Items with Index Term: project design

Number of items: 98.

Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.

Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Akrawi, S G (1998) Sensing and real-time expert system for a masonry building robot. PhD thesis, City, University of London, UK.

Al Shamsi, H A A (2015) A framework for group leadership in the construction industry in Abu Dhabi. PhD thesis, University of Wolverhampton, UK.

Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599

Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.

Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364

Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza. PhD thesis, University of Sheffield, UK.

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Assaf, G and Assaad, R H (2024) Analyzing the critical success factors affecting project bundling performance of infrastructure projects. Journal of Construction Engineering and Management, 150(9): 04024106, ISSN 0733-9364

Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.

Attallah, S O (2014) A life cycle analysis approach for the enhancement of sustainability decision-making in the construction industry using agent-based modeling. PhD thesis, Purdue University, USA.

Balgheeth, Y (2016) Enhancing existing health and safety processes in public sector construction projects within Saudi Arabia using building information modelling approaches. PhD thesis, University of Salford, UK.

Bastem, S S and Cekmis, A (2022) Development of historic building information modelling: A systematic literature review. Building Research & Information, 50(5), pp. 527-558. ISSN 0961-3218

Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Boudet, H S; Jayasundera, D C and Davis, J (2011) Drivers of conflict in developing country infrastructure projects: Experience from the water and pipeline sectors. Journal of Construction Engineering and Management, 137(7), pp. 498-511. ISSN 0733-9364

Cariaga, I; El-Diraby, T and Osman, H (2007) Integrating value analysis and quality function deployment for evaluating design alternatives. Journal of Construction Engineering and Management, 133(10), pp. 761-770. ISSN 0733-9364

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364

Cassandro, J; Mirarchi, C; Gholamzadehmir, M and Pavan, A (2025) Advancements and prospects in building information modeling (BIM) for construction: A review. Engineering, Construction and Architectural Management, 32(9), pp. 6006-6026. ISSN 0969-9988

Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531

Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531

Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175

Cheung, E; Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(1), pp. 7-20. ISSN 1366-4387

Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.

Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Ding, Z and Ng, F (2010) Personal construct-based factors affecting interpersonal trust in a project design team. Journal of Construction Engineering and Management, 136(2), pp. 227-234. ISSN 0733-9364

Ding, Z; Ng, F and Wang, J (2014) Testing trust scale measurement invariance in project teams. Journal of Engineering, Design and Technology, 12(2), pp. 209-222. ISSN 1726-0531

Dzokoto, F K; Edum-Fotwe, F and Demian, P (2014) Conceptualising actors' information behaviour: An investigation into project information dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ekanayake, E M A C; Xue, J; Shen, G Q and Kumaraswamy, M M (2021) Dynamic supply chain vulnerability analysis of Hong Kong-Zhuhai-Macao Bridge construction: A topic modelling approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

El-Bibany, H E-D (1992) Architecture for human-computer design, management and coordination in a collaborative AEC environment. PhD thesis, Stanford University, USA.

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Freer, D R (2000) Vital considerations for the design and construction of new student housing communities. EdD thesis, University of California, Los Angeles, USA.

Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988

Gambatese, J A (1996) Addressing construction worker safety in the project design. PhD thesis, University of Washington, USA.

Gledson, B; Rogage, K; Luk, M; Tallet, E; Thompson, A; Landy, M and Wigget, D (2022) Addressing design management challenges through the development of a web-based platform. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Gunasekara, D M H; Indikatiya, I H P R; Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(2), pp. 406-424. ISSN 1471-4175

Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364

Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.

Harper, C M; Molenaar, K R and Cannon, J P (2016) Measuring constructs of relational contracting in construction projects: The owner's perspective. Journal of Construction Engineering and Management, 142(10): 04016053, ISSN 0733-9364

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.

Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.

Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364

Kasapolu, E (2011) Leadership behaviors in project design offices. Journal of Construction Engineering and Management, 137(5), pp. 356-363. ISSN 0733-9364

Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.

Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.

Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.

Li, M N; Wang, X; Cheng, R X and Chen, Y (2025) Aided design decision-making framework for engineering projects considering cost and social benefits. Engineering, Construction and Architectural Management, 32(8), pp. 5040-5065. ISSN 0969-9988

Ma, J (2016) A data driven study on LEED credits and green building related implications in city planning. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Maxwell, D and Couper, R (2023) Construction tracking: Implications of logistics data. Construction Innovation, 23(2), pp. 322-339. ISSN 1471-4175

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Morrison, S; Callaghan, N; Tong, M and Thomson, C (2022) Quantity surveyors incorporating circularity at early project design stage: A literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Mosley, J C and Bubshait, A A (2021) Investigative study of project procurement methods and project performance indicators in Saudi Arabia. International Journal of Construction Management, 21(8), pp. 845-857. ISSN 1562-3599

Murtaza, M B; Fisher, D J and Skibniewski, M J (1993) Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119(1), pp. 115-130. ISSN 0733-9364

Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

O'Connor, J T and Koo, H J (2021) Proactive design quality assessment tool for building projects. Journal of Construction Engineering and Management, 147(2): 04020174, ISSN 0733-9364

Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007

Ojiako, U; Maseko, L; Root, D; Venkatachalam, S; Marshall, A; AlRaeesi, E and Chipulu, M (2025) Design phase collaborative risk management factors: A case study of a green rating system in South Africa. Engineering, Construction and Architectural Management, 32(9), pp. 6268-6301. ISSN 0969-9988

Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.

Olatunji, O A and Sher, W (2015) Estimating in geometric 3D CAD. Journal of Financial Management of Property and Construction, 20(1), pp. 24-49. ISSN 1366-4387

Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage. PhD thesis, Concordia University, Canada.

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Rowbotham, A (2018) Designing for fluid transitions to sustainable infrastructure: the case of the Bedford & Milton Keynes Waterway. PhD thesis, Open University, UK.

Senescu, R R (2011) Design process communication methodology. PhD thesis, Stanford University, USA.

Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.

Sezer, A A (2016) Construction performance measurement: Site managers in refurbishment projects. PhD thesis, Chalmers University of Technology, Sweden.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.

Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green building fund. Building Research & Information, 43(2), pp. 160-169. ISSN 0961-3218

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

Stukhart, G (1984) Contractual incentives. Journal of Construction Engineering and Management, 110(1), pp. 34-42. ISSN 0733-9364

Suraji, A; Sulaiman, K; Mahyuddin, N and Mohamed, O (2006) Rethinking construction safety: An introduction to total safety management. Journal of Construction Research, 7(1), pp. 49-63. ISSN 1609-9451

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tijani, Bashir (2022) Developing a framework for mental health management of project management practitioners in architecture, engineering and construction project organizations. PhD thesis, Western Sydney University, Australia.

Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988

Volker, L and Prins, M (2006) Critical reflections on measuring the effect of steering activities in architectural design. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180

Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(2), pp. 158-184. ISSN 1471-4175

Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599

Wuni, I Y; Shen, G Q and Antwi-Afari, M F (2023) Exploring the design risk factors for modular integrated construction projects. Construction Innovation, 23(1), pp. 213-228. ISSN 1471-4175

Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499

Zhikun, D; Fungfai, N G and Jiayuan, W (2010) Personal construct based factors affecting willingness to share knowledge between architects in a project design team. International Journal of Construction Management, 10(3), pp. 1-11. ISSN 1562-3599

This list was generated on Sat Aug 22 02:09:58 2026 UTC.