Items with Index Term: programming
Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management. PhD thesis, Iowa State University, USA.
Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abdessalem, J; Fakhreddine, D; Said, A and Mohamed, H (2014) Shape optimization for a hyperelastic axisymmetric structure. Journal of Engineering, Design and Technology, 12(2), pp. 177-194. ISSN 1726-0531
Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175
Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Adams, J (2019) Dynamic criticality analysis of industrial assets and system. PhD thesis, University of Cambridge, UK.
Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.
Adeyemi, H O; Adejuyigbe, S B; Ismaila, S O and Adekoya, A F (2015) Low back pain assessment application for construction workers. Journal of Engineering, Design and Technology, 13(3), pp. 419-434.
Adibzadeh, S; Adibzadeh, B and Akbari, A (2025) Environmental components affecting location in iran's national housing planning. International Journal of Construction Management, 25(16), pp. 2020-2029. ISSN 1562-3599
Aghimien, E I; Aghimien, L M; Petinrin, O O and Aghimien, D O (2021) High-performance computing for computational modelling in built environment-related studies: A scientometric review. Journal of Engineering, Design and Technology, 19(5), pp. 1138-1157. ISSN 1726-0531
Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599
Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.
Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007
Al-Amin, Md (2023) Pavement maintenance and rehabilitation programming and budget allocation from strategic perspectives: Multiobjective optimization models. PhD thesis, University of Texas at Austin, USA.
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Hussein, M; Alkass, S and Moselhi, O (2001) An algorithm for mobile crane selection and location on construction sites. Construction Innovation, 1(2), pp. 91-105. ISSN 1471-4175
Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions. PhD thesis, North Carolina State University, USA.
Al-Otaibi, S (2021) Assessing the impact of transport investment and railway accessibility on economic productivity. PhD thesis, Loughborough University, UK.
Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.
Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(2), pp. 121-132. ISSN 0969-9988
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Alexandrou, K; Thravalou, S and Artopoulos, G (2024) Heritage-BIM for energy simulation: A data exchange method for improved interoperability. Building Research & Information, 52(3), pp. 373-386. ISSN 0961-3218
Alim, S (1985) Fuzzy expert systems in civil engineering. PhD thesis, Imperial College London, UK.
Alkass, S; Alhussein, M and Moselhi, O (1997) Computerized crane selection for construction projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Almeraikhi, A M (2010) An integrated framework for multi-project planning and control. PhD thesis, Sheffield Hallam University, UK.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Altun, M (2024) Data-driven and knowledge-assisted model-based frameworks for supporting facility maintenance. PhD thesis, Middle East Technical University, Turkey.
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364
Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599
Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.
Anspach, J A; Sharma, V and Madathil, K C (2024) Hospital design planning: unscheduled trauma ER visits impacting inpatient space allocation. Building Research & Information, 52(7), pp. 836-850. ISSN 0961-3218
Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007
Arif, F (2013) A decision support framework for infrastructure maintenance investment decision-making. PhD thesis, Florida International University, USA.
Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.
Arora, R (1997) Role and influence of emerging social dynamics in decisions on investment opportunities in construction industry. PhD thesis, Indian Institute of Technology Delhi, India.
Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.
Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007
Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.
Augugliaro, F (2015) Physical interaction, aerial construction, and coordinated flight for flying machines. DSc thesis, ETH Zürich, Switzerland.
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries. PhD thesis, University of Maryland, College Park, USA.
Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.
Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.
Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.
Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.
Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.
Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.
Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.
Batie, D L (1996) The incorporation of construction history into architectural history education: The "histcon" interactive computer program. PhD thesis, Texas A&M University, USA.
Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.
Begić, H; Galić, M and Klanšek, U (2024) Active BIM system for optimized multi-project ready-mix-concrete delivery. Engineering, Construction and Architectural Management, 31(12), pp. 5057-5084. ISSN 0969-9988
Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364
Beltramin, Renata Maria Geraldini (2020) A graphical-systematic approach to architectural programming for office buildings and spaces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Bender, M J (1996) A framework for collaborative planning and investigations of decision support tools for hydro development. PhD thesis, University of Manitoba, Canada.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599
Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Bowes, D and Arnold, S (2009) The engineering and construction contract and its implications for project programming procedures. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Bowles, G; Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(4), pp. 315-326. ISSN 01446193
Bowles, Graeme (1995) Annual sinking fund modelling for housing association major repairs provision. PhD thesis, Abertay University, UK.
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364
Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Brooks, T and McIlwaine, S (2021) Why does anyone want to work in the UK construction industry? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Bueno, C; Pereira, L M and Fabricio, M M (2018) Life cycle assessment and environmental-based choices at the early design stages: An application using building information modelling. Architectural Engineering and Design Management, 14(5), pp. 332-346. ISSN 1745-2007
Burt, J and Purver, K (2014) Building information modelling for small-scale residential projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 134-140. ISSN 17514304
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries. PhD thesis, Aston University, UK.
Cao, J; Said, H; Savov, A and Hall, D (2024) Graph-based evolutionary search for optimal hybrid modularization of building construction projects. Journal of Construction Engineering and Management, 150(8): 04024098, ISSN 0733-9364
Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364
Chadalawada, J (2017) Data driven modelling and knowledge discovery in water resources engineering. PhD thesis, National University of Singapore, Singapore.
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Chand, Shelvin (2018) Automated design of heuristics for the resource constrained project scheduling problem. PhD thesis, University of New South Wales, Australia.
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.
Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.
Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding. PhD thesis, Purdue University, USA.
Cheng, Y (2005) Development of bridge management systems using fuzzy case-based reasoning. PhD thesis, Kansas State University, USA.
Chesworth, B (2015) Is the concept of zero harm an achievable goal? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.
Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.
Chovichien, V (1981) The discounted cost model and application to acquisition and utilization policies of construction equipment. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.
Colberg, M R (1950) Federal control of construction following World War II. PhD thesis, University of Michigan, USA.
Cui, X (2002) Delay time modelling and software development. PhD thesis, University of Salford, UK.
Das, P P; Khatri, V N; Doley, R; Dutta, R K and Yadav, J S (2024) Estimation of bearing capacity of shallow footings on layered sand using finite elements analysis. Journal of Engineering, Design and Technology, 22(2), pp. 385-403. ISSN 1726-0531
De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Delgado-Hernandez, D J and Aspinwall, E M (2005) Improvement tools in the UK construction industry. Construction Management and Economics, 23(9), pp. 965-977. ISSN 01446193
Deng, Y and Poon, S W (2014) Positioning mega-event flagships: from performing arts center of Expo 2010 to Mercedes-Benz Arena. Architectural Engineering and Design Management, 10(3-4), pp. 233-250. ISSN 1745-2007
Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193
Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364
Dong, S (2012) A single element based modeling approach for simulating construction operations. PhD thesis, University of Nebraska - Lincoln, USA.
Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364
Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364
Easa, S M and Can, E K (1985) Optimization model for aggregate blending. Journal of Construction Engineering and Management, 111(3), pp. 216-230. ISSN 0733-9364
El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.
El Korany, T. M.; Fouad, A. and Sanad, H. (2026) Identifying contractor selection criteria in Egyptian construction tenders: A SNA and PLS-SEM approach. Construction Innovation, 26(5), pp. 1356-1383. ISSN 1471-4175
El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364
El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Eldin, N N (1989) Measurement of work progress: Quantitative technique. Journal of Construction Engineering and Management, 115(3), pp. 462-474. ISSN 0733-9364
Elf, M; Svedbo Engström, M and Wijk, H (2012) An assessment of briefs used for designing healthcare environments: A survey in Sweden. Construction Management and Economics, 30(10), pp. 835-844. ISSN 1466433X
Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.
Engida Woldemichael, D. and Mohd Hashim, F. (2011) A framework for functionbased conceptual design support system. Journal of Engineering, Design and Technology, 9(3), pp. 250-272. ISSN 1726-0531
Engida Woldemichael, D and Mohd Hashim, F (2011) A framework for function-based conceptual design support system. Journal of Engineering, Design and Technology, 9(3), pp. 250-272. ISSN 1726-0531
Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.
Farouk, A M; Rahman, R A and Romali, N S (2023) Economic analysis of rehabilitation approaches for water distribution networks: Comparative study between Egypt and Malaysia. Journal of Engineering, Design and Technology, 21(1), pp. 130-149. ISSN 1726-0531
Farzaneh, A (2019) Development of BIM-BEM framework to support the design process. DEng thesis, Ecole de Technologie Superieure, Canada.
Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364
Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures. PhD thesis, Stanford University, USA.
França, Ana Judite Galbiatti Limongi (2016) Continuous improvement applied to standardized typology of buildings: Knowledge management in the context of the asset portfolio. PhD thesis, Universidade de São Paulo, Brazil.
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Fuyama, H (1993) Computer assisted conceptual structural design of steel buildings. PhD thesis, Stanford University, USA.
Gade, A N and Opoku, A (2020) Challenges for implementing the Sustainable Development Goals in the Danish construction industry: Building owners' perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Gbadamosi, S L and Nwulu, N I (2020) Optimal planning of renewable energy systems for power loss reduction in transmission expansion planning. Journal of Engineering, Design and Technology, 18(5), pp. 1209-1222. ISSN 1726-0531
Ghasemi, M; Chakrabortty, R K; Shahabi-Shahmiri, R and Mirnezami, S A (2024) A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem. International Journal of Construction Management, 24(10), pp. 1090-1106. ISSN 1562-3599
Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988
Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalized document management system to update highway operation and management systems using building information modeling. Journal of Construction Engineering and Management, 152(7): 04026090, ISSN 0733-9364
Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.
Grau, D; Cruz Rios, F and Sherman, R (2021) Project validation: A set-based and concurrent design approach to inform owner's authorization decision on complex projects. Journal of Construction Engineering and Management, 147(10): 04021132, ISSN 0733-9364
Guikema, S D (2003) Optimal resource allocation in an engineering design team with asymmetric information. PhD thesis, Stanford University, USA.
Hague, D J (1985) Incentives and motivation in the construction industry: A critique. Construction Management and Economics, 3(2), pp. 163-170. ISSN 01446193
Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.
Hammad, A W A; Tam, V W Y and Haddad, A N (2025) A bi-level mixed integer non-linear programming model to solve the billboard location problem in cities. International Journal of Construction Management, 25(16), pp. 1929-1937. ISSN 1562-3599
Hammad, A; Akbarnezhad, A; Grzybowska, H; Wu, P and Wang, X (2019) Mathematical optimisation of location and design of windows by considering energy performance, lighting and privacy of buildings. Smart and Sustainable Built Environment, 8(2), pp. 117-137. ISSN 2046-6099
Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193
Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.
Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364
Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218
Hasanain, F A (2022) A BIM-Mostadam plug-in design and evaluation model. PhD thesis, University of Florida, USA.
Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.
He, W (1997) Pavement project optimization and analysis. PhD thesis, Arizona State University, USA.
Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.
Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.
Hijazi, A M (1989) Simulation analysis of linear construction processes. PhD thesis, Purdue University, USA.
Ho, K H; Hui, E C M and Su, H (2010) Examining fuzzy tactical asset allocation (FTAA) as an alternative to modern portfolio theory (MPT) asset allocation for international and direct real estate investment. Journal of Financial Management of Property and Construction, 15(1), pp. 71-94. ISSN 1366-4387
Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment. PhD thesis, University of Florida, USA.
Hong, Ying Civil (2018) Modelling and evaluating the adoption of building information modelling in Australian and Chinese small and medium-sized construction organisations. PhD thesis, University of New South Wales, Australia.
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Hu, W and Panthi, K (2020) Project status reporting system (PSRS) for pipeline relocation programs. Built Environment Project and Asset Management, 10(5), pp. 693-708. ISSN 2044-124X
Huang, J (2025) Structure-aware 3D building reconstruction. PhD thesis, Delft University of Technology, Netherlands.
Huang, Y (2008) Analysis of the supply chain design and planning issues: Models and algorithms. PhD thesis, National University of Singapore, Singapore.
Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.
Hussain, M A D (2001) Value engineering expert system in suburban highway design (VEESSHD). PhD thesis, University of Pittsburgh, USA.
Hussey, H; Thurairajah, N; Ginige, K and Goulding, J (2019) Establishing descriptions of building work in UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ibrahim, Y M (2010) On the measurement of work in progress using computer vision: A computerised reporting model. Journal of Engineering, Design and Technology, 8(1), pp. 45-63. ISSN 1726-0531
Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007
Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. PhD thesis, Illinois Institute of Technology, USA.
Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364
Irving, P A (2016) Explicating excessive financial resource allocation by building control in achieving regulatory conformity in domestic extensions. PhD thesis, University of Salford, UK.
Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364
Ismail, Z-A (2017) Maintenance management system (MMS) to support facilities management at Malaysian polytechnic. Smart and Sustainable Built Environment, 6(1), pp. 19-33. ISSN 2046-6099
Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599
Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364
Jafari, K G; Nozhat Sadat Ghazi, S and Noorzai, E (2021) BIM-based integrated solution for analysis and management of mismatches during construction. Journal of Engineering, Design and Technology, 19(1), pp. 81-102. ISSN 1726-0531
Javed, F (2010) Integrated prioritization and optimization approach for pavement management. PhD thesis, National University of Singapore, Singapore.
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Ji, Y and Leite, F (2020) Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming. Journal of Construction Engineering and Management, 146(3): 04020007, ISSN 0733-9364
Jiang, Y (1990) The development of performance prediction and optimization models for bridge management systems. PhD thesis, Purdue University, USA.
Jiang, Y; Yang, G; Li, H; Zhang, T and Khudhair, A (2024) Physics-informed knowledge-driven decision-making framework for holistic bridge maintenance. Journal of Construction Engineering and Management, 150(9): 04024105, ISSN 0733-9364
Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364
Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364
Kannimuthu, M; Raphael, B; Palaneeswaran, E and Kuppuswamy, A (2019) Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Built Environment Project and Asset Management, 9(1), pp. 44-63. ISSN 2044-124X
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988
Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099
Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988
Khalid, M; Yusuf, A; Akanmu, A; Murzi, H and Awolusi, I (2024) The impact of individual differences in developing computational thinking and sensor data analytics skills in construction engineering education. International Journal of Construction Education and Research, 20(4), pp. 483-500. ISSN 1557-8771
Khalid, Mohammad (2025) Enhancing computational thinking skills of the future construction workforce to perform sensor data analytics with end-user programming environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364
Khorshid, E; Alfadli, A and Falah, A (2018) Application of constraint infeasibility detection methods in engineering design problems. Journal of Engineering, Design and Technology, 16(2), pp. 285-312. ISSN 1726-0531
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364
Kong, R; Bai, S; Tang, C; Liang, Y; Wang, Q and Li, M (2026) A multidimensional factor evaluation method for tunnel contour quality assessment using lidar scanning data. Journal of Construction Engineering and Management, 152(3): 04025274, ISSN 0733-9364
Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures. PhD thesis, University of Colorado at Boulder, USA.
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.
Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.
Kuldip, C (1989) OR applications in strategic sector constructions with capital budgeting. PhD thesis, Indian Institute of Technology Delhi, India.
Kumar, V (2019) Developing COBie dataset management system (CDMS) to enhance usability of building information model-facilities management information exchange standard. PhD thesis, National University of Singapore, Singapore.
Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.
LaValva, S V (2016) An examination of the relationship among New Jersey county vocational school administrators' perceptions and the variables that impact enrollment in high school level building trades programs. EdD thesis, Saint Peter's University, USA.
Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364
Lee, J K (2011) Building environment rule and analysis (BERA) language and its application for evaluating building circulation and spatial program. PhD thesis, Georgia Institute of Technology, USA.
Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.
Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Li, Guokai (2024) A research on construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.
Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Liang, L Y; Thompson, R G and Young, D M (2004) Optimising the design of sewer networks using genetic algorithms and tabu search. Engineering, Construction and Architectural Management, 11(2), pp. 101-112. ISSN 0969-9988
Liang, X (2012) Development of a framework for real-time 3D positioning and visualization of construction resources. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lin, Y-S (1996) Optimal design and probabilistic evaluation of fire egress systems. PhD thesis, Duke University, USA.
Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364
Logcher, R D; Wang, M T and Chen, F H S (1989) Knowledge processing for construction management data base. Journal of Construction Engineering and Management, 115(2), pp. 196-211. ISSN 0733-9364
Louzolo-Kimbembé, P and Pettang, C (2006) A new approach for construction planning in the developing countries: the sub-structure chaining diagram (SSCD). Journal of Construction Research, 7(1), pp. 159-176. ISSN 1609-9451
Lovesmith, D M (2009) Areas of knowledge needed by superintendents and architects to enhance their collaboration in the school design process. EdD thesis, Texas A&M University, USA.
Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.
Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364
Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.
Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction. PhD thesis, University of Alberta, Canada.
Maor, I (2002) Conceptual design and selection of HVAC&r systems by combining knowledge based expert system with a building energy simulation program. PhD thesis, Drexel University, USA.
Martínez-Rocamora, A; García-Alvarado, R; Casanova-Medina, E; González-Böhme, L F and Auat-Cheein, F (2020) Parametric programming of 3D printed curved walls for cost-efficient building design. Journal of Construction Engineering and Management, 146(5): 04020039, ISSN 0733-9364
Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.
Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.
Mater, Y; Kamel, M; Karam, A and Bakhoum, E (2023) Ann-python prediction model for the compressive strength of green concrete. Construction Innovation, 23(2), pp. 340-359. ISSN 1471-4175
Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.
Mathur, Sandeep (2024) Managing data science initiatives as exploratory projects : A new approach to program management. PhD thesis, University of Technology Sydney, Australia.
Matthews, J; Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1-2), pp. 117-131. ISSN 0969-9988
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mayer, R H J (1982) Cost estimates from stochastic geometric programs. PhD thesis, University of Delaware, USA.
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.
Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.
Medjdoub, B and Chenini, M B (2015) A constraint-based parametric model to support building services design exploration. Architectural Engineering and Design Management, 11(2), pp. 123-136. ISSN 1745-2007
Mehrvarz, Nassim (2025) Optimising sustainability in building design from a life cycle perspective. PhD thesis, University of New South Wales, Australia.
Mezher, T; Abdul-Malak, M A; Arnaout, S and Bassil, Z (2004) Public project programming system (3PS): A decision support system for public sector investment. Construction Innovation, 4(2), pp. 99-111. ISSN 1471-4175
Mishra, S (2009) Transportation infrastructure investment decision making under uncertainty and risk. PhD thesis, Wayne State University, USA.
Mohamad Karimi, S; Jamshid Mousavi, S; Kaveh, A and Afshar, A (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), pp. 181-190. ISSN 0733-9364
Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration. PhD thesis, Concordia University, Canada.
Morris, P W G (1972) A study of selected building projects in the context of theories of organization. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364
Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364
Moussa, M A E-F M (2013) Unified simulation methodology and project risk assessment framework. PhD thesis, University of Calgary, Canada.
Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364
Moussourakis, J and Haksever, C (2007) Models for accurate computation of earliest and latest start times and optimal compression in project networks. Journal of Construction Engineering and Management, 133(8), pp. 600-608. ISSN 0733-9364
Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Nabizadeh, M; Khalilzadeh, M; Ebrahimnejad, S and Ershadi, M J (2021) Developing a fuzzy goal programming model for health, safety and environment risks based on hybrid fuzzy FMEA-vikor method. Journal of Engineering, Design and Technology, 19(2), pp. 317-338. ISSN 1726-0531
Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.
Naples, L M (1996) Outcomes-based evaluation for educational programs in engineering: A focus on the construction industry's needs. PhD thesis, Carnegie Mellon University, USA.
Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Newman, W M (1968) An investigation of methods of using computers for processing and storing architectural designs. PhD thesis, Imperial College London, UK.
Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.
Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988
Nik Bakht, M (2015) Analyzing social network discussions of infrastructure projects: towards a bottom-up decision making environment. PhD thesis, University of Toronto, Canada.
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Noguchi, M (2004) A choice model for mass customisation of lower-cost and higher-performance housing in sustainable development. PhD thesis, McGill University, Canada.
O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Oh, Heung Jin (2024) Exploratory analysis of construction job opening advertisements for investigating actual labor needs using web scraping and text analytics. PhD thesis, Georgia Institute of Technology, USA.
Okojie, D E; Jimoh, A A G; Hamam, Y and Yusuff, A A (2019) Optimal capacity utilisation of transmission lines network in power flow operations: A survey. Journal of Engineering, Design and Technology, 17(5), pp. 1056-1076. ISSN 1726-0531
Onat, N (1998) An approach to the determination of adaptable spatial design concept in housing production by using prefabricated building elements. PhD thesis, Dokuz Eylul Universitesi, Turkey.
Onungwa, I O and Uduma-Olugu, N (2017) Building information modelling and collaboration in the Nigerian construction industry. Journal of Construction Business and Management, 1(2), pp. 1-10. ISSN 2521-0165
Osman, A E (2006) Life cycle optimization model for integrated cogeneration and energy systems applications in buildings. PhD thesis, University of Pittsburgh, USA.
Oti, A H (2014) Building information modelling for sustainability appraisal of conceptual design of steel-framed buildings. PhD thesis, University of Nottingham, UK.
Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.
Paiva, A G C (1996) A framework for the evaluation of quality of dwellings. PhD thesis, University of Bristol, UK.
Pantouvakis, J P and Manoliadis, O G (2008) A compromise programming model for site selection of borrow pits. Construction Management and Economics, 26(5), pp. 433-446. ISSN 1466433X
Park, T i (2009) A comprehensive asset management system for sewer infrastructures. PhD thesis, Pennsylvania State University, USA.
Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.
Peng, J and Liu, X J (2024) Labor resource allocation under extremely short construction period based on the inverse optimization method. Engineering, Construction and Architectural Management, 31(3), pp. 1254-1271. ISSN 0969-9988
Perkinson, G M; Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(1), pp. 69-84. ISSN 0969-9988
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures. PhD thesis, University of Florida, USA.
Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards. PhD thesis, North Carolina State University, USA.
Platt, L S; Chen, X; Sabo-Attwood, T; Iovine, N; Brown, S and Pollitt, B (2024) Improving infection prevention briefing through predictive predesign: A computational approach to architectural programming by evaluating socioecological risk factors. Architectural Engineering and Design Management, 20(4), pp. 776-788. ISSN 1745-2007
Polat, G (2010) Using ANP priorities with goal programming in optimally allocating marketing resources. Construction Innovation, 10(3), pp. 346-365. ISSN 1471-4175
Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component. PhD thesis, University of Florida, USA.
Quinn, J T (1991) Analysis of optimal and nearly optimal plans for multipurpose river projects. PhD thesis, Harvard University, USA.
Rahmani Asl, M (2015) A building information model (BIM) based framework for performance optimization. PhD thesis, Texas A&M University, USA.
Raphael, B (2011) Multi-criteria decision making for collaborative design optimization of buildings. Built Environment Project and Asset Management, 1(2), pp. 122-136. ISSN 2044-124X
Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364
Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364
Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage. PhD thesis, Concordia University, Canada.
Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007
Renev, Ivan (2019) Automation of the conceptual design process in construction industry using ideas generation techniques. PhD thesis, Lappeenranta-Lahti University of Technology, Finland.
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Rodrigues, F; Antunes, F and Matos, R (2021) Safety plugins for risks prevention through design resourcing BIM. Construction Innovation, 21(2), pp. 244-258. ISSN 1471-4175
Rooke, J; Seymour, D and Fellows, R (2004) Planning for claims: An ethnography of industry culture. Construction Management and Economics, 22(6), pp. 655-662. ISSN 01446193
Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364
Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599
Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364
Sameer, H and Bringezu, S (2021) Building information modelling application of material, water, and climate footprint analysis. Building Research & Information, 49(6), pp. 593-612. ISSN 0961-3218
Sanseverino, Anna (2023) Application of BIM methodology for structural inspection and maintenance eco-systems: Semi-automated monitoring procedures to implement different kinds of data into enriched cooperative systems. PhD thesis, Università degli Studi di Salerno, Italy.
Sarhan, M (2008) Risk-based approach in highway geometric design. PhD thesis, Carleton University, Canada.
Sarkar, D; Gohel, J and Dabasia, K (2021) Optimization of ready mixed concrete delivery for commercial batching plants of Ahmedabad, India. International Journal of Construction Management, 21(10), pp. 1024-1043. ISSN 1562-3599
Satti, H M (2006) Integrating building code analysis within the architectural design process into the building information model. PhD thesis, Illinois Institute of Technology, USA.
Sedaghati, R (2000) Investigations in structural optimization of nonlinear problems using the finite element method. PhD thesis, University of Victoria, Canada.
Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599
Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.
Shahbazi, B; Akbarnezhad, A; Rey, D; Ahmadian Fard Fini, A and Loosemore, M (2019) Optimization of job allocation in construction organizations to maximize workers' career development opportunities. Journal of Construction Engineering and Management, 145(6): 04019036, ISSN 0733-9364
Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.
Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.
Sharma, V; Caldas, C H and Mulva, S P (2020) Identification and prioritization of factors affecting the overall project cost of healthcare facilities. Journal of Construction Engineering and Management, 146(2): 04019106, ISSN 0733-9364
Shealy, T; Klotz, L; Weber, E U; Johnson, E J and Bell, R G (2016) Using framing effects to inform more sustainable infrastructure design decisions. Journal of Construction Engineering and Management, 142(9): 04016037, ISSN 0733-9364
Shehab-Eldeen, T (2002) An automated system for detection, classification and rehabilitation of defects in sewer pipes. PhD thesis, Concordia University, Canada.
Shields, B A (2018) Parallel machine replacement: an analysis in construction industry with considerations of horizon uncertainty, multi-purpose machines and transportation. PhD thesis, University of Tennessee, USA.
Shoaib Khan, M; Kim, J; Park, S; Lee, S and Seo, J (2021) Methodology for voxel-based earthwork modeling. Journal of Construction Engineering and Management, 147(10): 04021111, ISSN 0733-9364
Showalter, W E and Halpin, D W (2008) Dynamic programming approach to optimization of site remediation. Journal of Construction Engineering and Management, 134(10), pp. 820-827. ISSN 0733-9364
Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.
Silva-Jauregui, D (1982) The economics of capacity expansion in the mexican cement industry. PhD thesis, Northwestern University, USA.
Singh, H; Elghaish, F and Brooks, T (2023) Automated workflows for design coordination: Supporting MEP systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Sirca, G F (2019) Analysis of full-scale in-service civil engineering structures. PhD thesis, Ohio State University, USA.
Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029
Smadi, O G (2000) Knowledge-based expert system pavement management optimization. PhD thesis, Iowa State University, USA.
Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.
Smith, J M; Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: An exploratory study. Engineering, Construction and Architectural Management, 5(4), pp. 387-398. ISSN 0969-9988
Sohani, H; Seyed Hossein Hosseini, N and Saghatforoush, E (2024) The optimized form of building made from the reused elements. Architectural Engineering and Design Management, 20(2), pp. 191-213. ISSN 1745-2007
Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.
Souza, Douglas Lopes de (2024) Natural language processing of technical standard for the construction sector the study of the nbr 15.575. PhD thesis, Universidade Estadual de Campinas, Brazil.
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Stojanovic, V; Falconer, R; Isaacs, J; Gilmour, D and Blackwood, D (2013) Interactive visualisation to support sustainability assessment in land use scenario planning. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Taneja, L and Bolia, N B (2018) Pedestrian control measures for efficient emergency response management in mass gatherings. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 273-290. ISSN 1759-5916
Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.
Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. PhD thesis, University of Surrey, UK.
Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.
Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.
Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Sightplan model for site layout. Journal of Construction Engineering and Management, 118(4), pp. 749-766. ISSN 0733-9364
Tu, H and Jin, S (2024) A group decision-making model for architectural programming in megaprojects. Engineering, Construction and Architectural Management, 31(13), pp. 342-368. ISSN 0969-9988
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599
Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.
Visser, A T (1981) An evaluation of unpaved road performance and maintenance. PhD thesis, University of Texas at Austin, USA.
Viteri, V R (2003) Experiential learning environments for structural behavior. PhD thesis, Massachusetts Institute of Technology, USA.
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364
Wang, M-T (1989) Knowledge processing for a construction management database. PhD thesis, Massachusetts Institute of Technology, USA.
Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193
Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.
Wang, W; Guo, J; Tian, Q; Peng, Y; Yu, B and Cao, Z (2024) Layout optimization for stormwater harvesting facilities in coal ports considering stochasticity of underlying surface types. Journal of Construction Engineering and Management, 150(10): 04024132, ISSN 0733-9364
Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.
Wang, X; Wang, B; Xu, Y and Shi, L (2021) A chance constrained programming method to determine optimal capital structure for privatized infrastructure. Construction Management and Economics, 39(7), pp. 579-594. ISSN 01446193
Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.
Wao, J O (2014) Value engineering methodology to improve building sustainability outcomes. PhD thesis, University of Florida, USA.
Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988
Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364
Williams, A (2019) Developing metadata and methodologies to support assessment of the social value of buildings and communities in future smart cities. EngD thesis, University of Hertfordshire, UK.
Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.
Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.
Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193
Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.
Yan, P; Liu, J; Zhao, X and Skitmore, M (2022) Risk response incorporating risk preferences in international construction projects. Engineering, Construction and Architectural Management, 29(9), pp. 3499-3519. ISSN 0969-9988
Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364
Yang, I T; Hsieh, Y M and Kung, L O (2012) Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning. Journal of Construction Engineering and Management, 138(2), pp. 215-226. ISSN 0733-9364
Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Yi, W; Wang, H; Zhen, L; Song, Y and Xiao, B (2026) Strategic planning of modular construction hubs: A bilevel framework integrating governmental and industrial perspectives. Journal of Construction Engineering and Management, 152(5): 04026034, ISSN 0733-9364
Yi, H (2022) 4D-printed parametric façade in architecture: Prototyping a self-shaping skin using programmable two-way shape memory composite (twsmc). Engineering, Construction and Architectural Management, 29(10), pp. 4132-4152. ISSN 0969-9988
Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364
Yu, J; Wang, J; Shi, Q; Xu, J and Wang, J (2026) Exploring job competency related to intelligent construction in China using a text mining method. Engineering, Construction and Architectural Management, 33(1), pp. 318-335. ISSN 0969-9988
Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2008) Comparative study of the variables in construction project briefing/architectural programming. Journal of Construction Engineering and Management, 134(2), pp. 122-138. ISSN 0733-9364
Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zhang, X (2006) Markov-based optimization model for building facilities management. Journal of Construction Engineering and Management, 132(11), pp. 1203-1211. ISSN 0733-9364
Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.
Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection. PhD thesis, Auckland University of Technology, New Zealand.
Zhong, S; Sun, Z; Huang, Q and Cao, C (2011) A framework for geographical surveillance of disease in China. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 256-267. ISSN 1759-5916
Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Zhuravchak, R; Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: An inferential analysis. Building Research & Information, 50(6), pp. 662-680. ISSN 0961-3218
Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.
Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
de Oliveira, R (1994) A methodology for housing design. PhD thesis, University of Waterloo, Canada.
van Rensburg, R; Mellado, B and Augusto Marin Tobon, C (2019) Wireless mesh network data communications and reliability analysis for anti-theft application deployment in educational institutions. Journal of Engineering, Design and Technology, 17(3), pp. 474-489. ISSN 1726-0531
Up a level