans: Lessons from the Greater Middlehaven Regeneration Project. Built Environment Project and Asset Management, 4(1), pp. 108-122. ISSN 2044-124X

Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

Valverde-Gascueña, N; Navarro-Astor, E; Fuentes-del-Burgo, J and Ruiz-Fernandez, J P (2011) Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Vaz-Serra, P; Edwards, P and Aranda-Mena, G (2022) An early-stage project complexity assessment tool for the AEC industry. Construction Innovation, 22(2), pp. 242-262. ISSN 1471-4175

Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Wang, Y (2009) Measuring competitiveness of chinese professional design firms. PhD thesis, University of Reading, UK.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599

Xenidis, Y and Angelides, D (2005) The legal risks in build-operate-transfer projects. Journal of Construction Research, 6(2), pp. 273-292. ISSN 1609-9451

Xia, B; Wu, T; Skitmore, M; Chen, Q; Li, M and Zuo, J (2016) Delivering sustainable communities: A case study in China. Built Environment Project and Asset Management, 6(3), pp. 253-267. ISSN 2044-124X

Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yunus, R and Yang, J (2014) Improving ecological performance of industrialized building systems in Malaysia. Construction Management and Economics, 32(1-2), pp. 183-195. ISSN 01446193

Zainul Abidin, N and Powmya, A (2025) Identifying barriers in constructing green buildings in Oman: A study on project contractors' experience. Built Environment Project and Asset Management, 15(1), pp. 67-84. ISSN 2044-124X

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599

Zhou, L; Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3), pp. 232-250. ISSN 1366-4387

Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.

de Blois, M and De Coninck, P (2008) The dynamics of actors' and stakeholders' participation: An approach of management by design. Architectural Engineering and Design Management, 4(3-4), pp. 176-188. ISSN 1745-2007

This list was generated on Sat Aug 22 02:15:51 2026 UTC.