Items with Index Term: project delay

Number of items: 178.

Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abd El-Razek, M E; Bassioni, H A and Mobarak, A M (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. ISSN 0733-9364

Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599

Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.

Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364

Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X

Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099

Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Agyekum-Mensah, G and Knight, A D (2017) The professionals' perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), pp. 828-841. ISSN 0969-9988

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Al Hawsah, M O (2020) The impact of project sponsors' decisions on the success of projects: An action research study. PhD thesis, University of Liverpool, UK.

Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599

Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988

Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.

Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499

Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.

Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599

Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988

Alyatama, M (2021) Application of agile project management in Kuwait oil and gas capital projects. PhD thesis, University of Northampton, UK.

Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.

Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988

Arhinful, R; Attabra, F K; Mensah, L and Obeng, H A (2026) The mediating role of talent management in the relationship between project manager competencies and sustainable competitive advantage in the Ghanaian construction industry. Construction Management and Economics, 44(2), pp. 119-142. ISSN 0144-6193

Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364

Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Baumann, L (2013) The impact of national culture on project management in the Middle East. PhD thesis, Loughborough University, UK.

Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(3), pp. 327-337. ISSN 01446193

Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364

Buhamizo, I; Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), pp. 221-241. ISSN 1823-6499

Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Chan, A P C; Chiang, Y H; Wong, F K W; Liang, S and Abidoye, F A (2020) Work-life balance for construction manual workers. Journal of Construction Engineering and Management, 146(5): 04020031, ISSN 0733-9364

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.

Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708

De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364

Derakhshanfar, H; Ochoa, J J; Kirytopoulos, K; Mayer, W and Langston, C (2021) A cartography of delay risks in the Australian construction industry: Impact, correlations and timing. Engineering, Construction and Architectural Management, 28(7), pp. 1952-1978. ISSN 0969-9988

Doloi, H; Sawhney, A and Iyer, K C (2012) Structural equation model for investigating factors affecting delay in Indian construction projects. Construction Management and Economics, 30(10), pp. 869-884. ISSN 1466433X

Edwards, D J; Owusu-Manu, D-G; Baiden, B; Badu, E and Love, P E (2017) Financial distress and highway infrastructure delays. Journal of Engineering, Design and Technology, 15(1), pp. 118-132.

Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.

Eizakshiri, F; Chan, P W and Emsley, M (2011) Delays, what delays? A critical review of the literature on delays in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988

El-Sayegh, S M and Rabie, M M (2016) Modified price plus time bi-parameter bidding model incorporating float loss impact. International Journal of Construction Management, 16(4), pp. 267-280. ISSN 1562-3599

Erlita, A; Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), pp. 1-17. ISSN 1823-6499

Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364

Francis, M; Ramachandra, T and Rotimi, J O B (2016) Strategies to minimise the effects of delayed payments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 199-207. ISSN 17514304

Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.

Gondia, A; Siam, A; El-Dakhakhni, W and Nassar, A H (2020) Machine learning algorithms for construction projects delay risk prediction. Journal of Construction Engineering and Management, 146(1): 04019085, ISSN 0733-9364

González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364

Gould, N and King, C (2010) The mediation of construction disputes: Recent research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 29-39. ISSN 17514312

Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387

Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Gurgun, A P; Koc, K and Kunkcu, H (2024) Exploring the adoption of technology against delays in construction projects. Engineering, Construction and Architectural Management, 31(3), pp. 1222-1253. ISSN 0969-9988

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387

Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364

Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364

Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364

Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X

Hughes, M L (2020) Evaluating the impact of knowledge transfer on project delays for construction project delivery: A qualitative case study. PhD thesis, Northcentral University, USA.

Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.

Hwang, B-G; Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(3), pp. 327-346. ISSN 0969-9988

Isah, M A and Kim, B S (2025) Question-answering system powered by knowledge graph and generative pretrained transformer to support risk identification in tunnel projects. Journal of Construction Engineering and Management, 151(1): 04024193, ISSN 0733-9364

Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.

Ju, Q; Dai, Y; Liu, H and Shen, Z (2026) Interface management of complex capital projects from the perspective of interface clusters: Using complex networks and spectral clustering methods. Journal of Construction Engineering and Management, 152(2): 04025257, ISSN 0733-9364

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Korczynski, M (1993) Capital, labour and economic performance in the engineering construction industry: 1960-1990. PhD thesis, University of Warwick, UK.

Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.

Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.

Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988

Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364

Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364

Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Mahalingam, A and Levitt, R E (2007) Safety issues on global projects. Journal of Construction Engineering and Management, 133(7), pp. 506-516. ISSN 0733-9364

Mahdi, I and Soliman, E (2021) Significant and top ranked delay factors in Arabic Gulf Countries. International Journal of Construction Management, 21(2), pp. 167-180. ISSN 1562-3599

Majrouhi Sardroud, J (2011) Assessment and development of radio frequency identification applications for effective management of construction activities. PhD thesis, Kingston University, UK.

Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599

Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.

Mazen, A M (2023) The extent to which the national and organisational culture contributes to delays of Libyan construction projects. PhD thesis, Bournemouth University, UK.

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364

Mehdi Riazi, Salman Riazi (2014) The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects. PhD thesis, Queensland University of Technology, Australia.

Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Naim, A A A A (2018) An investigation of building information modelling implementation in KSA. PhD thesis, University of Wolverhampton, UK.

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.

Nyqvist, Roope (2025) Data-driven transformation in construction management: From artificial intelligence to network modeling. PhD thesis, Aalto University, Finland.

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Omopariola, E D; Windapo, A; Edwards, D J and Thwala, W D (2020) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), pp. 308-325. ISSN 1726-0531

Opoku, R A (2026) Antecedents of construction project time overrun in ghana's public sector: The moderating role of political connection. International Journal of Construction Management, 26(4), pp. 537-560. ISSN 1562-3599

Oshin-Martin, M (2014) Managing beyond the contract: Communicating and connecting to build sustainable collaborative relationships in international public-private partnerships. DM thesis, University of Maryland University College, USA.

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), pp. 286-302. ISSN 1366-4387

Pall, G K; Bridge, A J; Washington, S; Gray, J and Skitmore, M (2022) Critical delay factors in power transmission projects: A structural equation modeling approach. International Journal of Construction Management, 22(6), pp. 1158-1170. ISSN 1562-3599

Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.

Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.

Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.

Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364

Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.

Sami Ur Rehman, M; Shafiq, M T; Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(6), pp. 830-845. ISSN 2044-124X

Sami Ur Rehman, M; Thaheem, M J; Nasir, A R and Khan, K I A (2022) Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8), pp. 1489-1499. ISSN 1562-3599

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599

Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.

Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.

Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988

Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.

Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X

Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364

Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364

Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.

Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.

Soto Ortiz, S.; Kang, K.; Hubbard, B. and Besiktepe, D. (2026) Supply chain disruption risks in U.S. Construction industry: Post-pandemic perspectives. Construction Management and Economics, 44(9), pp. 703-720. ISSN 0144-6193

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175

Tang, L; Chen, C; Li, H and Mak, D Y Y (2022) Developing a BIM GIS-integrated method for urban underground piping management in China: A case study. Journal of Construction Engineering and Management, 148(9): 05022004, ISSN 0733-9364

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364

Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.

Thompson, D.; Chileshe, N.; Coggins, J. and Stevels, A. (2025) COVID-19 challenges on construction-related SMEs and response strategies: A scoping review. International Journal of Construction Management, 25(14), pp. 1649-1659. ISSN 1562-3599

Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988

Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193

Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988

Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(3), pp. 349-368. ISSN 0969-9988

Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(2), pp. 171-182. ISSN 2044-124X

Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364

Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988

Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599

White, C; Lees, J M and MacAskill, K (2026) Bridging the information gap using targeted digital transformation: Process mapping large-scale concrete activity. Building Research & Information, 54(1), pp. 24-43. ISSN 0961-3218

Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X

Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.

Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988

Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.

Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364

Yusof, I H M; An, M and Barghi, M H (2015) Integration of lean construction considerations into design process of construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Zagia, F.; Kajewski, S.; Omrani, S. and Motamedisedeh, O. (2026) Prioritizing the key causes of construction project delay in different countries: A cross-sectional analysis of different project types. International Journal of Construction Management, 26(9), pp. 1879-1904. ISSN 1562-3599

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599

Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364