Items with Index Term: programme evaluation and review technique
Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects. PhD thesis, Heriot-Watt University, UK.
Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364
Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Goedert, J D and Sekpe, V D (2013) Decision support system-enhanced scheduling in matrix organizations using the analytic hierarchy process. Journal of Construction Engineering and Management, 139(11): 5013003, ISSN 0733-9364
Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364
Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364
Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(1), pp. 45-52. ISSN 01446193
Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988
Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364
Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364
Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.
Wang, W C and Demsetz, L A (2000) Application example for evaluating networks considering correlation. Journal of Construction Engineering and Management, 126(6), pp. 467-474. ISSN 0733-9364
Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364