Items with Index Term: project cost

Number of items: 619.

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), pp. 405-409. ISSN 1562-3599

Abdel-Hamid, M and Mohamed Abdelhaleem, H (2022) Impact of poor labor productivity on construction project cost. International Journal of Construction Management, 22(12), pp. 2356-2363. ISSN 1562-3599

Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.

Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364

Adamtey, S and Onsarigo, L (2018) Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(3), pp. 461-477. ISSN 1726-0531

Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.

Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers. PhD thesis, University of Florida, USA.

Agyekum, K; Ghansah, F A; Tetteh, P A and Amudjie, J (2021) The role of project managers (pms) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, 19(1), pp. 245-262. ISSN 1726-0531

Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364

Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.

Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364

Aiyetan, A O and Das, D K (2023) Use of drones for construction in developing countries: Barriers and strategic interventions. International Journal of Construction Management, 23(16), pp. 2888-2897. ISSN 1562-3599

Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599

Akinladenu, Kafilat (2025) Exploring the relationship between project managers' technical competence and project success. DBA thesis, Wilmington University (Delaware), USA.

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364

Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.

Al Nahyan, Moza Tahnoon (2012) Management of mega infrastructure projects in the United Arab Emirates. PhD thesis, Monash University, Australia.

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.

Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness. PhD thesis, University of Strathclyde, UK.

Al-Sabah, R; Menassa, C C and Hanna, A (2014) Evaluating impact of construction risks in the Arabian gulf region from perspective of multinational architecture, engineering and construction firms. Construction Management and Economics, 32(4), pp. 382-402. ISSN 01446193

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

Alarcón, L F; Rodríguez, A and Mourgues, C (2012) Impact of machine-failure costs on equipment replacement policies: Tunneling company case study. Journal of Construction Engineering and Management, 138(6), pp. 767-774. ISSN 0733-9364

Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X

Alfeld, L E (1990) Construction delays: A simulation analysis. DSc thesis, Washington University in St. Louis, USA.

Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364

Alhawamdeh, M and Lee, A (2025) A systematic review and meta-synthesis of the barriers of offsite construction projects. International Journal of Construction Management, 25(9), pp. 1087-1099. ISSN 1562-3599

Ali, K S (2006) Construction project planning: Improving effectiveness of resources allocation. PhD thesis, University College London, UK.

Aliasgari, R; Fan, C; Li, X; Golabchi, A and Hamzeh, F (2024) MOCAP and ai-based automated physical demand analysis for workplace safety. Journal of Construction Engineering and Management, 150(7): 04024060, ISSN 0733-9364

Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499

Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499

Alipouri, Y; Bokharaeian, A and Monfared, E (2025) Construction labor activity recognition via an imu-implemented wristband. Journal of Construction Engineering and Management, 151(11): 04025182, ISSN 0733-9364

Alkilani, S and Loosemore, M (2022) Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry. Construction Management and Economics, 40(10), pp. 743-769. ISSN 01446193

Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almarri, K; Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(1), pp. 85-104. ISSN 1471-4175

Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.

Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364

Alqahtani, A and Whyte, A (2016) Evaluation of non-cost factors affecting the life cycle cost: An exploratory study. Journal of Engineering, Design and Technology, 14(4), pp. 818-834.

Alsalman, A A (2012) Construction risks allocation: Optimal risk allocation decision support model. PhD thesis, Oregon State University, USA.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.

Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.

Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.

Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.

Amadi, A (2023) The statistical sensitivity of highway project cost to geo-heterogeneity in the tropics. International Journal of Building Pathology and Adaptation, 41(4), pp. 875-902. ISSN 23984708

Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), pp. 349-371. ISSN 1366-4387

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Amoah, C; Bamfo-Agyei, E and Simpeh, F (2022) The COVID-19 pandemic: The woes of small construction firms in Ghana. Smart and Sustainable Built Environment, 11(4), pp. 1099-1115. ISSN 2046-6099

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364

Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988

Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.

Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988

Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364

Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364

Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.

Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X

Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387

Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Ayat, M; Qureshi, S M and Kang, C (2025) The moderating role of emerging technologies on the impact of coronavirus disease 2019 and the performance of construction projects: The case of Pakistan. Journal of Engineering, Design and Technology, 23(1), pp. 21-50. ISSN 1726-0531

Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364

Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364

Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988

Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.

Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.

Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988

Banwo, O O (2022) Development of a framework for building cost information management in Nigeria. PhD thesis, Coventry University, UK.

Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364

Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Bayraktar, M E; Hastak, M; Gokhale, S and Safi, B (2011) Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects. Journal of Construction Engineering and Management, 137(9), pp. 645-655. ISSN 0733-9364

Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364

Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599

Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.

Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364

Bekele, A A; Mahesh, G and Ingle, P V (2025) Enhancing SMCs' competitiveness through improving material supply chain management practice. International Journal of Construction Management, 25(1), pp. 77-88. ISSN 1562-3599

Benjaoran, V; Sooksil, N and Metham, M (2019) Effect of demand variations on steel bars cutting loss. International Journal of Construction Management, 19(2), pp. 137-148. ISSN 1562-3599

Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988

Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364

Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.

Borthwick, F; Galloway, R L and Seden, R (1999) The impact of the european construction products directive on uk construction product manufacturers. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Boussabaine, A H and Elhag, T M S (1999) Knowledge discovery in residential construction project cost data. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364

Bu-Bushait, K A (1984) A descriptive examination of the relationships between the application of project management techniques and project characteristics. PhD thesis, Georgia State University, USA.

Bui, Diep Thi (2018) Improving the decision-making process for demolition waste management in urban redevelopment projects in Vietnam. PhD thesis, Queensland University of Technology, Australia.

Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364

Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364

Carr, R I (1987) Competitive bidding and opportunity costs. Journal of Construction Engineering and Management, 113(1), pp. 151-165. ISSN 0733-9364

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Cates, G R (2004) Improving project management with simulation and completion distribution functions. PhD thesis, University of Central Florida, USA.

Celoza, A and Alazzam, M (2026) Managing risk, innovation, and collaboration through supplier qualification. Journal of Construction Engineering and Management, 152(1): 04025223, ISSN 0733-9364

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2009) Drivers for adopting public private partnerships-empirical comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), pp. 1115-1124. ISSN 0733-9364

Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193

Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364

Chao, L C and Kuo, C P (2018) Neural-network-centered approach to determining lower limit of combined rate of overheads and markup. Journal of Construction Engineering and Management, 144(2): 04017117, ISSN 0733-9364

Chao, L C and Liou, C N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(8), pp. 835-843. ISSN 1466433X

Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175

Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.

Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364

Chen, Y E; Ahiaga-Dagbui, D; Thaheem, M and Shrestha, A (2022) Optimism bias in transport project cost appraisal: A review of the current body of knowledge. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Chen, Y Q; Zhang, Y B and Zhang, S J (2014) Impacts of different types of owner-contractor conflict on cost performance in construction projects. Journal of Construction Engineering and Management, 140(6): 4014017, ISSN 0733-9364

Chen, Y-K (1991) An analysis of decision strategy as applied to construction portfolios. PhD thesis, Stevens Institute of Technology, USA.

Chen, Z; Zhao, Y; Zhou, X; Hao, S and Li, J (2023) Identifying the risk factors and their interactions of human–robot collaboration implementation during engineering project construction: Evidence from China. Engineering, Construction and Architectural Management, 30(7), pp. 3073-3094. ISSN 0969-9988

Cheng, M Y; Huang, K Y and Hutomo, M (2018) Multiobjective dynamic-guiding PSO for optimizing work shift schedules. Journal of Construction Engineering and Management, 144(9): 04018089, ISSN 0733-9364

Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.

Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.

Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.

Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Cui, Q; Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(4), pp. 361-376. ISSN 1466433X

Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(2), pp. 91-104. ISSN 01446193

Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387

Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364

Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531

Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988

Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599

Daniel, E I; Oshodi, O S and Marte Gomez, J (2025) Developing future skills for the engineering sector: evidence from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 65-75. ISSN 17514304

Daoud, A O; Othman, A A E; Ebohon, O J and Bayyati, A (2022) Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: A critical analysis. Architectural Engineering and Design Management, 18(2), pp. 114-127. ISSN 1745-2007

Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364

Das, D K (2022) Exploring the factors and measures to improve safety in road construction in India. Journal of Construction in Developing Countries, 27(1), pp. 139-152. ISSN 1823-6499

Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988

Dawood, N N; Yasuhara, T; Usuda, Y; Matsuda, C and Sawada, A (2001) Analysis of cost escalation and risk assessment of infrastructure projects: An application in Japanese civil engineering projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

De Lapp, J A; Ford, D N; Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(4), pp. 284-291. ISSN 0969-9988

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.

Diekmann, J E (1983) Probabilistic estimating: Mathematics and applications. Journal of Construction Engineering and Management, 109(3), pp. 297-308. ISSN 0733-9364

Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364

Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499

Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988

Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.

El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.

El-Gafy, M and Abdelhamid, T S (2015) Impact of I/D contracts used for expediting Michigan's road construction. Journal of Construction Engineering and Management, 141(7): 5015005, ISSN 0733-9364

Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364

Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X

Eldin, N N (1987) Methodology for project management control in the construction industry. PhD thesis, Oklahoma State University, USA.

Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.

Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387

Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X

Eybpoosh, M; Dikmen, I and Birgonul, M T (2011) Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), pp. 1164-1175. ISSN 0733-9364

Faniran, O O; Love, P E D and Li, H (1999) Optimal allocation of construction planning resources. Journal of Construction Engineering and Management, 125(5), pp. 311-319. ISSN 0733-9364

Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599

Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531

Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988

Fellows, R; Liu, A and Fong, C M (2003) Leadership style and power relations in quantity surveying in Hong Kong. Construction Management and Economics, 21(8), pp. 809-818. ISSN 01446193

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Fillingham, V L (2018) Assessing information management as a tool for the ongoing maintenance of built assets. EngD thesis, University of Reading, UK.

Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Fobiri, G; Musonda, I and Muleya, F (2025) Using reality capture technology for efficient cost valuation and work verification of construction projects. Construction Innovation, 25(7), pp. 50-75. ISSN 1471-4175

Fobiri, G; Musonda, I and Muleya, F (2025) Unlocking the full potential of reality capture for construction project cost monitoring: A mixed review. Journal of Engineering, Design and Technology, 23(3), pp. 830-853. ISSN 1726-0531

Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364

Fortune, C and Lees, M (1997) Cognitive errors of judgement, learning style characteristics and clients' early cost advisors. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Fortune, C and Lees, M (1998) Quality in strategic cost advice: The effect of anchoring and adjustment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Fortune, C and Lees, M (2001) Systematic errors of judgement and the formulation of strategic cost advice for construction clients. Journal of Financial Management of Property and Construction, 6(2), pp. 81-93. ISSN 1366-4387

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Gambatese, J A; Behm, M and Hinze, J W (2005) Viability of designing for construction worker safety. Journal of Construction Engineering and Management, 131(9), pp. 1029-1036. ISSN 0733-9364

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599

Garg, S and Misra, S (2022) Understanding the components and magnitude of the cost of quality in building construction. Engineering, Construction and Architectural Management, 29(1), pp. 26-48. ISSN 0969-9988

Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.

George, A; Aboagye-Nimo, E and Mamphey, S (2021) The effects of skills shortages on construction costs in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 78-86. ISSN 17514304

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Gharaibeh, H M (2013) Managing the cost of power transmission projects: Lessons learned. Journal of Construction Engineering and Management, 139(8), pp. 1063-1067. ISSN 0733-9364

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghazal, M M and Hammad, A (2022) Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9), pp. 1632-1646. ISSN 1562-3599

Gholami Bavil Olyai, Farshid (2018) A framework for enhancing engineering deliverables to improve construction performance in oil and gas projects. PhD thesis, University of Calgary, Canada.

Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.

Goedert, J D and Rokooei, S (2016) Project-based construction education with simulations in a gaming environment. International Journal of Construction Education and Research, 12(3), pp. 208-223. ISSN 1557-8771

Golden, S K (2008) Immigration and construction: An analysis of the impact of immigration on construction project costs. PhD thesis, University of Maryland, College Park, USA.

Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.

Goodarzizad, P; Mohammadi Golafshani, E and Arashpour, M (2023) Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. International Journal of Construction Management, 23(5), pp. 763-779. ISSN 1562-3599

Griffiths, R; Lord, W and Coggins, J (2017) Project bank accounts: The second wave of security of payment? Journal of Financial Management of Property and Construction, 22(3), pp. 322-338. ISSN 1366-4387

Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988

Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.

Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price. PhD thesis, Indiana State University, USA.

Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.

Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.

Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364

Hanna, A S; Yeutter, M and Aoun, D G (2014) State of practice of building information modeling in the electrical construction industry. Journal of Construction Engineering and Management, 140(12): 05014011, ISSN 0733-9364

Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.

Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364

Heath, T; Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(6), pp. 543-549. ISSN 01446193

Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.

Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193

Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2020) Cost contingency and cost evolvement of construction projects in the preconstruction phase. Journal of Construction Engineering and Management, 146(6): 05020006, ISSN 0733-9364

Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988

Hu, Y; Song, J and Zhao, T (2024) Evolutionary game analysis of the intelligent upgrading of smart solar photovoltaic projects. Engineering, Construction and Architectural Management, 31(5), pp. 1835-1856. ISSN 0969-9988

Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.

Hwang, B G; Thomas, S R; Haas, C T and Caldas, C H (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198. ISSN 0733-9364

Hwang, S; Park, M; Lee, H S and Lee, S (2016) Hybrid simulation framework for immediate facility restoration planning after a catastrophic disaster. Journal of Construction Engineering and Management, 142(8): 4016026, ISSN 0733-9364

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Hyari, K H; Tarawneh, Z S and Katkhuda, H N (2016) Detection model for unbalanced pricing in construction projects: A risk-based approach. Journal of Construction Engineering and Management, 142(12): 04016078, ISSN 0733-9364

Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Imam, H (2021) Roles of shared leadership, autonomy, and knowledge sharing in construction project success. Journal of Construction Engineering and Management, 147(7): 04021067, ISSN 0733-9364

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364

Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364

Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ishtiaque, T A; Wondimu, P A and Klakegg, O J (2025) Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: The client's perception. International Journal of Construction Management, 25(10), pp. 1227-1238. ISSN 1562-3599

Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.

Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218

Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599

Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988

Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.

Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364

Jergeas, G and Der Put, J V (2001) Benefits of constructability on construction projects. Journal of Construction Engineering and Management, 127(4), pp. 281-290. ISSN 0733-9364

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364

Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364

Joubert, F J (2015) Risk simulation in a portfolio of port and rail capital projects. PhD thesis, University of Pretoria, South Africa.

Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531

Kalu, U G (2003) Optimizing the participation of suppliers and subcontractors in managing construction projects using concurrent engineering philosophy. PhD thesis, Golden Gate University, USA.

Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364

Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387

Kar, S and Jha, K N (2019) Assessment of criticality of materials in a construction project. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Kar, S and Jha, K N (2022) Assessing criticality of construction materials for prioritizing their procurement using ANP-TOPSIS. International Journal of Construction Management, 22(10), pp. 1852-1862. ISSN 1562-3599

Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988

Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.

Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364

Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364

Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988

Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175

Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364

Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364

Kim, C-S (2002) An information model for real-time project cost integration. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.

Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364

Kim, S (2013) Hybrid EVAS-CBR system for the preliminary cost estimation of high-rise buildings. PhD thesis, University of Reading, UK.

Kim, T-y (2001) Trends of selected construction industry practices. PhD thesis, University of Texas at Austin, USA.

Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.

Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364

Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364

Koch, C (2018) Productivity measurement: The social construction of reduction through expansion. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Konchar, M and Sanvido, V (1998) Comparison of U.S. Project delivery systems. Journal of Construction Engineering and Management, 124(6), pp. 435-444. ISSN 0733-9364

Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.

Kong, R; Bai, S; Tang, C; Liang, Y; Wang, Q and Li, M (2026) A multidimensional factor evaluation method for tunnel contour quality assessment using lidar scanning data. Journal of Construction Engineering and Management, 152(3): 04025274, ISSN 0733-9364

Koo, H J; O’Connor, J and Sprouse, R (2024) Analyzing the characteristics of design defect leading indicators on building construction projects. International Journal of Construction Management, 24(8), pp. 834-842. ISSN 1562-3599

Kostuk, K J (2003) Quantifying the uncertainty associated with long-term maintenance contracts. PhD thesis, University of Saskatchewan, Canada.

Kulevich, A E (2025) Effective strategies for mitigating bidding corruption for U.S. Infrastructure contracts. DBA thesis, Walden University, USA.

Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.

Kwok, E C S; Ng, S H S and Tam, J C L (2009) Risk assessment as an explicit dimension for tender evaluation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 117-120. ISSN 17514312

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Lambers, R; Lamari, F; Skitmore, M and Rajendra, D (2024) Key residential construction defects: A framework for their identification and correlated causes. Construction Innovation, 24(6), pp. 1425-1459. ISSN 1471-4175

Lapinski, A R; Horman, M J and Riley, D R (2006) Lean processes for sustainable project delivery. Journal of Construction Engineering and Management, 132(10), pp. 1083-1091. ISSN 0733-9364

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988

Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531

Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(6), pp. 2513-2535. ISSN 0969-9988

Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364

Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364

Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.

Lee, S H; Thomas, S R and Tucker, R L (2004) Effective practice utilization using performance prediction software. Journal of Construction Engineering and Management, 130(4), pp. 576-585. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193

Lee, S-H (2001) Discriminant function analysis for categorization of best practices. PhD thesis, University of Texas at Austin, USA.

Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988

Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364

Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364

Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387

Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988

Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988

Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.

Li, J; Jiang, W and Zuo, J (2020) The effects of trust network among project participants on project performance based on SNA approach: A case study in China. International Journal of Construction Management, 20(8), pp. 837-847. ISSN 1562-3599

Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Lines, B C; Kakarapalli, R and Nguyen, P H D (2022) Does best value procurement cost more than low-bid? A total project cost perspective. International Journal of Construction Education and Research, 18(1), pp. 85-100. ISSN 1557-8771

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(3), pp. 281-292. ISSN 2044-124X

Lingard, H; Hughes, W P and Chinyio, E (1998) The impact of contractor selection method on transaction costs: a review. Journal of Construction Procurement, 4(2), pp. 89-102. ISSN 1358-9180

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, J; Zhao, X and Yan, P (2016) Risk paths in international construction projects: Case study from Chinese contractors. Journal of Construction Engineering and Management, 142(6): 05016002, ISSN 0733-9364

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, Q; Ye, G; Feng, Y; Wang, C and Peng, Y (2020) Case-based insights into rework costs of residential building projects in China. International Journal of Construction Management, 20(4), pp. 347-355. ISSN 1562-3599

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364

Lo, T Y; Fung, I W H and Tung, K C F (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), pp. 636-649. ISSN 0733-9364

Love, P; Smith, J and Han, S (2011) Systemic rework risk classification for offshore projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.

Love, P E D (2025) Explaining cost overrun causation in transport projects: Drawing on evidential pluralism to develop theory. Journal of Construction Engineering and Management, 151(2): 06024003, ISSN 0733-9364

Love, P E D; Davis, P R; Chevis, R and Edwards, D J (2011) Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), pp. 127-136. ISSN 0733-9364

Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364

Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193

Love, P E D; Wang, X; Sing, C P and Tiong, R L K (2013) Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), pp. 321-330. ISSN 0733-9364

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Lu, Na (2007) Investigation of designers' and general contractors' perceptions of offsite construction techniques in the United States construction industry. PhD thesis, Clemson University, USA.

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599

Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Madihi, M H; Shirzadi Javid, A A and Nasirzadeh, F (2025) Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks. Engineering, Construction and Architectural Management, 32(3), pp. 2022-2043. ISSN 0969-9988

Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599

Maharjan, S; Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(5), pp. 2008-2025. ISSN 0969-9988

Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988

Majrouhi Sardroud, J (2011) Assessment and development of radio frequency identification applications for effective management of construction activities. PhD thesis, Kingston University, UK.

Mak, S and Wong, L (1997) Estimating using risk analysis for construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.

Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.

Malin, N (2000) The cost of green materials. Building Research & Information, 28(5-6), pp. 408-412. ISSN 0961-3218

Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165

Marshall, H E (1985) A graphical approach to discounted payback. Construction Management and Economics, 3(2), pp. 105-120. ISSN 01446193

Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.

Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.

Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364

Meduri, S S and Annamalai, T R (2013) Unit costs of public and PPP road projects: Evidence from India. Journal of Construction Engineering and Management, 139(1), pp. 35-43. ISSN 0733-9364

Meharie, M G; Mengesha, W J; Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(7), pp. 2836-2853. ISSN 0969-9988

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364

Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599

Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Mhady, A A; Gürgün, A P; Budayan, C and Koc, K (2025) New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, 151(11): 04025160, ISSN 0733-9364

Miller, J (2024) Leadership traits among site leaders in the construction industry. DBA thesis, California Baptist University, USA.

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(3), pp. 366-378. ISSN 1562-3599

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), pp. 343-359. ISSN 01446193

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Morrow, T K (1998) Effects of selected practices on project cost performance. PhD thesis, University of Texas at Austin, USA.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364

Muehlhausen, F B (1988) Development of the materials management model for construction management curriculum development and a method to translate model information into instruction. PhD thesis, Purdue University, USA.

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Musarat, M A; Alaloul, W S and Liew, M S (2022) Inflation rate and labours' wages in construction projects: Economic relation investigation. Engineering, Construction and Architectural Management, 29(6), pp. 2461-2494. ISSN 0969-9988

Muzorewa, Maxwell (2024) Project management strategies used in hospitality construction projects to improve performance. DBA thesis, Walden University, USA.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988

Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099

Narbaev, T and De Marco, A (2014) Combination of growth model and earned schedule to forecast project cost at completion. Journal of Construction Engineering and Management, 140(1): 04013038, ISSN 0733-9364

Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nicholson, M P and Naamani, Z (1992) Managing architectural design: a recent survey. Construction Management and Economics, 10(6), pp. 479-487. ISSN 01446193

Nickdoost, N; Choi, J; Abdelrazig, Y A and Sobanjo, J (2022) A project life-cycle approach to managing procrastination in construction projects: State-of-the-art review. Journal of Construction Engineering and Management, 148(5): 03122001, ISSN 0733-9364

Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364

Nkoba, N. and Amoah, C. (2026) Curbing corruption and unethical practices in construction projects. International Journal of Construction Management, 26(9), pp. 1799-1814. ISSN 1562-3599

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt. PhD thesis, University of Manchester, UK.

Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193

O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364

O'Connor, J T and Yang, L R (2004) Project performance versus use of technologies at project and phase levels. Journal of Construction Engineering and Management, 130(3), pp. 322-329. ISSN 0733-9364

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Oey, M (2001) Effects of selected practices on the cost performance of building projects. PhD thesis, University of Texas at Austin, USA.

Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of SME contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), pp. 1-16. ISSN 2521-0165

Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387

Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387

Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.

Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599

Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364

Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531

Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X

Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304

Olayinka, R A (2015) A knowledge management framework for reducing the cost of poor quality on construction projects. PhD thesis, University of Wolverhampton, UK.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Oo, B L (2017) Release of construction clients' pre-tender cost estimates: An experimental study. Construction Economics and Building, 17(4), pp. 37-47. ISSN 2204-9029

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.

Orgut, R E; Zhu, J; Batouli, M; Mostafavi, A and Jaselskis, E J (2018) Metrics that matter: Core predictive and diagnostic metrics for improved project controls and analytics. Journal of Construction Engineering and Management, 144(11): 04018100, ISSN 0733-9364

Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531

Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387

Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499

Oyedele, L; Jaiyeoba, B and Fadeyi, M (2003) Design factors influencing quality of building projects in Nigeria: Consultants' perception. Construction Economics and Building, 3(2), pp. 25-32. ISSN 2204-9029

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Panquet, Q; Bourgault, M; Pellerin, R; Danjou, C and Perrier, N (2024) A process-improvement method for implementing earned value-based project management in organizations. Journal of Construction Engineering and Management, 150(12): 04024170, ISSN 0733-9364

Paquin, J P; Morin, P P; Lambert, A and Koplyay, T (2022) Assessing project contingency reserves with the expected cost overrun risk measure. Journal of Construction Engineering and Management, 148(10): 04022102, ISSN 0733-9364

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.

Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387

Patel, P. and Sturgill, R. (2026) An interpretive structure modeling approach to assess the value of underground utility as-builts. Journal of Construction Engineering and Management, 152(10): 04026164, ISSN 0733-9364

Peansupap, V and Walker, D H T (2009) Exploratory factors influencing design practice learning within a Thai context. Engineering, Construction and Architectural Management, 16(3), pp. 238-253. ISSN 0969-9988

Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193

Pesek, A E (2017) Impact of construction document deficiencies on heavy/civil low-bid infrastructure projects and the introduction of a contractor document review assessment. PhD thesis, Arizona State University, USA.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Polat, G (2008) Factors affecting the use of precast concrete systems in the United States. Journal of Construction Engineering and Management, 134(3), pp. 169-178. ISSN 0733-9364

Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X

Qiao, Y; Fricker, J D and Labi, S (2019) Influence of project bundling on maintenance of traffic costs across highway project types. Journal of Construction Engineering and Management, 145(8): 05019010, ISSN 0733-9364

Rachmawati, F; Mudjahidin, M and Dewi Widowati, E (2024) Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), pp. 213-225. ISSN 1562-3599

Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.

Rajan Annamalai, T and Jain, N (2013) Project finance and investments in risky environments: Evidence from the infrastructure sector. Journal of Financial Management of Property and Construction, 18(3), pp. 251-267. ISSN 1366-4387

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(3), pp. 233-243. ISSN 01446193

Ranasinghe, M (1996) Total project cost: A simplified model for decision makers. Construction Management and Economics, 14(6), pp. 497-505. ISSN 01446193

Ranasinghe, M (1998) Risk management in the insurance industry: Insights for the engineering construction industry. Construction Management and Economics, 16(1), pp. 31-39. ISSN 01446193

Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(4), pp. 395-406. ISSN 01446193

Rapp, R R and Pan, J (2010) Disaster restoration professional body of knowledge. International Journal of Construction Education and Research, 6(3), pp. 202-218. ISSN 1557-8771

Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.

Rauscher, Kimberly (2024) Successful strategies government executive stakeholders use to mitigate higher project costs and user adoption failure rates. DBA thesis, Walden University, USA.

Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364

Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364

Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364

Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007

Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499

Rezaei, Mohammad (2019) Characterizing controlled low-strength materials (CLSM) for narrow-trench reinstatement. PhD thesis, University of Alberta, Canada.

Ringwald, R C (1986) General overhead distribution to project costs. Journal of Construction Engineering and Management, 112(1), pp. 83-89. ISSN 0733-9364

Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Rose, T M and Manley, K (2014) Revisiting the adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 32(9), pp. 904-917. ISSN 01446193

Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X

Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364

Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165

Salama, M; Kaka, A and Leishman, C (2005) The relationship between the performance of the economy and the cost of construction of educational buildings in Egypt: A preliminary study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.

Salari, M; Ghanbari, M; Skitmore, M and Alipour, M (2026) Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm. Construction Innovation, 26(3), pp. 745-767. ISSN 1471-4175

Sami Ur Rehman, M; Shafiq, M T and Afzal, M (2022) Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology, 20(1), pp. 245-266. ISSN 1726-0531

Schexnayder, C; Weber, S L and Brooks, B T (1999) Effect of truck payload weight on production. Journal of Construction Engineering and Management, 125(1), pp. 1-7. ISSN 0733-9364

Scott, D and Krishnan, V (1983) Appropriate technology for Fiji. Construction Papers, 2(1), pp. 51-61. ISSN 0144-8587

Seethapathy, S and Henderson, J H (2017) Management of construction waste in nuclear and thermal power plant projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 19-46. ISSN 1823-6499

Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.

Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364

Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364

Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364

Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364

Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.

Shahid, M. U.; Thaheem, M. J. and Arshad, H. (2023) Quantification and benchmarking of construction waste and its impact on cost: A case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988

Shahid, M U; Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost: a case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988

Shahrin, F; Mahmood, K and Hassan, F (2021) Project cost overruns and risk allocation in public funded projects in Malaysia. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Shalwani, A and Lines, B (2022) Using issue logs to improve construction project performance. Engineering, Construction and Architectural Management, 29(2), pp. 896-915. ISSN 0969-9988

Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364

Shamshiri, A; Ryu, K R; Park, J Y and Choi, K (2023) Project phase-based contingency adjustment framework for infrastructure renewal projects. Journal of Construction Engineering and Management, 149(2): 04022176, ISSN 0733-9364

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.

Sharma, V; Caldas, C H and Mulva, S P (2020) Identification and prioritization of factors affecting the overall project cost of healthcare facilities. Journal of Construction Engineering and Management, 146(2): 04019106, ISSN 0733-9364

Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599

Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shen, Q (1993) A knowledge based structure for implementing Value Management in the design of office buildings. PhD thesis, University of Salford, UK.

Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364

Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.

Signor, R; Love, P E D; Marchiori, F F and Felisberto, A D (2020) Underpricing in social infrastructure projects: Combating the institutionalization of the winner's curse. Journal of Construction Engineering and Management, 146(12), ISSN 0733-9364

Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771

Sinesilassie, E G; Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108-119. ISSN 1562-3599

Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988

Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364

Skitmore, R M (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(1), pp. 83-89. ISSN 01446193

Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007

Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364

Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.

Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364

Stone, M L; Johnson, P W and Leopard, T A (2011) Using design-based change orders as a lessons learned metric in university dormitory construction. International Journal of Construction Education and Research, 7(3), pp. 226-240. ISSN 1557-8771

Stuban, S M F (2011) Employing risk management to control military construction costs. PhD thesis, George Washington University, USA.

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Taggart, M; Koskela, L and Rooke, J (2014) The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach. Construction Management and Economics, 32(7-8), pp. 829-842. ISSN 01446193

Taggart M, K L R R (2013) The role of the supply chain in elimination and reduction of construction rework and defects: An action research approach. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.

Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Tilford, K R; Jaselskis, E J and Smith, G R (2000) Impact of environmental contamination on construction projects. Journal of Construction Engineering and Management, 126(1), pp. 45-51. ISSN 0733-9364

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Touran, A (2003) Probabilistic model for cost contingency. Journal of Construction Engineering and Management, 129(3), pp. 280-284. ISSN 0733-9364

Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Tse, R Y C and Love, P E D (2003) An economic analysis of the effect of delays on project costs. Journal of Construction Research, 4(2), pp. 155-160. ISSN 1609-9451

Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364

Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(2), pp. 163-176. ISSN 1358-9180

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: Neural networks versus traditional methods. Construction Innovation, 1(4), pp. 227-243. ISSN 1471-4175

Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.

Walker, K K; Schexnayder, C; Mayo, R E and Walsh, K D (1996) Methods and procedural considerations in demolishing tall concrete chimneys. Journal of Construction Engineering and Management, 122(3), pp. 223-230. ISSN 0733-9364

Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364

Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Wang, W C (2002) Sim-utility: Model for project ceiling price determination. Journal of Construction Engineering and Management, 128(1), pp. 76-84. ISSN 0733-9364

Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364

Ward, P (2005) The socl's delay and disruption protocol and the Australian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wasi, D and Skitmore, M (2001) Factors affecting the performance of small indigenous contractors in Papau New Guinea. Construction Economics and Building, 1(1), pp. 80-90. ISSN 2204-9029

Whang, S W; Flanagan, R and Kim, K P (2025) An analysis of the optimal research and development investment level of contractor using the panel threshold regression model. International Journal of Construction Management, 25(16), pp. 2007-2019. ISSN 1562-3599

Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.

Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193

Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, P S P; Cheung, S O and Chan, L L Y (2004) Enhancing construction value chain effectiveness in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Xie, H; Abourizk, S and Zou, J (2012) Quantitative method for updating cost contingency throughout project execution. Journal of Construction Engineering and Management, 138(6), pp. 759-766. ISSN 0733-9364

Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control. PhD thesis, University of the West of England, Bristol, UK.

Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364

Yang, L R (2007) Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25(10), pp. 1041-1051. ISSN 1466433X

Yang, L-R (2003) Influence of technology on project success measures. PhD thesis, University of Texas at Austin, USA.

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yoon, J; Yu, I and Jung, D (2018) Factors needed for the development of a constructability assessment model for building renovation and extension in Korea. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Younes, B (2013) A framework for invoice management in construction. PhD thesis, University of Alberta, Canada.

Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364

Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.

Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(1), pp. 73-87. ISSN 1466433X

Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. PhD thesis, University of Calgary, Canada.

Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.

Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364

Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599

Zhang, Y (2012) An investigation on cooperative behaviors in the Chinese construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364

Zheng, Z; Li, Y and Torres, J (2024) An integrated method of automated layout design and optimization for modular construction. Engineering, Construction and Architectural Management, 31(3), pp. 1016-1036. ISSN 0969-9988

Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.

al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175

de Neufville, R and King, D (1991) Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), pp. 659-673. ISSN 0733-9364

van der Kuyp, D J (2018) Strategies construction managerial leaders use to counteract material cost overruns. PhD thesis, Walden University, USA.