Items with Index Term: profit
Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193
Abdul-Rashid, I; Bassioni, H and Bawazeer, F (2007) Factors affecting safety performance in large construction contractors in Egypt. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
AbdulLateef, O; Sanmargaraja, S; Oni, O; Anavhe, P and Mewomo, C M (2024) An association rule mining model for the application of construction technologies during COVID-19. International Journal of Construction Management, 24(4), pp. 443-453. ISSN 1562-3599
Abdulai, R T (2025) Financial viability decision rules in residual valuation method of property development appraisal: Case study of London, England. Journal of Financial Management of Property and Construction, 30(1), pp. 154-173. ISSN 1366-4387
Abotaleb, I S and El-Adaway, I H (2017) Construction bidding markup estimation using a multistage decision theory approach. Journal of Construction Engineering and Management, 143(1): 04016079, ISSN 0733-9364
Abouel-Enin, M A (1994) An empirical study of factors influencing the success of Egypt-United States of America joint ventures engaging in businesses in Egypt. PhD thesis, United States International University, USA.
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Adamu, N; Zubairu, I K; Ibrahim, Y M and Ibrahim, A M (2011) Evaluating the impact of product diversification on financial performance of selected Nigerian construction firms. Journal of Construction in Developing Countries, 16(2), pp. 91-114. ISSN 1823-6499
Addae-Dapaah, K and Ching, W H (2003) Effects of property acquisition and disposal on property stock value. Journal of Financial Management of Property and Construction, 8(3), pp. 139-154. ISSN 1366-4387
Adedokun, O A; Egbelakin, T; Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in Southwestern Nigeria. Journal of Engineering, Design and Technology, 21(6), pp. 1901-1924. ISSN 1726-0531
Adia, I (2019) Strategies to secure sustainable funding for the successful conclusion of infrastructure projects. PhD thesis, Walden University, USA.
Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988
Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.
Adnan, H (2004) Joint venture projects in Malaysian construction industry: Factors critical to success. PhD thesis, Nottingham Trent University, UK.
Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success. PhD thesis, Nottingham Trent University, UK.
Afolabi, A O; Oluwatayo, A; Oyeyipo, O; Ojelabi, R and Fagbenle, O (2018) Assessment of designers' perception of post conflict housing schemes for internally displaced persons. Construction Economics and Building, 18(1), pp. 27-47. ISSN 2204-9029
Ahmad-Latiffi, A (2012) Performance measurement for construction businesses. PhD thesis, Loughborough University, UK.
Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364
Ahmed, S (2022) Risk management framework an analysis of risk management process in SMEs of the UK construction industry. PhD thesis, University of the West of Scotland, UK.
Ahn, Y H; Holley, P and Kang, J S (2009) Risk management of exchange rates in international construction. International Journal of Construction Education and Research, 5(1), pp. 24-44. ISSN 1557-8771
Aho, I (2013) Value-added business models: Linking professionalism and delivery of sustainability. Building Research & Information, 41(1), pp. 110-114. ISSN 0961-3218
Aje, I O; Oladinrin, T O and Nwaole, A N C (2016) Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 19-34. ISSN 1823-6499
Akintoye, A and Skitmore, M (1991) Profitability of UK construction contractors. Construction Management and Economics, 9(4), pp. 311-325. ISSN 01446193
Al-Obaidi, T S A (2018) A transformational organisational framework for improving Iraqi quasi-governmental construction companies' performance. PhD thesis, University of Salford, UK.
Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.
Alarcón, L F; Rodríguez, A and Mourgues, C (2012) Impact of machine-failure costs on equipment replacement policies: Tunneling company case study. Journal of Construction Engineering and Management, 138(6), pp. 767-774. ISSN 0733-9364
Alashwal, A M and Al-Sabahi, M H (2018) Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2), pp. 43-62. ISSN 1823-6499
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Aldemir, Bora (2022) An agent based model for exploring the effects of overconfidence on the winner's curse in construction projects. PhD thesis, Izmir Institute of Technology, Turkey.
Algarni, A M; Arditi, D and Polat, G (2007) Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728-735. ISSN 0733-9364
Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X
Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304
Alkalbani, S; Rezgui, Y; Vorakulpipat, C and Wilson, I E (2013) ICT adoption and diffusion in the construction industry of a developing economy: The case of the Sultanate of Oman. Architectural Engineering and Design Management, 9(1), pp. 62-75. ISSN 1745-2007
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alnasseri N, O A S G (2013) Organizational culture, leadership style and effectiveness: A case study of middle eastern construction clients. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Amarah, Burhan (2016) Development of a triple bottom line stakeholder satisfaction model. PhD thesis, Bond University, Australia.
Ambekar, S; Roy, D; Hiray, A; Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: A case of construction, real estate, infrastructure and project (crip) sectors. Engineering, Construction and Architectural Management, 29(7), pp. 2878-2902. ISSN 0969-9988
Ammar, A; Hanna, A S; Nordheim, E V and Russell, J S (2003) Indicator variables model of firm's size-profitability relationship of electrical contractors using financial and economic data. Journal of Construction Engineering and Management, 129(2), pp. 192-197. ISSN 0733-9364
Amorim, Aldo Siervo de (2016) Critical analysis of the economic and environmental feasibility of the civil construction waste recycling process at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.
Amos, D; Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: A developing country perspective. Engineering, Construction and Architectural Management, 27(9), pp. 2715-2735. ISSN 0969-9988
Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.
Anagnostou, G (2008) Quality in the apartment building industry a case study in Greece. PhD thesis, University College London, UK.
Andalib, R; Hoseini, A and Gatmiri, B (2018) A stochastic model of cash flow forecasting considering delays in owners' payments. Construction Management and Economics, 36(10), pp. 545-564. ISSN 01446193
Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988
Arai, K and Morimoto, E (2021) Productivity and innovation in the Japanese construction industry. Construction Innovation, 21(4), pp. 917-933. ISSN 1471-4175
Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Asamoah, R O; Baiden, B K; Nani, G and Kissi, E (2022) Identifying intangible resources to enhance profitability strategies of small-medium scale construction firms (SMSCFs) in developing countries. International Journal of Construction Management, 22(11), pp. 2207-2214. ISSN 1562-3599
Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.
Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364
Assad, M; Hosny, O; Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(1), pp. 21-40. ISSN 1745-2007
Atanasov, V; Greenwood, D J; Madebwe, T M and Cox, R (2023) Building time, cost and quality performance of modern methods of construction in a live research project. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ateloye, A; Bowles, G and Oyegoke, A (2016) Private sector participation in Nigeria higher education infrastructure development. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Au, T and Hendrickson, C (1986) Profit measures for construction projects. Journal of Construction Engineering and Management, 112(2), pp. 273-286. ISSN 0733-9364
Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries. PhD thesis, University of Maryland, College Park, USA.
Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.
Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.
Axelsson, P-O (1991) Accident prevention in the construction industry. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Azman, M. A.; Chuweni, N. N.; Muhamad Halil, F.; Ku Azir, K. M. A.; Juhari, F. N.; Lee, B. L. and Skitmore, M. (2026) Market competition and construction firm productivity: The role of market regulation in a developing economy. Engineering, Construction and Architectural Management, 33(7), pp. 5760-5782. ISSN 0969-9988
Bachman, L R (2013) New professionalism: The post-industrial context. Building Research & Information, 41(6), pp. 752-760. ISSN 0961-3218
Bagies, A and Fortune, C (2006) Bid/no-bid decision modelling for construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Bailey, K A (1995) The metamorphosis of Battersea, 1800-1914: a building history. PhD thesis, Open University, UK.
Bailey, M; Booth, C A; Horry, R; Vidalakis, C; Mahamadu, A M and Awuah, K G B (2020) Opinions of small and medium UK construction companies on environmental management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 23-34. ISSN 17514304
Bajracharya, A; Ogunlana, S; Tan, H C and Siew, G C (2021) Understanding the performance of construction business: A simulation-based experimental study. Construction Economics and Building, 21(4), pp. 60-88. ISSN 2204-9029
Baker, M; Ali, M and French, E (2021) Leadership diversity and its influence on equality initiatives and performance: Insights for construction management. Journal of Construction Engineering and Management, 147(10): 02147, ISSN 0733-9364
Baker, Scott William (1997) Risk management in major projects. PhD thesis, University of Edinburgh, UK.
Balatbat, M C A; Lin, C Y and Carmichael, D G (2010) Australian construction growth ratios: Industry and company analyses. International Journal of Construction Management, 10(4), pp. 23-43. ISSN 1562-3599
Ball, M; Farshchi, M and Grilli, M (2000) Competition and the persistence of profits in the UK construction industry. Construction Management and Economics, 18(7), pp. 733-745. ISSN 01446193
Basha, M (2021) Intra-sector firm performance and its determinants in the UK construction industry. PhD thesis, University of Westminster, UK.
Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice. PhD thesis, University of Warwick, UK.
Beard, J L (2011) Theoretical framework for determinants of A/E/C firm value, strategy and continuity: An analysis incorporating corporeal, volitional and knowledge assets. PhD thesis, Georgia Institute of Technology, USA.
Bekele, A A and Mahesh, G (2024) Exploring the impact of endogenic factors on the competency of small and medium contractors in the Ethiopian construction industry. Journal of Construction in Developing Countries, 29(1), pp. 211-245. ISSN 1823-6499
Bell, K L (1994) The strategic management of projects to enhance value for money for BAA plc. PhD thesis, Heriot-Watt University, UK.
Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.
Berg, J B; Thuesen, C; Ernstsen, S K and Jensen, P A (2021) Reconfiguring the construction value chain: Analysing key sources of friction in the business model archetypes of AEC companies in strategic partnerships. Construction Management and Economics, 39(6), pp. 533-548. ISSN 01446193
Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364
Bollen, R (2000) Applying quantitative techniques to evaluate residential development profitability. Journal of Financial Management of Property and Construction, 5(1-2), pp. 51-64. ISSN 1366-4387
Bonuke, D O (2021) Strategies to improve survival rate among small businesses in the construction industry. PhD thesis, Walden University, USA.
Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Bos-de Vos, M; Volker, L and Wamelink, H (2015) Prioritizing quality over profit: Value trade-offs within architect-client relations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bos-de Vos, M; Wamelink, J W F H and Volker, L (2016) Trade-offs in the value capture of architectural firms: The significance of professional value. Construction Management and Economics, 34(1), pp. 21-34. ISSN 01446193
Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.
Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193
Bowen, P; Allen, Y; Edwards, P; Cattell, K and Simbayi, L (2014) Guidelines for effective workplace HIV/AIDS intervention management by construction firms. Construction Management and Economics, 32(4), pp. 362-381. ISSN 01446193
Bowers, R (2019) Gendered economies of extraction: seeking permanence amidst the rubble of Bengaluru's construction industry. PhD thesis, London School of Economics and Political Science, UK.
Brissi, S G (2021) Principles for the adoption of offsite construction in design and construction companies. PhD thesis, Purdue University, USA.
Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364
Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.
Butler, R D (1989) Minority ownership in the construction industry of the puget sound region of Washington state and its struggle for equality. PhD thesis, United States International University, USA.
Callaghan, N (2013) Alignment of house buyer and house builder opinions in the delivery of energy efficient homes in Scotland. PhD thesis, Glasgow Caledonian University, UK.
Carr, R I (1983) Impact of number of bidders on competition. Journal of Construction Engineering and Management, 109(1), pp. 61-73. ISSN 0733-9364
Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X
Cattell, D W; Bowen, P A and Kaka, A P (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), pp. 562-573. ISSN 0733-9364
Cattell, D W; Bowen, P A and Kaka, A P (2011) Proposed framework for applying cumulative prospect theory to an unbalanced bidding model. Journal of Construction Engineering and Management, 137(12), pp. 1052-1059. ISSN 0733-9364
Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X
Cayer, A F (2018) Design and profit: Architectural practice in the age of accumulation. PhD thesis, University of California, Los Angeles, USA.
Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), pp. 369-391. ISSN 2044-124X
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, T K and Abdul-Aziz, A-R (2017) Financial performance and operating strategies of Malaysian property development companies during the global financial crisis. Journal of Financial Management of Property and Construction, 22(2), pp. 174-191. ISSN 1366-4387
Chan, Zenobia Tin Yan (2024) Alms and influence the dynamics of inducements and concessions in international politics. PhD thesis, Princeton University, USA.
Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364
Chang, C Y (2014) Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032, ISSN 0733-9364
Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364
Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.
Chao, L C and Liou, C N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(8), pp. 835-843. ISSN 1466433X
Charbel, G; Assaad, R H; Qiao, Y and Labi, S (2025) Predicting the level of competition and determining optimal bidding strategies for bundled projects: Integrating machine-learning algorithms and probabilistic modeling. Journal of Construction Engineering and Management, 151(11): 04025178, ISSN 0733-9364
Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988
Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193
Cheah, C; Kang, J and Chew, D (2007) Strategic analysis of large local construction firms in China. Construction Management and Economics, 25(1), pp. 25-38. ISSN 1466433X
Chen, C and Messner, J (2011) Characterizing entry modes for international construction markets: Paving the way to a selection model. Engineering, Construction and Architectural Management, 18(6), pp. 547-567. ISSN 0969-9988
Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.
Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364
Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding. PhD thesis, Purdue University, USA.
Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988
Chia, Fah Choy (2011) Economic fluctuations and productivity in the Malaysian construction sector. PhD thesis, Queensland University of Technology, Australia.
Chien, H-J (2003) Developing a digital nervous system for enhancing effectiveness of construction management and increasing commercial benefit in the UK construction industry. PhD thesis, University of Glamorgan, UK.
Chileshe, N; Edwards, D J; Kavishe, N and Haupt, T C (2020) Perception on challenges impacting bid decision of indigenous building contractors in Dar es Salaam, Tanzania. Journal of Engineering, Design and Technology, 18(6), pp. 1641-1662. ISSN 1726-0531
Chovichien, V and Suriyanon, N (2011) Attitudes of people in the Thai construction industry sector on issues related to delay in the approval of submittals. Journal of Construction in Developing Countries, 16(1), pp. 41-67. ISSN 1823-6499
Christodoulou, S E (2008) A bid-unbalancing method for lowering a contractor's financial risk. Construction Management and Economics, 26(12), pp. 1291-1302. ISSN 1466433X
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Christudason, A; Kenna, P; Amann, W and Mundt, A (2010) Designing a new rental housing law for Romania. International Journal of Law in the Built Environment, 2(2), pp. 157-177. ISSN 1756-1450
Clapp, D; Shuler, S; Nobe, M D; Demiranda, M and Nobe, M E C (2007) Capital equipment acquisition in heavy construction. International Journal of Construction Education and Research, 3(3), pp. 159-178. ISSN 1557-8771
Clarke, K (2021) A critical analysis of the gap between collaborative risk management policies and practice in construction projects in the Scottish Highlands. DProf thesis, University of Salford, UK.
Clarke, N; Bradley, J G and Spillane, J P (2020) Mental health and well-being in micro-enterprises in the construction industry: An Irish perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cleary, J (2024) Data driven insights into building project performance and outcomes through advanced data analytics. PhD thesis, Arizona State University, USA.
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
Comet, C (2009) Social capital and profits of small firms in the French construction industry. Construction Management and Economics, 27(4), pp. 411-418. ISSN 1466433X
Connell, A and Mason, J (2014) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Connell, A and Mason, J (2015) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. International Journal of Law in the Built Environment, 7(3), pp. 176-194. ISSN 1756-1450
Conteh, Augustine (2023) Values of real assets: Focus on infrastructure and housing in Australia. PhD thesis, Griffith University, Australia.
Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.
Cui, L (2023) Collusion governance strategies under the construction supervision system in China. Construction Management and Economics, 41(9), pp. 724-738. ISSN 01446193
Cui, L (2025) Incentive contract design and selection for inhibiting unethical collusion in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 870-892. ISSN 0969-9988
Cui, Q (2005) A dynamic model for profitability analysis of construction firms: Towards complexity, learning, and uncertainty. PhD thesis, Purdue University, USA.
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Dahanayake, B; Ramachandra, T and Thurairajah, N (2016) Assessment on rework costs probability of housing projects in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Dauda, J A; Ajayi, S; Omotayo, T; Oladiran, O O and Ilori, O M (2024) Implementation of lean for small- and medium-sized construction organisational improvement. Smart and Sustainable Built Environment, 13(3), pp. 496-511. ISSN 2046-6099
Davis, R and Watson, P (1999) The utilization of formulae in overhead and profit claims. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.
De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364
Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.
Delaney, F T (2003) Effectiveness of mergers and acquisitions and corporate financial performance in construction. PhD thesis, Edinburgh Napier University, UK.
Delaney, F T and Wamuziri, S C (2002) Corporate profitability in construction and allied industries. Journal of Financial Management of Property and Construction, 7(2), pp. 107-116. ISSN 1366-4387
Delgado, J M D; Oyedele, L; Bilal, M; Ajayi, A; Akanbi, L and Akinade, O (2020) Big data analytics system for costing power transmission projects. Journal of Construction Engineering and Management, 146(1): 05019017, ISSN 0733-9364
Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.
Denny-Smith, G and Loosemore, M (2018) Cultural counterfactuals: Assessing the impact of indigenous social procurement in Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Dewundara Maha Galappaththi Arachchige, N M S (2021) Innovation in construction project-based firms through the lens of exploratory and exploitative learning : effects of social capital and collaborative environment. PhD thesis, University of Hong Kong, Hong Kong.
Direitinho, Romao Manuel Leitao Carrapato (2020) Civil construction waste (RCC) management model supported by the analytic hierarchy process (AHP) method. PhD thesis, Universidade Federal de São Carlos, Brazil.
Dmaidi, N (1995) Simplified estimating and control procedures for the offshore oil construction industry. PhD thesis, University of Dundee, UK.
Doerstling, K W (2003) Building inspectors: Bureaucrats, professionals or heroes? PhD thesis, University of Southern California, USA.
Dongjie, Y (2018) How to choose the agent construction mode in Chinese government investment projects? PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.
Du, J; Liu, B; Hu, Y and Castro-Lacouture, D (2024) Analyzing Prefabricated Components Supply Chain Cooperation Patterns with Multiparty Dynamics Using Evolutionary Game Theory. Journal of Construction Engineering and Management, 150(12): 04024175, ISSN 0733-9364
Duan, Y; Ye, M; Zhang, Q and Lu, S (2025) Informal institutional pressures and ESG implementation by international contractors: The moderating effects of joint ventures. Journal of Construction Engineering and Management, 151(10): 04025139, ISSN 0733-9364
Duckles, B M (2009) The green building industry in California: From ideals to buildings. PhD thesis, University of Arizona, USA.
Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988
Dulaimi, M F and Shan, H G (2002) The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Construction Management and Economics, 20(7), pp. 601-610. ISSN 01446193
Eaton, D (2000) A phenomenologically based contingent anatomy of competitive advantage within the construction industry. PhD thesis, University of Salford, UK.
Ebrahiminejad, M; Shakeri, E and Ardeshir, A (2014) Establishing abatement alternatives in construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Egan, T P (1993) Home restoration cooperative: A case study of a small construction craft skill worker participative cooperative. PhD thesis, University of Kentucky, USA.
Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988
Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.
El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Elazouni, A M and Metwally, F G (2000) D-sub: Decision support system for subcontracting construction works. Journal of Construction Engineering and Management, 126(3), pp. 191-199. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.
Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry. PhD thesis, Iowa State University, USA.
Enshassi, A; Al-Hallaq, K and Mohamed, S (2006) Causes of contractor's business failure in developing countries: The case of Palestine. Journal of Construction in Developing Countries, 11(2), pp. 1-14. ISSN 1823-6499
Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387
Eriksson, P E and Szentes, H (2017) Managing the tensions between exploration and exploitation in large construction projects. Construction Innovation, 17(4), pp. 492-510. ISSN 1471-4175
Ernzen, J J and Schexnayder, C (2000) One company's experience with design/build: Labor cost risk and profit potential. Journal of Construction Engineering and Management, 126(1), pp. 10-14. ISSN 0733-9364
Famakin, I O; Moyanga, D T and Agboola, A A (2024) Effect of innovative practices on the growth of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 22(6), pp. 1723-1741. ISSN 1726-0531
Fan, C; Li, X and Li, H (2024) Optimizing the regulation of commercial real estate presale deposits: The role of third-party regulation and the design of government incentives. Journal of Construction Engineering and Management, 150(10): 04024143, ISSN 0733-9364
Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.
Farrell, M L (1996) Real property valuation in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 1(1), pp. 5-20. ISSN 1366-4387
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fernando, S; Hansen, E; Kozak, R and Sinha, A (2018) Organizational cultural compatibility of engineered wood products manufacturers and building specifiers in the Pacific Northwest. Architectural Engineering and Design Management, 14(5), pp. 398-410. ISSN 1745-2007
Foulds, C; Royston, S; Aggeli, A; Crowther, A and Robison, R (2026) Sharing energy renovations know-how through citizen–professional knowledge networks. Buildings & Cities, 7(1), pp. 341-359. ISSN 2632-6655
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Frödell, M; Josephson, P E and Lindahl, G (2008) Swedish construction clients' views on project success and measuring performance. Journal of Engineering, Design and Technology, 6(1), pp. 21-32. ISSN 1726-0531
Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.
Gao, H and Zou, L (2025) How to improve customer trust in residential quality: An analysis of quality information disclosure strategies considering blockchain. Journal of Construction Engineering and Management, 151(9): 04025117, ISSN 0733-9364
Gao, R and Liu, J (2019) Selection of government supervision mode of PPP projects during the operation stage. Construction Management and Economics, 37(10), pp. 584-603. ISSN 01446193
García De Soto, B; Turk, Ž; MacIel, A; Mantha, B; Georgescu, A and Sonkor, M S (2022) Understanding the significance of cybersecurity in the construction industry: Survey findings. Journal of Construction Engineering and Management, 148(9): 04022095, ISSN 0733-9364
Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.
Gharouni Jafari, K. and Noorzai, E. (2026) Challenging the status quo: Critical barriers to integrated project delivery implementation in Iran. Architectural Engineering and Design Management, 22(1), pp. 83-98. ISSN 1745-2007
Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.
Ghosh, S and Burghart, J (2021) Lean construction: Experience of us contractors. International Journal of Construction Education and Research, 17(2), pp. 133-153. ISSN 1557-8771
Girmscheid, G and Brockmann, C (2010) Inter- and intraorganizational trust in international construction joint ventures. Journal of Construction Engineering and Management, 136(3), pp. 353-360. ISSN 0733-9364
Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.
Gongming, M (2018) The influence of trust on risk allocation in Chinese PPP projects. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
Goodman, R E (1998) Taxonomy of knowledge requirements for executives of general contracting and construction management enterprises. PhD thesis, Georgia Institute of Technology, USA.
Goodrum, P M (2001) The impact of equipment technology on productivity in the United States construction industry. PhD thesis, University of Texas at Austin, USA.
Goodrum, P M and Haas, C T (2004) Long-term impact of equipment technology on labor productivity in the U.S. Construction industry at the activity level. Journal of Construction Engineering and Management, 130(1), pp. 124-133. ISSN 0733-9364
Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.
Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193
Gouett, M C; Haas, C T; Goodrum, P M and Caldas, C H (2011) Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117-1124. ISSN 0733-9364
Gounder, S; Hasan, A; Shrestha, A and Elmualim, A (2023) Barriers to the use of sustainable materials in Australian building projects. Engineering, Construction and Architectural Management, 30(1), pp. 189-209. ISSN 0969-9988
Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies. PhD thesis, Nottingham Trent University, UK.
Graham, G (2016) Factors influencing and risk associated with the use of drones by specialty construction companies in the United States of America. PhD thesis, Indiana State University, USA.
Gransberg, D D and Riemer, C (2009) Impact of inaccurate engineer's estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), pp. 1138-1145. ISSN 0733-9364
Griner Jr., C H (2019) Small construction business owners' strategies for employee retention. DBA thesis, Walden University, USA.
Grosse, H (2016) The insider's perspective -auto-ethnography in the construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Gruneberg, S (2005) The performance of major firms in the heating and ventilating industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988
Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193
Guo, S (2025) Optimizing profit distribution in IPD projects: A fuzzy cooperative game approach to address resource-based input uncertainty. Journal of Construction Engineering and Management, 151(9): 04025118, ISSN 0733-9364
Guo, S; Wang, J and Wu, H (2021) Profit distribution of IPD projects using fuzzy alliance. Engineering, Construction and Architectural Management, 28(8), pp. 2069-2089. ISSN 0969-9988
Guo, S; Wang, J and Xiong, H (2023) The influence of effort level on profit distribution strategies in ipd projects. Engineering, Construction and Architectural Management, 30(9), pp. 4099-4119. ISSN 0969-9988
Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.
Hadavi, A and Krizek, R J (1993) Short-term goal setting for construction. Journal of Construction Engineering and Management, 119(3), pp. 622-630. ISSN 0733-9364
Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.
Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499
Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364
Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation. PhD thesis, Concordia University, Canada.
Hamouda, H and Abu-Shaaban, N (2014) Enhancing labour productivity within construction industry through analytical hierarchy process, the case of Gaza Strip. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Han, J and Huang, H (2023) Cooperative behavior, supervision, and contract choice in PPP projects: An evolutionary game theory approach incorporating an other-regarding preference. Journal of Construction Engineering and Management, 149(12): 04023140, ISSN 0733-9364
Han, S H; Diekmann, J E and Ock, J H (2005) Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), pp. 283-292. ISSN 0733-9364
Han, S H; Kim, D Y and Kim, H (2007) Predicting profit performance for selecting candidate international construction projects. Journal of Construction Engineering and Management, 133(6), pp. 425-436. ISSN 0733-9364
Han, S H; Park, S H; Kim, D Y; Kim, H and Kang, Y W (2007) Causes of bad profit in overseas construction projects. Journal of Construction Engineering and Management, 133(12), pp. 932-943. ISSN 0733-9364
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S; Lotfallah, W; Aoun, D G and Asmar, M E (2014) Mathematical formulation of the project quarterback rating: New framework to assess construction project performance. Journal of Construction Engineering and Management, 140(8): 04014033, ISSN 0733-9364
Hanna, A S and Skiffington, M A (2010) Effect of preconstruction planning effort on sheet metal project performance. Journal of Construction Engineering and Management, 136(2), pp. 235-241. ISSN 0733-9364
Harris, R B (1992) A challenge for research. Journal of Construction Engineering and Management, 118(3), pp. 422-434. ISSN 0733-9364
Harrison, B W (1982) Socially responsive professional behavior of architectural firms: A social psychological perspective. PhD thesis, University of Michigan, USA.
Hartwell, J (2018) Construction organisation structure and innovation adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Hartwell, J C; Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(2), pp. 302-314. ISSN 2044-124X
Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364
Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364
Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599
Ho, Man Fong Christabel (2003) Ethics management in a construction organisation: Employees' attitudes to corporate codes of ethics. PhD thesis, University of New South Wales, Australia.
Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction. PhD thesis, University of Manchester, UK.
Hoque, M I and Hasan, M (2025) Factors affecting the construction quality in Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 321-337. ISSN 2398-4708
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Howard, M A (2022) Integration strategies for mergers and acquisitions in the United Kingdom housing sector. DBA thesis, Walden University, USA.
Huang, Y; Chen, R; Guo, P and Duan, Z (2025) Research on contractor claim strategy based on the principle of maximizing profits by using evolutionary game model. Engineering, Construction and Architectural Management, 32(12), pp. 8423-8444. ISSN 0969-9988
Huang, H (2003) The effects of building regulations control on the design of private residential buildings. PhD thesis, University of Hong Kong, Hong Kong.
Hughes, B; Edwards, D J; Martek, I; Chileshe, N and Thwala, W D (2022) Assessing the "clerk of works" role in delivering quality affordable housing: A UK case study. Smart and Sustainable Built Environment, 11(4), pp. 996-1016. ISSN 2046-6099
Hughes, J O; Pallin, S; Aldykiewicz, A J and Clark, C J (2021) Installation quality framework: Investment return approach for energy savings on building product installation. Journal of Construction Engineering and Management, 147(11): 04021158, ISSN 0733-9364
Hui, E C M and Ivan, I M H (2008) A risk-based option pricing strategy for property valuation: An empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(1), pp. 48-59. ISSN 1366-4387
Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. PhD thesis, Loughborough University, UK.
Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.
Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.
Hwang, Hyemi (2011) Rational irrationality: The making of property decisions in firms as a part of resource allocation processes - a Korean example. PhD thesis, University of New South Wales, Australia.
Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2013) Dynamic feasibility analysis of the housing supply strategies in a recession: Korean housing market. Journal of Construction Engineering and Management, 139(2), pp. 148-160. ISSN 0733-9364
Ibbs, C W J (1980) Risk, complex decision-making and the application of multiattribute utility analysis in the construction industry. PhD thesis, University of California, Berkeley, USA.
Ibrahim, Y M; Ibrahim, A M and Kabir, B (2009) Geographic diversification, performance, and the risk profile of UK construction firms. Journal of Engineering, Design and Technology, 7(2), pp. 171-185. ISSN 1726-0531
Ibrahim, Y M and Kaka, A P (2007) The impact of diversification on the performance of UK construction firms. Journal of Financial Management of Property and Construction, 12(2), pp. 73-86. ISSN 1366-4387
Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ioannou, P G (2019) Friedman's bidding model: Errors and corrections. Journal of Construction Engineering and Management, 145(10): 04019058, ISSN 0733-9364
Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364
Islam, Md Mainul M (2009) Optimizing concessionary items' values for procuring privately financed infrastructure projects. PhD thesis, Griffith University, Australia.
Ive, G (1994) A theory of ownership types applied to the construction majors. Construction Management and Economics, 12(4), pp. 349-364. ISSN 01446193
Jacobs, A (2007) Will the new offence of corporate manslaughter motivate companies to prioritise safety over profit? PhD thesis, University of Birmingham, UK.
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jagboro, G O (1998) The effect of payment for advance purchase of building materials on contractor's cash-flow projections. Journal of Financial Management of Property and Construction, 3(3), pp. 71-83. ISSN 1366-4387
Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387
Jaselskis, E J and Talukhaba, A (1998) Bidding considerations in developing countries. Journal of Construction Engineering and Management, 124(3), pp. 185-193. ISSN 0733-9364
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988
Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988
Johnson, L R (1969) A competitive strategy model for highway construction proposals. PhD thesis, Oklahoma State University, USA.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Kamat, K J (2003) Decision making and negotiation: Establishing social order on a construction site. PhD thesis, University of Birmingham, UK.
Kang, J; Cheah, C Y J and Chew, D A S (2005) Strategic analysis of large chinese construction enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.
Kashiwagi, D; Egbu, C; Kovel, J and Badger, W W (2004) Leadership vs. Management in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599
Kassim, Y H (2012) Information technology business value model for engineering and construction industry. PhD thesis, University of Salford, UK.
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Ke, Y; Ling, F Y Y; Ning, Y and Zhang, Z (2019) Managing relationships in large public projects: Comparative study of China and Singapore. Built Environment Project and Asset Management, 9(3), pp. 348-363. ISSN 2044-124X
Killingsworth, J and Mehany, M H (2018) Implications of collection period variance in the construction industry. Journal of Financial Management of Property and Construction, 23(3), pp. 330-348. ISSN 1366-4387
Kim, S; Makhmalbaf, A and Shahandashti, M (2025) Forecasting the architecture billings index (abi) using machine learning predictive models. Engineering, Construction and Architectural Management, 32(8), pp. 5371-5393. ISSN 0969-9988
Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364
Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X
Kim, H J and Reinschmidt, K F (2011) Effects of contractors' risk attitude on competition in construction. Journal of Construction Engineering and Management, 137(4), pp. 275-283. ISSN 0733-9364
Kim, Jong Jin (2005) A study of the externalities of reconstruction projects in neighbourhood residential markets. PhD thesis, University of New South Wales, Australia.
Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.
Kissi, E; Agyekum, K; Baiden, B K; Reuben Agyei, T; Badu Eshun, B T and Badu, E (2022) Factors influencing tender pricing strategies of construction SMEs in Ghana. International Journal of Construction Management, 22(3), pp. 387-399. ISSN 1562-3599
Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(2), pp. 99-110. ISSN 1366-4387
Klopper, C H (1986) An investigation into and evaluation of the cost reimbursable basis for building contracts. DSc thesis, University of Pretoria, South Africa.
Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364
Koch, C and Urup, L (2017) Project performance: An emerging constellation of multiple institutions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Koehn, E and Espaillat, C A (1984) Costs and benefits of MBE rules in construction. Journal of Construction Engineering and Management, 110(2), pp. 235-247. ISSN 0733-9364
Kohn, M J (1970) The stock of unfinished construction in the USSR, 1950-1965: An efficiency problem in a centrally planned economy. PhD thesis, Yale University, USA.
Koksal, A and Arditi, D (2004) An input/output model for business failures in the construction industry. Journal of Construction Research, 5(1), pp. 1-16. ISSN 1609-9451
Korczynski, M (1993) Capital, labour and economic performance in the engineering construction industry: 1960-1990. PhD thesis, University of Warwick, UK.
Koutsikouri, D (2010) Individual and collective success: the social dynamics of multidisciplinary design teamwork. EngD thesis, Loughborough University, UK.
Kreitl, G; Urschitz, G and Oberndorfer, W J (2002) Corporate growth of engineering consulting firms: A European review. Construction Management and Economics, 20(5), pp. 437-448. ISSN 01446193
Kulczak-Dawkins, R P (2021) Managing sustainability through architectural design decision processes: influences of values and frames. PhD thesis, University of Brighton, UK.
Kululanga, G K (1999) A framework to facilitate construction contractors' learning. PhD thesis, Loughborough University, UK.
La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.
Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Lai, H Y; Abdul-Aziz, A R and Chan, T K (2014) Effect of the global financial crisis on the financial performance of public listed construction companies in Malaysia. Journal of Financial Management of Property and Construction, 19(3), pp. 246-263. ISSN 1366-4387
Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988
Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.
Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988
Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988
Langston, Craig A (1994) The determination of equivalent value in life-cost studies: An intergenerational approach. PhD thesis, University of Technology Sydney, Australia.
Larew, R E (1976) A quantitative approach to estimating and pricing in a construction company. PhD thesis, University of Iowa, USA.
Laryea, S (2016) Risk apportionment in target cost contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 248-257. ISSN 17514304
Laryea, S and Hughes, W (2009) How contractors in Ghana include risk in their bid prices. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Latiffi, A A; Carrillo, P; Ruikar, K and Anumba, C J (2009) The need for performance measurement in construction strategy development: A current scenario. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lawani, K; McKenzie-Govan, S; Hare, B; Sherratt, F and Cameron, I (2022) Skill shortage of bricklayers in Scotland. Journal of Engineering, Design and Technology, 20(1), pp. 321-338. ISSN 1726-0531
Lebunu Hewage, U W A; Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 296-311. ISSN 2044-124X
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Lee, H S; Seo, J O; Park, M; Ryu, H G and Kwon, S S (2009) Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type. Journal of Construction Engineering and Management, 135(11), pp. 1232-1240. ISSN 0733-9364
Lee, K W; Han, S H; Park, H and David Jeong, H (2016) Empirical analysis of host-country effects in the international construction market: An industry-level approach. Journal of Construction Engineering and Management, 142(3): 04015092, ISSN 0733-9364
Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193
Leung, M Y; Yu, J and Chong, M L A (2016) Effects of stress and commitment on the performance of construction estimation participants in Hong Kong. Journal of Construction Engineering and Management, 142(2): 04015081, ISSN 0733-9364
Li, H; Li, V; Skitmore, M; Wong, J K W and Cheng, E W L (2009) Competitiveness factors: A study of the real estate market in China. Construction Management and Economics, 27(6), pp. 567-579. ISSN 1466433X
Li, R Y M (2012) Econometric modelling of risk adverse behaviours of entrepreneurs in the provision of house fittings in China. Construction Economics and Building, 12(1), pp. 72-82. ISSN 2204-9029
Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.
Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.
Li, S and Ling, F Y Y (2012) Critical strategies for Chinese architectural, engineering and construction firms to achieve profitability. Engineering, Construction and Architectural Management, 19(5), pp. 495-511. ISSN 0969-9988
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Lim, J N (2007) Stimulating construction innovation in Singapore by developing the national system of innovation. PhD thesis, National University of Singapore, Singapore.
Lim, J N and Ofori, G (2007) Classification of innovation for strategic decision making in construction businesses. Construction Management and Economics, 25(9), pp. 963-978. ISSN 1466433X
Lim, J N; Schultmann, F and Ofori, G (2010) Tailoring competitive advantages derived from innovation to the needs of construction firms. Journal of Construction Engineering and Management, 136(5), pp. 568-580. ISSN 0733-9364
Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X
Lindhard, S M (2024) Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24(4-5), pp. 1-17. ISSN 2204-9029
Ling, F and Lim, S H (2010) Improving export performance of contractors from China. Engineering, Construction and Architectural Management, 17(6), pp. 581-597. ISSN 0969-9988
Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364
Lingard, H (2000) The relationship between 'family friendly' employment practices and the well-being and satisfaction of white collar employees in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X
Liska, R W and Snell, B (1992) Financial incentive programs for average-size construction firm. Journal of Construction Engineering and Management, 118(4), pp. 667-676. ISSN 0733-9364
Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193
Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X
Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364
Lizarralde, G; Valladares, A; Okoman, A H; Bourgault, M; Binet, J; Hasan, L; Pearl, D; Herazo, B and Boudreau, J P (2025) Trajectories of innovation in wood construction: an actor-network analysis of building decarbonization practices in Canada. Construction Management and Economics, 43(8), pp. 617-636. ISSN 0144-6193
Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387
Longwe, T; Lord, W and Carrillo, P (2015) The impact of employee experience in uptake of company collaborative tool. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Loosemore, M (2015) Building a new third construction sector through social enterprise. Construction Management and Economics, 33(9), pp. 724-739. ISSN 01446193
Loosemore, M and Alkilani, S (2022) The collaborative challenges of social procurement. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Loosemore, M; Alkilani, S Z and Hammad, A W A (2022) Barriers to employment for refugees seeking work in the Australian construction industry: An exploratory study. Engineering, Construction and Architectural Management, 29(2), pp. 619-642. ISSN 0969-9988
Loosemore, M and Barraket, J (2017) The co-creation of social value between social enterprises and private firms in the construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Loosemore, M; Denny-Smith, G; Barraket, J; Keast, R; Chamberlain, D; Muir, K; Powell, A; Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(7), pp. 1908-1928. ISSN 0969-9988
Loosemore, M; Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 3075-3093. ISSN 0969-9988
Loosemore, M; Osborne, J and Higgon, D (2021) Affective, cognitive, behavioural and situational outcomes of social procurement: A case study of social value creation in a major facilities management firm. Construction Management and Economics, 39(3), pp. 227-244. ISSN 01446193
Love, P E D (2026) Quantifying the costs of field rework in construction. Journal of Construction Engineering and Management, 152(1): 06025003, ISSN 0733-9364
Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.
Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364
Lulyalya, L P; Kikwasi, G J and Sospeter, N G (2026) Adequacy of contractor's financial capability weighing criteria in Tanzania construction projects: A quadratic and gap analysis. Journal of Engineering, Design and Technology, 24(1), pp. 24-44. ISSN 1726-0531
Lum, S K (2003) Market efficiency and technical analysis in the Singapore property market. Journal of Financial Management of Property and Construction, 8(1), pp. 29-39. ISSN 1366-4387
Lundgren, R; Kyrö, R and Olander, S (2024) The lifecycle impact and value capture of circular business models in the built environment. Construction Management and Economics, 42(6), pp. 527-544. ISSN 01446193
Luo, Y.; Li, J.; Feng, W.; Li, H. and Zhou, Y. (2026) The impact of incentive mechanisms on innovation performance in engineering project networks: The mediating role of knowledge sharing. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988
Luu, C; von Meding, J K and Kanjanabootra, S (2017) Balancing costs and benefits in Vietnam's hydropower industry: A strategic proposal. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 27-39. ISSN 1759-5916
Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708
Maaz, Z N; Adediran, A O; Mohamad Ramly, Z and Darmansah, N F (2026) Artificial intelligence monetization model preference: Supply and demand insights from the built environment sector. Built Environment Project and Asset Management, 16(2), pp. 396-414. ISSN 2044-124X
Machete, S M (1997) Waste management in construction sites of emerging contractors in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Madanayake, U (2021) Digitalisation to improve organisational competitive advantage: a study on BBI exploitation. PhD thesis, London South Bank University, UK.
Mahat, N; Tah, J H M and Vidalakis, C (2019) Sustainable construction and residential building developers in Malaysia: Factors affecting the adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Mahdavi, A (2016) A system-of-systems approach to ex-ante analysis of profit potential of a project portfolio. PhD thesis, Purdue University, USA.
Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A systematic evaluation on the competencies of construction supervisors in productivity and performance improvement practices: Sri Lankan perspective. Smart and Sustainable Built Environment, 13(4), pp. 960-988. ISSN 2046-6099
Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Masu, S; Gichunge, H and K'Akumu, O A (2012) Component ratios of new building costs in Nairobi: A contractors' perspective. Journal of Financial Management of Property and Construction, 17(3), pp. 222-234. ISSN 1366-4387
Mat Isa, C M; Saman, H M and Preece, C N (2015) Determining significant factors influencing Malaysian construction business performance in international markets. Journal of Construction in Developing Countries, 20(2), pp. 1-23. ISSN 1823-6499
Matel, E; Vahdatikhaki, F; Hosseinyalamdary, S; Evers, T and Voordijk, H (2022) An artificial neural network approach for cost estimation of engineering services. International Journal of Construction Management, 22(7), pp. 1274-1287. ISSN 1562-3599
Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364
Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193
Meng, J; Yan, J; Xue, B; Fu, J and He, N (2018) Reducing construction material cost by optimizing buy-in decision that accounts the flexibility of non-critical activities. Engineering, Construction and Architectural Management, 25(8), pp. 1092-1108. ISSN 0969-9988
Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.
Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364
Ming, C S; Runeson, G and Skitmore, M (1996) Changes in profit as market conditions change: An historical study of a building firm. Construction Management and Economics, 14(3), pp. 253-264. ISSN 01446193
Mitchell, Z; Hildreth, J and Vorster, M (2011) Using the cumulative cost model to forecast equipment repair costs: Two different methodologies. Journal of Construction Engineering and Management, 137, pp. 817-822. ISSN 0733-9364
Mokhlesian, S and Holmén, M (2012) Business model changes and green construction processes. Construction Management and Economics, 30(9), pp. 761-775. ISSN 1466433X
Mooney III, B F (2023) Construction workforce development: The impact of the conation theory on the prediction of candidate selection in the construction trade programs in western Pennsylvania. PhD thesis, Trident University International, USA.
Moyanga, D T; Famakin, I O and Awodele, O A (2025) Theoretical model for predicting survival of quantity surveying firms in Nigeria. International Journal of Construction Management, 25(10), pp. 1218-1226. ISSN 1562-3599
Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.
Na, L J; Ofori, G and Park, M (2006) Stimulating construction innovation in Singapore through the national system of innovation. Journal of Construction Engineering and Management, 132(10), pp. 1069-1082. ISSN 0733-9364
Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Nascimento, C R S M S; Almeida-Filho, A T and Perez Palha, R (2025) A TOPSIS-based framework for construction projects' portfolio selection in the public sector. Engineering, Construction and Architectural Management, 32(4), pp. 2553-2570. ISSN 0969-9988
Ng, F P; Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(2), pp. 141-150. ISSN 01446193
Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599
Nicholas, J and Edwards, D J (2003) A model to evaluate materials suppliers' and contractors' business interactions. Construction Management and Economics, 21(3), pp. 237-245. ISSN 01446193
Nicholas, J; Holt, G D and Harris, P T (2000) An investigation into predicting materials suppliers' profits. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Nicholas, J; Holt, G D and Mihsein, M (2000) Predicting materials suppliers' bad debt. Journal of Construction Research, 1(2), pp. 159-167. ISSN 1609-9451
Nicholas, J; Holt, G D and Mihsein, M (2000) Contractor financial credit limits; their derivation and implications for materials suppliers. Construction Management and Economics, 18(5), pp. 535-545. ISSN 01446193
Nicholson, M P and Naamani, Z (1992) Managing architectural design: a recent survey. Construction Management and Economics, 10(6), pp. 479-487. ISSN 01446193
Nie, Z A and Wong, K C (2012) Why build more to earn less: Property right implications of urban villages. International Journal of Construction Management, 12(4), pp. 65-82. ISSN 1562-3599
Ning, X; Ye, X; Li, H; Rajendra, D and Skitmore, M (2024) Evolutionary game analysis of optimal strategies for construction stakeholders in promoting the adoption of green building technology innovation. Journal of Construction Engineering and Management, 150(5): 04024037, ISSN 0733-9364
Niss, J F (1965) Custom production, theory and practice: With special emphasis on the goals and pricing procedures of the contract construction industry. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(2), pp. 96-108. ISSN 0144-6193
Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599
Ofori, G; Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), pp. 785-803. ISSN 2044-124X
Ogbu, C P and Adindu, C C (2020) Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective. Journal of Engineering, Design and Technology, 18(2), pp. 326-342. ISSN 1726-0531
Ogunbayo, O T (2019) Respondents' perception of risk factors on residential property development in Abuja, Nigeria. Journal of Construction Business and Management, 3(1), pp. 18-26. ISSN 2521-0165
Ohemeng, F A (1998) Rehabilitation versus demolition and redevelopment: A value-based decision framework for private commercial properties. PhD thesis, University of Salford, UK.
Ojo, E M (2016) Assessment of green supply-chain management in South African and Nigerian construction firms. DPhil thesis, University of Johannesburg, South Africa.
Oke, A E; Ibironke, O T and Bayegun, O A (2017) Appraisal of reward packages in construction firms: A case of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 15(6), pp. 722-737.
Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.
Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.
Oladimeji, O and Aina, O O (2018) Financial performance of locally owned construction firms in Southwestern Nigeria. Journal of Financial Management of Property and Construction, 23(1), pp. 112-128. ISSN 1366-4387
Oladimeji, O and Aina, O O (2021) Cash flow management techniques practices of local firms in Nigeria. International Journal of Construction Management, 21(4), pp. 395-403. ISSN 1562-3599
Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235-251. ISSN 1366-4387
Olatunde, N A; Awodele, I A and Adebayo, B O (2022) Impact of COVID-19 pandemic on indigenous contractors in a developing economy. Journal of Engineering, Design and Technology, 20(1), pp. 267-280. ISSN 1726-0531
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193
Oliveros Romero, Jose Alejandro (2019) Ex-post impact evaluation method for public-private partnership projects from the perspective of multiple stakeholders. PhD thesis, University of Melbourne, Australia.
Oluwatayo, A A; Amole, D and Uwakonye, O (2016) Organisational life cycle, business orientation and performances of architectural firms in Nigeria. Construction Economics and Building, 16(1), pp. 50-63. ISSN 2204-9029
Omopariola, E D; Windapo, A; Edwards, D J and Thwala, W D (2020) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), pp. 308-325. ISSN 1726-0531
Onyido, T B C; Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(1), pp. 30-45. ISSN 1471-4175
Owusu-Manu, D G; Holt, G D; Edwards, D J and Badu, E (2014) Determinants of trade credit supply among the Ghanaian construction sector. Built Environment Project and Asset Management, 4(4), pp. 368-383. ISSN 2044-124X
Oyekunle Oyewobi, L; Olukemi Windapo, A and Cattell, K S (2013) Impact of business diversification on South African construction companies' corporate performance. Journal of Financial Management of Property and Construction, 18(2), pp. 110-127. ISSN 1366-4387
Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988
Paidakaki, A. (2026) Creating resilient cities: Advocacy and planning for equity-based recovery. Buildings & Cities, 7(1), pp. 597-613. ISSN 2632-6655
Park, H; Han, S H; Rojas, E M; Son, J and Jung, W (2011) Social network analysis of collaborative ventures for overseas construction projects. Journal of Construction Engineering and Management, 137(5), pp. 344-355. ISSN 0733-9364
Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.
Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(1), pp. 39-53. ISSN 1366-4387
Patil, N A and Laishram, B (2016) Public‒private partnerships from sustainability perspective: a critical analysis of the Indian case. International Journal of Construction Management, 16(2), pp. 161-174. ISSN 1562-3599
Pekuri, A; Pekuri, L and Haapasalo, H (2013) The role of business models in Finnish construction companies. Construction Economics and Building, 13(3), pp. 13-23. ISSN 2204-9029
Pellegrino, R; Ranieri, L; Costantino, N and Mummolo, G (2011) A real options-based model to supporting risk allocation in price cap regulation approach for public utilities. Construction Management and Economics, 29(12), pp. 1197-1207. ISSN 1466433X
Peng, C L; Scorpio, D E and Kibert, C J (1997) Strategies for successful construction and demolition waste recycling operations. Construction Management and Economics, 15(1), pp. 49-58. ISSN 01446193
Perera, Weebadda Arachchilage Salinda (2018) An investigation into developing productive construction environments to improve quality performance in Australian building construction. PhD thesis, University of New South Wales, Australia.
Perng, Y H and Chang, C L (2004) How does government procurement law affect bidding price competition in Taiwan? Building Research & Information, 32(6), pp. 497-509. ISSN 0961-3218
Pilgrim, M; Bouchlaghem, D; Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(2), pp. 117-130. ISSN 1471-4175
Pillajo, E; Mourgues, C and González, V A (2024) Formalizing the information requirements for decision-making of field managers during indoor construction activities. Engineering, Construction and Architectural Management, 31(10), pp. 4125-4145. ISSN 0969-9988
Preece, C; Moodley, K and Cox, I (2001) Assessing the effectiveness of websites as an interactive business communications tool. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X
Rafferty, M and Toner, P (2019) Thinking like capital markets: Financialisation of the Australian construction industry. Construction Management and Economics, 37(3), pp. 156-168. ISSN 01446193
Raghib, A T; Belayutham, S; Mohammad, M Z and Ibrahim, C K I C (2023) Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt. International Journal of Construction Management, 23(11), pp. 1875-1885. ISSN 1562-3599
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.
Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Reid, A; Poade, D and Langford, S (2025) Deskercise: the impact of 10 minutes of exercise on mental and physical wellbeing in the construction industry. International Journal of Construction Management, 25(10), pp. 1197-1206. ISSN 1562-3599
Renukappa, S; Egbu, C; Akintoye, A and Goulding, J (2012) A critical reflection on sustainability within the UK industrial sectors. Construction Innovation, 12(3), pp. 317-334. ISSN 1471-4175
Renukappa, S; Egbu, C; Suresh, S and Mushatat, S (2015) Drivers for managing sustainability-related knowledge. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 66-75. ISSN 17514304
Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.
Ribeiro, J A N P (2013) Essays on the use of real options approach in construction projects and build-own-transfer projects. PhD thesis, Universidade do Porto, Portugal.
Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.
Robinson, Benjamin Tyrell (2021) Identifying and pricing risk in residential development. PhD thesis, RMIT University, Australia.
Ross, D G (1970) The construction of the railroads of Central America. PhD thesis, University of California, Santa Barbara, USA.
Ruane, K (2020) Management strategies used by construction managers to reduce employee absenteeism. PhD thesis, Walden University, USA.
Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.
Rungjang, K (2013) Public investment for developing port facilities within competitive market. PhD thesis, University of Wisconsin - Madison, USA.
Russell, J S and Zhai, H (1996) Predicting contractor failure using stochastic dynamics of economic and financial variables. Journal of Construction Engineering and Management, 122(2), pp. 183-191. ISSN 0733-9364
Ryan, Peter William Joseph (2017) Unlocking the key to mega project delivery. PhD thesis, University of Melbourne, Australia.
Sagar, Khaled Anowar (2021) The impact of social capital and extrinsic drivers on innovation ambidexterity in Australian construction project-based small and medium size enterprises. PhD thesis, Queensland University of Technology, Australia.
Sai, A K; Devi, S L T and Azad, S (2026) Do good, do well? A comparative study of CSR engagement and financial metrics in Indian construction firms and other sectors. Journal of Financial Management of Property and Construction, 31(1), pp. 1-27. ISSN 1366-4387
Saini, V (2009) Endogenous asymmetries in dynamic procurement auctions. PhD thesis, Johns Hopkins University, USA.
Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.
Sardén, Y and Engström, S (2010) Modern methods of construction: A solution for an industry characterized by uncertainty? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Sarkar, D and Sheth, A (2023) Public private partnership model for sustainable bus rapid transit system in Ahmedabad, India. International Journal of Construction Management, 23(7), pp. 1233-1243. ISSN 1562-3599
Savoie, É; Sapinski, J P and Laroche, A M (2025) Key factors for revitalising heritage buildings through adaptive reuse. Buildings & Cities, 6(1), pp. 103-120. ISSN 2632-6655
Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218
Schultz, C (2012) The role of problem solving in construction management practices. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364
Seydel, J (2003) Evaluating and comparing bidding optimization effectiveness. Journal of Construction Engineering and Management, 129(3), pp. 285-292. ISSN 0733-9364
Seydel, J and Olson, D L (1990) Bids considering multiple criteria. Journal of Construction Engineering and Management, 116(4), pp. 609-623. ISSN 0733-9364
Seydel, J F (1991) Development and implementation of multiple criteria approaches to optimization in construction bidding. PhD thesis, Texas A&M University, USA.
Seyed-Alangi, F; Parchami-Jalal, M and Noorzai, E (2026) The challenges of risk and reward sharing in the implementation of integrated project delivery contracts in the Iranian construction industry. International Journal of Construction Education and Research, 22(1), pp. 72-95. ISSN 1557-8771
Sha, K and Jiang, Z (2003) Improving rural labourers'status in China's construction industry. Building Research & Information, 31(6), pp. 464-473. ISSN 0961-3218
Sha, K and Lin, S (2001) Reforming China's construction state-owned enterprises. Building Research & Information, 29(4), pp. 270-276. ISSN 0961-3218
Shah, M; Tang, L and Hughes, W P (2012) Exploring process, productivity and structure in design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.
Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531
Shamma, E M (1988) A dynamic model for the growth of construction firms. DSc thesis, George Washington University, USA.
Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.
Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X
Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193
Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193
Sherratt, F; Ivory, C; Sherratt, S and Crawley, S (2022) Organizing construction work: A digital and cooperative way forwards for micro-projects. Building Research & Information, 50(5), pp. 559-573. ISSN 0961-3218
Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.
Shi, J; Lu, Z; Xu, H and Cui, J (2024) System dynamic-based remanufacturing economic analysis model of used automobile engine under two recycling modes. Journal of Engineering, Design and Technology, 22(5), pp. 1433-1446. ISSN 1726-0531
Shimbo, Lúcia Zanin (2010) Social housing, market housing: The confluence of state, construction companies and financial capital. PhD thesis, Universidade de São Paulo, Brazil.
Siamuzwe-Manase, V; Halcro, K R; Kumar, B and Skitmore, M (2024) Project-oriented strategic management of UK construction firms: Towards corporate diversification: critical literature review. Built Environment Project and Asset Management, 14(6), pp. 937-955. ISSN 2044-124X
Sievert Jr., R W (2000) A model for managing co -marketing alliances. PhD thesis, Northwestern University, USA.
Siew, Karyne Cheng (2018) Multi-stakeholder perspectives of value in project portfolios. PhD thesis, University of Technology Sydney, Australia.
Sims, B L (1999) Program assessment of the mechanical contractors association of America's Construction Continuing Education Project Management Course. PhD thesis, Purdue University, USA.
Simu, K (2009) The construction site manager's impact on risk management performance. PhD thesis, Luleå University of Technology, Sweden.
Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.
Sing, T F (2001) Is property stock market efficient in the weak form? Singapore's evidence. Journal of Financial Management of Property and Construction, 6(1), pp. 3-18. ISSN 1366-4387
Singh, A (1990) Development of process and mix flexibility in construction. PhD thesis, Purdue University, USA.
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988
Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: Some scalar equilibrium results. Construction Management and Economics, 26(8), pp. 785-801. ISSN 1466433X
Smith, P (2001) Information technology and the QS practice. Construction Economics and Building, 1(1), pp. 1-21. ISSN 2204-9029
Sobotka, S P (1952) The influence of unions on wages and earnings of labor in the construction industry. PhD thesis, University of Chicago, USA.
Sodade, B A A (2011) Project management complexities in municipal projects. PhD thesis, University of Calgary, Canada.
Song, S (2017) Construction equipment travel path visualization and productivity evaluation. PhD thesis, University of Alabama, USA.
Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.
Steele, J and Murray, M (2004) Creating, supporting and sustaining a culture of innovation. Engineering, Construction and Architectural Management, 11(5), pp. 316-322. ISSN 0969-9988
Stephens, P (1974) Builders' and plumbers' merchanting: an attribute study of organization, functions and performance. PhD thesis, University of Manchester, UK.
Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Stukhart, G (1984) Contractual incentives. Journal of Construction Engineering and Management, 110(1), pp. 34-42. ISSN 0733-9364
Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory. PhD thesis, Columbia University, USA.
Sturts, C S and Griffis, F H (2005) Addressing pricing: Value bidding for engineers and consultants. Journal of Construction Engineering and Management, 131(6), pp. 621-630. ISSN 0733-9364
Su, L; Cao, Y; Li, H and Zhang, C (2024) Water environment treatment ppp projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(2), pp. 866-890. ISSN 0969-9988
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193
Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364
Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. I: Theory for periodic phenomena and time value of money. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Suarez, J J (2004) A neural network model to predict business failure in construction companies, in the United States of America. PhD thesis, University of Florida, USA.
Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.
Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364
Sumanarathna, N and Rowlinson, R (2019) Examining construction contractors' innovation through the lens of exploration and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Sun, W; Deng, X; Yu, H; Antwi-Afari, M F and Hwang, B G (2025) A multianalytical approach to identifying influential factors in data sharing among international construction enterprises. Journal of Construction Engineering and Management, 151(11): 04025165, ISSN 0733-9364
Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364
Sundling, R; Blomsterberg, Å and Landin, A (2019) Enabling energy-efficient renovation: the case of vertical extension to buildings. Construction Innovation, 19(1), pp. 2-14. ISSN 1471-4175
Sundling, R; Olander, S; Wallentén, P; Burke, S; Bernardo, R and Blomsterberg, Å (2019) Lifecycle profit analysis of prefabricated multi-active façades. International Journal of Building Pathology and Adaptation, 37(5), pp. 565-578. ISSN 23984708
Sunindijo, R Y and Kamardeen, I (2017) Attracting and retaining women professionals in construction: A work-stress management perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387
Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Tamer, Z; Yoon, Y and Hastak, M (2012) Protocol for profitability analysis using internal entities in organizational structure of construction companies. Journal of Construction Engineering and Management, 138(12), pp. 1394-1402. ISSN 0733-9364
Tan, Q and Ye, M (2024) Allocation of environmental responsibilities in the prefabricated construction supply chain: Exploring the influence of government subsidies. Journal of Construction Engineering and Management, 150(11): 04024167, ISSN 0733-9364
Tan, W (1988) GNP, interest rate and construction investment: Empirical evidence from U.S. data. Construction Management and Economics, 6(3), pp. 185-193. ISSN 01446193
Tan, Y; Shen, L and Langston, C (2010) Contractors' competition strategies in bidding: Hong Kong study. Journal of Construction Engineering and Management, 136(10), pp. 1069-1077. ISSN 0733-9364
Tang, C M; Leung, A Y T and Lam, K C (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132(10), pp. 1099-1113. ISSN 0733-9364
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599
Taylor-Lewis, D (2012) Entrepreneurial support for black (afro-caribbean) and Asian construction businesses: Can it enhance their growth? PhD thesis, Oxford Brookes University, UK.
Tello, L M (2017) Theorizing the state of health practices and climate in construction via fourfold structuration. PhD thesis, Arizona State University, USA.
Teng, Y; Li, X; Wu, P and Wang, X (2019) Using cooperative game theory to determine profit distribution in IPD projects. International Journal of Construction Management, 19(1), pp. 32-45. ISSN 1562-3599
Thiele, Brett James (2024) A financial decision support tool for improved project and portfolio profit performance in project-based organisations. PhD thesis, University of New South Wales, Australia.
Tobi, S U M and Amaratunga, D (2010) Social enterprise applications in an urban facilities management setting. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364
Tsado, A J (2019) Innovation: its impact on the success of construction micro, small, and medium enterprises in Northern Nigeria. PhD thesis, Nelson Mandela University, South Africa.
Tsolas, I E (2011) Modelling profitability and effectiveness of Greek-listed construction firms: An integrated DEA and ratio analysis. Construction Management and Economics, 29(8), pp. 795-807. ISSN 1466433X
Tsolas, I E (2013) Modeling profitability and stock market performance of listed construction firms on the athens exchange: Two-stage DEA approach. Journal of Construction Engineering and Management, 139(1), pp. 111-119. ISSN 0733-9364
Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364
Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Uniacke, H (2001) Design of a low cost ventilated photovoltaic cladding. PhD thesis, Cardiff University, UK.
Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.
Unsal, H I and Taylor, J E (2011) Absorptive capacity of project networks. Journal of Construction Engineering and Management, 137(11), pp. 994-1002. ISSN 0733-9364
Urquhart, S and Whyte, A (2018) Impact of contractor internal tendering procedure governance on tender win-rates: How procedures can be improved. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.
Vaux, J S and Kirk, W M (2018) Relationship conflict in construction management: Performance and productivity problem. Journal of Construction Engineering and Management, 144(6): 1478, ISSN 0733-9364
Vaux, James S (2014) Relationship conflict in construction management and how it affects performance and profit. PhD thesis, Washington State University, USA.
Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction. PhD thesis, University of Florida, USA.
Vogelius, P and Storgaard, K (2016) Cooperation in construction: The role of values. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wang, D (2004) The Chinese construction industry from the perspective of industrial organization. PhD thesis, Northwestern University, USA.
Wang, D; Wang, X; Wang, L; Liu, H; Sing, M and Liu, B (2023) Optimisation of government subsidies in infrastructure public-private partnerships. Journal of Engineering, Design and Technology, 21(5), pp. 1280-1302. ISSN 1726-0531
Wang, S Q; Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), pp. 237-252. ISSN 01446193
Wang, T (2022) Motivating management: evidence from construction project teams. PhD thesis, University of Hong Kong, Hong Kong.
Wang, W; Hao, S; Zhong, H and Sun, Z (2024) Toward sustainable construction: Optimizing carbon emission reduction in the building supply chain through game-theoretic strategies, government subsidies, and cost-sharing contract. Journal of Construction Engineering and Management, 150(6): 04024042, ISSN 0733-9364
Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988
Wang, Y; Zhuang, J; Lai, R and Chen, L (2024) A tripartite governance strategy for infrastructure reits considering tax incentives and antiavoidance regulations. Journal of Construction Engineering and Management, 150(11): 04024162, ISSN 0733-9364
Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364
Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.
Wantanakorn, D (2000) Effects of management errors on construction projects. PhD thesis, University of Nottingham, UK.
Wantanakorn, D; Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112-120. ISSN 0969-9988
Ward, M J (2004) The capture and integration of construction site data. EngD thesis, Loughborough University, UK.
Warszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(5), pp. 447-459. ISSN 01446193
Watanabe, R; Watanabe, T and Skitmore, M (2025) Evaluating the implementation of innovative technology in japan's bidding system: A dynamic stackelberg game theoretical analysis. Construction Management and Economics, 43(9), pp. 657-684. ISSN 0144-6193
Whang, S W; Flanagan, R; Kim, S and Kim, S (2017) Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5): 06016009, ISSN 0733-9364
White, J A (1964) Determination of income and financial reporting for long-term construction-type contracts. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Willis, M A (1979) The effects of cyclical demand on industry structure and on the rate of technological change: An international comparison of the housebuilding sectors in the United States, Great Britain and France. PhD thesis, Yale University, USA.
Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.
Wong, T K (1985) The effects of cyclical construction demand on the performance and operation of construction firms. PhD thesis, Massachusetts Institute of Technology, USA.
Wu, M; Wang, L; Li, M and Long, H (2015) Alleviating feature fatigue in product development based on the bass model. Journal of Engineering, Design and Technology, 13(3), pp. 350-368.
Xiao, L; Mokhtar, N A and Sulaiman, M K A M (2025) Enhancing profitability and cost efficiency in China's construction industry. Construction Economics and Building, 25(3-4), pp. 1-21. ISSN 2204-9029
Xiao, F (2007) Game-theoretic models for competitive pricing and network design problems. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Yamaguchi, H; Uher, T E and Runeson, G (2001) Risk allocation in PFI projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Yang, H; Chan, A P C; Yeung, J F Y and Li, Q (2012) Concentration effect on construction firms: Tests of resource partitioning theory in Jiangsu province (China) from 1989 to 2007. Journal of Construction Engineering and Management, 138(1), pp. 144-153. ISSN 0733-9364
Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364
Ye, S and Tiong, R L K (2003) Tariff adjustment frameworks for privately financed infrastructure projects. Construction Management and Economics, 21(4), pp. 409-419. ISSN 01446193
Yearsley, W S (2007) How differences in heavy civil project set-up practices impact performance. PhD thesis, Colorado State University, USA.
Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193
Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.
Yorston, N and Chileshe, N (2014) Lessons learned from building the education revolution (BER) program by the South Australia construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364
Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988
Yu, T; Shen, G Q and Shi, Q (2017) Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4): 04016111, ISSN 0733-9364
Zailani, M B; Abubakar, M and Muhammad, A (2019) Assessment of barriers to risk management implementation in small construction projects in Nigeria. African Journal of Built Environment Research, 3(1), pp. 15-28. ISSN 2414-0236
Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364
Zhang, K.; Shaheen, Q. H. and Cui, Q. (2026) Understanding structured project finance for US transportation public-private partnerships: What maximizes financing capacity? Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Zhang, Y; Xu, L; Xue, X; Wang, Z and Skibniewski, M (2026) Formation and dynamics of prefabricated building innovation network. Engineering, Construction and Architectural Management, 33(1), pp. 98-124. ISSN 0969-9988
Zhang, Y; Peng, Z; Lu, W and Webster, C (2025) Profit-sensitive generative design for high-rise building morphologies: Innovations in 3D form generation and cost-revenue assessment. Building Research & Information, 53(4), pp. 435-457. ISSN 0961-3218
Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.
Zheng, J (2013) Ownership structure and company performance : the case of listed real estate companies in mainland China. PhD thesis, University of Hong Kong, Hong Kong.
Zhong, B; Zhong, W; Wu, H; Guan, Q; Tang, B and M.e Sepasgozar, S (2025) Strategic impacts of blockchain adoption on contractor decisions in competitive construction markets: A game-theoretic approach. Journal of Construction Engineering and Management, 151(12): 04025203, ISSN 0733-9364
Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Zhu, J; Shi, Q; Zhang, C; Yuan, J; Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public-private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(2), pp. 789-811. ISSN 0969-9988
Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.
Zulch, B G and Verster, J J P (2010) Project management and performance strategies. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175
de Paula, N; Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(6), pp. 1040-1050. ISSN 0969-9988
de la Garza, J M and Melin, J W (1986) Prepayment ability to offset inflation. Journal of Construction Engineering and Management, 112(4), pp. 514-529. ISSN 0733-9364
van der Kuil, P A v d (2023) Investorenarchitektur. The planning, organisation and control of architectural quality in commercial real estate. PhD thesis, Technische Universitaet Berlin, Germany.