Items with Index Term: productivity

Number of items: 2318.

Abankwa, Derek Asante (2021) What drives technology adaptation in construction firms? An investigation of the antecedents, adaptive behaviours, and outcomes. PhD thesis, University of Hong Kong, Hong Kong.

Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abbas, M A; Ajayi, S O; Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(4), pp. 1306-1324. ISSN 1726-0531

Abbasian-Hosseini, S A (2015) Social and engineering aspects of construction site management using simulation and social network analysis. PhD thesis, North Carolina State University, USA.

Abbott, M and Carson, C (2013) A comparative approach to determining the growth of productivity of the New Zealand construction industry. Construction Economics and Building, 13(4), pp. 65-77. ISSN 2204-9029

Abbsaian-Hosseini, S A; Liu, M and Hsiang, S M (2019) Social network analysis for construction crews. International Journal of Construction Management, 19(2), pp. 113-127. ISSN 1562-3599

Abdal Noor, B and Yi, S (2018) Review of BIM literature in construction industry and transportation: meta-analysis. Construction Innovation, 18(4), pp. 433-452. ISSN 1471-4175

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdeen, F N; Gunatilaka, R N; Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(4), pp. 892-911. ISSN 1471-4175

Abdel-Hamid, M and Mohamed Abdelhaleem, H (2022) Impact of poor labor productivity on construction project cost. International Journal of Construction Management, 22(12), pp. 2356-2363. ISSN 1562-3599

Abdel-Salam, A N (2018) Corporate social responsibility of construction and real estate development companies in developing countries: An assessment model. PhD thesis, Purdue University, USA.

Abdel-Wahab, M and Vogl, B (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Construction Management and Economics, 29(6), pp. 635-644. ISSN 1466433X

Abdel-Wahab, M S (2008) An examination of the relationship between skills development and productivity in the construction industry. PhD thesis, Loughborough University, UK.

Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Abdel-Wahab, M S; Dainty, A R J; Ison, S G; Bowen, P and Hazlehurst, G (2008) Trends of skills and productivity in the UK construction industry. Engineering, Construction and Architectural Management, 15(4), pp. 372-382. ISSN 0969-9988

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work. PhD thesis, University of Michigan, USA.

Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364

Abdelhamid, T S and Everett, J G (1999) Time series analysis for construction productivity experiments. Journal of Construction Engineering and Management, 125(2), pp. 87-95. ISSN 0733-9364

Abdirad, H (2017) Metric-based BIM implementation assessment: A review of research and practice. Architectural Engineering and Design Management, 13(1), pp. 52-78. ISSN 1745-2007

Abdul Ghafar, M and Ibrahim, R (2025) Quantifying AEC professionals' cross-work culture productivity: Comparison between Malaysian and UK projects during industrialized building project. Smart and Sustainable Built Environment, 14(4), pp. 921-942. ISSN 2046-6099

Abdul Nabi, M and El-Adaway, I H (2022) Understanding disputes in modular construction projects: Key common causes and their associations. Journal of Construction Engineering and Management, 148(1): 04021184, ISSN 0733-9364

Abdul-Lateef, O A (2010) Quantitative analysis of criteria in university building maintenance in Malaysia. Construction Economics and Building, 10(3), pp. 51-61. ISSN 2204-9029

AbdulLateef, O; Sanmargaraja, S; Oni, O; Anavhe, P and Mewomo, C M (2024) An association rule mining model for the application of construction technologies during COVID-19. International Journal of Construction Management, 24(4), pp. 443-453. ISSN 1562-3599

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

Abotaleb, I S and El-Adaway, I H (2018) First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9): 04018084, ISSN 0733-9364

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.

AbouMoemen, A A (2022) A BIM maturity-KPI assessment framework for a UK public sector local authority client. PhD thesis, University of Salford, UK.

AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364

Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988

Abreu, M M and Lordsleem, A C (2019) Aluminum formwork system: Loss and productivity. Built Environment Project and Asset Management, 9(5), pp. 616-627. ISSN 2044-124X

Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.

Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.

Abu-Hijleh, S F and Ibbs, C W (1993) Systematic automated management exception reporting. Journal of Construction Engineering and Management, 119(1), pp. 87-104. ISSN 0733-9364

Abubakar, M; Abdullahi, M and Bala, K (2018) Analysis of the causality links between the growth of the construction industry and the growth of the Nigerian economy. Journal of Construction in Developing Countries, 23(1), pp. 103-113. ISSN 1823-6499

Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364

Abuelma'atti, A (2012) A strategic approach to the implementation of information technologies in small and medium-sized architecture, engineering and construction enterprises. PhD thesis, University of Salford, UK.

Abulfatih, B M (2000) Project manager's effectiveness in productivity of Bahrain's construction industry. PhD thesis, University of Reading, UK.

Abuwarda, Z; Mostafa, K; Morita, P and Hegazy, T (2024) Optimizing construction work-rest schedules and worker reassignment utilizing wristband physiological data. Journal of Construction Engineering and Management, 150(11): 04024149, ISSN 0733-9364

Acheampong, P (2013) Employers' perception of graduates with entry-level technical skills from construction industry programs in Ghana and Nigeria. PhD thesis, Pennsylvania State University, USA.

Acheng, P O; Kibwami, N; Mukasa, T J; Odongkara, B B; Birungi, R; Semanda, J and Manga, M (2023) Building information modelling adoption in uganda's construction industry. International Journal of Construction Management, 23(13), pp. 2185-2208. ISSN 1562-3599

Acosta, D (1986) Application of production planning methods to improve productivity: Issues from the Venezuelan construction industry. PhD thesis, University of California, Berkeley, USA.

Adafin, J; Wilkinson, S; Rotimi, J O B; MacGregor, C; Tookey, J and Potangaroa, R (2022) Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation, 22(1), pp. 185-204. ISSN 1471-4175

Adas, A A (1996) The level of organizational effectiveness of the (ICI) construction firm: A multivariate model-based prediction methodology. PhD thesis, University of Waterloo, USA.

Addy, M N; Adinyira, E; Dadzoe, F and Opoku, D (2022) The market for green buildings in Sub-Saharan Africa: Experts' perspective on the economic benefits in Ghana. Journal of Construction in Developing Countries, 27(1), pp. 173-188. ISSN 1823-6499

Ade-Ojo, O C (2022) Awareness of the LEED requirements for green housing development among built-environment professionals in Nigeria. Built Environment Project and Asset Management, 12(4), pp. 521-536. ISSN 2044-124X

Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Adebowale, O J and Agumba, J N (2023) A meta-analysis of factors affecting construction labour productivity in the middle East. Journal of Construction in Developing Countries, 28(1), pp. 193-220. ISSN 1823-6499

Adebowale, O J and Agumba, J N (2024) Applications of augmented reality for construction productivity improvement: A systematic review. Smart and Sustainable Built Environment, 13(3), pp. 479-495. ISSN 2046-6099

Adebowale, O J and Agumba, J N (2025) Construction SMEs labour productivity: Causal layered analysis. Journal of Engineering, Design and Technology, 23(2), pp. 501-524. ISSN 1726-0531

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Adeyemi, B S and Aigbavboa, C O (2024) An evaluation of the impacts of construction professionals' conflict on performance in the Nigerian construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 469-482. ISSN 23984708

Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988

Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.

Adrian, J J (1974) Modeling construction method productivity. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Adu, E. T.; Olowookere, L. B. and Olorunlogbon, O. O. (2026) Gender inclusiveness in addressing manpower shortages in the Nigerian construction industry: Barriers and benefits. International Journal of Construction Education and Research, 22(2), pp. 191-210. ISSN 1557-8771

Afifi, M; Fotouh, A; Al-Hussein, M and Abourizk, S (2022) Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings. International Journal of Construction Management, 22(13), pp. 2423-2434. ISSN 1562-3599

Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Agbo, B C D (2015) Human capital obsolescence in the building construction industry: Strategic imperatives for Nigeria. PhD thesis, University of Minnesota, USA.

Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499

Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Aghimien, D O; Awodele, O A and Maipompo, C S (2019) Organisational commitment of construction skilled workers in selected construction firms in Nigeria. Journal of Construction Business and Management, 3(1), pp. 8-17. ISSN 2521-0165

Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises. PhD thesis, University of Johannesburg, South Africa.

Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.

Agyekum, K; Hammond, S F and Salgin, B (2021) Occupants' perceived importance and satisfaction with the indoor environmental quality of a green building. Built Environment Project and Asset Management, 11(4), pp. 627-642. ISSN 2044-124X

Agyemang, E.; Deku, C. S.; Owusu-Mante, S.; Forkuor, J. B.; Dwumah, P. and Ofori-Dua, K. (2026) Housing adaptations for climate resilience: Predictors of climate-responsive housing in coastal and savannah zones. Smart and Sustainable Built Environment, pp. 1-25. ISSN 2046-6099

Agyemang, E A; Musonda, I and Zulu, S (2024) Assessing the impact of shareholder focus and productivity pursuit on safety performance: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahadzi, M and Bowles, G (2001) Public-private partnerships in UK infrastructure development: The macroeconomic perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahmad, I U; Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(2), pp. 163-171. ISSN 01446193

Ahmad, S B S; Mazhar, M U; Bruland, A; Andersen, B S; Langlo, J A and Torp, O (2020) Labour productivity statistics: A reality check for the Norwegian construction industry. International Journal of Construction Management, 20(1), pp. 39-52. ISSN 1562-3599

Ahmad, S B S; Mazhar, M U; Laedre, O; Bruland, A and Torp, O (2022) Improvement measures to achieve sustainable construction labour performance. International Journal of Construction Management, 22(1), pp. 85-102. ISSN 1562-3599

Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988

Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364

Ahmed, S; Hossain, M M and Haq, I (2021) Implementation of lean construction in the construction industry in Bangladesh: Awareness, benefits and challenges. International Journal of Building Pathology and Adaptation, 39(2), pp. 368-406. ISSN 23984708

Ahn, C (2012) An integrated framework for sustainable construction processes: Understanding and managing the environmental performance of construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ahn, S; Lee, S and Steel, R P (2013) Effects of workers' social learning: Focusing on absence behavior. Journal of Construction Engineering and Management, 139(8), pp. 1015-1025. ISSN 0733-9364

Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Aiolova, Maria (2026) Building AI fluency in the built environment: Developing organizational learning cultures to drive AI adoption and innovation in the architecture, engineering, and construction industry. EdD thesis, Northeastern University, USA.

Aiyetan, A O and Olotuah, A O (2006) Impact of motivation on workers' productivity in the Nigerian construction industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Aiyetan, O A and Dillip, D (2018) System dynamics approach to mitigating skilled labour shortages in the construction industry: A South Africa context. Construction Economics and Building, 18(4), pp. 45-63. ISSN 2204-9029

Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ajayi, S; Saad, A; Oyegoke, A and Alaka, H (2024) Enhancing productivity and sustainability through BIM-based plugins: A case study of AutoBIM carbon diagnostics system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Aka, A; Isah, A D; Eze, C J and Timileyin, O (2020) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(3), pp. 658-679. ISSN 0969-9988

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akindele, Olabode Akinkunmi (2026) Innovation strategies for small and medium-sized construction companies in Nigeria. DBA thesis, Walden University, USA.

Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.

Akmam Syed Zakaria, S; Gajendran, T; Rose, T and Brewer, G (2018) Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: A review. Architectural Engineering and Design Management, 14(1-2), pp. 3-26. ISSN 1745-2007

Akrawi, S G (1998) Sensing and real-time expert system for a masonry building robot. PhD thesis, City, University of London, UK.

Aksenova, G; Kiviniemi, A; Kocaturk, T and Lejeune, A (2019) From Finnish AEC knowledge ecosystem to business ecosystem: Lessons learned from the national deployment of BIM. Construction Management and Economics, 37(6), pp. 317-335. ISSN 01446193

Akunyumu, S; Fugar, F D K; Adinyira, E and Danku, J C (2021) A review of models for assessing readiness of construction organisations to innovate. Construction Innovation, 21(2), pp. 279-299. ISSN 1471-4175

Al Ghazal, H (2018) Post occupancy evaluation involving end users in Saudi Arabian office buildings through the use of a shortened quality function deployment method. PhD thesis, University of Manchester, UK.

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Al Rfoa, S K; Jaafar, M and Mohd Raslim, F (2023) Influences of high-performance work practices on trust in organisation in Jordanian construction firms. International Journal of Construction Management, 23(10), pp. 1715-1725. ISSN 1562-3599

Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms. PhD thesis, University of Wisconsin - Madison, USA.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al-Abbadi, G M and Agyekum-Mensah, G (2022) The effects of motivational factors on construction professionals productivity in Jordan. International Journal of Construction Management, 22(5), pp. 820-831. ISSN 1562-3599

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia. DM thesis, University of Phoenix, USA.

Al-Bayati, A J (2019) Satisfying the need for diversity training for Hispanic construction workers and their supervisors at US construction workplaces: A case study. Journal of Construction Engineering and Management, 145(6): 05019007, ISSN 0733-9364

Al-Fahad, J Y (2012) Reform of building codes, regulations, administration and enforcement in Kuwait: within the legal, administrative, technical & social framework. PhD thesis, Loughborough University, UK.

Al-Hammad, I A (1991) A knowledge-based framework for construction methods selection. PhD thesis, University of British Columbia, Canada.

Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599

Al-Musleh, A M (2011) Development of a framework for total quality management principles in the construction companies with special reference to the construction companies in the state of Qatar. PhD thesis, Queen Mary University of London, UK.

Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.

Al-Otaibi, S (2021) Assessing the impact of transport investment and railway accessibility on economic productivity. PhD thesis, Loughborough University, UK.

Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Al-Saleh, H A (1991) A program to improve construction productivity in the construction industry in Saudi Arabia. DEngr thesis, University of Kansas, USA.

AlAbbadi, G (2020) Development of a framework towards enhancing workers productivity in the Jordanian construction industry. PhD thesis, Coventry University, UK.

Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Alaghbari, W; Al-Sakkaf, A A and Sultan, B (2019) Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), pp. 79-91. ISSN 1562-3599

Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), pp. 21-37. ISSN 0969-9988

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry. PhD thesis, Aston University, UK.

Albert, A; Hallowell, M R; Lingard, H and Kleiner, B M (2015) Multiple baseline testing: Experimental method for drawing causal inferences in construction engineering and management research. Journal of Construction Engineering and Management, 141(7): 4015012, ISSN 0733-9364

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Alblooshi, M (2021) Exploring the influence of management style on job satisfaction: The case of construction companies in Abu Dhabi, the United Arab Emirates (UAE). PhD thesis, Liverpool John Moores University, UK.

Alchaer, E and Issa, C A (2020) Engineering productivity measurement: A novel approach. Journal of Construction Engineering and Management, 146(8): 0001875, ISSN 0733-9364

Alenazi, E O N (2018) Using BIM for delay management in public sector construction projects in KSA. PhD thesis, Loughborough University, UK.

Alhamami, A (2021) Standardized qualification framework for achieving energy efficiency training for BIM. PhD thesis, Cardiff University, UK.

Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.

Ali, B; Aibinu, A and Paton-Cole, V (2023) Facilitating agreement in disruption claims through disruption analysis methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175

Ali, G M; Bouferguene, A and Al-Hussein, M (2023) Crane mat layout optimization based on agent-based greedy and reinforcement-learning approach. Journal of Construction Engineering and Management, 149(8): 04023067, ISSN 0733-9364

Ali, S; Zayed, T and Hegab, M (2007) Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems. Journal of Construction Engineering and Management, 133(10), pp. 743-748. ISSN 0733-9364

Aliasgari, R; Fan, C; Li, X; Golabchi, A and Hamzeh, F (2024) MOCAP and ai-based automated physical demand analysis for workplace safety. Journal of Construction Engineering and Management, 150(7): 04024060, ISSN 0733-9364

Alinaitwe, H M (2009) Prioritising lean construction barriers in Uganda's construction industry. Journal of Construction in Developing Countries, 14(1), pp. 15-30. ISSN 1823-6499

Alinaitwe, H M; Widén, K; Mwakali, J and Hansson, B (2007) Innovation barriers and enablers that affect productivity in Uganda building industry. Journal of Construction in Developing Countries, 12(1), pp. 59-75. ISSN 1823-6499

Alipouri, Y; Bokharaeian, A and Monfared, E (2025) Construction labor activity recognition via an imu-implemented wristband. Journal of Construction Engineering and Management, 151(11): 04025182, ISSN 0733-9364

Aliu, J; Aigbavboa, C and Wellington Didibhuku, T (2021) Driving the fourth industrial revolution initiative through university and industry collaborations. Journal of Construction in Developing Countries, 26(2), pp. 211-230. ISSN 1823-6499

Aliu, J and Oke, A E (2023) Construction in the digital age: Exploring the benefits of digital technologies. Built Environment Project and Asset Management, 13(3), pp. 412-429. ISSN 2044-124X

Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599

Alkalbani, S (2009) Exploring information and communication technology adoption and diffusion in the Omani construction industry. PhD thesis, University of Salford, UK.

Alkalbani, Saeed (2009) Exploring ICT adoption and diffusion in the Omani construction industry. PhD thesis, University of Salford, UK.

Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.

Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(2), pp. 82-91. ISSN 0961-3218

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988

Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988

Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Allmon, E; Haas, C T; Borcherding, J D and Goodrum, P M (2000) U.S. Construction labor productivity trends, 1970-1998. Journal of Construction Engineering and Management, 126(2), pp. 97-104. ISSN 0733-9364

Allouche, E N; Ariaratnam, S T and Lueke, J S (2000) Horizontal directional drilling: Profile of an emerging industry. Journal of Construction Engineering and Management, 126(1), pp. 68-76. ISSN 0733-9364

Allouche, E N; Ariaratnam, S T and MacLeod, C W (2003) Software for planning and cost control in directional drilling projects. Journal of Construction Engineering and Management, 129(4), pp. 446-453. ISSN 0733-9364

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almami, A (2014) Investigating the antecedents and consequences of Saudization in the construction sector. PhD thesis, University of Plymouth, UK.

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alnasseri N, O A S G (2013) Organizational culture, leadership style and effectiveness: A case study of middle eastern construction clients. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Alqarni, K H (2018) A case study of information technology acceptance in the Saudi Arabian architecture, engineering and construction industry. PhD thesis, University of Reading, UK.

Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599

Alruwaythi, O (2017) Influence of engineering information format, demographics, and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.

Alruwaythi, O F (2017) Influence of engineering information format, demografics and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.

Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.

Alsakini, W (2012) Two models for managing the virtualisation of construction management firms in the context of Finnish construction markets. PhD thesis, Aalto University, Finland.

Alsamarraie, M. M. and Mohd Ghazali, F. E. (2026) A novel framework for sustainable contracting process in organisational public procurement. International Journal of Construction Management, 26(8), pp. 1653-1668. ISSN 1562-3599

Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.

Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.

Alsulami, H; Serbaya, S H; Rizwan, A; Saleem, M; Maleh, Y and Alamgir, Z (2023) Impact of emotional intelligence on the stress and safety of construction workers' in Saudi Arabia. Engineering, Construction and Architectural Management, 30(4), pp. 1365-1378. ISSN 0969-9988

Alsulamy, S; Wamuziri, S and Taylor, M (2012) Evaluation of key metrics for measurement of project performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Altayeb, S (1992) Efficacy of drug testing programs implemented by contractors. Journal of Construction Engineering and Management, 118(4), pp. 780-790. ISSN 0733-9364

Altayeb, S A (1990) Drug testing and its impact on the incident rate in the construction industry. PhD thesis, Clemson University, USA.

Altomonte, S (2005) CH2: lighting and physiology. Construction Economics and Building, 5(2), pp. 40-46. ISSN 2204-9029

Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation, 19(1), pp. 110-124. ISSN 1471-4175

Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364

Alwasel, A; Abdel-Rahman, E M; Haas, C T and Lee, S (2017) Experience, productivity, and musculoskeletal injury among masonry workers. Journal of Construction Engineering and Management, 143(6): 05017003, ISSN 0733-9364

Alwisy, A; Bu Hamdan, S; Barkokebas, B; Bouferguene, A and Al-Hussein, M (2019) A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), pp. 187-205. ISSN 1562-3599

Alzahrani, H; Arif, M; Kaushik, A K; Rana, M Q and Aburas, H M (2023) Evaluating the effects of indoor air quality on teacher performance using artificial neural network. Journal of Engineering, Design and Technology, 21(2), pp. 604-618. ISSN 1726-0531

Alzahrani, Sami Salem (2015) Developing a project management maturity model to initiate sustainable project performance and modernisation in the Kingdom of Saudi Arabia. PhD thesis, University of Adelaide, Australia.

Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599

Alzubi, K. M.; Alaloul, W. S.; Al Salaheen, M.; Musarat, M. A.; Baarimah, A. O. and Mushtaha, A. W. (2025) Indoor construction productivity assessment using computer vision and mask region-based convolutional neural networks. Construction Innovation, 26(5), pp. 1523-1555. ISSN 1471-4175

Alzubi, K M; Alkhateeb, A M and Hiyassat, M A (2023) Factors affecting the job satisfaction of construction engineers: Evidence from Jordan. International Journal of Construction Management, 23(2), pp. 319-328. ISSN 1562-3599

Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Amarasinghe, Sam (2025) Performance optimizing for precast concrete construction. PhD thesis, Queensland University of Technology, Australia.

Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: Practices and challenges. Journal of Construction Business and Management, 1(2), pp. 47-54. ISSN 2521-0165

Ameyaw, E. E.; Agyekum-Mensah, G.; Kumar, B. and Edwards, D. J. (2026) Understanding barriers to the adoption of blockchain-enabled smart contracts in construction projects: Perspectives of construction practitioners. Smart and Sustainable Built Environment, 15(2), pp. 597-621. ISSN 2046-6099

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Amoah, C; Bamfo-Agyei, E and Simpeh, F (2022) The COVID-19 pandemic: The woes of small construction firms in Ghana. Smart and Sustainable Built Environment, 11(4), pp. 1099-1115. ISSN 2046-6099

Anand, K B and Ramamurthy, K (2003) Laboratory-based productivity study on alternative masonry systems. Journal of Construction Engineering and Management, 129(3), pp. 237-242. ISSN 0733-9364

Anderson, A K (2015) Visualization, communication, and copresence: Using building information models in virtual worlds. PhD thesis, University of Washington, USA.

Andres, L A (2005) The impact of privatization on firms in the infrastructure sector in latin American countries. PhD thesis, University of Chicago, USA.

Aniekwu, A N and Okpala, C D (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(2), pp. 171-182. ISSN 01446193

Aniekwu, A N and Okpala, D C (1988) Contractual arrangements and the performance of the Nigerian construction industry (the structural component). Construction Management and Economics, 6(1), pp. 3-11. ISSN 01446193

Anjomshoa, E (2025) The application of building information modeling (BIM) system in the smartification of green and sustainable buildings. Engineering, Construction and Architectural Management, 32(8), pp. 5194-5227. ISSN 0969-9988

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(3), pp. 1-20. ISSN 2204-9029

Annunen, P and Haapasalo, H (2023) Industrial operation model for the construction industry. International Journal of Construction Management, 23(16), pp. 2736-2745. ISSN 1562-3599

Anson, M and Siu, M F F (2020) Augmented balance point diagrams for matching site and concrete-supply resources. Journal of Construction Engineering and Management, 146(4): 04020021, ISSN 0733-9364

Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Antai, I; Lenka, S and Achtenhagen, L (2025) Digital platforms and the construction supply chain: Trends and emerging themes in extant AEC research. Construction Management and Economics, 43(2), pp. 113-129. ISSN 0144-6193

Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364

Anukaenyi, V; Gbadamosi, A Q; Mahamadu, A M and Olawale, O (2023) Enhancing offsite construction for UK SMEs through building information modelling: A comprehensive analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Aquere, A L; Dinis-Carvalho, J and Lima, R M (2013) Project cell: Cellular organization of the building design process. Journal of Construction Engineering and Management, 139(5), pp. 538-546. ISSN 0733-9364

Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Arai, K and Morimoto, E (2021) What is required for recovering from disaster: Theoretical and empirical verification. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Arai, K and Morimoto, E (2021) Productivity and innovation in the Japanese construction industry. Construction Innovation, 21(4), pp. 917-933. ISSN 1471-4175

Arain, F M (2009) Leveraging on information technology to teach construction law to built environment students: A knowledge-based system approach. Journal of Construction in Developing Countries, 14(2), pp. 77-102. ISSN 1823-6499

Aramvareekul, P (2003) An analysis of labor productivity in the United States construction industry. PhD thesis, State University of New York at Buffalo, USA.

Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364

Arata, S; Sugiuchi, M; Ikaga, T; Shiraishi, Y; Hayashi, T; Ando, S and Kawakubo, S (2024) Office environment and employee differences by company health management certification. Buildings & Cities, 5(1), pp. 723-743. ISSN 2632-6655

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175

Arbabian, H (1998) Changes in building construction in an earthquake country. PhD thesis, University of Manchester, UK.

Arditi, D (1985) Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), pp. 1-14. ISSN 0733-9364

Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364

Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193

Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193

Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364

Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Arewa, A O (2014) An empirical analysis of commitment to health and safety and its effect on the profitability of UK Construction SMEs. PhD thesis, University of Bolton, UK.

Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.

Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.

Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Arowoiya, V A; Oke, A E; Aigbavboa, C O and Aliu, J (2020) An appraisal of the adoption internet of things (IoT) elements for sustainable construction. Journal of Engineering, Design and Technology, 18(5), pp. 1193-1208. ISSN 1726-0531

Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599

Arowoiya, V A and Oyefusi, O N (2023) An analysis of the benefits of adopting modular construction: A Nigerian construction industry context. Journal of Construction in Developing Countries, 28(1), pp. 243-265. ISSN 1823-6499

Arvanitis, L.; Al-Tarazi, D.; Agyekum, K.; Kissi, E.; Manu, P.; Mahamadu, A. M.; Booth, C.; Prabhakaran, A. and Pittri, H. (2025) BIM maturity and its influence on BIM implementation challenges: The perspectives of UK contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 231-243. ISSN 1751-4304

Ashley, D B; Uehara, K and Robinson, B E (1983) Critical decision making during construction. Journal of Construction Engineering and Management, 109(2), pp. 146-162. ISSN 0733-9364

Ashraf, Hassan (2018) Psychological conflict management climate in general contractor's project organization and its influence on project performance: exploring multiple psychosocial and behavioral pathways. PhD thesis, University of Hong Kong, Hong Kong.

Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.

Aslam, M; Gao, Z and Smith, G (2021) Development of lean approaching sustainability tools (LAST) matrix for achieving integrated lean and sustainable construction. Construction Economics and Building, 21(3), pp. 176-197. ISSN 2204-9029

Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599

Asok, A (2017) Work-life balance of migrant labourers in Kerala with special reference to civil construction sector. PhD thesis, University of Kerala, India.

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364

Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364

Attia, T M (2002) The impact of communication technologies on group problem-solving performance in construction. PhD thesis, North Carolina State University, USA.

Attoh-Okine, N O (2003) Rule induction in productivity analysis: A rough set approach. Engineering, Construction and Architectural Management, 10(6), pp. 413-417. ISSN 0969-9988

Atukpa, D J (2021) Managerial support strategies to minimize job insecurity among Nigerian private firms. PhD thesis, Walden University, USA.

Avci, A B (2026) Machine learning-based prediction of thermal comfort: Exploring building types, climate, ventilation strategies, and seasonal variations. Building Research & Information, 54(1), pp. 100-117. ISSN 0961-3218

Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364

Awagah, Nicholas K (2024) An integrated framework for mentoring artisans in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499

Aye, L and Fuller, R J (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(2), pp. 32-39. ISSN 2204-9029

Aye, L and Fuller, R J (2005) An evaluation of a proposed ventilation system for melbourne's CH2 building. Construction Economics and Building, 5(2), pp. 47-57. ISSN 2204-9029

Ayegba, C and Root, D (2019) Application of signalling theory in contractor selection for long-term collaborative relationships in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.

Ayinla, K; Cheung, F and Tawil, R A (2019) Towards an ontology-based approach to measuring productivity for offsite manufacturing method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193

Ayinla, K O; Cheung, F and Tawil, A R (2020) Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system. Construction Innovation, 20(2), pp. 223-246. ISSN 1471-4175

Ayodele, O A; Chang-Richards, A and González, V (2020) Factors affecting workforce turnover in the construction sector: A systematic review. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Azcarate-Aguerre, J F; Conci, M; Zils, M; Hopkinson, P and Klein, T (2022) Building energy retrofit-as-a-service: A total value of ownership assessment methodology to support whole life-cycle building circularity and decarbonisation. Construction Management and Economics, 40(9), pp. 676-689. ISSN 01446193

Azhar, S; Lukkad, M Y and Ahmad, I (2013) An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique. International Journal of Construction Education and Research, 9(3), pp. 203-225. ISSN 1557-8771

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.

Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.

Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099

Aziz, Z; Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(3), pp. 294-323. ISSN 1471-4175

Azman, M. A.; Chuweni, N. N.; Muhamad Halil, F.; Ku Azir, K. M. A.; Juhari, F. N.; Lee, B. L. and Skitmore, M. (2026) Market competition and construction firm productivity: The role of market regulation in a developing economy. Engineering, Construction and Architectural Management, 33(7), pp. 5760-5782. ISSN 0969-9988

Azman, M A; Lee, B L; Rahman, R A and Ballesteros-Pérez, P (2026) Ownership and contracting specialization: Unlocking the productivity of construction firms in hybrid market economies. Construction Management and Economics, 44(1), pp. 61-78. ISSN 0144-6193

Azman, M A; Abdul-Samad, Z; Lee, B L; Skitmore, M; Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(2), pp. 618-637. ISSN 0969-9988

Azman, M A; Chuweni, N N; Halil, F M; Ku Mohammad Asyraf Ku, A; Lee, B L; Farah Nazira, J and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: Firm-level evidence in a developing economy. Construction Management and Economics, 42(3), pp. 199-214. ISSN 01446193

Azman, M A; Hon, C K H; Skitmore, M; Lee, B L and Xia, B (2019) A meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: Evidence from Malaysia. Construction Management and Economics, 37(2), pp. 72-88. ISSN 01446193

Azman, M A; Hon, C K H; Xia, B; Lee, B L and Skitmore, M (2021) Product diversification and large construction firm productivity: The effect of institutional environments in Malaysia. Engineering, Construction and Architectural Management, 28(4), pp. 994-1013. ISSN 0969-9988

Azman, Mohd Azrai (2020) Diversification, institutions, and productivity performance of large construction firms in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance. PhD thesis, Iowa State University, USA.

Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599

Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531

Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531

Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.

Badamasi, A A; Aryal, K R; Makarfi, U U and Dodo, M (2022) Drivers and barriers of virtual reality adoption in UK AEC industry. Engineering, Construction and Architectural Management, 29(3), pp. 1307-1318. ISSN 0969-9988

Badawy, M; Hussein, A; Elseufy, S M and Alnaas, K (2021) How to predict the rebar labours' production rate by using ANN model. International Journal of Construction Management, 21(4), pp. 427-438. ISSN 1562-3599

Baek, F; Sohn, J; Bae, J; Kim, D and Lee, S (2026) Physical, cognitive, and emotional responses and their interrelated effects on human-robot team performance in construction. Journal of Construction Engineering and Management, 152(1): 04025224, ISSN 0733-9364

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bai, Y (2007) Intelligent painting process planner for robotic bridge painting. Journal of Construction Engineering and Management, 133(4), pp. 335-342. ISSN 0733-9364

Bajc, T and Kerčov, A (2025) Assessment of students' productivity in context of indoor environmental quality and personal factors. Building Research & Information, 53(5), pp. 620-635. ISSN 0961-3218

Bajracharya, A (2009) Implementation of innovation on construction projects: A behavioral perspective. PhD thesis, National University of Singapore, Singapore.

Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.

Bakheet, M T (1995) Contractors' risk assessment system. PhD thesis, Georgia Institute of Technology, USA.

Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process. PhD thesis, Pennsylvania State University, USA.

Ball, M (1987) Economic change in the British construction industry. PhD thesis, University of London, Birkbeck, UK.

Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988

Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364

Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.

Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988

Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180

Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218

Barbosa, J A; Araújo, C; Mateus, R and Bragança, L (2016) Smart interior design of buildings and its relationship to land use. Architectural Engineering and Design Management, 12(2), pp. 97-106. ISSN 1745-2007

Barkokebas, B; Al-Hussein, M and Hamzeh, F (2023) Assessment of digital twins to reassign multiskilled workers in offsite construction based on lean thinking. Journal of Construction Engineering and Management, 149(1): 04022143, ISSN 0733-9364

Baroudi, B and McAnulty, S (2013) Management of remote construction projects: The Australian experience. International Journal of Construction Management, 13(2), pp. 1-12. ISSN 1562-3599

Barrett, J (2020) Choose your future: A feminist perspective on Construction 4.0 as techno-utopia or digital dystopia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 153-157. ISSN 17514304

Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.

Basma Ben, M; Lehoux, N and Blanchet, P (2024) Integration mechanisms for material suppliers in the construction supply chain: A systematic literature review. Construction Management and Economics, 42(1), pp. 70-107. ISSN 01446193

Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.

Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364

Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Benachio, G L F; Freitas, M D C D and Tavares, S F (2021) Interactions between lean construction principles and circular economy practices for the construction industry. Journal of Construction Engineering and Management, 147(7): 04021068, ISSN 0733-9364

Benjaoran, V; Dawood, N and Scott, D (2004) Bespoke precast productivity estimation with neural network model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988

Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599

Berg, J B; Thuesen, C; Ernstsen, S K and Jensen, P A (2021) Reconfiguring the construction value chain: Analysing key sources of friction in the business model archetypes of AEC companies in strategic partnerships. Construction Management and Economics, 39(6), pp. 533-548. ISSN 01446193

Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Bernold, L E (2007) Quantitative assessment of backhoe operator skill. Journal of Construction Engineering and Management, 133(11), pp. 889-899. ISSN 0733-9364

Bernold, L E and Chang, P (1992) Potential gains through welded-wire fabric reinforcement. Journal of Construction Engineering and Management, 118(2), pp. 244-257. ISSN 0733-9364

Bernold, L E and Guler, N (1993) Analysis of back injuries in construction. Journal of Construction Engineering and Management, 119(3), pp. 607-621. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Davis, M L (2001) Technological intervention to eliminate back injury risks for nailing. Journal of Construction Engineering and Management, 127(3), pp. 245-250. ISSN 0733-9364

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771

Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.

Best, R (2010) Using purchasing power parity to assess construction productivity. Construction Economics and Building, 10(4), pp. 1-10. ISSN 2204-9029

Best, R (2012) International comparisons of cost and productivity in construction: A bad example. Construction Economics and Building, 12(3), pp. 82-88. ISSN 2204-9029

Best, R and Purdey, B (2012) Assessing occupant comfort in an iconic sustainable education building. Construction Economics and Building, 12(3), pp. 55-65. ISSN 2204-9029

Betts, M and Wood-Harper, T (1994) Re-engineering construction: A new management research agenda. Construction Management and Economics, 12(6), pp. 551-556. ISSN 01446193

Bew, M D (2017) Engineering better social outcomes through requirements management & integrated asset data processing. PhD thesis, University of Salford, UK.

Bhanu, A C (2024) Integrating artificial intelligence and augmented reality for enhanced task performance in the construction industry. PhD thesis, Clemson University, USA.

Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364

Bhattacharya, S; Momaya, K S and Iyer, K C (2021) Bridging the gaps for business growth among Indian construction companies. Built Environment Project and Asset Management, 11(2), pp. 231-250. ISSN 2044-124X

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364

Bidarianzadeh, G R and Fortune, C J (2002) Lean thinking and the delivery of sustainable construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Bilhaif, A (1990) The influence of high temperatures on the productivity of construction workers. PhD thesis, University of Reading, UK.

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Blanchard, F L (1992) Construction industry organization, labor relations and productivity. PhD thesis, Massachusetts Institute of Technology, USA.

Boamah, F A; Zhang, J and Miah, M H (2023) The impact of tacit knowledge sharing on the success of construction companies operations. Journal of Engineering, Design and Technology, 21(6), pp. 1767-1784. ISSN 1726-0531

Boamah, F A; Zhang, J; Shehzad, M U; Sherani, S and Wen, D (2024) Exploring the impact of social capitals and knowledge creation on construction firms performance in the COVID-19 era. Journal of Engineering, Design and Technology, 22(2), pp. 404-421. ISSN 1726-0531

Boes, H and Holmen, E (2003) Changing supplier-customer interfaces in design-construct contracts? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364

Bohn, J S and Teizer, J (2010) Benefits and barriers of construction project monitoring using high-resolution automated cameras. Journal of Construction Engineering and Management, 136(6), pp. 632-640. ISSN 0733-9364

Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.

Bonham, D R (2015) The derivation and implications of a master code of accounts for mechanical piping systems. PhD thesis, University of Colorado at Boulder, USA.

Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364

Bonwetsch, T (2015) Robotically assembled brickwork: Manipulating assembly processes of discrete elements. DSc thesis, ETH Zürich, Switzerland.

Bordass, B; Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: Conclusions and implications. Building Research & Information, 29(2), pp. 144-157. ISSN 0961-3218

Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies. PhD thesis, KTH Royal Institute of Technology, Sweden.

Borg, L and Song, H S (2015) Quality change and implications for productivity development: Housing construction in Sweden 1990-2010. Journal of Construction Engineering and Management, 141(1): 05014014, ISSN 0733-9364

Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364

Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.

Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: Building services evaluation. Building Research & Information, 48(2), pp. 207-217. ISSN 0961-3218

Bosserman, B E and Ford, M E (1984) Development of computerized specifications. Journal of Construction Engineering and Management, 110(3), pp. 375-384. ISSN 0733-9364

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218

Bowen, P; Allen, Y; Edwards, P; Cattell, K and Simbayi, L (2014) Guidelines for effective workplace HIV/AIDS intervention management by construction firms. Construction Management and Economics, 32(4), pp. 362-381. ISSN 01446193

Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.

Bowlby, R L and Schriver, W R (1986) Observations on productivity and composition of building construction output in the United States, 1972-82. Construction Management and Economics, 4(1), pp. 1-18. ISSN 01446193

Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation. PhD thesis, Indiana State University, USA.

Brahmi, B F; Sassi Boudemagh, S; Kitouni, I and Kamari, A (2022) IPD and BIM-focussed methodology in renovation of heritage buildings. Construction Management and Economics, 40(3), pp. 186-206. ISSN 01446193

Braimah, N; Ndekugri, I and Gameson, R (2006) A review of industry standards and publications/charts for adjusting productivity losses in construction contracts. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Brandenburg, S G (2004) The Tier I workforce management strategy: Concept and application. PhD thesis, University of Texas at Austin, USA.

Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364

Brett, R; Dainty, A R J and Fernie, S (2024) Direct employment of construction workers: Skill and productivity in site practice. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193

Bridgeman, J; Murdock, A; Maple, P; Townley, C and Graham, J (2015) Putting a value on young people's journey into construction: Introducing SROI at construction youth trust. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218

Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364

Bronke J, F N (2023) Perceptions and understandings of construction site productivity: Insights from the Danish construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364

Brown, J and Loosemore, M (2015) Behavioural factors influencing corrupt action in the Australian construction industry. Engineering, Construction and Architectural Management, 22(4), pp. 372-389. ISSN 0969-9988

Bruce, P J; Hrymak, V; Bruce, C and Byrne, J (2025) The role of interpersonal conflict as a cause of work-related stress in construction managers in Ireland. Construction Innovation, 25(1), pp. 61-77. ISSN 1471-4175

Bruni, M (1981) Business cycles and seasonality in the Italian construction sector. PhD thesis, University of California, Berkeley, USA.

Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029

Budayan, C (2008) Strategic group analysis: Strategic perspective, differentiation and performance in construction. PhD thesis, Middle East Technical University, Turkey.

Buli, L G (2017) Strategies for improving labor productivity in construction companies. PhD thesis, Walden University, USA.

Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.

Burleson, R C; Haas, C T; Tucker, R L and Stanley, A (1998) Multiskilled labor utilization strategies in construction. Journal of Construction Engineering and Management, 124(6), pp. 480-489. ISSN 0733-9364

Burt, J and Purver, K (2014) Building information modelling for small-scale residential projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 134-140. ISSN 17514304

Buswell, R; Webb, L; Mitchell, V and Leder Mackley, K (2017) Multidisciplinary research: Should effort be the measure of success? Building Research & Information, 45(5), pp. 539-555. ISSN 0961-3218

Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.

Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X

C.R, A; Murali, S; Haq, M A; Bysani, T N and Narahari, N S (2023) Exoskeleton for lower extremities based on Indian anthropomorphism with gait allowance: Design and development. Journal of Engineering, Design and Technology, 21(5), pp. 1343-1372. ISSN 1726-0531

Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Candido, C; Kim, J; de Dear, R and Thomas, L (2016) BOSSA: A multidimensional post-occupancy evaluation tool. Building Research & Information, 44(2), pp. 214-228. ISSN 0961-3218

Candido, C; Thomas, L; Haddad, S; Zhang, F; Mackey, M and Ye, W (2019) Designing activity-based workspaces: Satisfaction, productivity and physical activity. Building Research & Information, 47(3), pp. 275-289. ISSN 0961-3218

Cao, X.; Hong, C.; Xu, Y.; Lee, C. Y. and Skitmore, M. (2026) Effects of abusive supervision on construction industry workers' work efficiency: A study based on EEG. Journal of Construction Engineering and Management, 152(6): 04026073, ISSN 0733-9364

Cao, J; Said, H; Savov, A and Hall, D (2024) Graph-based evolutionary search for optimal hybrid modularization of building construction projects. Journal of Construction Engineering and Management, 150(8): 04024098, ISSN 0733-9364

Cargnelutti, Dejan (2025) 4IR technologies within germany’s construction sector to meet fire protection standards and international climate objectives: A multiple-case study. PhD thesis, European Institute of Management, Malta.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users perception. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carson, C and Abbott, M (2012) A review of productivity analysis of the New Zealand construction industry. Construction Economics and Building, 12(3), pp. 1-15. ISSN 2204-9029

Cass, Yael (2020) The challenges and opportunities faced by women in the construction industry when progressing their careers in trades and professional roles. PhD thesis, RMIT University, Australia.

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Cha, H S; Kim, K H and Kim, C K (2012) Case study on selective demolition method for refurbishing deteriorated residential apartments. Journal of Construction Engineering and Management, 138(2), pp. 294-303. ISSN 0733-9364

Chagadama, J (2022) Small construction business owners’ strategies to reduce voluntary employee turnover. PhD thesis, Walden University, USA.

Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192-210. ISSN 0969-9988

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193

Chan, I Y S and Leung, M Y (2011) Impact of stress on injury incidents among construction workers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Chan, I Y S and Liu, A M M (2012) Antecedents of innovation climate in construction firms in Hong Kong. International Journal of Construction Management, 12(4), pp. 37-46. ISSN 1562-3599

Chan, P (2002) Factors affecting labour productivity in the construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Chan, P and Kaka, A (2003) A blue-collar insight into improving construction labour productivity. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chan, P; Puybaraud, M C and Kaka, A (2001) Construction training: A linkage to productivity improvements. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.

Chan, P W (2013) A 'zombie' existence: Exploring Ulrich Beck's zombie categories and construction management research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chan, P W (2020) Construction in the platform society: New directions for construction management research. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Chan, P W; Grantham, A; Kaplinsky, R; Mynors, D; Mohamed, S; Walsh, K and Coles, R (2006) A taxonomy of knowledge leakage: Some early developments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chan, T K and Gao, S (2019) Can we really measure construction productivity? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chancellor, W and Abbott, M (2015) The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176-186. ISSN 01446193

Chancellor, W; Abbott, M and Carson, C (2015) Factors promoting innovation and efficiency in the construction industry: A comparative study of New Zealand and Australia. Construction Economics and Building, 15(2), pp. 63-80. ISSN 2204-9029

Chancellor, W and Lu, W (2016) A regional and provincial productivity analysis of the Chinese construction industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11): 05016013, ISSN 0733-9364

Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364

Chang, C Y (2005) Recent development of uk construction products sector: Evidence from microdata. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Chang, D-W (1987) Performance of the Korea-based construction firms in the Middle East. PhD thesis, New York University, Graduate School of Business Administration, USA.

Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Chaparro, D A; Ying, F J; Rotimi, F E and Egbelakin, T (2020) Commute and labour productivity: Investigation of inner city construction sites. Journal of Engineering, Design and Technology, 18(5), pp. 1305-1319. ISSN 1726-0531

Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.

Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.

Charousaei, M; Faizi, M and Khakzand, M (2025) The impact of the visual layout of university open space on students' behavior and satisfaction level: The case of Iran University of Science and Technology. Smart and Sustainable Built Environment, 14(4), pp. 992-1016. ISSN 2046-6099

Charpia, J (2018) Employee turnover intentions in the construction industry: A quantitative correlational study. PhD thesis, Northcentral University, USA.

Chau, K W (1993) Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(5), pp. 370-383. ISSN 01446193

Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(1), pp. 38-50. ISSN 0969-9988

Chau, K W and Wang, Y S (2005) An analyseis of productivity growth in the construction industry: A non-parametric approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chauhan, H; Jang, Y and Jeong, I (2026) Assessing the impact of human-robot collaboration on worker productivity in construction through psychophysiological response analysis. Journal of Construction Engineering and Management, 152(3): 04025273, ISSN 0733-9364

Cheetham, D W and Lewis, J (2001) Productivity, buildability and constructability: Is work study the missing link? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.

Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364

Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364

Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.

Chen, Q and Jin, R (2012) Safety4site commitment to enhance jobsite safety management and performance. Journal of Construction Engineering and Management, 138(4), pp. 509-519. ISSN 0733-9364

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Chen, X; Chang-Richards, A Y; Yiu, T W; Ling, F Y Y; Pelosi, A and Yang, N (2024) A multivariate regression analysis of barriers to digital technologies adoption in the construction industry. Engineering, Construction and Architectural Management, 31(11), pp. 4281-4307. ISSN 0969-9988

Chen, Y (2020) The identification of a potential solution to improve the construction project performance in the Chinese construction industry: By analyzing similar construction industries in other developing countries. PhD thesis, Arizona State University, USA.

Chen, Y-T (2008) Automated on-site productivity evaluation using RFID and GPS. PhD thesis, Purdue University, USA.

Cheng, M-Y (1992) Automated site layout of temporary construction facilities using geographic information systems (GIS). PhD thesis, University of Texas at Austin, USA.

Chesworth, B; London, K and Gajendran, T (2011) Understanding lean implementation: Perspectives and approaches of an American construction organisation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, C M; Bowen, P; Cattell, K and Davis, J (2019) Measuring what counts: Workplace well-being of project professionals. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Chew, A T W and Ling, F Y Y (2002) Increasing Singapore's construction productivity through construction process re-engineering. Journal of Construction Research, 3(1), pp. 123-45. ISSN 1609-9451

Chia, F C; Skitmore, M; Gray, J and Bridge, A (2018) International comparisons of nominal and real construction labour productivity. Engineering, Construction and Architectural Management, 25(7), pp. 896-915. ISSN 0969-9988

Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2012) An analysis of construction productivity in Malaysia. Construction Management and Economics, 30(12), pp. 1055-1069. ISSN 1466433X

Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2014) Economic development and construction productivity in Malaysia. Construction Management and Economics, 32(9), pp. 874-887. ISSN 01446193

Chia, Fah Choy (2011) Economic fluctuations and productivity in the Malaysian construction sector. PhD thesis, Queensland University of Technology, Australia.

Chiang, Lee-Yun (2023) Affordable housing as an infrastructure asset: A public-private partnerships approach. PhD thesis, Griffith University, Australia.

Chien, H-J (2003) Developing a digital nervous system for enhancing effectiveness of construction management and increasing commercial benefit in the UK construction industry. PhD thesis, University of Glamorgan, UK.

Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.

Cho, M (1994) Productivity analysis in construction using an expert system approach. PhD thesis, University of Manchester, UK.

Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Choi, K and Lee, H W (2016) Deconstructing the construction industry: A spatiotemporal clustering approach to profitability modeling. Journal of Construction Engineering and Management, 142(10): 04016051, ISSN 0733-9364

Choi, S D; Griinke, D and Lederer, M (2006) Fall protection equipment effects on productivity and safety in residential roofing construction. Journal of Construction Research, 7(1), pp. 149-157. ISSN 1609-9451

Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.

Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.

Chui, K W (2010) Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement methods. PhD thesis, University of Kansas, USA.

Chuing, L S (2015) Modelling capability-based risk assessment for international construction project ventures. PhD thesis, University of Malaya, Malaysia.

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Clarke, L and Wall, C (2000) Craft versus industry: The division of labour in European housing construction. Construction Management and Economics, 18(6), pp. 689-698. ISSN 01446193

Clements-Croome, D (2005) Designing the indoor environment for people. Architectural Engineering and Design Management, 1(1), pp. 45-55. ISSN 1745-2007

Cocerhan, I and Bradley, J (2019) Investigation into how technology can overcome language barriers experienced by construction workers from eastern Europe on sites in London. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.

Cooper, Arthur Ashley (1971) An economic study of housing production and associated works in Australia. PhD thesis, University of New South Wales, Australia.

Costa, S; Sameiro Carvalho, M; Pimentel, C and Duarte, C (2025) Conceptualizing the phenomenon of construction industrialization: linking theory and practice through a cross-sector case study. International Journal of Construction Management, 25(8), pp. 923-931. ISSN 1562-3599

Cotton, A P; Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(6), pp. 617-632. ISSN 0969-9988

Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193

Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Cox, R F; Issa, R R A and Ahrens, D (2003) Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, 129(2), pp. 142-151. ISSN 0733-9364

Crawford, P and Vogl, B (2006) Measuring productivity in the construction industry. Building Research & Information, 34(3), pp. 208-219. ISSN 0961-3218

Crespo Vallejo, L G (2018) Project manager strategies to improve the delivery of construction projects. PhD thesis, Walden University, USA.

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Çıdık, M S (2019) Construction productivity and digitalisation: An it productivity paradox perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Dabirian, S; Moussazadeh, M; Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(4), pp. 606-618. ISSN 1562-3599

Dadi, G B (2013) Applying cognitive principles to the delivery of engineering information by different mediums. PhD thesis, University of Kentucky, USA.

Dadi, G B; Goodrum, P M; Taylor, T R B and Carswell, C M (2014) Cognitive workload demands using 2D and 3D spatial engineering information formats. Journal of Construction Engineering and Management, 140(5): 04014001, ISSN 0733-9364

Dai, J (2006) A latent analysis and prototype system to manage jobsite factors impacting construction labor productivity. PhD thesis, University of Kentucky, USA.

Dai, J and Goodrum, P M (2011) Differences in perspectives regarding labor productivity between Spanish-and English-speaking craft workers. Journal of Construction Engineering and Management, 137(9), pp. 689-697. ISSN 0733-9364

Dai, J; Goodrum, P M and Maloney, W F (2007) Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. Construction Management and Economics, 25(11), pp. 1139-1152. ISSN 01446193

Dai, J; Goodrum, P M and Maloney, W F (2009) Construction craft workers' perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3), pp. 217-226. ISSN 0733-9364

Dai, J; Goodrum, P M; Maloney, W F and Srinivasan, C (2009) Latent structures of the factors affecting construction labor productivity. Journal of Construction Engineering and Management, 135(5), pp. 397-406. ISSN 0733-9364

Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599

Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364

Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988

Daniel, E I; Oshodi, O; Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: Exploration of the influencing factors and the way forward. Construction Innovation, 24(4), pp. 965-985. ISSN 1471-4175

Danso, A. K.; Edwards, D. J.; Adjei, E. K.; Adjei-Kumi, T.; Owusu-Manu, D. G.; Fianoo, S. I. and Thwala, W. D. (2026) Analysis of the underlying factors affecting BIM-LCA integration in the Ghanaian construction industry: A factor analysis approach. Construction Innovation, 26(3), pp. 871-891. ISSN 1471-4175

Darlow, G; Rotimi, J O B and Wajiha Mohsin, S (2022) Automation in New Zealand's offsite construction: A status update. Built Environment Project and Asset Management, 12(1), pp. 38-52. ISSN 2044-124X

Das, D K (2020) Perspectives of smart cities in South Africa through applied systems analysis approach: A case of Bloemfontein. Construction Economics and Building, 20(2), pp. 65-88. ISSN 2204-9029

Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.

Dauda, J A; Chavan, N N; Saka, A B; Ajayi, S O and Oyegoke, A S (2025) An appraisal of barriers to digitalisation of construction industry in developing countries: perspective from India. International Journal of Construction Management, 25(7), pp. 770-782. ISSN 1562-3599

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Davila Delgado, J M; Oyedele, L; Beach, T and Demian, P (2020) Augmented and virtual reality in construction: Drivers and limitations for industry adoption. Journal of Construction Engineering and Management, 146(7): 04020079, ISSN 0733-9364

Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364

Davis, P; Gajendran, T; Vaughan, J and Owi, T (2016) Assessing construction innovation: Theoretical and practical perspectives. Construction Economics and Building, 16(3), pp. 104-115. ISSN 2204-9029

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193

Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.

De Silva, N; Darmicka, R and Fernando, E (2014) Impact of foreign workforce on productivity in foreign-funded infrastructure projects. Journal of Financial Management of Property and Construction, 19(2), pp. 168-183. ISSN 1366-4387

Deacon, C and Smallwood, J (2003) Health promotion in South African construction. Journal of Construction Research, 4(2), pp. 129-140. ISSN 1609-9451

Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.

Debrah, C; Chan, A P C; Darko, A; Akowuah, E; Amudjie, J; Asare, K A B and Ghansah, F A (2025) A bibliometrix-based scientometric-systematic analysis and visualization of the global outlook on post-occupancy evaluation of green building. Building Research & Information, 53(8), pp. 1058-1074. ISSN 0961-3218

Debs, L and Hubbard, B (2023) Gathering and disseminating lessons learned in construction companies to support knowledge management. Construction Economics and Building, 23(1-2), pp. 56-76. ISSN 2204-9029

Deep, S; Gajendran, T and Jefferies, M (2021) A systematic review of 'enablers of collaboration' among the participants in construction projects. International Journal of Construction Management, 21(9), pp. 919-931. ISSN 1562-3599

Deep, S; Sonkar, N; Yadav, P; Vishnoi, S; Bhoola, V and Kumar, A (2024) Factors influencing the mental health of white-collar construction workers in developing economies: Analytical study during the COVID-19 pandemic in India. Journal of Construction Engineering and Management, 150(7): 04024058, ISSN 0733-9364

Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.

Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364

Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599

Dewundara Maha Galappaththi Arachchige, N M S (2021) Innovation in construction project-based firms through the lens of exploratory and exploitative learning : effects of social capital and collaborative environment. PhD thesis, University of Hong Kong, Hong Kong.

Dharmapalan, Vineeth (2021) Supply chain visibility for industrial construction projects: Assessment of benefits, current status, definitions, barriers, and enablers. PhD thesis, University of Texas at Austin, USA.

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.

Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.

Dickerson, D E (2024) Construction health hazard control innovations: A web-based intervention to change perceptions. International Journal of Construction Education and Research, 20(3), pp. 243-262. ISSN 15578771

Diekmann, J E and Peppier, S E (1984) Union and open shop labor cost differences. Journal of Construction Engineering and Management, 110(1), pp. 87-99. ISSN 0733-9364

Dike, I (2017) A critical exploration of the impact of building information modelling on the culture and performance of UK construction supply chains. PhD thesis, Coventry University, UK.

Dinca, M S; Barbuta-Misu, N; Madaleno, M; Dinca, G and Deari, F (2017) Integrated analysis of EU construction companies' financial performances. Journal of Construction Engineering and Management, 143(6): 04017002, ISSN 0733-9364

Dinh, T N; Kuo, K C; Lu, W M and Nguyen, D T (2023) The effect of quantitative easing on Asian construction firms' performance. International Journal of Construction Management, 23(1), pp. 38-47. ISSN 1562-3599

Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis. PhD thesis, University of Alberta, Canada.

Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology, 17(3), pp. 554-571. ISSN 1726-0531

Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.

Doczy, R (2018) Risk-benefit analysis and optimization of LEED-certified school buildings design and construction: Statisitical and machine learning approaches. PhD thesis, Florida State University, USA.

Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193

Donato, Matteo (2016) The influence of resource dependency on collaboration in the construction supply chain. PhD thesis, Victoria University, Australia.

Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.

Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599

Dowsett, R. M. and Harty, C. F. (2019) Assessing the implementation of BIM–an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 0144-6193

Dowsett, R and Harty, C (2016) Making the link between bim's benefits and implementation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dowsett, R M and Harty, C F (2019) Assessing the implementation of BIM: an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 01446193

Du Plessis, C and Sherratt, F (2020) Construction 4.0 and built assets in-use: Creating an e-topia or dystopia? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 182-189. ISSN 17514304

Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.

Dubois, A and Gadde, L E (2002) The construction industry as a loosely coupled system: Implications for productivity and innovation. Construction Management and Economics, 20(7), pp. 621-631. ISSN 01446193

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Duncheva, T and Bradley, F F (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(8): 04019043, ISSN 0733-9364

Duncheva, T A (2019) Offsite timber systems multi-factor productivity index. PhD thesis, University of Strathclyde, UK.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Dunlop, P G and Smith, S D (2002) Simulation analysis of the UK concrete delivery and placement process: A tool for planners. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Dunn, P J; Oyegoke, A S; Ajayi, S; Palliyaguru, R and Devkar, G (2023) Challenges and benefits of led retrofit projects: A case of salix financed secondary school in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1883-1900. ISSN 1726-0531

Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Durdyev, S and Mbachu, J (2011) On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Construction Economics and Building, 11(3), pp. 18-33. ISSN 2204-9029

Durdyev, S and Mbachu, J (2018) Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), pp. 385-393. ISSN 1562-3599

Dwairi, S (2018) Development of an Ontology-based framework and tool for Employer Information Requirements (OntEIR). PhD thesis, University of the West of England, Bristol, UK.

Dyer, B; Goodrum, P M and Viele, K (2012) Effects of omitted variable bias on construction real output and its implications on productivity trends in the United States. Journal of Construction Engineering and Management, 138(4), pp. 558-566. ISSN 0733-9364

Dyer, B D (2010) Construction industry productivity: Examining the effects of omitted variable bias in the census construction price index models. PhD thesis, University of Kentucky, USA.

Dykes, C and Baird, G (2014) Performance benchmarks for non-domestic buildings: Towards user perception benchmarks. Building Research & Information, 42(1), pp. 62-71. ISSN 0961-3218

Eastman, C M and Sacks, R (2008) Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering and Management, 134(7), pp. 517-526. ISSN 0733-9364

Eaves S, G D G A (2013) Building healthy construction workers by better workplace design: Understanding the context. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B and Rohayati, M I (2024) Investigating safety violations on Nigerian construction sites. International Journal of Construction Management, 24(13), pp. 1454-1464. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C O; Aliu, J and Thwala, W D (2024) Generic skills of future built environment practitioners in South Africa: Unexplored mechanism via students' perception. Journal of Engineering, Design and Technology, 22(2), pp. 561-577. ISSN 1726-0531

Ebekozien, A; Ebekozien, E O; Ahmed, M A H; Aigbavboa, C O; Ayo-Odifiri, S O; Samsurijan, M S; Adekunle, S A; Akinradewo, O and Momoh, N I (2025) The role of health belief model in improving construction artisans' mental health intervention: Nigerian stakeholders' perspective. Engineering, Construction and Architectural Management, 32(13), pp. 174-192. ISSN 0969-9988

Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988

Ed Koehn, E; Kothari, R K and Pan, C S (1995) Safety in developing countries: Professional and bureaucratic problems. Journal of Construction Engineering and Management, 121(3), pp. 261-265. ISSN 0733-9364

Edirisinghe, R and Gunathilake, L (2025) IoT-based smart vest for heat stress management in construction. International Journal of Construction Management, 25(16), pp. 2137-2149. ISSN 1562-3599

Edum-Fotwe, F T; Gregory, M J; Thorpe, A; Cooper, R and Deasley, P J (2002) Managing distributed design teams and processes: A cross-sector study of construction and aerospace. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Edwards, D J (1999) A methodology for predicting the total average hourly maintenance cost of tracked hydraulic excavators operating in the UK opencast mining industry. PhD thesis, University of Wolverhampton, UK.

Edwards, D J and Holt, G D (2000) Quantifying the cost of plant operators' productivity. Journal of Financial Management of Property and Construction, 5(1-2), pp. 85-92. ISSN 1366-4387

Edwards, D J and Holt, G D (2000) Estivate: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52-62. ISSN 0969-9988

Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218

Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(4), pp. 321-335. ISSN 0969-9988

Edwards, D J and Holt, G D (2009) Construction plant and equipment management research: Thematic review. Journal of Engineering, Design and Technology, 7(2), pp. 186-206. ISSN 1726-0531

Edwards, D J and Holt, G D (2011) Mini-excavator safety: Toward innovative stability testing, procurement, and manufacture. Journal of Construction Engineering and Management, 137(12), pp. 1125-1133. ISSN 0733-9364

Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387

Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193

Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387

Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175

Edwards, D J; Yang, J; Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(2), pp. 173-187. ISSN 1726-0531

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2006) Multiskilling: A UK construction and building services perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2008) The impact of multiskilling on UK's construction manpower. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 25-30. ISSN 17514312

Ekeskär, A; Havenvid, M I; Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: Coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(1), pp. 25-40. ISSN 01446193

Ekeskär, A and Rudberg, M (2016) Third-party logistics in construction: The case of a large hospital project. Construction Management and Economics, 34(3), pp. 174-191. ISSN 01446193

Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ekström, D (2019) Integrated structural and construction engineering: a study of project team performance in Swedish bridge design. PhD thesis, Chalmers University of Technology, Sweden.

El Bakry, S M (1981) Measurement of productivity and cost of the direct labour organisation within highways maintenance departments. PhD thesis, Aston University, UK.

El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364

El-Mashaleh, M S (2003) Firm performance and information technology utilization in the construction industry: An empirical study. PhD thesis, University of Florida, USA.

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.

Elazouni, A M and Basha, I M (1996) Evaluating the performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, 122(2), pp. 109-114. ISSN 0733-9364

Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Eldin, N N (1987) Methodology for project management control in the construction industry. PhD thesis, Oklahoma State University, USA.

Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364

Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364

Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364

Elias, I; Felix, H; David, P and David, O (2011) Improving construction health and safety: Application of cost-benefit analysis (CBA) for accident prevention. International Journal of Construction Management, 11(1), pp. 19-35. ISSN 1562-3599

Elkliny, A.; Mahmoudi, A.; Deng, X. and Gaber, M. M. (2026) Data-driven identification of critical skills for international construction supply chain management practitioners. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Elkliny, A.; Mahmoudi, A.; Deng, X. and Gaber, M. M. (2026) Data-driven identification of critical skills for international construction supply chain management practitioners. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364

Eltigani, Hadi Mohammed Ahmed (1995) An investigation into the impact of quality management systems upon construction productivity at the site level. PhD thesis, University of Strathclyde, UK.

Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Emuze, F (2021) Fortifying management control of health, safety and productivity loss in South African construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Emuze, F; Linake, M and Seboka, L (2016) Construction work and the housekeeping challenge in Lesotho. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Emuze, F and Mollo, L (2019) Disrespecting people with working conditions in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 112-117. ISSN 17514304

Emuze, F and Smallwood, J J (2012) Bridging public works project performance gaps in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 111-118. ISSN 17514312

Enshassi, A; Al-Swaity, E; Abdul Aziz, A R and Choudhry, R (2018) Coping behaviors to deal with stress and stressor consequences among construction professionals: A case study at the Gaza Strip, Palestine. Journal of Financial Management of Property and Construction, 23(1), pp. 40-56. ISSN 1366-4387

Enshassi, A; El-Rayyes, Y and Alkilani, S (2015) Job stress, job burnout and safety performance in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 20(2), pp. 170-187. ISSN 1366-4387

Enshassi, A; Mohamed, S and Ekarriri, A (2009) Essential skills and training provisions for building project stakeholders in Palestine. Journal of Construction in Developing Countries, 14(1), pp. 31-50. ISSN 1823-6499

Enshassi, A and Shaath, K (2007) Training assessment of palestinian contractors. Journal of Construction in Developing Countries, 12(1), pp. 39-58. ISSN 1823-6499

Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364

Eriksson, P E; Olander, S; Szentes, H and Widén, K (2014) Managing short-term efficiency and long-term development through industrialized construction. Construction Management and Economics, 32(1-2), pp. 97-108. ISSN 01446193

Eriksson, V; Hulthén, K; Sundquist, V; Fredriksson, A and Janné, M (2021) The role of public actors in construction logistics: Effects on and of relational interfaces. Construction Management and Economics, 39(10), pp. 791-806. ISSN 01446193

Ershadi, M; Jefferies, M; Davis, P and Mojtahedi, M (2021) Enhancing productivity in infrastructure development: The key role of project management offices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Ershadi, Mahmoud (2021) Analysing and modelling the critical success factors of project management offices in the construction industry. PhD thesis, University of Newcastle, Australia.

Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Everett, J G (1991) Construction automation: Basic task selection and development of the cranium. PhD thesis, Massachusetts Institute of Technology, USA.

Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364

Everett, J G and Kelly, D L (1998) Drywall joint finishing: Productivity and ergonomics. Journal of Construction Engineering and Management, 124(5), pp. 347-353. ISSN 0733-9364

Everett, J G and Saito, H (1996) Construction automation: Demands and satisfiers in the United States and Japan. Journal of Construction Engineering and Management, 122(2), pp. 147-151. ISSN 0733-9364

Everett, J G and Slocum, A H (1993) Cranium: Device for improving crane productivity and safety. Journal of Construction Engineering and Management, 119(1), pp. 23-39. ISSN 0733-9364

Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364

Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175

Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364

Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387

Fagbenle, O I; Adeyemi, A Y and Adesanya, D A (2004) The impact of non-financial incentives on bricklayers' productivity in Nigeria. Construction Management and Economics, 22(9), pp. 899-911. ISSN 01446193

Fan, S; Shen, Q and Lin, G (2007) Comparative study of idea generation between traditional value management workshops and GDSS-supported workshops. Journal of Construction Engineering and Management, 133(10), pp. 816-825. ISSN 0733-9364

Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364

Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.

Farmer, I W (1996) Performance of chain trenchers in mixed ground. Journal of Construction Engineering and Management, 122(2), pp. 115-124. ISSN 0733-9364

Farooqui, R U-H (2011) Achieving zero accidents: a strategic framework for continuous safety improvement in the construction industry. PhD thesis, Florida International University, USA.

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Fellows, M (2022) Migrant workers as informal interpreters on construction sites. PhD thesis, University of Reading, UK.

Fellows, M F; Phua, F T T and Tutt, D E (2023) Building bridges: The bilingual language work of migrant construction workers. Construction Management and Economics, 41(2), pp. 153-171. ISSN 01446193

Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.

Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.

Ferguson, M (2020) Improving mobile robot navigation with dynamic building information models and stochastic neural control. PhD thesis, Stanford University, USA.

Fernando, N G; Amaratunga, D and Haigh, R (2014) The career advancement of the professional women in the UK construction industry: The career success factors. Journal of Engineering, Design and Technology, 12(1), pp. 53-70. ISSN 1726-0531

Fernie, S (2005) Making sense of supply chain management in UK construction organisations: theory versus practice. PhD thesis, Loughborough University, UK.

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fiorineschi, L; Conti, L; Rossi, G and Rotini, F (2024) Conceptual design of a small production plant for eco-friendly packaging. Journal of Engineering, Design and Technology, 22(4), pp. 1257-1281. ISSN 1726-0531

Fisher, D J and O’Connor, J T (1991) Constructability for piping automation: Field operations. Journal of Construction Engineering and Management, 117(3), pp. 468-485. ISSN 0733-9364

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Fitzpatrick, C; Curran, M R; Clarke-Hagan, M; Spillane, J P and Bradley, J G (2024) Is a compressed workweek viable for work-life balance in the Irish construction industry? An exploratory study into a four-day week. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Fitzpatrick-Ramirez, Cameron (2014) Strategies and contradictions: Knowledge workers and the built environment. PhD thesis, University of New South Wales, Australia.

Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.

Fleming, E; Callaghan, N and Craig, N (2019) Robotics and automation as a solution to bridging the UK housing gap. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Fletcher, K (2018) A systemic model for a building performance and condition evaluation for primary schools. PhD thesis, University of Salford, UK.

Flores, M and Mourgues, C (2024) Impact of using a formalized methodology for conflict detection based on 4D-BIM. Journal of Construction Engineering and Management, 150(7): 04024059, ISSN 0733-9364

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Forbes, D; El-Haram, M; Horner, M and Lilley, S (2012) Forecasting the number of jobs created through construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364

Forman, M and Haugbølle, K (2011) The role of clients/end-users in innovation of standardised detached houses. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Foroughi Sabzevar, M; Gheisari, M and Lo, J (2025) Analyzing the pros and cons of paper-based 2D drawings in construction: a survey of U.S. construction professionals. International Journal of Construction Management, 25(4), pp. 428-438. ISSN 1562-3599

Foroughi Sabzevar, M; Gheisari, M and Lo, L J (2021) Improving access to design information of paper-based floor plans using augmented reality. International Journal of Construction Education and Research, 17(2), pp. 178-198. ISSN 1557-8771

Forsythe, P (2011) Drivers of housing demolition decision making and the impact on timber waste management. Construction Economics and Building, 11(1), pp. 1-14. ISSN 2204-9029

Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193

Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988

Foudah, A; Tarek, M; Essam, S; El Hawary, M; Adel, K and Marzouk, M (2026) Digital twin publications in construction (2017–2023): A bibliometrics-based visualization analysis. Construction Innovation, 26(1), pp. 147-172. ISSN 1471-4175

Fox, S; Marsh, L and Cockerham, G (2001) Design for manufacture: A strategy for successful application to buildings. Construction Management and Economics, 19(5), pp. 493-502. ISSN 01446193

Fox, S; Marsh, L and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(5-6), pp. 378-387. ISSN 0969-9988

Fox, S J (2001) Application of design for manufacture principles to building design and construction. PhD thesis, Sheffield Hallam University, UK.

Francis, Matthew Charles (2020) Assessing impact of the built environment on academic research productivity. PhD thesis, RMIT University, Australia.

Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(1), pp. 28-36. ISSN 2204-9029

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franke, M and Nadler, C (2021) Towards a holistic approach for assessing the impact of IEQ on satisfaction, health, and productivity. Building Research & Information, 49(4), pp. 417-444. ISSN 0961-3218

Franzè, A P; Belek Fialho Teixeira, M; Caldwell, G; Rafizadeh, H R; Schork, T; Gainey, L and Zahra, T (2025) Bricklayers' perspectives on human-robot collaboration (HRC) in on-site masonry construction: Opportunities, challenges, and considerations. Construction Innovation, 25(7), pp. 384-408. ISSN 1471-4175

Fredericks, T K; Abudayyeh, O; Choi, S D; Wiersma, M and Charles, M (2005) Occupational injuries and fatalities in the roofing contracting industry. Journal of Construction Engineering and Management, 131(11), pp. 1233-1240. ISSN 0733-9364

Fredslund, L; Søder, P H; Hansen, E J d P and Koch, C (2022) An institutional analysis of how the construction industry's complexity affects waste: An alternative response to future market demands for sustainability. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Fredslund, L M and Gottlieb, S C (2018) Engaging the construction supply chain: A pluralistic perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Fredslund, L M; Gottlieb, S C and Leiringer, R (2019) Understanding supply chain integration as recoupling. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988

Fuentes-del-Burgo J, N-A E (2013) Do educational mismatches influence job satisfaction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Fulford, R G (2019) The implications of the construction industry to national wealth. Engineering, Construction and Architectural Management, 26(5), pp. 779-793. ISSN 0969-9988

Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.

Gaber Abubaker, A (2016) Factors affecting maintenance labour productivity in the building industry. PhD thesis, University of Dundee, UK.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.

Gajendran, T; Brewer, G; Gudergan, S and Sankaran, S (2014) Deconstructing dynamic capabilities: The role of cognitive and organizational routines in the innovation process. Construction Management and Economics, 32(3), pp. 246-261. ISSN 01446193

Gallardo, C A S; Granja, A D and Picchi, F A (2014) Productivity gains in a line flow precast concrete process after a basic stability effort. Journal of Construction Engineering and Management, 140(4): B4013004, ISSN 0733-9364

Gambo, N; Said, I and Ismail, R (2016) Comparing the levels of performance of small scale local government contractors in Northern Nigeria with international practice. Engineering, Construction and Architectural Management, 23(5), pp. 588-609. ISSN 0969-9988

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Ganesan, S and Kelsey, J (2006) Technology transfer: International collaboration in Sri Lanka. Construction Management and Economics, 24(7), pp. 743-753. ISSN 1466433X

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364

Gao, S and Low, S P (2015) Implementing Toyota way principles for construction projects in China: A case study. International Journal of Construction Management, 15(3), pp. 179-195. ISSN 1562-3599

Gao, S; Low, S P and Nair, K (2018) Design for manufacturing and assembly (DFMA): A preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), pp. 440-456. ISSN 1745-2007

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364

García de Soto, B; Agustí-Juan, I; Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(2), pp. 205-217. ISSN 1562-3599

Gatti, U C (2012) Measuring and evaluating physical strain to improve construction workforce productivity. PhD thesis, University of New Mexico, USA.

Gatti, U C; Migliaccio, G C; Bogus, S M and Schneider, S (2014) An exploratory study of the relationship between construction workforce physical strain and task level productivity. Construction Management and Economics, 32(6), pp. 548-564. ISSN 01446193

Gavilan, R M and Bernold, L E (1994) Source evaluation of solid waste in building construction. Journal of Construction Engineering and Management, 120(3), pp. 536-552. ISSN 0733-9364

Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector. PhD thesis, University of Liverpool, UK.

Gehrig, G B (1985) Organizational practices and theories: Alignment of construction executive's beliefs with company policies. PhD thesis, Colorado State University, USA.

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364

Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364

Getuli, V; Capone, P and Bruttini, A (2021) Planning, management and administration of hs contents with BIM and VR in construction: An implementation protocol. Engineering, Construction and Architectural Management, 28(2), pp. 603-623. ISSN 0969-9988

Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.

Ghanbariazarneir, S.; Maskell, D.; Darby, A.; Heshmati, K. and Walker, I. (2026) The relationship between temperature, relative humidity, and productivity in workplace settings. Building Research & Information, 54(5), pp. 611-631. ISSN 0961-3218

Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.

Ghansah, F A and Lu, W (2023) Responses to the COVID-19 pandemic in the construction industry: A literature review of academic research. Construction Management and Economics, 41(9), pp. 781-803. ISSN 01446193

Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531

Gharehbaghi, K; Georgy, M; Robson, K M; Wilkinson, S and Farnes, K (2022) Versatility in sustainable building design (sbd) practices: An empirical study. International Journal of Building Pathology and Adaptation, 40(5), pp. 728-752. ISSN 23984708

Ghasemi Poor Sabet, Pejman (2020) A hybrid OSM–BIM framework for construction management system. PhD thesis, Curtin University, Australia.

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Gholipour, H F; Farzanegan, M R and Abu Al-Foul, M N (2024) House prices and labour productivity growth: Evidence from oecd countries. Construction Management and Economics, 42(6), pp. 582-589. ISSN 01446193

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Gilly, B A; Touran, A and Asai, T (1987) Quality control circles in construction. Journal of Construction Engineering and Management, 113(3), pp. 427-439. ISSN 0733-9364

Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Gledson, B; Rogage, K; Luk, M; Tallet, E; Thompson, A; Landy, M and Wigget, D (2022) Addressing design management challenges through the development of a web-based platform. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Godfrey Ochieng, E and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(6), pp. 527-543. ISSN 0969-9988

Goh, C S and Abdul-Rahman, H (2013) The identification and management of major risks in the Malaysian construction industry. Journal of Construction in Developing Countries, 18(1), pp. 19-32. ISSN 1823-6499

Goh, E and Loosemore, M (2017) The impacts of industrialization on construction subcontractors: A resource-based view. Construction Management and Economics, 35(5), pp. 288-304. ISSN 0144-6193

Gomar, J E; Haas, C T and Morton, D P (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128(2), pp. 103-109. ISSN 0733-9364

Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Gong, J (2009) An object recognition, tracking, and contextual reasoning based video interpretation methodology for rapid productivity analysis of construction operations. PhD thesis, University of Texas at Austin, USA.

Gong, J; Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction. Construction Management and Economics, 29(7), pp. 737-751. ISSN 1466433X

Gonsalves, N; Akanmu, A; Gao, X; Agee, P and Shojaei, A (2023) Industry perception of the suitability of wearable robot for construction work. Journal of Construction Engineering and Management, 149(5): 04023017, ISSN 0733-9364

Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation. PhD thesis, Purdue University, USA.

Goodarzi, F; Palaniappan, K; Pillay, M and Ershadi, M (2025) A scoping review of indoor air quality assessment in refurbished buildings. Smart and Sustainable Built Environment, 14(1), pp. 93-118. ISSN 2046-6099

Goodarzizad, P; Mohammadi Golafshani, E and Arashpour, M (2023) Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. International Journal of Construction Management, 23(5), pp. 763-779. ISSN 1562-3599

Goodrum, P M (2001) The impact of equipment technology on productivity in the United States construction industry. PhD thesis, University of Texas at Austin, USA.

Goodrum, P M and Haas, C T (2002) Partial factor productivity and equipment technology change at activity level in U.S. Construction industry. Journal of Construction Engineering and Management, 128(6), pp. 463-472. ISSN 0733-9364

Goodrum, P M and Haas, C T (2004) Long-term impact of equipment technology on labor productivity in the U.S. Construction industry at the activity level. Journal of Construction Engineering and Management, 130(1), pp. 124-133. ISSN 0733-9364

Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193

Goodrum, P M; Zhai, D and Yasin, M F (2009) Relationship between changes in material technology and construction productivity. Journal of Construction Engineering and Management, 135(4), pp. 278-287. ISSN 0733-9364

Gordo-Gregorio, P; Alavi, H; Edwards, D J; Forcada, N and Guéna, F (2026) An occupant-centric approach on digital twins for building management. Building Research & Information, 54(1), pp. 59-78. ISSN 0961-3218

Gorman, S (2014) Peering into the culture of a civil engineering discipline and finding the white rabbit. EdD thesis, Northern Arizona University, USA.

Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2018) Institutional logics and hybrid organizing in public-private partnerships. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2020) Hybrid organisations as trading zones: Responses to institutional complexity in the shaping of strategic partnerships. Construction Management and Economics, 38(7), pp. 603-622. ISSN 01446193

Gottlieb, S C and Storgaard, K (2006) Flexible strategic partnerships in Danish construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gouett, M C; Haas, C T; Goodrum, P M and Caldas, C H (2011) Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117-1124. ISSN 0733-9364

Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193

Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029

Gradeci, K and Labonnote, N (2020) On the potential of integrating building information modelling (BIM) for the additive manufacturing (AM) of concrete structures. Construction Innovation, 20(3), pp. 321-343. ISSN 1471-4175

Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Graham, L T; Parkinson, T and Schiavon, S (2021) Lessons learned from 20 years of CBE's occupant surveys. Buildings & Cities, 2(1), pp. 166-184. ISSN 2632-6655

Gransberg, D D (1996) Optimizing haul unit size and number based on loading facility characteristics. Journal of Construction Engineering and Management, 122(3), pp. 248-253. ISSN 0733-9364

Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364

Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.

Grau Torrent, D (2008) Development of a methodology for automating the identification and localization of engineered components and assessment of its impact on construction craft productivity. PhD thesis, University of Texas at Austin, USA.

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(2), pp. 133-144. ISSN 01446193

Green, S D (2022) Modern methods of construction: Reflections on the current research agenda. Buildings & Cities, 3(1), pp. 653-662. ISSN 2632-6655

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X

Grenzfurtner, W; Rudberg, M; Mayrhofer, R; Loike, K and Gronalt, M (2022) Performance measurement and management practices of on-site activities in industrialized housebuilding. Construction Management and Economics, 40(4), pp. 239-253. ISSN 01446193

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.

Guerrero, J R and Lindblad, H (2018) Client strategies for stimulating innovation in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Guerrini, Fabio Muller (1999) A integrated model of management production for civil construction companies. PhD thesis, Universidade de São Paulo, Brazil.

Guha, P; Kar, S and Jha, K N (2025) Exploring leadership styles and their effect on the safety and quality performances in construction projects. Journal of Construction Engineering and Management, 151(9): 04025120, ISSN 0733-9364

Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364

Guo, X; Wu, H; Chen, Y; Chang, Y and Ao, Y (2023) Gauging the impact of personal lifestyle, indoor environmental quality and work-related factors on occupant productivity when working from home. Engineering, Construction and Architectural Management, 30(8), pp. 3713-3730. ISSN 0969-9988

Gupta, M; Hasan, A; Jain, A K and Jha, K N (2018) Site amenities and workers' welfare factors affecting workforce productivity in Indian construction projects. Journal of Construction Engineering and Management, 144(11): 04018101, ISSN 0733-9364

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Guribie, F L; Kheni, N A and Sule, M (2022) Structural equation modeling of the critical driving forces of offsite construction in Ghana. Built Environment Project and Asset Management, 12(4), pp. 667-683. ISSN 2044-124X

Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193

Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364

Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(1), pp. 77-86. ISSN 1562-3599

Gurmu, A T (2021) Hybrid model for assessing the influence of safety management practices on labor productivity in multistory building projects. Journal of Construction Engineering and Management, 147(11): 04021139, ISSN 0733-9364

Gurmu, A T and Aibinu, A A (2017) Construction equipment management practices for improving labor productivity in multistory building construction projects. Journal of Construction Engineering and Management, 143(10): 04017081, ISSN 0733-9364

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364

Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364

Görsch, Christopher (2024) Learning to see flow: A worker-centric exploration towards task planning and control in construction. DSc thesis, Aalto University, Finland.

Günay, G (2025) Development of standards for modular construction: Learning from the freight container. PhD thesis, Middle East Technical University, Turkey.

Haas, T C; Rodriguez, A M; Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(6), pp. 633-641. ISSN 01446193

Habib, M R (1988) The relative effectiveness of large-scale public and private construction contractors: The case of Egypt. DSc thesis, George Washington University, USA.

Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.

Hadavi, A and Krizek, R J (1993) Short-term goal setting for construction. Journal of Construction Engineering and Management, 119(3), pp. 622-630. ISSN 0733-9364

Haddad, S; Osmond, P and King, S (2017) Revisiting thermal comfort models in Iranian classrooms during the warm season. Building Research & Information, 45(4), pp. 457-473. ISSN 0961-3218

Hague, D J (1985) Incentives and motivation in the construction industry: A critique. Construction Management and Economics, 3(2), pp. 163-170. ISSN 01446193

Hairstans, R and Smith, R E (2018) Offsite hub (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK. Architectural Engineering and Design Management, 14(1-2), pp. 60-77. ISSN 1745-2007

Haizelden, J; Marasini, R and Daniel, E (2019) An analysis of diversity management in the construction industry: A case study of a main contractor. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Haji Karimian, S; Mbachu, J; Egbelakin, T and Shahzad, W (2019) Improving efficiency in roading projects: A New Zealand study. Engineering, Construction and Architectural Management, 26(5), pp. 827-849. ISSN 0969-9988

Hajifathalian, K; Howell, G; Wambeke, B W; Hsiang, S M and Liu, M (2016) Oops simulation: Cost-benefits trade-off analysis of reliable planning for construction activities. Journal of Construction Engineering and Management, 142(8): 4016030, ISSN 0733-9364

Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364

Hajikazemi, S.; Duryan, M.; Smyth, H.; Yuan, F. and Liu, C. (2026) Exploring mindfulness as a tool for recognition and prevention of burnout in construction and engineering. Engineering, Construction and Architectural Management, 33(7), pp. 5675-5694. ISSN 0969-9988

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Halligan, D W; Demsetz, L A; Brown, J D and Pace, C B (1994) Action-response model and loss of productivity in construction. Journal of Construction Engineering and Management, 120(1), pp. 47-64. ISSN 0733-9364

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Hamouda, H and Abu-Shaaban, N (2014) Enhancing labour productivity within construction industry through analytical hierarchy process, the case of Gaza Strip. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Hamza, M; Shahid, S; Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(3), pp. 413-425. ISSN 1562-3599

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.

Han, S; Bouferguene, A; Al-Hussein, M and Hermann, U R (2017) 3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites. Journal of Construction Engineering and Management, 143(9): 04017060, ISSN 0733-9364

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Hanc, M; McAndrew, C and Ucci, M (2019) Conceptual approaches to wellbeing in buildings: A scoping review. Building Research & Information, 47(6), pp. 767-783. ISSN 0961-3218

Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193

Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364

Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364

Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364

Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Hanna, A S; Ibrahim, M W; Lotfallah, W; Iskandar, K A and Russell, J S (2016) Modeling project manager competency: An integrated mathematical approach. Journal of Construction Engineering and Management, 142(8): 4016029, ISSN 0733-9364

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Hanna, A S; Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: A guideline for assessing vulnerability of mechanical and electrical projects to productivity loss. Construction Management and Economics, 37(2), pp. 101-111. ISSN 01446193

Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364

Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364

Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364

Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193

Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364

Hanna, A S; Yeutter, M and Aoun, D G (2014) State of practice of building information modeling in the electrical construction industry. Journal of Construction Engineering and Management, 140(12): 05014011, ISSN 0733-9364

Hanus, V P (2025) Predicting critical management-controlled factors to increase productivity within the construction industry. DEngr thesis, George Washington University, USA.

Harfield, T; Panko, M; Davies, K and Kenley, R (2007) Toward a learning-styles profile of construction students: Results from New Zealand. International Journal of Construction Education and Research, 3(3), pp. 143-158. ISSN 1557-8771

Harryson, P (2008) Industrial bridge engineering: structural developments for more efficient bridge construction. PhD thesis, Chalmers University of Technology, Sweden.

Hartwell, J (2018) Construction organisation structure and innovation adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Hasan, A; Elmualim, A; Rameezdeen, R; Baroudi, B and Marshall, A (2018) An exploratory study on the impact of mobile ICT on productivity in construction projects. Built Environment Project and Asset Management, 8(3), pp. 320-332. ISSN 2044-124X

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites. PhD thesis, University of Alberta, Canada.

Hasanzadeh, S and De La Garza, J M (2020) Productivity-safety model: Debunking the myth of the productivity-safety divide through a mixed-reality residential roofing task. Journal of Construction Engineering and Management, 146(11): 04020124, ISSN 0733-9364

Hashemi, A (2009) Construction technology transfer: an assessment of the relevance of modern methods of construction to housing shortages in Iran. PhD thesis, Cardiff University, UK.

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, M E (2013) Assessing the impact of lean/integrated project delivery system on final project success. PhD thesis, George Mason University, USA.

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassan, T M; McCaffer, R O N and Thorpe, T (1999) Emerging clients' needs for large scale engineering projects. Engineering, Construction and Architectural Management, 6(1), pp. 21-29. ISSN 0969-9988

Hassanain, M A; Aljuhani, M; Sanni-Anibire, M O and Abdallah, A (2019) Interdisciplinary design checklists for mechanical, electrical and plumbing coordination in building projects. Built Environment Project and Asset Management, 9(1), pp. 29-43. ISSN 2044-124X

Hassanain, M A; Sanni-Anibire, M O; Mahmoud, A S and Ahmed, W (2020) Post-occupancy evaluation of research and academic laboratory facilities. International Journal of Building Pathology and Adaptation, 38(5), pp. 797-810. ISSN 23984708

Hassandokht Mashhadi, A; Handy, R; Farhadmanesh, M; Rashidi, A; Honda, T; Sleeth, D K and Henry, T (2022) Feasibility study of using nebulizer-retrofitted uavs at construction projects: The case study of residential jobsites in Utah. Journal of Construction Engineering and Management, 148(10): 05022009, ISSN 0733-9364

Hassane Assaad, R (2021) Innovative modeling and management of infrastructure systems, engineering and construction operations, and offsite construction technology using computational data analytics. PhD thesis, Missouri University of Science and Technology, USA.

Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364

Hatami, N and Rashidi, A (2025) Enhancing the adoption of building information modeling in the Iranian AEC sector: Insights from a Delphi study. Engineering, Construction and Architectural Management, 32(2), pp. 847-869. ISSN 0969-9988

Hatem, W A H (2012) Comparing the effectiveness of face to face and computer mediated collaboration in design. PhD thesis, Cardiff University, UK.

Haugbølle, K; Larsen, J N and Nielsen, J (2019) Construction productivity revisited: Towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(5), pp. 794-813. ISSN 0969-9988

Haupt, T C and Smallwood, J (2003) HIV/AIDS in construction: Are older workers aware? Journal of Engineering, Design and Technology, 1(1), pp. 43-54. ISSN 1726-0531

Haupt, T C and Smallwood, J (2004) HIV and AIDS in SA construction: attitudes and perceptions of workers. Journal of Construction Research, 5(2), pp. 311-327. ISSN 1609-9451

Hayford, J K T; Eccles, T and Fong, D (2023) Development of conceptual motivation framework to enhance construction labour productivity in the UK. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Hazrati, A (2016) Predicting construction labor productivity with Bayesian belief networks. PhD thesis, University of Nebraska - Lincoln, USA.

He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.

He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364

Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.

Heerwagen, J (2000) Green buildings, organizational success and occupant productivity. Building Research & Information, 28(5-6), pp. 353-367. ISSN 0961-3218

Heerwagen, J H; Kampschroer, K; Powell, K M and Loftness, V (2004) Collaborative knowledge work environments. Building Research & Information, 32(6), pp. 510-528. ISSN 0961-3218

Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364

Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364

Hegazy, T; Zaneldin, E and Grierson, D (2001) Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127(4), pp. 322-329. ISSN 0733-9364

Henderson, Z; Morgan, B and Watson, J (2019) Implementing the circular economy in buildings: Processes of sensemaking in design and delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364

Henricsson, J P E; Ericsson, S; Flanagan, R and Jewell, C A (2004) Rethinking competitiveness for the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hepner, C M and Boser, R A (2006) Architects' perceptions of LEED indoor environmental quality checklist items on employee productivity. International Journal of Construction Education and Research, 2(3), pp. 193-208. ISSN 1557-8771

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.

Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.

Hijazi, A M (1989) Simulation analysis of linear construction processes. PhD thesis, Purdue University, USA.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hinze, J and Appelgate, L L (1991) Costs of construction injuries. Journal of Construction Engineering and Management, 117(3), pp. 537-550. ISSN 0733-9364

Hinze, J; Devenport, J N and Giang, G (2006) Analysis of construction worker injuries that do not result in lost time. Journal of Construction Engineering and Management, 132(3), pp. 321-326. ISSN 0733-9364

Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364

Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale. PhD thesis, University of California, Berkeley, USA.

Hitt, S J; Hairstans, R; Oloke, D; Bertasso, S; Tamagnone, G and Shirley, B (2024) Developing modern construction professionals with a focus on timber – a UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 32-40. ISSN 17514304

Hiyasat, R; Sosa, M and Ahmad, L (2023) Use of work-space at home under COVID-19 conditions in the UAE. Engineering, Construction and Architectural Management, 30(8), pp. 3142-3159. ISSN 0969-9988

Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Hon, C K H; Sun, C; Xia, B; Jimmieson, N L; Way, K A and Wu, P P Y (2022) Applications of Bayesian approaches in construction management research: A systematic review. Engineering, Construction and Architectural Management, 29(5), pp. 2153-2182. ISSN 0969-9988

Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364

Hong, Ying Civil (2018) Modelling and evaluating the adoption of building information modelling in Australian and Chinese small and medium-sized construction organisations. PhD thesis, University of New South Wales, Australia.

Horman, M J and Kenley, R (2005) Quantifying levels of wasted time in construction with meta-analysis. Journal of Construction Engineering and Management, 131(1), pp. 52-61. ISSN 0733-9364

Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364

Horta, I M; Camanho, A S and Da Costa, J M (2010) Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. Journal of Construction Engineering and Management, 136(5), pp. 581-594. ISSN 0733-9364

Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.

Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.

Hossain, M M; Ahmed, S; Anam, S M A; Baxramovna, I A; Meem, T I; Sobuz, M H R and Haq, I (2025) BIM-based smart safety monitoring system using a mobile app: A case study in an ongoing construction site. Construction Innovation, 25(2), pp. 552-576. ISSN 1471-4175

Hosseini, M R; Jupp, J; Papadonikolaki, E; Mumford, T; Joske, W and Nikmehr, B (2021) Position paper: Digital engineering and building information modelling in Australia. Smart and Sustainable Built Environment, 10(3), pp. 331-344. ISSN 2046-6099

Hou, J-H (2006) Object modeling and proper abstractions: The case of stair design. DDes thesis, Harvard University, USA.

Howard, Robert W (2021) Of incentive, bias, and behaviour: an empirical economic investigation into project delivery constructs influencing the adoption of building information modelling. PhD thesis, University College London, UK.

Howell, G; Laufer, A and Ballard, G (1993) Interaction between subcycles: One key to improved methods. Journal of Construction Engineering and Management, 119(4), pp. 714-728. ISSN 0733-9364

Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364

Hsieh, T Y (1998) Impact of subcontracting on site productivity: Lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), pp. 91-100. ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.

Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(4), pp. 575-592. ISSN 0969-9988

Hu, Xiancun (2015) Construction industry performance measurement with carbon reduction. PhD thesis, Deakin University, Australia.

Hua, G B (2009) Construction and economic development of four most competitive economies in the world: A comparison. International Journal of Construction Education and Research, 5(4), pp. 261-275. ISSN 1557-8771

Hua, G B and Pin, T H O (2000) Forecasting construction industry demand, price and productivity in Singapore: The Box-Jenkins approach. Construction Management and Economics, 18(5), pp. 607-618. ISSN 01446193

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, J (2020) Infrastructure, the economy and policy. PhD thesis, University of Oxford, UK.

Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations. PhD thesis, Purdue University, USA.

Huang, Z; Mao, C; Wang, J and Sadick, A M (2022) Understanding the key takeaway of construction robots towards construction automation. Engineering, Construction and Architectural Management, 29(9), pp. 3664-3688. ISSN 0969-9988

Hughes, R and Thorpe, D (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(2), pp. 210-228. ISSN 1471-4175

Hughes, S W (2004) The relationship between a project's success and the level of engagement of its labor and management. PhD thesis, University of Alabama in Huntsville, USA.

Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Huijbregts, H J J (2002) Information and communications technology for real estate investment management. DDes thesis, Harvard University, USA.

Husam, S; Laishram, B and Johari, S (2024) Determining the extent of attributes contributing to gender inclusion of workers in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024145, ISSN 0733-9364

Huynh, N M; Le-Hoai, L and Do, C D (2025) Assessing and improving labor productivity management in construction: A practical framework and measurement tool. Construction Economics and Building, 25(1), pp. 69-96. ISSN 2204-9029

Hwang, J.; Bagh, S. and Han, K. (2026) Toward automated SLAM-to-BIM for digital twin applications: BIM-assisted 360-degree camera-based visual SLAM using reference point-based bundle adjustment. Journal of Construction Engineering and Management, 152(10): 04026161, ISSN 0733-9364

Hwang, B G; Krishnankutty, P; Zhu, L; Caldas, C H; Shounak, A and Mulva, S (2020) Improving labour productivity in process construction maintenance and shutdown/turnaround projects. International Journal of Construction Management, 20(7), pp. 822-836. ISSN 1562-3599

Hwang, B G and Soh, C K (2013) Trade-level productivity measurement: Critical challenges and solutions. Journal of Construction Engineering and Management, 139(11): 4013013, ISSN 0733-9364

Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364

Hwang, S; Jebelli, H; Choi, B; Choi, M and Lee, S (2018) Measuring workers' emotional state during construction tasks using wearable EEG. Journal of Construction Engineering and Management, 144(7): 04018050, ISSN 0733-9364

Hwang, S and Liu, L Y (2010) Contemporaneous time series and forecasting methodologies for predicting short-term productivity. Journal of Construction Engineering and Management, 136(9), pp. 1047-1055. ISSN 0733-9364

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Ibbs, C W; Kwak, Y H; Ng, T and Murat Odabasi, A (2003) Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4), pp. 382-387. ISSN 0733-9364

Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364

Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364

Ibironke, O T; Ekundayo, D and Awodele, O A (2011) A survey on the use and impact of information technology in quantity surveying service delivery in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ibrahim, K; Agidani, J; Emmanuel Oke, A; Ikuabe, M and Kajimo Shakantu, K (2025) Assessing work-life balance strategies employed by Nigerian Builders. International Journal of Construction Management, 25(8), pp. 887-898. ISSN 1562-3599

Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.

Idoro, G I (2011) Effect of mechanisation on occupational health and safety performance in the Nigerian construction industry. Journal of Construction in Developing Countries, 16(2), pp. 27-45. ISSN 1823-6499

Igwe, C; Hammad, A and Nasiri, F (2022) Influence of lean construction wastes on the transformation-flow-value process of construction. International Journal of Construction Management, 22(13), pp. 2598-2604. ISSN 1562-3599

Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988

Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599

Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708

Ikuma, L H; Nahmens, I and James, J (2011) Use of safety and lean integrated kaizen to improve performance in modular homebuilding. Journal of Construction Engineering and Management, 137(7), pp. 551-560. ISSN 0733-9364

Indergård, K and Hansen, G K (2025) The impact of workplace design on academic staff: A systematic literature review. Building Research & Information, 53(4), pp. 479-491. ISSN 0961-3218

Ingirige, B (2016) Theorizing construction industry practice within a disaster risk reduction setting: Is it a panacea or an illusion? Construction Management and Economics, 34(7-8), pp. 592-607. ISSN 01446193

Ingle, P V and Mahesh, G (2022) Construction project performance areas for Indian construction projects. International Journal of Construction Management, 22(8), pp. 1443-1454. ISSN 1562-3599

Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364

Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.

Inyang, N; Al-Hussein, M; El-Rich, M and Al-Jibouri, S (2012) Ergonomic analysis and the need for its integration for planning and assessing construction tasks. Journal of Construction Engineering and Management, 138(12), pp. 1370-1376. ISSN 0733-9364

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.

Iqbal, M.; Lin, Z.; Ahmed, R. I.; Ahmad, N. and Hussain, K. (2026) Exploring the paths to big data analytics implementation success in construction projects: An integrated approach. Engineering, Construction and Architectural Management, 33(7), pp. 5418-5444. ISSN 0969-9988

Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364

Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated? Construction Management and Economics, 32(6), pp. 495-505. ISSN 01446193

Isah, M A and Kim, B S (2025) Question-answering system powered by knowledge graph and generative pretrained transformer to support risk identification in tunnel projects. Journal of Construction Engineering and Management, 151(1): 04024193, ISSN 0733-9364

Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.

Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988

Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364

Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.

Ismail, S; Hon, C K H; Crowther, P; Skitmore, M and Lamari, F (2023) The drivers and challenges of adopting the Malaysia industrialised building system for sustainable infrastructure development. Construction Innovation, 23(5), pp. 1054-1074. ISSN 1471-4175

Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708

Issa, M H (2011) The Canadian green building initiative: Post occupancy evaluation of Canadian green schools. PhD thesis, University of New Brunswick, Canada.

Issa, R R A; Olbina, S and Zuppa, D (2018) Model for developing trust on US construction projects. Built Environment Project and Asset Management, 8(1), pp. 5-23. ISSN 2044-124X

Ive, G; Murray, A and Marsh, R (2015) Cost and value ratios of operating renewed English secondary schools. Building Research & Information, 43(4), pp. 465-485. ISSN 0961-3218

Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599

Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jadidoleslami, S; Azizi, M; Sobhiyah, M and Zareravasan, A (2026) A cross-impact analysis of digital transformation factors in construction firms: A multilevel MICMAC analysis. Journal of Construction Engineering and Management, 152(2): 04025243, ISSN 0733-9364

Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175

Jahanger, Q K; Trejo, D and Louis, J (2025) Evaluation of field labor and management productivity in the USA construction industry. Engineering, Construction and Architectural Management, 32(1), pp. 259-281. ISSN 0969-9988

Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364

Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jamir Singh, P S; Oke, A E; Aliu, J; Isaiah Kayode, T; Azura Ramli, R; Haizzan Yahaya, M and Idris, A (2026) A study on substance abuse awareness and usage trends within the construction sector. Construction Innovation, 26(3), pp. 674-692. ISSN 1471-4175

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.

Jang, H; Kim, K; Kim, J and Kim, J (2011) Labour productivity model for reinforced concrete construction projects. Construction Innovation, 11(1), pp. 92-113. ISSN 1471-4175

Jang, Y; Kim, K; Leite, F; Ayer, S and Cho, Y K (2021) Identifying the perception differences of emerging construction-related technologies between industry and academia to enable high levels of collaboration. Journal of Construction Engineering and Management, 147(10): 06021004, ISSN 0733-9364

Janné, M (2020) Construction logistics in a city development setting. PhD thesis, Linköping University, Sweden.

Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.

Janssen, J (2000) The European construction industry and its competitiveness: A construct of the European commission. Construction Management and Economics, 18(6), pp. 711-720. ISSN 01446193

Jaraskumjonkul, T (2020) A digital prototype for collaborative conceptual design in the Thai AEC sector. PhD thesis, University of Salford, UK.

Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of walls. International Journal of Construction Management, 10(4), pp. 101-117. ISSN 1562-3599

Jarkas, A M (2010) The effects of buildability factors on rebar fixing labour productivity of isolated foundations. International Journal of Construction Management, 10(2), pp. 33-51. ISSN 1562-3599

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531

Jarkas, A M (2011) Buildability factors that influence micro-level formwork labour productivity of beams in building floors. Journal of Construction in Developing Countries, 16(1), pp. 1-18. ISSN 1823-6499

Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364

Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364

Jarkas, A M (2012) Factors influencing power-trowelling productivity of concrete surface floors. Journal of Engineering, Design and Technology, 10(1), pp. 34-51. ISSN 1726-0531

Jarkas, A M (2015) Factors influencing labour productivity in Bahrain's construction industry. International Journal of Construction Management, 15(1), pp. 94-108. ISSN 1562-3599

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity? Engineering, Construction and Architectural Management, 24(3), pp. 537-552. ISSN 0969-9988

Jarkas, A M; Al Balushi, R A and Raveendranath, P K (2015) Determinants of construction labour productivity in Oman. International Journal of Construction Management, 15(4), pp. 332-344. ISSN 1562-3599

Jarkas, A M and Bitar, C G (2014) Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), pp. 811-820. ISSN 0733-9364

Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems. PhD thesis, North Carolina State University, USA.

Javed, A A; Pan, W; Chen, L and Zhan, W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement. Built Environment Project and Asset Management, 8(3), pp. 239-252. ISSN 2044-124X

Jayasena, H S; Thurairajah, N; Perera, B A K S and Siriwardena, M (2019) Promotion of diffusion of innovation: A study of BIM adoption in construction industries. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218

Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress. PhD thesis, University of Michigan, USA.

Jebelli, H; Choi, B and Lee, S (2019) Application of wearable biosensors to construction sites. II: Assessing workers' physical demand. Journal of Construction Engineering and Management, 145(12): 04019080, ISSN 0733-9364

Jebelli, H; Choi, B and Lee, S H (2019) Application of wearable biosensors to construction sites. I: Assessing workers' stress. Journal of Construction Engineering and Management, 145(12): 04019079, ISSN 0733-9364

Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.

Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.

Jensen, Christopher Antony (2019) Staged competition as a driver of construction innovation. PhD thesis, University of Melbourne, Australia.

Jeong, J and Jeong, J (2024) Sustainability in prefabricated construction: Enhancing multicriteria analysis and prediction using machine learning. Journal of Construction Engineering and Management, 150(8): 04024081, ISSN 0733-9364

Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.

Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193

Ji, A; Xue, X; Zhang, L; Luo, X and Man, Q (2025) A transformer-based deep learning method for automatic pixel-level crack detection and feature quantification. Engineering, Construction and Architectural Management, 32(4), pp. 2455-2486. ISSN 0969-9988

Jia, A Y; Loosemore, M; Gilbert, D and Rowlinson, S (2016) Shielding workers from heat stress: Reconciling the paradoxes of protection and production logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jiang, S and Li, J (2025) Impact of person-environment fit on construction project managers' turnover intention: A moderated mediation model. Engineering, Construction and Architectural Management, 32(4), pp. 2487-2506. ISSN 0969-9988

Jimenez, A; Engstroöm, S and Stehn, L (2019) Why (not) measuring productivity in house-building companies? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Jin, R; Zuo, J and Hong, J (2019) Scientometric review of articles published in ASCE's journal of construction engineering and management from 2000 to 2018. Journal of Construction Engineering and Management, 145(8): 06019001, ISSN 0733-9364

Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Johari, S (2021) Effect of socioemotional cognitive, and technical competencies of workers on construction labor productivity. PhD thesis, Indian Institute of Technology Delhi, India.

Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(2), pp. 321-340. ISSN 0969-9988

John, S T; Mohan, A; Philip, M S; Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(5), pp. 1991-2010. ISSN 0969-9988

Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.

Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988

Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364

Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364

Jones, A M (1990) Design and construction for traditional house building. PhD thesis, Aston University, UK.

Jones, K; Mosca, L; Whyte, J; Davies, A and Glass, J (2022) Addressing specialization and fragmentation: Product platform development in construction consultancy firms. Construction Management and Economics, 40(11-12), pp. 918-933. ISSN 01446193

Jones, W; Gibb, A G F and Chow, V (2022) Adapting to COVID-19 on construction sites: What are the lessons for long-term improvements in safety and worker effectiveness? Journal of Engineering, Design and Technology, 20(1), pp. 66-85. ISSN 1726-0531

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, H and Rudberg, M (2015) Production system classification matrix: Matching product standardization and production-system design. Journal of Construction Engineering and Management, 141(6): 05015004, ISSN 0733-9364

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Joo, M.; Im, J. B.; Lee, K. T. and Kim, J. H. (2026) Comparative analysis of work performance and physiological response based on office types and indoor space design. Architectural Engineering and Design Management, 22(2), pp. 365-381. ISSN 1745-2007

Josephson, P E and Bjorkman, L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(6), pp. 589-603. ISSN 0969-9988

Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599

Jowett, B R (2023) A framework for the implementation of mobile BIM technology at project and organisational level supporting lean construction approaches. PhD thesis, University of Northumbria at Newcastle, UK.

Jowkar, M; Temeljotov-Salaj, A; Lindkvist, C M and Støre-Valen, M (2022) Sustainable building renovation in residential buildings: Barriers and potential motivations in Norwegian culture. Construction Management and Economics, 40(3), pp. 161-172. ISSN 01446193

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.

Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process). PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kalu, T C U (1990) New approach to construction management. Journal of Construction Engineering and Management, 116(3), pp. 494-513. ISSN 0733-9364

Kaluarachchi, M; Waidyasekara, K and Rameezdeen, R (2022) Antecedents of noise pollution control behaviour of employees of construction companies. Built Environment Project and Asset Management, 12(2), pp. 277-292. ISSN 2044-124X

Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), pp. 1-13. ISSN 1823-6499

Kamal, E M; Lou, E C W; Yusof, N and Osmadi, A (2022) Absorptive capacity of Malaysian SME construction organisations. Architectural Engineering and Design Management, 18(3), pp. 313-324. ISSN 1745-2007

Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.

Kamardeen, I and Sunindijo, R Y (2017) Personal characteristics moderate work stress in construction professionals. Journal of Construction Engineering and Management, 143(10): 04017072, ISSN 0733-9364

Kaming, P F (1996) A productivity audit system for construction management in Indonesia. PhD thesis, University of Wolverhampton, UK.

Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193

Kaming, P F; Olomolaiye, P O; Holt, G D; Kometa, S T and Harris, F C (1996) Project managers' perception of production problems: an Indonesian case study. Building Research & Information, 24(5), pp. 302-310. ISSN 0961-3218

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kangari, R and Halpin, D W (1989) Potential robotics utilization in construction. Journal of Construction Engineering and Management, 115(1), pp. 126-143. ISSN 0733-9364

Kannan, G (2011) Field studies in construction equipment economics and productivity. Journal of Construction Engineering and Management, 137, pp. 823-828. ISSN 0733-9364

Kapelko, M and Abbott, M (2017) Productivity growth and business cycles: Case study of the Spanish construction industry. Journal of Construction Engineering and Management, 143(5): 05016026, ISSN 0733-9364

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Kar, S and Jha, K N (2019) Assessment of criticality of materials in a construction project. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988

Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6), pp. 368-380. ISSN 01446193

Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364

Karthik, D and Kameswara Rao, C B (2022) Identifying the significant factors affecting the masonry labour productivity in building construction projects in India. International Journal of Construction Management, 22(3), pp. 464-472. ISSN 1562-3599

Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.

Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kassim, Y H (2012) Information technology business value model for engineering and construction industry. PhD thesis, University of Salford, UK.

Kaushik, A; Arif, M; Ebohon, O J; Arsalan, H; Rana, M Q and Obi, L (2023) Effect of indoor environmental quality on visual comfort and productivity in office buildings. Journal of Engineering, Design and Technology, 21(6), pp. 1746-1766. ISSN 1726-0531

Kavuri, A S; Soetanto, R; Goodier, C; Murguia, D and Szczygiel, M (2020) Scenarios for the digitalisation of the construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kazaz, A and Ulubeyli, S (2006) Organizational factors influencing construction manpower productivity in Turkey. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kazaz, A and Ulubeyli, S (2006) Physical factors affecting productivity of Turkish construction workers. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Keirouz, W T (1988) Domain modeling of constructed facilities for robotic applications. PhD thesis, Carnegie Mellon University, USA.

Kenny, J; Curran, M; Spillane, J P and Brooks, T (2021) Do you want some sauce on that? Factors influencing dietary habits among the Irish construction workforce: A case study review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kereri, J O and Adamtey, S (2019) RFID use in residential/commercial construction industry. Journal of Engineering, Design and Technology, 17(3), pp. 591-612. ISSN 1726-0531

Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Khalid, Mohammad (2025) Enhancing computational thinking skills of the future construction workforce to perform sensor data analytics with end-user programming environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.

Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364

Khamkanya, T (2011) A holistic approach to workplace environments, management systems and new technologies in meeting corporate end-user requirements. PhD thesis, University of Ulster, UK.

Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.

Khan, K I A; Flanagan, R and Lu, S L (2015) Managing the complexity of information flow for construction small and medium-sized enterprises (csmes) using system dynamics and collaborative technologies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Khan, S B; Proverbs, D G and Xiao, H (2022) The motivation of operatives in small construction firms towards health and safety: a conceptual framework. Engineering, Construction and Architectural Management, 29(1), pp. 245-261. ISSN 0969-9988

Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.

Khanh, H D; Kim, S Y; Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(4), pp. 596-605. ISSN 1562-3599

Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988

Khanzadi, M; Nasirzadeh, F; Mir, M and Nojedehi, P (2018) Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. Construction Innovation, 18(1), pp. 2-19. ISSN 1471-4175

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.

Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364

Kim, B; Lee, H; Park, H and Kim, H (2012) Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), pp. 982-990. ISSN 0733-9364

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation. PhD thesis, University of Texas at Austin, USA.

Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364

Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.

Kim, J (2007) Health insurance and workers' retention in the construction industry. PhD thesis, University of Utah, USA.

Kim, J and Philips, P (2014) Remuneration and absenteeism on a large construction site. Construction Management and Economics, 32(10), pp. 983-999. ISSN 01446193

Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364

Kim, K; Tiedmann, H R and Faust, K M (2025) Construction industry changes induced by the COVID-19 pandemic. Engineering, Construction and Architectural Management, 32(7), pp. 4413-4438. ISSN 0969-9988

Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.

Kim, Suryeon (2024) Strategic approaches for accelerating effective sharing and dissemination of construction management knowledge and methods. PhD thesis, Texas A&M University, USA.

Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364

Kim, T W; Yu, J H and Lee, H S (2003) On-site productivity evaluation through productivity achievement ratio. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kiomjian, D; Srour, I and Srour, F J (2020) Knowledge sharing and productivity improvement: An agent-based modeling approach. Journal of Construction Engineering and Management, 146(7): 04020076, ISSN 0733-9364

Kirby, M; Rotimi, F E and Naismith, N (2025) Factors for improving productivity in the New Zealand residential construction sector. Journal of Engineering, Design and Technology, 23(5), pp. 1712-1728. ISSN 1726-0531

Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364

Kissi, E; Agyekum, K; Baiden, B K; Tannor, R A; Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(3), pp. 364-382. ISSN 2044-124X

Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2010) Construction professionals' perspectives on cross-cultural training for international construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites. PhD thesis, Illinois Institute of Technology, USA.

Knotten, V; Lædre, O and Hansen, G K (2017) Building design management: key success factors. Architectural Engineering and Design Management, 13(6), pp. 479-493. ISSN 1745-2007

Koc, K; Budayan, C; Ekmekcioǧlu, Ö and Tokdemir, O B (2024) Predicting cost impacts of nonconformances in construction projects using interpretable machine learning. Journal of Construction Engineering and Management, 150(1): 04023143, ISSN 0733-9364

Koch, C (2018) Productivity measurement: The social construction of reduction through expansion. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Koch, C and Larsen, A (2018) Performance of retrofit with ICT of social housing: Proving technology optimists wrong? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kodikara Edirisinghe, R. and Gunathilake, L. (2026) An IoT-based heat stress management system for the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2200-2219. ISSN 0969-9988

Koehn, E and Brown, G (1985) Climatic effects on construction. Journal of Construction Engineering and Management, 111(2), pp. 129-137. ISSN 0733-9364

Koehn, E and Caplan, S B (1987) Work improvement data for small and medium size contractors. Journal of Construction Engineering and Management, 113(2), pp. 327-339. ISSN 0733-9364

Koehn, E and Datta, N K (2003) Quality, environmental, and health and safety management systems for construction engineering. Journal of Construction Engineering and Management, 129(5), pp. 562-569. ISSN 0733-9364

Kolar, Duro (2017) Improving the link between project management and strategy to optimise project success. PhD thesis, RMIT University, Australia.

Kong, M.; Son, Y. J.; Snyder, E.; Byun, K.; C. Pope, Z. and Hogan, C. J. (2026) Indoor environmental quality in the era of hybrid work: Comparing home and healthy office environments. Building Research & Information, 54(6), pp. 693-713. ISSN 0961-3218

Konstantinou, E (2018) Vision-based construction worker task productivity monitoring. PhD thesis, University of Cambridge, UK.

Konstantinou, E and Brilakis, I (2018) Matching construction workers across views for automated 3D vision tracking on-site. Journal of Construction Engineering and Management, 144(7): 04018061, ISSN 0733-9364

Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.

Koopman, K L (2023) Implementation of technological innovations within the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099

Korkmaz, S (2007) Piloting evaluation metrics for high performance green building project delivery. PhD thesis, Pennsylvania State University, USA.

Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988

Kothapally, P R; Gbadamosi, A Q; Delgado, J M D and Mahamadu, A M (2023) An implementation strategy for the application of digital twin for construction progress monitoring using wearable technologies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Kouch, K A; Panuwatwanich, K; Sancharoen, P and Sahachaisaree, S (2021) Development of augmented reality application for onsite inspection of expressway structures using microsoft hololens. Journal of Construction in Developing Countries, 26(2), pp. 87-116. ISSN 1823-6499

Kraatz, J A and Hampson, K D (2013) Brokering innovation to better leverage R&D investment. Building Research & Information, 41(2), pp. 187-197. ISSN 0961-3218

Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Krishnaraj, L; Kumar, V R P; Balasubramanian, M; Kumar, N and Shyamala, T (2022) Futuristic evaluation of building energy simulation model with comparison of conventional villas. International Journal of Construction Management, 22(1), pp. 31-40. ISSN 1562-3599

Kristensen, E K (2011) Systemic barriers to a future transformation of the building industry from a buyer controlled to a seller driven industry: an analysis of key systemic variables in the building industry, such as 'procurement model', 'buyer perception', 'production mode' and 'leadership and management', principally in a Danish development context and seen from the perspective of the architect. PhD thesis, Robert Gordon University, UK.

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction. PhD thesis, University of Florida, USA.

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kumara, W H C D; Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(3), pp. 302-316. ISSN 2044-124X

Kumaraswamy, M and Dulaimi, M (2001) Empowering innovative improvements through creative construction procurement. Engineering, Construction and Architectural Management, 8(5-6), pp. 325-334. ISSN 0969-9988

Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kumaraswamy, M M and Chan, D W M (1995) Determinants of construction duration. Construction Management and Economics, 13(3), pp. 209-217. ISSN 01446193

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193

Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531

Kurtzer, D; Blackmore, N; Farrugia, N and Chileshe, N (2020) Productivity enablers and inhibiting health and wellbeing practices of South Australian construction site-based workers: A qualitative study. International Journal of Construction Management, 20(8), pp. 882-899. ISSN 1562-3599

Kwawu, W and Elmualim, A (2011) Sustainability in facilities management: A review of drivers and policy issues. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364

Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(2), pp. 118-128. ISSN 1358-9180

Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Laitinen, K; Luhtala, M; Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: Capability maturity model integration approach. Built Environment Project and Asset Management, 14(2), pp. 201-227. ISSN 2044-124X

Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.

Lam, K C; Lam, M C K and Wang, D (2008) MBNQA-oriented self-assessment quality management system for contractors: Fuzzy AHP approach. Construction Management and Economics, 26(5), pp. 447-461. ISSN 1466433X

Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218

Langford, D A; Abukhder, J; Murray, M; Hardcastle, C and Vernea, E (2004) Rethinking construction: What about the SMEs? Journal of Construction Procurement, 10(1),

Langston, Craig A (1994) The determination of equivalent value in life-cost studies: An intergenerational approach. PhD thesis, University of Technology Sydney, Australia.

Larbi, J A; Tang, L C M; Ababio, B K and Antwi-Afari, P (2025) Developing an integrated digital delivery framework for designing and planning construction projects: a review of interoperable digital technologies. International Journal of Construction Management, 25(3), pp. 347-362. ISSN 1562-3599

Larsson, J; Eriksson, P E; Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1-2), pp. 83-96. ISSN 01446193

Larsson, J; Lu, W; Krantz, J and Olofsson, T (2016) Discrete event simulation analysis of product and process platforms: A bridge construction case study. Journal of Construction Engineering and Management, 142(4): 04015097, ISSN 0733-9364

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Larsson, R and Rudberg, M (2023) Effects of weather conditions on concrete work task productivity: a questionnaire survey. Construction Innovation, 23(2), pp. 306-321. ISSN 1471-4175

Lasni, A and Boton, C (2022) Implementing construction planning and control software: A specialized contractor perspective. Journal of Construction Engineering and Management, 148(9): 05022003, ISSN 0733-9364

Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988

Lau, S C; Lu, M and Poon, C S (2014) Formalized approach to discretize a continuous plant in construction simulations. Journal of Construction Engineering and Management, 140(8): 04014032, ISSN 0733-9364

Laufer, A (1980) Assessment of financial incentive programs for the construction labor force: A Delphi analysis. PhD thesis, University of Texas at Austin, USA.

Laufer, A and Moore, B E (1983) Attitudes toward productivity pay programs. Journal of Construction Engineering and Management, 109(1), pp. 89-101. ISSN 0733-9364

Laufer, A and Shohet, I M (1991) Span of control of construction foreman: Situational analysis. Journal of Construction Engineering and Management, 117(1), pp. 90-105. ISSN 0733-9364

Lavikka, R H; Kyrö, R; Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1946-1961. ISSN 0969-9988

Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system. PhD thesis, Illinois Institute of Technology, USA.

LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364

Leaman, A and Bordass, B (1999) Productivity in buildings: The 'killer' variables. Building Research & Information, 27(1), pp. 4-19. ISSN 0961-3218

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: The probe occupant surveys and their implications. Building Research & Information, 29(2), pp. 129-143. ISSN 0961-3218

Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304

Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364

Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988

Lee, D; Lee, S G and Kim, S (2017) Composite phase-change material mold for cost-effective production of free-form concrete panels. Journal of Construction Engineering and Management, 143(6): 04017012, ISSN 0733-9364

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364

Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364

Lee, Gaang (2022) Wearable biosensor-based stress detection to understand and improve the quality of interactions between humans and construction and built environments. PhD thesis, University of Michigan, USA.

Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Lee, J; Lorenc, S J and Bernold, L E (2003) Comparative performance evaluation of tele-operated pipe laying. Journal of Construction Engineering and Management, 129(1), pp. 32-40. ISSN 0733-9364

Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364

Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), pp. 56-73. ISSN 0969-9988

Lee, J S and Ham, Y (2025) Paradox of time pressure: Cognitive and task performance during time-sensitive and challenging teleoperation. Journal of Construction Engineering and Management, 151(1): 04024186, ISSN 0733-9364

Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.

Lee, S (2007) Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods. PhD thesis, University of California, Berkeley, USA.

Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.

Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers. PhD thesis, University of Washington, USA.

Lee, W and Migliaccio, G C (2018) Temporal effect of construction workforce physical strain on diminishing marginal productivity at the task level. Journal of Construction Engineering and Management, 144(9): 04018083, ISSN 0733-9364

Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.

Lei, Z; Sadiq Altaf, M; Cheng, Z; Liu, H and Tang, S (2023) Measurement of information loss and transfer impacts of technology systems in offsite construction processes. Journal of Construction Engineering and Management, 149(9): 05023011, ISSN 0733-9364

Leino, J L (2008) Community and private sector approaches to development in Kenya. PhD thesis, University of California, Berkeley, USA.

Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Lema, N M and Price, A D F (1996) Construction process performance variability: Focus on labour productivity. Building Research & Information, 24(6), pp. 339-350. ISSN 0961-3218

Lerche, J; Enevoldsen, P and Seppänen, O (2022) Application of takt and kanban to modular wind turbine construction. Journal of Construction Engineering and Management, 148(2), ISSN 0733-9364

Lester, E (2021) COVID-19 crisis management left tacit knowledge behind. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Leung, M-y and Yu, R K T (2003) An investigation of conflict resolution in the construction industry. Journal of Construction Procurement, 9(1), ISSN 1358-9180

Lewis, B T (1983) Building maintenance planning and estimating system. Construction Management and Economics, 1(3), pp. 217-231. ISSN 01446193

Li, B (1998) Assessing the influence of the indoor environment on self-reported productivity in offices. PhD thesis, University of Reading, UK.

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X

Li, H; Guo, H L; Li, Y and Skitmore, M (2012) From IKEA model to the lean construction concept: A solution to implementation. International Journal of Construction Management, 12(4), pp. 47-63. ISSN 1562-3599

Li, H; Guo, H L; Skitmore, M; Huang, T; Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(3), pp. 233-245. ISSN 01446193

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Li, X; Li, H; Skitmore, M and Wang, F (2022) Understanding the influence of safety climate and productivity pressure on non-helmet use behavior at construction sites: A case study. Engineering, Construction and Architectural Management, 29(1), pp. 72-90. ISSN 0969-9988

Li, Y; Lin, J; Cui, Z; Wang, C and Li, G (2021) Workforce productivity evaluation of the US construction industry from 2006 to 2016. Engineering, Construction and Architectural Management, 28(1), pp. 55-81. ISSN 0969-9988

Li, Y and Liu, C (2010) Malmquist indices of total factor productivity changes in the Australian construction industry. Construction Management and Economics, 28(9), pp. 933-945. ISSN 1466433X

Li, Y and Liu, C (2011) Construction capital productivity measurement using a data envelopment analysis. International Journal of Construction Management, 11(1), pp. 49-61. ISSN 1562-3599

Liang, C J; Wang, X; Kamat, V R and Menassa, C C (2021) Human-robot collaboration in construction: Classification and research trends. Journal of Construction Engineering and Management, 147(10): 03121006, ISSN 0733-9364

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Liang, J (1998) System integration and database management for computer-aided design of tall building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liang, L; Hu, X; Tivendale, L and Liu, C (2017) The log mean divisia index based carbon productivity in the Australian construction industry. Construction Economics and Building, 17(3), pp. 68-84. ISSN 2204-9029

Liao, L (2018) Building information modeling-based process transformation to improve productivity in the Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029

Liao, P-C (2008) Influence factors of engineering productivity and their impact on project performance. PhD thesis, University of Texas at Austin, USA.

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(1), pp. 106-133. ISSN 1471-4175

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2025) A guideline for BIM and lean integrated construction practice. Smart and Sustainable Built Environment, 14(4), pp. 1264-1291. ISSN 2046-6099

Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.

Lim, J N; Schultmann, F and Ofori, G (2010) Tailoring competitive advantages derived from innovation to the needs of construction firms. Journal of Construction Engineering and Management, 136(5), pp. 568-580. ISSN 0733-9364

Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X

Lin, C L and Huang, H M (2010) Improved baseline productivity analysis technique. Journal of Construction Engineering and Management, 136(3), pp. 367-376. ISSN 0733-9364

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, L-k (1994) Improving the productivity of roadway construction job sites with a portable expert system. PhD thesis, University of Utah, USA.

Lin, S C J (2014) A decision making framework for procurement method selection for building maintenance projects: The case of public universities in Malaysia. PhD thesis, University of Malaya, Malaysia.

Linares-Garcia, D A and Roofigari-Esfahan, N (2024) Practical deployment of BIM-interoperable voice-based intelligent virtual agent support construction worker productivity. Journal of Construction Engineering and Management, 150(11): 04024153, ISSN 0733-9364

Lindblad, H (2016) Translating building information modelling: A study of the BIM implementation process at a large Swedish client organisation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lindblad, H (2019) BIM in translation exploring client organisations as drivers for change in construction. PhD thesis, KTH Royal Institute of Technology, Sweden.

Lindblad, H and Gustavsson, T K (2018) Project managers as involuntary policy implementers? The case of implementing BIM. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Lindgren, J (2016) Diffusing systemic innovations: Influencing factors, approaches and further research. Architectural Engineering and Design Management, 12(1), pp. 19-28. ISSN 1745-2007

Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599

Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599

Ling, F Y Y; Heng, G T H; Chang-Richards, A; Chen, X and Yiu, T W (2023) Impact of digital technology adoption on the comparative advantage of architectural, engineering, and construction firms in Singapore. Journal of Construction Engineering and Management, 149(12): 04023125, ISSN 0733-9364

Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(2), pp. 211-225. ISSN 2044-124X

Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364

Liou, F S and Borcherding, J D (1986) Work sampling can predict unit rate productivity. Journal of Construction Engineering and Management, 112(1), pp. 90-103. ISSN 0733-9364

Liska, R W and Snell, B (1992) Financial incentive programs for average-size construction firm. Journal of Construction Engineering and Management, 118(4), pp. 667-676. ISSN 0733-9364

Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.

Liu, Y; Junjia, Y; Wang, H and Alias, A H (2026) Bridging robotics implementation and operational efficiency via agile management: Evidence from commercial residential projects. Journal of Construction Engineering and Management, 152(4): 04026019, ISSN 0733-9364

Liu, B; Wang, X; Chen, Y and Shen, Y (2013) Market structure of China's construction industry based on the panzar-rosse model. Construction Management and Economics, 31(7), pp. 731-745. ISSN 1466433X

Liu, C and Song, Y (2005) Multifactor productivity measures of construction sectors using oecd input-output database. Journal of Construction Research, 6(2), pp. 209-222. ISSN 1609-9451

Liu, F; Chang-Richards, A; Wang, K I K and Dirks, K N (2023) Critical indoor environmental factors affecting productivity: Perspectives from university staff and postgraduate students. Building Research & Information, 51(6), pp. 730-745. ISSN 0961-3218

Liu, H; Han, S and Zhu, Z (2023) Blockchain technology toward smart construction: Review and future directions. Journal of Construction Engineering and Management, 149(3): 03123002, ISSN 0733-9364

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Liu, J; Zhao, X and Yan, P (2016) Risk paths in international construction projects: Case study from Chinese contractors. Journal of Construction Engineering and Management, 142(6): 05016002, ISSN 0733-9364

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.

Liu, R; Du, J; Issa, R R A and Giel, B (2017) BIM cloud score: Building information model and modeling performance benchmarking. Journal of Construction Engineering and Management, 143(4): 04016109, ISSN 0733-9364

Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364

Liu, X X; Liu, H H; Yang, G L and Pan, J F (2023) Productivity assessment of the real estate industry in China: A dea-malmquist index. Engineering, Construction and Architectural Management, 30(3), pp. 1243-1270. ISSN 0969-9988

Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.

Liu, Y; Habibnezhad, M; Shayesteh, S; Jebelli, H and Lee, S (2021) Paving the way for future EEG studies in construction: Dependent component analysis for automatic ocular artifact removal from brainwave signals. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988

Llale, J; Setati, M; Mavund, S; Ndlovu, T; Root, D and Wembe, P (2019) Construction stakeholders' perceptions on the wider adoption of construction automation and robotics: An exploratory pre-study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Lo, T Y; Fung, I W H and Tung, K C F (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), pp. 636-649. ISSN 0733-9364

Lochau-Emden, G H (1983) A manufacturers' exchange as a source of information for strategic management and an economic stabilising aid in the building and construction sector: A theoretical and empirical study. DBA thesis, University of Pretoria, South Africa.

Loganathan, S and Forsythe, P (2020) Unravelling the influence of teamwork on trade crew productivity: A review and a proposed framework. Construction Management and Economics, 38(11), pp. 1040-1060. ISSN 01446193

Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029

Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.

London, B C K and Gajendran, T (2010) Diffusing cultural awareness and maturity in lean managed organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Long, N L M and Le Minh Long, V T (2025) Evaluating of attributes affecting contractors' sustainability productivity management in developing countries based on the balanced scorecard perspectives. International Journal of Construction Management, 25(15), pp. 1834-1846. ISSN 1562-3599

Long, J (2004) Computer-integrated information modelling for design of building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Longwe, T; Lord, W and Carrillo, P (2015) The impact of employee experience in uptake of company collaborative tool. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Loosemore, M (2003) Impediments to reform in the Australian building and construction industry. Construction Economics and Building, 3(2), pp. 1-8. ISSN 2204-9029

Loosemore, M (2014) Rebalancing the construction productivity debate. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Loosemore, M; Alkilani, S and Mathenge, R (2020) The risks of and barriers to social procurement in construction: A supply chain perspective. Construction Management and Economics, 38(6), pp. 552-569. ISSN 01446193

Loosemore, M; Alkilani, S Z and Luperdi, S (2021) Productivity and industrial relations in the Australian construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 167-176. ISSN 17514304

Loosemore, M and Holliday, S (2012) Pro-innovation bias in construction- enablers and risks. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Loosemore, M and McCallum, A (2022) The situational and individual determinants of entrepreneurship in the construction industry. Engineering, Construction and Architectural Management, 29(2), pp. 1038-1060. ISSN 0969-9988

Loosemore, M; Phua, F; Teo, M and Dunn, K M (2012) Management strategies to harness cultural diversity on Australian construction sites: a social identity perspective. Construction Economics and Building, 12(1), pp. 1-11. ISSN 2204-9029

Loosemore, M and Richard, J (2015) Valuing innovation in construction and infrastructure: Getting clients past a lowest price mentality. Engineering, Construction and Architectural Management, 22(1), pp. 38-53. ISSN 0969-9988

Lopes, Carmen Silvia Gonçalves (2016) Active learning in training engineer: The influence of the use of learning strategies for skills based on a systemic view. PhD thesis, Universidade de São Paulo, Brazil.

Lopez Del Puerto, C; Clevenger, C M; Boremann, K and Gilkey, D P (2014) Exploratory study to identify perceptions of safety and risk among residential Latino construction workers as distinct from commercial and heavy civil construction workers. Journal of Construction Engineering and Management, 140(2): 04013048, ISSN 0733-9364

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.

Love, P E D; Huang, J C; Edwards, D J and Irani, Z (2004) Nurturing a learning organization in construction: A focus on strategic shift, organizational transformation, customer orientation and quality centered learning. Construction Innovation, 4(2), pp. 113-126. ISSN 1471-4175

Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364

Love, P E D and Smith, J (2016) Toward error management in construction: Moving beyond a zero vision. Journal of Construction Engineering and Management, 142(11): 04016058, ISSN 0733-9364

Low, S P (2012) Strategic development of the built environment through international construction, quality and productivity management. DSc thesis, University of Birmingham, UK.

Low, S P and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), pp. 91-111. ISSN 1823-6499

Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.

Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(2), pp. 101-113. ISSN 01446193

Lowe, J G (1990) The fixed capital stock in use by the UK construction industry. Construction Management and Economics, 8(1), pp. 63-75. ISSN 01446193

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, M; Shen, X and Chen, W (2009) Automated collection of mixer truck operations data in highly dense urban areas. Journal of Construction Engineering and Management, 135(1), pp. 17-23. ISSN 0733-9364

Lu W, Z D R S (2013) BIM collaboration: A conceptual model and its characteristics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364

Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304

Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364

Lundula, N (2024) Influence of leaders’ conflict management skills on multicultural team management. PhD thesis, Walden University, USA.

Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Luo, M; Fan, H Q and Liu, G (2020) Measuring regional differences of construction productive efficiency in China: A distance friction minimization approach. Engineering, Construction and Architectural Management, 27(4), pp. 952-974. ISSN 0969-9988

Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry. PhD thesis, University of Manchester, UK.

Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ma, J (2016) A data driven study on LEED credits and green building related implications in city planning. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ma, J; Li, H; Yu, X; Fang, X; Fang, B; Zhao, Z; Huang, X; Anwer, S and Xing, X (2023) Sweat analysis-based fatigue monitoring during construction rebar bending tasks. Journal of Construction Engineering and Management, 149(9): 04023072, ISSN 0733-9364

Ma, L and Liu, C (2014) Did the late-2000s financial crisis influence construction labour productivity? Construction Management and Economics, 32(10), pp. 1030-1047. ISSN 01446193

Ma, L and Liu, C (2018) Decomposition of temporal changes in construction labour productivity. International Journal of Construction Management, 18(1), pp. 65-77. ISSN 1562-3599

Ma, L; Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(3), pp. 283-301. ISSN 0969-9988

Ma, X; Chan, A P C; Wu, H; Xiong, F and Dong, N (2018) Achieving leanness with BIM-based integrated data management in a built environment project. Construction Innovation, 18(4), pp. 469-487. ISSN 1471-4175

Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.

Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry. PhD thesis, University of Kansas, USA.

MacDonald, J and Mills, J (2013) An IPD approach to construction education. Construction Economics and Building, 13(2), pp. 93-103. ISSN 2204-9029

Mace, B K (2001) A production control model for commercial construction. PhD thesis, Pennsylvania State University, USA.

Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988

Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.

Madanayake, U H and Çıdık, M S (2019) The potential of digital technology to improve construction productivity. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.

Maghrebi, M; Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(2), pp. 185-202. ISSN 1471-4175

Maghsoudi, Soroush (2017) Evaluation of innovation in building, construction, and infrastructure projects. PhD thesis, University of Melbourne, Australia.

Magill, L J; Jafarifar, N; Watson, A and Omotayo, T (2022) 4D BIM integrated construction supply chain logistics to optimise on-site production. International Journal of Construction Management, 22(12), pp. 2325-2334. ISSN 1562-3599

Mahamid, I (2013) Contractors' perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(4), pp. 446-460. ISSN 0969-9988

Mahboubi Niazmandi, M; Moussavi, P; Ahmadi Bonakdar, Z; Shakiba, A; Sedaeesoula, R; Mohammadzade Esfahani Nezhad, S and Oke, A E (2025) Synergistic effects of building information modelling and lean construction: A conceptual model for enhancing productivity in construction projects. International Journal of Construction Management, 25(13), pp. 1552-1569. ISSN 1562-3599

Mahdi, H S and Afshar, E (2024) Performance of electronic devices for bridging existing information gaps at construction sites: The case of a developing country. International Journal of Construction Management, 24(14), pp. 1510-1520. ISSN 1562-3599

Mahmood, S; Ahmed, S M; Panthi, K and Kureshi, N I (2014) Determining the cost of poor quality and its impact on productivity and profitability. Built Environment Project and Asset Management, 4(3), pp. 296-311. ISSN 2044-124X

Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364

Mai, T P A; Doan, D T and Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4): 04025014, ISSN 0733-9364

Makulsawatudom, A (2003) Construction productivity measurement and improvement in Thailand by improved work-sampling. PhD thesis, University of Strathclyde, UK.

Makulsawatudom, A and Emsley, M (2001) Factors affecting the productivity of the construction industry in Thailand: The project managers' perception. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599

Mallawaarachchi, H; De Silva, L and Rameezdeen, R (2016) Indoor environmental quality and occupants' productivity: Suggestions to enhance national green certification criteria. Built Environment Project and Asset Management, 6(5), pp. 462-477. ISSN 2044-124X

Mallawaarachchi, V T; Senanayake, S M A H; Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), pp. 44-56. ISSN 1562-3599

Maloney, W F (1983) Productivity improvement: The influence of labor. Journal of Construction Engineering and Management, 109(3), pp. 321-334. ISSN 0733-9364

Maloney, W F and McFillen, J M (1985) Valence of and satisfaction with job outcomes. Journal of Construction Engineering and Management, 111(1), pp. 53-73. ISSN 0733-9364

Manavazhi, M R and Xunshi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(4), pp. 379-391. ISSN 01446193

Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.

Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364

Manivannan, J; Loganathan, S; Kamalanabhan T J and Kalidindi, S N (2022) Investigating the relationship between occupational stress and work-life balance among Indian construction professionals. Construction Economics and Building, 22(2), pp. 27-51. ISSN 2204-9029

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A new productivity benchmarking system connected to well-designed labour apprenticeship framework for construction projects. Construction Economics and Building, 23(3-4), pp. 125-142. ISSN 2204-9029

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A guiding model for developing construction training programmes focusing on productivity and performance improvement for different qualification levels. Construction Innovation, 23(4), pp. 733-756. ISSN 1471-4175

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A competency-based training guide model for labourers in construction. International Journal of Construction Management, 23(8), pp. 1323-1333. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) Assessment of critical factors influencing the performance of labour in Sri Lankan construction industry. International Journal of Construction Management, 23(1), pp. 144-155. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications. International Journal of Construction Management, 24(3), pp. 339-350. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A training guide for the reinforcement of continuous professional development of engineers and project managers on performance and productivity improvement practices in construction. International Journal of Construction Management, 24(13), pp. 1475-1484. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A systematic evaluation on the competencies of construction supervisors in productivity and performance improvement practices: Sri Lankan perspective. Smart and Sustainable Built Environment, 13(4), pp. 960-988. ISSN 2046-6099

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour – Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour: Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531

Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2022) A curriculum guide model to the next normal in developing construction supervisory training programmes. Built Environment Project and Asset Management, 12(5), pp. 792-822. ISSN 2044-124X

Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X

Mansour, H; Aminudin, E; Omar, B and Al-Sarayreh, A (2022) Development of an impact-on-performance index (ipi) for construction projects in Malaysia: A Delphi study. International Journal of Construction Management, 22(11), pp. 2003-2012. ISSN 1562-3599

Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364

Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.

Mao, X and Zhang, X (2008) Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), pp. 371-381. ISSN 0733-9364

Mao, Z (2003) Forecasting total factor productivity growth in the construction industry using neural network modelling. PhD thesis, National University of Singapore, Singapore.

Maqbool, R and Shaji, A (2026) Quantifying the social loafing led productivity issues in architecture, engineering and construction project teams. Engineering, Construction and Architectural Management, 33(1), pp. 620-640. ISSN 0969-9988

Maqsood, T and Akintoye, A (2002) Supply chain management: More than a new name for management of relationships. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Maqsood, T; Finegan, A D and Walker, D H T (2003) A conceptual model for exploring knowledge channelization from sources of innovation in construction organizations: Extending the role of knowledge management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Maqsood, Tayyab (2006) Role of knowledge management in supporting innovation and learning in construction. PhD thesis, RMIT University, Australia.

Mararo, I. M.; Babafemi, A. J. and Aigbavboa, C. (2026) Towards understanding the perceptions of 3D construction printing in Kenya. International Journal of Construction Management, 26(7), pp. 1320-1340. ISSN 1562-3599

Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.

Marinelli, M and Lambropoulos, S (2013) Algorithmic method for scraper load-time optimization. Journal of Construction Engineering and Management, 139(5), pp. 459-465. ISSN 0733-9364

Mariz, Renato Nunes (2024) Method for applying the work design in construction based on lean thinking. PhD thesis, Universidade Estadual de Campinas, Brazil.

Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework. PhD thesis, University of Johannesburg, South Africa.

Martin, H; Watson, C and Brooks, T (2025) Synergizing BIM and riba in architectural practice-technology workflow efficiencies, challenges, and insights. Architectural Engineering and Design Management, 21(1), pp. 35-59. ISSN 1745-2007

Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364

Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364

Marton, J and Richter, A (2004) In search of safety on construction sites -implications of culture, organizational structures and structural change on safety. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499

Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy. PhD thesis, University of Newcastle upon Tyne, UK.

Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.

Maxwell, D A; Back, W E and Toon, J (1998) Optimization of crew configurations using activity-based costing. Journal of Construction Engineering and Management, 124(2), pp. 162-168. ISSN 0733-9364

Maxwell, Duncan William (2018) The case for design-value in industrialised house building platforms: Product to ecosystem. PhD thesis, University of Sydney, Australia.

Mbachu, J; Egbelakin, T; Rasheed, E O and Shahzad, W M (2017) Influence of key role players on productivity outcomes in the residential building lifecycle. Journal of Engineering, Design and Technology, 15(4), pp. 528-551.

Mbaraja, T Z and Moyo, T (2025) Insights on virtual reality adoption for construction workers' training in Zimbabwe. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 103-111. ISSN 17514304

McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries. DSc thesis, George Washington University, USA.

McFarland, T C; Ryu, J; Haas, C T and Abdel-Rahman, E M (2024) Crafting safe and efficient masonry practices: Quantitative assessment of postural characteristics in movement strategies. Journal of Construction Engineering and Management, 150(2): 04023159, ISSN 0733-9364

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McKim, R A (1990) Risk management for the construction owner. PhD thesis, University of Waterloo, Canada.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods. PhD thesis, Aston University, UK.

McWilliam, Sarah (2022) Global value chain governance dynamics: A co-evolutionary perspective on the transition from relational to modular governance in construction. PhD thesis, University of Sydney, Australia.

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Meir, I A; Schwartz, M; Davara, Y and Garb, Y (2019) A window of one's own: A public office post-occupancy evaluation. Building Research & Information, 47(4), pp. 437-452. ISSN 0961-3218

Mellado, F (2022) Organisational readiness for BIM, lean and sustainability adoption: a conceptual self-assessment framework for construction SMEs in Chile. PhD thesis, University of Manchester, UK.

Memarian, B (2012) Development of high reliability construction work systems: Lessons from production practices of high performance work crews. PhD thesis, Arizona State University, USA.

Memarzia, K (1995) Productivity and the Iranian building industry: a case study of component manufacture. PhD thesis, University of York, UK.

Menadue, Vanessa Rachel (2014) Green commercial office buildings: Environmental performance and user perceptions. PhD thesis, University of Adelaide, Australia.

Mesquita, Maria Julia de Moraes (2007) Subsidy for quality plans of buildings in the hospitality sector. PhD thesis, Universidade de São Paulo, Brazil.

Messaoudi, M (2020) BIM-based virtual permitting review process for residential building in the state of Florida. PhD thesis, University of Florida, USA.

Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.

Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.

Mewomo, M C (2022) Construction labour productivity in South Africa: Challenges and possible remedies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Meyer, H W G (1991) Conceptual model for integrating business activity and data systems in the AEC industry. PhD thesis, University of Wisconsin - Madison, USA.

Miller, M L and Bernold, L E (1991) Sensor-integrated nailing for building construction. Journal of Construction Engineering and Management, 117(2), pp. 213-225. ISSN 0733-9364

Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Millett, S J; Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: A cross-sectoral analysis. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Milner, Philip E (2025) A phenomenological study of lean labor method adoption in commercial construction projects. DBA thesis, California Southern University, USA.

Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364

Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364

Mishra, S P; Parbat, D K and Modak, J P (2014) Field data-based mathematical simulation of manual rebar cutting. Journal of Construction in Developing Countries, 19(1), pp. 111-126. ISSN 1823-6499

Missa, P (2013) An investigation of the underrepresentation of BMEs in the UK construction industry. PhD thesis, University of Salford, UK.

Mitropoulos, P (1996) Technology adoption decisions in construction organizations. PhD thesis, Stanford University, USA.

Mitropoulos, P and Cupido, G (2009) Safety as an emergent property: Investigation into the work practices of high-reliability framing crews. Journal of Construction Engineering and Management, 135(5), pp. 407-415. ISSN 0733-9364

Mitropoulos, P and Guillama, V (2010) Analysis of residential framing accidents, activities, and task demands. Journal of Construction Engineering and Management, 136(2), pp. 260-269. ISSN 0733-9364

Mitropoulos, P and Guillama, V (2011) A framework of task demand factors for residential framing. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 19-27. ISSN 17514312

Mitropoulos, P and Memarian, B (2013) Task demands in masonry work: Sources, performance implications, and management strategies. Journal of Construction Engineering and Management, 139(5), pp. 581-590. ISSN 0733-9364

Mitropoulos, P and Namboodiri, M (2011) The task demands assessment methodology. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 9-17. ISSN 17514312

Mitropoulos, P and Tajima, V (2022) Constructability opportunities in the engineering design of marine pier structures: A case study. International Journal of Construction Management, 22(3), pp. 366-378. ISSN 1562-3599

Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988

Mogotlhwane, T; Khosrowshahi, F and Underwood, J (2006) Impact of ICT applications in performance: Search for evidence. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Mohagheghi-Fard, M N (2019) An online collaboration framework for small and medium sized enterprises in the United Kingdom construction sector. PhD thesis, University of Salford, UK.

Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.

Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988

Mohamed, Yamen (2023) Adopting modern methods of construction in low-income housing projects in Egypt. PhD thesis, London South Bank University, UK.

Moharrami, S; Bayat, A and Abourizk, S (2022) Modeling microtunnel boring machine penetration rate using a mechanistic approach. Journal of Construction Engineering and Management, 148(11): 04022128, ISSN 0733-9364

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.

Momade, M H; Durdyev, S; Dixit, S; Shahid, S and Alkali, A K (2024) Modeling labor costs using artificial intelligence tools. International Journal of Building Pathology and Adaptation, 42(6), pp. 1263-1281. ISSN 2398-4708

Momade, M H; Durdyev, S; Van Tam, N; Shahid, S; Mbachu, J and Momade, Y (2024) Factors influencing adoption of construction technologies in Vietnam's residential construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1002-1018. ISSN 2398-4708

Momade, M H; Shahid, S; Falah, G; Syamsunur, D and Estrella, D (2023) Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management, 23(4), pp. 697-707. ISSN 1562-3599

Momade, M H; Shahid, S; Hainin, M R B; Nashwan, M S and Tahir Umar, A (2022) Modelling labour productivity using SVM and rf: A comparative study on classifiers performance. International Journal of Construction Management, 22(10), pp. 1924-1934. ISSN 1562-3599

Momaya, K S (1996) International competitiveness of the Canadian construction industry: A comparison with Japan and the United States. PhD thesis, University of Toronto, Canada.

Montali, J (2019) Digitised engineering knowledge for prefabricated fac?ades. PhD thesis, University of Cambridge, UK.

Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2020) Construction worker productivity in hot and humid weather conditions: A review of measurement methods at task, crew and project levels. Engineering, Construction and Architectural Management, 27(1), pp. 83-108. ISSN 0969-9988

Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2023) Proximity activity intensity identification system in hot and humid weather conditions: Development and implementation. Journal of Construction Engineering and Management, 149(12): 04023122, ISSN 0733-9364

Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364

Moon, S; Ham, N; Kim, S; Hou, L; Kim, J H and Kim, J J (2020) Fourth industrialization-oriented offsite construction: Case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(9), pp. 2271-2286. ISSN 0969-9988

Moon, S; Xu, S; Hou, L; Wu, C; Wang, X and Tam, V W Y (2018) RFID-aided tracking system to improve work efficiency of scaffold supplier: Stock management in Australasian supply chain. Journal of Construction Engineering and Management, 144(2): 04017115, ISSN 0733-9364

Morimoto, E and Arai, K (2024) Public procurement and business performance in COVID-19 situation: Decline in firms' entry. International Journal of Construction Management, 24(14), pp. 1589-1598. ISSN 1562-3599

Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.

Morua Padilla, E (1986) Resource strategies for dynamic construction project management. PhD thesis, University of Michigan, USA.

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

Moselhi, O and Khan, Z (2010) Analysis of labour productivity of formwork operations in building construction. Construction Innovation, 10(3), pp. 286-303. ISSN 1471-4175

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029

Mostafa, S; Kim, K P; Tam, V W Y and Rahnamayiezekavat, P (2020) Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. International Journal of Construction Management, 20(2), pp. 146-156. ISSN 1562-3599

Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599

Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Mousaei, A; Taghaddos, H; Marzieh Bagheri, S and Hermann, U (2021) Optimizing heavy lift plans for industrial construction sites using dijkstra's algorithm. Journal of Construction Engineering and Management, 147(11): 04021160, ISSN 0733-9364

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Moyo, T; Crafford, G and Emuze, F (2021) People-centred management for improving construction workers' productivity in Zimbabwe. Built Environment Project and Asset Management, 11(2), pp. 350-368. ISSN 2044-124X

Moyo, T; Crafford, G and Emuze, F (2022) Significant decent work objectives for monitoring construction workers' productivity performance in Zimbabwe. Journal of Construction in Developing Countries, 27(1), pp. 95-110. ISSN 1823-6499

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364

Muehlhausen, F B (1988) Development of the materials management model for construction management curriculum development and a method to translate model information into instruction. PhD thesis, Purdue University, USA.

Muhammed, A; Folorunso, C O and Fadairo, G (2024) Assessment of sandcrete hollow blocks' thermal performance as a walling material for tropical buildings in Lokoja, Nigeria. International Journal of Building Pathology and Adaptation, 42(4), pp. 653-671. ISSN 23984708

Mukopfa, C (2021) Strategies to sustain small construction businesses beyond the first 5 years of operation. DBA thesis, Walden University, USA.

Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364

Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.

Murguia, D; Soetanto, R; Szczygiel, M; Goodier, C I and Kavuri, A (2026) Construction 4.0 implementation for performance improvement: An innovation management perspective. Construction Innovation, 26(3), pp. 843-870. ISSN 1471-4175

Murguia, D; Demian, P and Soetanto, R (2017) A systemic BIM innovation model in the construction supply chain. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Murguia, D; Rathnayake, A; Jansen Van Vuuren, T and Middleton, C (2024) Measuring construction productivity across projects: Multilevel three-dimensional framework. Journal of Construction Engineering and Management, 150(11): 04024151, ISSN 0733-9364

Murillo, K P; Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(8), pp. 1801-1819. ISSN 0969-9988

Murphy, R; Concannon, R and Seriki, O (2023) Leadership for the future: Towards the challenge of understanding leadership in the AEC sector. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Murray, M and Zagaretos, P (2001) The influence of cultural differences on the performance of international contractors. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Musarat, M A; Alaloul, W S and Liew, M S (2022) Inflation rate and labours' wages in construction projects: Economic relation investigation. Engineering, Construction and Architectural Management, 29(6), pp. 2461-2494. ISSN 0969-9988

Mustaffa, N K (2022) Alternative configurations of earthmoving loading practices toward emissions reduction. Journal of Construction Engineering and Management, 148(1): 04021177, ISSN 0733-9364

Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Myrtveit, I and Stensrud, E (2005) Identifying high performance construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mándoki, R and Orr, J (2023) The social acceptance of mass produced residential buildings among Hungarian young adults. Architectural Engineering and Design Management, 19(2), pp. 148-162. ISSN 1745-2007

Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.

Nadim, W and Goulding, J S (2011) Offsite production: A model for building down barriers a European construction industry perspective. Engineering, Construction and Architectural Management, 18(1), pp. 82-101. ISSN 0969-9988

Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.

Naim, A A A A (2018) An investigation of building information modelling implementation in KSA. PhD thesis, University of Wolverhampton, UK.

Naji, K; Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), pp. 3060-3077. ISSN 0969-9988

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Nanayakkara, L (1999) An interpretive research methodology for assessing the appicability of western productivity techniques in Sri Lanka. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Nanayakkara, L (2012) Site layout: how it is perceived to affect productivity in public sector construction projects in Sri Lanka. PhD thesis, Oxford Brookes University, UK.

Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Nash, W R (1985) Raise boring in civil and mining applications. Journal of Construction Engineering and Management, 111(1), pp. 15-30. ISSN 0733-9364

Nasir, H; Ahmed, H; Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), pp. 595-607. ISSN 01446193

Nasirian, A; Abbasi, B; Cheng, T C E and Arashpour, M (2022) Multiskilled workforce planning: A case from the construction industry. Journal of Construction Engineering and Management, 148(5): 04022021, ISSN 0733-9364

Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364

Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099

Nath, N D (2021) Human-centered computing and visual analytics for future of work in construction. PhD thesis, Texas A&M University, USA.

Nath, T; Attarzadeh, M and Tiong, R L K (2016) Precast workflow productivity measurement through BIM adoption. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 208-216. ISSN 17514304

Navab-Kashani, R; Gay, L F and Bayat, A (2015) Productivity improvement of sewer CCTV inspection through time study and route optimization. Journal of Construction Engineering and Management, 141(6): 04015009, ISSN 0733-9364

Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Navon, R; Kelly, P W and Johnston, D W (1993) Human factors in introducing on-site construction automation. Journal of Construction Engineering and Management, 119(4), pp. 801-812. ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193

Nawi, M N M (2012) Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects. PhD thesis, University of Salford, UK.

Nazeer, F S; Kamardeen, I and Hasan, A (2025) Establishment of an end-user engaged building design framework. Built Environment Project and Asset Management, 15(1), pp. 106-124. ISSN 2044-124X

Nazem, S M (1969) A study into the technical and managerial manpower in the construction industry. PhD thesis, University of Manchester, UK.

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364

Neve, H H; Wandahl, S; Lindhard, S; Teizer, J and Lerche, J (2020) Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights. Journal of Construction Engineering and Management, 146(9): 04020110, ISSN 0733-9364

Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.

Newsham, G; Brand, J; Donnelly, C; Veitch, J; Aries, M and Charles, K (2009) Linking indoor environment conditions to job satisfaction: A field study. Building Research & Information, 37(2), pp. 129-147. ISSN 0961-3218

Newsham, G R; Veitch, J A and Hu, Y V (2018) Effect of green building certification on organizational productivity metrics. Building Research & Information, 46(7), pp. 755-766. ISSN 0961-3218

Newton, K L and Chileshe, N (2012) Awareness, usage and benefits of building information modelling (BIM) adoption-the case of South Australian construction organizations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ng, K-W A (2009) Improving main contractors' site coordination in the Hong Kong building projects. PhD thesis, Loughborough University, UK.

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Ng, S T; Chen, S E; McGeorge, D; Lam, K C and Evans, S (2001) Current state of IT usage by Australian subcontractors. Construction Innovation, 1(1), pp. 3-13. ISSN 1471-4175

Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193

Ng, S T; Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(3), pp. 224-237. ISSN 0969-9988

Nguyen, M. V.; Khanh, H. D.; Phan, C. T. and Thuc, L. D. (2026) Investigating the impacts of psychological safety climate on mental ill health in the Vietnamese construction industry. Engineering, Construction and Architectural Management, 33(4), pp. 3240-3263. ISSN 0969-9988

Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029

Nguyen, Hai N (2010) The impact of leadership behaviours and organisational culture on knowledge management practices in small and medium enterprises. PhD thesis, Griffith University, Australia.

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364

Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988

Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364

Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708

Ni, G; Zhou, Q; Miao, X; Niu, M; Zheng, Y; Zhu, Y and Ni, G (2025) What and how influence the safety knowledge sharing of new generation of construction workers in China: A study based on DEMATEL and ISM. Engineering, Construction and Architectural Management, 32(4), pp. 2160-2189. ISSN 0969-9988

Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364

Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.

Ninan, J; Sergeeva, N and Winch, G (2022) Narrative shapes innovation: A study on multiple innovations in the UK construction industry. Construction Management and Economics, 40(11-12), pp. 884-902. ISSN 01446193

Niroshana, N; Siriwardana, C and Jayasekara, R (2023) The impact of COVID-19 on the construction industry and lessons learned: A case of Sri Lanka. International Journal of Construction Management, 23(15), pp. 2521-2538. ISSN 1562-3599

Nisonen, E; Bernal, D M and Pelsmakers, S (2025) The unfitness of dwellings: Why spatial and conceptual boundaries matter. Buildings & Cities, 6(1), pp. 619-633. ISSN 2632-6655

Niu, Y (2019) Smart construction objects (SCOs): towards a new paradigm of smart construction. PhD thesis, University of Hong Kong, Hong Kong.

Niza, I L; da Luz, I M; de Souza, M P and Broday, E E (2025) Hierarchical and two-step clustering to assess symptoms of sick building syndrome in office spaces in an educational building. Architectural Engineering and Design Management, 21(4), pp. 603-620. ISSN 1745-2007

Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

Noriega, M S; Valles, C A; Torres-Argüelles, V; Martínez, G E and Hernández, G A (2016) Six sigma improvement project in a concrete block plant. Construction Innovation, 16(4), pp. 526-544. ISSN 1471-4175

Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.

Nouh, A; Elkasaby, E and Wageh, O (2024) Dynamic approach for investigating delivery system effects on infrastructure project performance. Engineering, Construction and Architectural Management, 31(12), pp. 4791-4808. ISSN 0969-9988

Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.

Nwadike, A and Aigwi, I E (2024) Impacts of the COVID-19 pandemic on building consents and construction sector activities in New Zealand. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Nwaogu, J M; Chan, A P C and Tetteh, M O (2022) Staff resilience and coping behavior as protective factors for mental health among construction tradesmen. Journal of Engineering, Design and Technology, 20(3), pp. 671-695. ISSN 1726-0531

Nzekwe-Excel, C (2012) Satisfaction assessment in construction projects: A conceptual framework. Built Environment Project and Asset Management, 2(1), pp. 86-102. ISSN 2044-124X

O'Brien, M and Al-Soufi, A (1994) A survey of data communications in the UK construction industry. Construction Management and Economics, 12(5), pp. 457-465. ISSN 01446193

O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. PhD thesis, Stanford University, USA.

O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364

O'Connor, J T (1983) Improving industrial project constructability (productivity, value engineering). PhD thesis, University of Texas at Austin, USA.

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364

Obasa, A J; Akinradewo, O F and Olanipekun, A O (2024) Impact of technologies towards addressing stress-related problems among practicing quantity surveyors in Lagos, Nigeria. International Journal of Construction Management, 24(6), pp. 623-632. ISSN 1562-3599

Odesola, I A and Idoro, G I (2014) Influence of labour-related factors on construction labour productivity in the South-South geo-political zone of Nigeria. Journal of Construction in Developing Countries, 19(1), pp. 93-109. ISSN 1823-6499

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Ofori, G (2015) Nature of the construction industry, its needs and its development: A review of four decades of research. Journal of Construction in Developing Countries, 20(2), pp. 115-135. ISSN 1823-6499

Ofori, G; Dulaimi, M F and Ling, F Y Y (2004) Improving performance of construction industry in Singapore: motivators, enablers and lessons for developing countries. Journal of Construction Research, 5(2), pp. 267-289. ISSN 1609-9451

Ofori, G; Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), pp. 785-803. ISSN 2044-124X

Ofori, G; Zhang, Z and Ling, F Y Y (2022) Key barriers to increase construction productivity: The Singapore case. International Journal of Construction Management, 22(14), pp. 2635-2646. ISSN 1562-3599

Ofori, J N A; Tomori, M and Ogunseiju, O (2025) Assessing the ethical, social and psychological risks of active and passive exoskeletons in the construction industry: Trust, productivity and stress levels. Smart and Sustainable Built Environment, 14(4), pp. 1091-1116. ISSN 2046-6099

Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175

Ogundare, I.; Kassa, R.; Maali, O.; Lines, B.; Smithwick, J. and Sullivan, K. (2026) Skillsets differences among field leaders in the US sheet metal and air conditioning trades. Built Environment Project and Asset Management, 16(3), pp. 561-577. ISSN 2044-124X

Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.

Ogunseiju, O; Olayiwola, J; Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(3), pp. 1358-1375. ISSN 0969-9988

Ogunseiju, O R; Olayiwola, J; Akanmu, A A and Nnaji, C (2022) Recognition of workers' actions from time-series signal images using deep convolutional neural network. Smart and Sustainable Built Environment, 11(4), pp. 812-831. ISSN 2046-6099

Ogwueleka, A C and Ikediashi, D I (2021) Exploring the effects of positive organizational behaviour models on occupational eustress amongst construction employees. Journal of Construction Business and Management, 5(1), pp. 38-46. ISSN 2521-0165

Ohueri, C C; Enegbuma, W I; Wong, N H; Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(3), pp. 293-304. ISSN 2044-124X

Ojo, G K; Adeyeye, G M; Opawole, A and Kajimo-Shakantu, K (2019) Gender differences in workplace stress response strategies of quantity surveyors in Southwestern Nigeria. International Journal of Building Pathology and Adaptation, 37(5), pp. 718-732. ISSN 23984708

Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X

Okafor, C C; Ani, U S and Ugwu, O (2022) Evaluation of supply chain management lapses in nigeria’s construction industry. International Journal of Construction Education and Research, 18(2), pp. 103-122. ISSN 1557-8771

Oke, A. E.; Aliu, J.; Ukaha Onyeukwu, S.; Jamir Singh, P. S.; Azura Ramli, R. and Shaharudin Samsurijan, M. (2026) An empirical study on the implications of social media for sustainable construction and productivity in Lagos state, Nigeria. Construction Innovation, 26(3), pp. 720-744. ISSN 1471-4175

Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988

Oke, A E; Aliu, J; Mwanaumo, E M M; Abayomi, T and Kahanji, C (2023) Leveraging gamification to enhance productivity and employee engagement in the Nigerian construction industry. Built Environment Project and Asset Management, 13(6), pp. 813-829. ISSN 2044-124X

Oke, A E; Aliu, J and Onajite, S A (2024) Barriers to the adoption of digital technologies for sustainable construction in a developing economy. Architectural Engineering and Design Management, 20(3), pp. 431-447. ISSN 1745-2007

Oke, A E; Arowoiya, V A and Akomolafe, O T (2022) Influence of the internet of things' application on construction project performance. International Journal of Construction Management, 22(13), pp. 2517-2527. ISSN 1562-3599

Oke, A E; Arowoiya, V A; Chan, M and Oyediran, A (2025) Digital twin technology (DTT) in a developing construction industry: Evaluation of the awareness and usage among professionals in Nigeria. International Journal of Construction Management, 25(11), pp. 1313-1323. ISSN 1562-3599

Okpala, I; Nnaji, C; Awolusi, I and Akanmu, A (2021) Developing a success model for assessing the impact of wearable sensing devices in the construction industry. Journal of Construction Engineering and Management, 147(7): 04021060, ISSN 0733-9364

Okpala, I; Nnaji, C and Gambatese, J (2023) Assessment tool for human-robot interaction safety risks during construction operations. Journal of Construction Engineering and Management, 149(1): 04022145, ISSN 0733-9364

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.

Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X

Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: User perspective. Built Environment Project and Asset Management, 2(2), pp. 167-181. ISSN 2044-124X

Olanrewaju, O I; Babarinde, S A; Chileshe, N and Sandanayake, M (2021) Drivers for implementation of building information modeling (BIM) within the Nigerian construction industry. Journal of Financial Management of Property and Construction, 26(3), pp. 366-386. ISSN 1366-4387

Olanrewaju, O I; Bello, A O; Semiu, M A and Mudashiru, S A (2025) Critical barriers to effective communication in the construction industry: evidence from Nigeria. International Journal of Construction Management, 25(7), pp. 783-801. ISSN 1562-3599

Olawumi, T O and Chan, D W M (2019) An empirical survey of the perceived benefits of executing BIM and sustainability practices in the built environment. Construction Innovation, 19(3), pp. 321-342. ISSN 1471-4175

Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193

Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364

Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.

Olomolaiye, P O (1990) An evaluation of the relationships between bricklayers' motivation and productivity. Construction Management and Economics, 8(3), pp. 301-313. ISSN 01446193

Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(2), pp. 175-186. ISSN 01446193

Olugboyega, O; Edwards, D J; Windapo, A O; Omopariola, E D and Martek, I (2021) Development of a conceptual model for evaluating the success of BIM-based construction projects. Smart and Sustainable Built Environment, 10(4), pp. 681-701. ISSN 2046-6099

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Onososen, A and Musonda, I (2024) VR-based training methods in enhancing communication within human-robot teams in construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Onososen, A; Musonda, I and Molusiwa, R (2023) Evaluating the health and safety practices of human-robot teams. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Onsarigo, L M (2016) Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations. PhD thesis, Indiana State University, USA.

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.

Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. PhD thesis, Northumbria University, UK.

Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.

Osuizugbo, I. C.; Awuzie, B. O. and Olorunlogbon, O. O. (2026) Assessing the proficiency and application of artificial intelligence skills among construction professionals in a developing country: Evidence from Nigeria. Journal of Engineering, Design and Technology, ISSN 1726-0531

Osundiran, Adeola Oluwatoyin and Makgopa, Tshehla (2026) Port efficiency: The application of blockchain technology in the construction material supply chain. Journal of Construction Business and Management, 8(S1), pp. 48-61. ISSN 2521-0165

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Ouedraogo, A L S N; Messan, A; Yamegueu, D and Coulibaly, Y (2022) A model for thermal comfort assessment of naturally ventilated housing in the hot and dry tropical climate. International Journal of Building Pathology and Adaptation, 40(2), pp. 183-201. ISSN 23984708

Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499

Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.

Owen, R; Amor, R; Palmer, M; Dickinson, J; Tatum, C B; Kazi, A S; Prins, M; Kiviniemi, A and East, B (2010) Challenges for integrated design and delivery solutions. Architectural Engineering and Design Management, 6(4), pp. 232-240. ISSN 1745-2007

Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padilla, E M and Carr, R I (1991) Resource strategies for dynamic project management. Journal of Construction Engineering and Management, 117(2), pp. 279-293. ISSN 0733-9364

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218

Paliari, José Carlos (2008) Method for the prognosis of productivity and the unitary consumption of materials: Hydraulic building systems. PhD thesis, Universidade de São Paulo, Brazil.

Pallubinsky, H; Kingma, B R M; Schellen, L; Dautzenberg, B; van Baak, M A and van Marken Lichtenbelt, W D (2017) The effect of warmth acclimation on behaviour, thermophysiology and perception. Building Research & Information, 45(7), pp. 800-807. ISSN 0961-3218

Palos, S; Kiviniemi, A and Kuusisto, J (2014) Future perspectives on product data management in building information modeling. Construction Innovation, 14(1), pp. 52-68. ISSN 1471-4175

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.

Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X

Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218

Pan, W and Pan, M (2023) Rethinking lean synergistically in practice for construction industry improvements. Engineering, Construction and Architectural Management, 30(7), pp. 2669-2690. ISSN 0969-9988

Panadés, K.; Olbina, S. and Kohlman Rabbani, E. R. (2026) Social sustainability in building retrofit projects: A systematic literature review. International Journal of Building Pathology and Adaptation, 44(4), pp. 1098-1120. ISSN 2398-4708

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364

Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599

Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Pandey, A R (2016) Heuristic decision-making model for electrical foremen when workflow is disrupted. PhD thesis, Illinois Institute of Technology, USA.

Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364

Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry. PhD thesis, University of Texas at Austin, USA.

Pantzartzis, E; Deka, L; Price, A D F; Tann, C; Mills, G R W and Rich-Mahadkar, S (2016) Sustainable management of NHS assets backlog maintenance. Built Environment Project and Asset Management, 6(5), pp. 535-552. ISSN 2044-124X

Pantzartzis, E; Price, A D F and Pascale, F (2016) A built environment response to the rising costs of dementia. Journal of Financial Management of Property and Construction, 21(2), pp. 160-187. ISSN 1366-4387

Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity: Case study of Iran. Journal of Financial Management of Property and Construction, 24(3), pp. 630-654. ISSN 1366-4387

Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988

Parida, S and Brown, K (2018) Investigating systematic review for multi-disciplinary research in the built environment. Built Environment Project and Asset Management, 8(1), pp. 78-90. ISSN 2044-124X

Park, H S; Thomas, S R and Tucker, R L (2005) Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772-778. ISSN 0733-9364

Park, H-S (2002) Development of a construction productivity metrics system (CPMS). PhD thesis, University of Texas at Austin, USA.

Park, J H and Lee, G (2017) Design coordination strategies in a 2D and BIM mixed-project environment: Social dynamics and productivity. Building Research & Information, 45(6), pp. 631-648. ISSN 0961-3218

Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.

Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.

Park, T; Kim, M K; Kim, C and Kim, H (2009) Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction. Journal of Construction Engineering and Management, 135(11), pp. 1261-1270. ISSN 0733-9364

Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364

Parkin, A B; Tutesigensi, A and Büyükalp, A I (2009) Motivation among construction workers in Turkey. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499

Parvar, J; Lowe, D; Emsley, M and Duff, A R (2000) Neural networks as a decision support system for the decision to bid process. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Paskins, J F (2012) The social experience of building construction work in and around Paris during the 1960s. PhD thesis, University College London, UK.

Patel, T; Bapat, H and Patel, D (2026) Assessing barriers of automation and robotics adoption in the Indian construction industry: A fuzzy DEMATEL approach. Construction Innovation, 26(3), pp. 935-957. ISSN 1471-4175

Paulson, B C; Chan, W T and Koo, C C (1987) Construction operations simulation by microcomputer. Journal of Construction Engineering and Management, 113(2), pp. 302-314. ISSN 0733-9364

Pavitt, T C (2002) Managing construction interfaces within the building facade. PhD thesis, Loughborough University, UK.

Peansupap, V and Walker, D H T (2009) Exploratory factors influencing design practice learning within a Thai context. Engineering, Construction and Architectural Management, 16(3), pp. 238-253. ISSN 0969-9988

Peat, M (2009) Promotion of materials and products with sustainable credentials. Architectural Engineering and Design Management, 5(1-2), pp. 46-52. ISSN 1745-2007

Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(2), pp. 151-159. ISSN 01446193

Pekuri, A (2015) The role of business models in construction business management. PhD thesis, University of Oulu, Finland.

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(3), pp. 342-357. ISSN 0969-9988

Pellegrino, R; Costantino, N; Pietroforte, R and Sancilio, S (2012) Construction of multi-storey concrete structures in Italy: Patterns of productivity and learning curves. Construction Management and Economics, 30(2), pp. 103-115. ISSN 1466433X

Penteado Filho, P D A (1984) Productivity trends in the construction industry. PhD thesis, Cornell University, USA.

Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.

Perera, S; Davis, S and Marosszeky, M (2011) Head contractor role in construction value-based management: Australian building industry experience. Journal of Financial Management of Property and Construction, 16(1), pp. 31-41. ISSN 1366-4387

Perera, Weebadda Arachchilage Salinda (2018) An investigation into developing productive construction environments to improve quality performance in Australian building construction. PhD thesis, University of New South Wales, Australia.

Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364

Phan, D H D (1993) The primitive-composite (p-c) approach: A methodology for developing sharable object-oriented data representations for facility engineering integration. PhD thesis, Stanford University, USA.

Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193

Pieper, P J (1984) The measurement of real investment in structures and the construction productivity decline (deflation). PhD thesis, Northwestern University, USA.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pittri, H; Agyekum, K; Salgin, B; Dompey, A M A; Gasue, R and Anderson, S A (2025) The fourth industrial revolution technologies and the construction industry in Ghana. Construction Economics and Building, 25(3-4), pp. 231-253. ISSN 2204-9029

Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: A preliminary review of the relationship between buildability, site productivity and cost. Construction Management and Economics, 16(6), pp. 681-692. ISSN 01446193

Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193

Ponton, H; Osborne, A; Greenwood, D and Thompson, N (2019) Exploring the designer-constructor teamwork interface to improve collaboration: A review of current literature. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Pooladvand, S and Hasanzadeh, S (2023) Impacts of stress on workers' risk-taking behaviors: Cognitive tunneling and impaired selective attention. Journal of Construction Engineering and Management, 149(8): 04023060, ISSN 0733-9364

Poorisat, T.; Aigwi, I. E.; Doan, D. T. and GhaffarianHoseini, A. (2026) Integrating energy efficiency, water efficiency and indoor environmental quality towards advancing sustainable building designs and practices in New Zealand: Stakeholders' perspectives. Construction Innovation, 26(9), pp. 79-114. ISSN 1471-4175

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Pornthepkasemsant, P and Charoenpornpattana, S (2019) Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technology, 17(5), pp. 849-861. ISSN 1726-0531

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Powell, A; Galea, N; Salignac, F; Loosemore, M and Chappell, L (2018) Masculinity and workplace wellbeing in the Australian construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry. PhD thesis, University of Bath, UK.

Powell, R and Copping, A (2010) Sleep deprivation and its consequences in construction workers. Journal of Construction Engineering and Management, 136(10), pp. 1086-1092. ISSN 0733-9364

Powell, R and Copping, A (2010) Construction worker sleep deprivation and its effects on personal safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Manu, P; Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: An empirical study. Engineering, Construction and Architectural Management, 28(5), pp. 1440-1467. ISSN 0969-9988

Prachi Vinod, I; Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), pp. 1-20. ISSN 1726-0531

Pradhan, A R (2009) An approach for fusing data from multiple sources to support construction productivity analyses. PhD thesis, Carnegie Mellon University, USA.

Pradhananga, P; Elzomor, M and Santi Kasabdji, G (2021) Identifying the challenges to adopting robotics in the US construction industry. Journal of Construction Engineering and Management, 147(5): 0733, ISSN 0733-9364

Preece, C; Moodley, K and Hyde, J (2000) Knowledge management strategies to improve construction business development processes: A preliminary case study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Premakumara, A and Siriwardana, C (2025) A comprehensive approach for assessing the causes of low productivity in the construction sector: A systematic categorization and ranking using Pareto and fuzzy analysis. Construction Management and Economics, 43(1), pp. 40-58. ISSN 0144-6193

Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.

Price, A D F and Lu, J (2013) Impact of hospital space standardization on patient health and safety. Architectural Engineering and Design Management, 9(1), pp. 49-61. ISSN 1745-2007

Prigge, D V (2013) Experimentation of managerial techniques for the optimization of a voluntary construction workforce. PhD thesis, Arizona State University, USA.

Proverbs, D G and Holt, G D (1999) The strive for productivity and quality: Views of UK project managers. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193

Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988

Purushothaman, M B and Seadon, J (2024) System-wide construction waste and their connectivity to construction phases, impacting 5m factors and effects: A systematic review. Smart and Sustainable Built Environment, 13(2), pp. 354-369. ISSN 2046-6099

Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.

Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364

Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component. PhD thesis, University of Florida, USA.

Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.

Rachid, Ali Hassan (2021) Development of a framework to support embedding BIM within undergraduate architectural programmes in Lebanon. PhD thesis, University of Salford, UK.

Radosavljevic, M (2001) Autopoietic organization of firm: An illustration for the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.

Radosavljevic, M and Horner, M (2007) Process planning methodology: Dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(2), pp. 143-156. ISSN 1466433X

Radosavljević M, M W (2002) The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20(1), pp. 3-12. ISSN 01446193

Raed, H (1999) Empowerment via progressive participation: Jordanian experience of the low income housing production. PhD thesis, University College London, UK.

Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364

Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.

Raidén, A B; Dainty, A R J and Neale, R H (2001) Human resource information systems in construction: Are their capabilities fully exploited? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Raina, P (2015) An examination of the retention practice in the New Zealand construction industry. PhD thesis, Auckland University of Technology, New Zealand.

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.

Raisbeck, P (2019) Space oddity: Spatial design strategies and work place design. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Raisbeck, P and Tang, L C M (2009) Humanistic and scientific knowledge management: A comparison of design practice between architects and engineers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988

Ramani, P V and Lingan, L K (2022) Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(4), pp. 669-677. ISSN 1562-3599

Rambaruth, A; Adam, J K and Krishna, S B N (2022) Contributing elements and issues to strategic management in the construction industry among small and medium enterprises: A case study in South africa's ethekwini region. Journal of Construction Business and Management, 5(2), pp. 20-28. ISSN 2521-0165

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Ramsaran, R and Hosein, R (2006) Growth, employment and the construction industry in Trinidad and Tobago. Construction Management and Economics, 24(5), pp. 465-474. ISSN 1466433X

Ranasinghe, U; Ruwanpura, J and Liu, X (2012) Streamlining the construction productivity improvement process with the proposed role of a construction productivity improvement officer. Journal of Construction Engineering and Management, 138(6), pp. 697-706. ISSN 0733-9364

Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(5), pp. 477-490. ISSN 2044-124X

Randolph Thomas, H and Napolitan, C L (1995) Quantitative effects of construction changes on labor productivity. Journal of Construction Engineering and Management, 121(3), pp. 290-296. ISSN 0733-9364

Rasheed, E. O. and Wang, K. (2026) Do overall findings correlate with granular findings? An analysis of factors influencing office workers' thermal comfort and indoor air quality. International Journal of Building Pathology and Adaptation, 44(5), pp. 1211-1231. ISSN 2398-4708

Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

Rasmy, M O; Abu Atta, T A L and Mohamed Ibrahim, A A (2022) Sustainable strategy to create multisector or unisector smart economic hubs. Smart and Sustainable Built Environment, 11(3), pp. 692-716. ISSN 2046-6099

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Rathnayake, A and Middleton, C (2023) Systematic review of the literature on construction productivity. Journal of Construction Engineering and Management, 149(6): 03123005, ISSN 0733-9364

Rathnayake, A; Murguia, D and Middleton, C (2024) Measuring activity-level construction productivity. Journal of Construction Engineering and Management, 150(8): 04024099, ISSN 0733-9364

Rawlinson, F and Farrell, P (2008) Construction: A culture for concern? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364

Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.

Rees, W E (1999) The built environment and the ecosphere: A global perspective. Building Research & Information, 27(4-5), pp. 206-220. ISSN 0961-3218

Reilly, R (2022) Development of a management framework to improve the building services engineering design process: a case study of engineering management in an Irish consultancy practice. DProf thesis, University of Salford, UK.

Reinschmidt, K F; Griffis, F H and Bronner, P L (1991) Integration of engineering, design, and construction. Journal of Construction Engineering and Management, 117(4), pp. 756-772. ISSN 0733-9364

Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599

Reis, Sonia (2023) Career optimism of civil engineers in Australia. PhD thesis, Queensland University of Technology, Australia.

Rener, A T (2022) Innovative methodologies to enhance productivity, supply chain, and sustainability in industrialized construction. PhD thesis, Lawrence Technological University, USA.

Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499

Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364

Revolinsky, J A (2000) An analysis model of sequencing of computer systems for the construction manager: A study of automation impacts on the construction industry. PhD thesis, Texas A&M University, USA.

Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599

Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.

Ribeiro, D B; Coutinho, A R; Satyro, W C; Campos, F C; Lima, C R C; Contador, J C and Gonçalves, R F (2024) The DAWN readiness model to assess the level of use of Industry 4.0 technologies in the construction industry in Brazil. Construction Innovation, 24(2), pp. 515-536. ISSN 1471-4175

Ribeiro, F L and Henriques, P G (2002) The housing property markets in Portugal: Analysis and future trends. Journal of Financial Management of Property and Construction, 7(2), pp. 97-106. ISSN 1366-4387

Righetto, E.; Micelli, E. and Pellegrino, M. (2026) Can the deep retrofit of the housing stock cost less? Learning curves and the costs of off-site industrialised construction in France. Construction Management and Economics, 44(5), pp. 359-380. ISSN 0144-6193

Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364

Rivas, R A; Borcherding, J D; Gonzlez, V and Alarcn, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(4), pp. 312-320. ISSN 0733-9364

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Robertson, B (2020) On-site installation flexibility for disruption management in modular off-site construction systems. PhD thesis, University of Cambridge, UK.

Rodrigo, V (2016) Development of an e-business capability maturity model for construction organisations. PhD thesis, Northumbria University, UK.

Rodriguez, F S; Spilski, J; Hekele, F; Beese, N O and Lachmann, T (2020) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(3), pp. 745-764. ISSN 0969-9988

Rogers, T R (1996) A conceptual communication-system model applied to construction. PhD thesis, University of Maryland, College Park, USA.

Rojas, E M and Aramvareekul, P (2003) Is construction labor productivity really declining? Journal of Construction Engineering and Management, 129(1), pp. 41-46. ISSN 0733-9364

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364

Rosa, J E; Hon, C K H; Xia, B and Lamari, F (2017) Challenges, success factors and strategies for women's career development in the Australian construction industry. Construction Economics and Building, 17(3), pp. 27-46. ISSN 2204-9029

Rosenfeld, Y; Warszawski, A and Laufer, A (1992) Using quality circles to raise productivity and quality of work life. Journal of Construction Engineering and Management, 118(1), pp. 17-33. ISSN 0733-9364

Roskams, M J and Haynes, B P (2021) Testing the relationship between objective indoor environment quality and subjective experiences of comfort. Building Research & Information, 49(4), pp. 387-398. ISSN 0961-3218

Rouhparvar, M; Babaei, F and Navidi, H (2025) Cooperative game theory approach towards capital equipment procurement in construction projects: a concrete batch plant case study. International Journal of Construction Management, 25(8), pp. 899-910. ISSN 1562-3599

Rounds, J L and Chi, N Y (1985) Total quality management for construction. Journal of Construction Engineering and Management, 111(2), pp. 117-128. ISSN 0733-9364

Ruane, K (2020) Management strategies used by construction managers to reduce employee absenteeism. PhD thesis, Walden University, USA.

Ruddock, L (1994) Performance and efficiency measurement in local authority building organisations. PhD thesis, University of Salford, UK.

Ruddock, L and Ruddock, S (2009) Reassessing productivity in the construction sector to reflect hidden innovation and the knowledge economy. Construction Management and Economics, 27(9), pp. 871-879. ISSN 1466433X

Ruddock, L and Ruddock, S (2011) Evaluation of trends in the UK construction industry using growth and productivity accounts. Construction Management and Economics, 29(12), pp. 1229-1239. ISSN 1466433X

Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), pp. 127-146. ISSN 1823-6499

Rungjang, K (2013) Public investment for developing port facilities within competitive market. PhD thesis, University of Wisconsin - Madison, USA.

Russell, A D; Tran, N and Staub-French, S (2014) Searching for value: Construction strategy exploration and linear planning. Construction Management and Economics, 32(6), pp. 520-547. ISSN 01446193

Russell, J S; Hanna, A; Bank, L C and Shapira, A (2007) Education in construction engineering and management built on tradition: Blueprint for tomorrow. Journal of Construction Engineering and Management, 133(9), pp. 661-668. ISSN 0733-9364

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Rustom, R N (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(2), pp. 11-19. ISSN 2204-9029

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Rwamamara, R and Simonsson, P (2009) Health and safety in concrete casting processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Rylander, D (2021) Productivity improvements in construction transport operation through lean thinking and systems of systems. PhD thesis, Malardalen University, Sweden.

Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ryu, J; Alwasel, A; Haas, C T and Abdel-Rahman, E M (2020) Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason's risk hump. Journal of Construction Engineering and Management, 146(8): 04020097, ISSN 0733-9364

Ryu, J; Banting, B; Abdel-Rahman, E M and Haas, C T (2023) Ergonomic characteristics of expert masons. Journal of Construction Engineering and Management, 149(1): 04022150, ISSN 0733-9364

Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Sa'eed, A; Gambo, N; Inuwa, I I and Musonda, I (2020) Effects of financial management practices on technical performance of building contractors in Northeast Nigeria. Journal of Financial Management of Property and Construction, 25(2), pp. 201-223. ISSN 1366-4387

Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599

Saad, N M (2016) The influence of safety culture on safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.

Sabet, P; Jonescu, E; Chong, H Y and Ramanyaka, C E (2025) Interacting possibilities between building information modelling and off-site manufacturing for performance improvement. Construction Economics and Building, 25(1), pp. 221-243. ISSN 2204-9029

Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175

Sabow, H (2011) The impact of organisational culture on the dimensions of pay satisfaction in private and public construction firms in Libya. PhD thesis, University of Salford, UK.

Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.

Safapour, E; Kermanshachi, S and Rouhanizadeh, B (2022) Key components of successful post–hurricane reconstruction of transportation infrastructures. Built Environment Project and Asset Management, 12(5), pp. 775-791. ISSN 2044-124X

Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175

Saini, M (2015) A framework for transferring and sharing tacit knowledge in construction supply chains within lean and agile processes. PhD thesis, University of Salford, UK.

Sajjad, S and Dar, K H (2025) Economic infrastructure and its impact on economic growth: A case study of 7 sister states. Journal of Financial Management of Property and Construction, 30(3), pp. 357-376. ISSN 1366-4387

Saka, N (2011) An assessment of the level of adoption of e-business practices by Nigerian construction contractors. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Saka, N and Ajayi, O M (2010) A comparative assessment of incentive scheme between indigenous and multinational construction contractors in Nigeria. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599

Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988

Salas, R I (2020) Empirical evaluation of construction safety: Insights from economic trends, national cultures and workplace injury rates. PhD thesis, University of Colorado at Boulder, USA.

Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364

Salem, M; Abdullah, M S; Islam, M S and Said, S O (2025) Subcontractors' BIM deployment in large-scale construction projects in the mena region. Journal of Construction Engineering and Management, 151(6): 04025061, ISSN 0733-9364

Salem, M A (1985) Motivation of national and expatriate construction workers in Jordan. PhD thesis, University of Michigan, USA.

Salhab, D; Pourrahimian, E and Hamzeh, F (2026) Integrating ontologies and AI for enhanced workspace planning and knowledge management. Journal of Construction Engineering and Management, 152(4): 04026031, ISSN 0733-9364

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988

Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364

Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.

Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364

Salvatierra, J L; Gálvez, M Á; Bastías, F; Castillo, T; Herrera, R F and Alarcón, L F (2019) Developing a benchmarking system for architecture design firms. Engineering, Construction and Architectural Management, 26(1), pp. 139-152. ISSN 0969-9988

Sam, M; Franz, B W and Alwisy, A (2026) Comparing vulnerability to adverse events in construction processes performed by human-robot collaboration and traditional crews: A case study in drywall finishing. Journal of Construction Engineering and Management, 152(6): 05026005, ISSN 0733-9364

Samaraweera, A; Senaratne, S and Sandanayake, Y G (2018) Nature of construction project cultures in the public sector: Case studies in Sri Lanka. Built Environment Project and Asset Management, 8(5), pp. 557-568. ISSN 2044-124X

Samasoni, J C (2017) Evaluating the feasibility of implementing a risk-based inspection scheme by building consent authorities in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364

Sanboskani, H and Srour, I (2022) Using advanced statistical methods to identify the drivers of knowledge sharing intention among construction workers. Journal of Construction Engineering and Management, 148(2): 04021201, ISSN 0733-9364

Sandbhor, S and Botre, R (2014) Applying total interpretive structural modeling to study factors affecting construction labour productivity. Construction Economics and Building, 14(1), pp. 20-31. ISSN 2204-9029

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.

Sanders, S R and Thomas, H R (1991) Factors affecting masonry-lahok productivity. Journal of Construction Engineering and Management, 117(4), pp. 626-644. ISSN 0733-9364

Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364

Sang, K J C (2007) Health and well-being in the architectural profession and the influence of gender. PhD thesis, Loughborough University, UK.

Sang, K J C; Dainty, A R J and Ison, S G (2004) The impact of the structure and culture of the construction industry on employee well-being: Directions for future research. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sanhudo, L P N (2021) Artificial intelligence for an enhanced as-is BIM energy analysis: Enabling an efficient energy retrofit through the automation of the scan-to-BIM process. PhD thesis, Universidade do Porto, Portugal.

Sanni-Anibire, M O; Hassanain, M A; Mahmoud, A S and Ahmed, W (2018) An evaluation of the functional performance of research and academic laboratories using the space syntax approach. International Journal of Building Pathology and Adaptation, 36(5), pp. 516-528. ISSN 23984708

Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599

Santoso, D S; Ogunlana, S O and Minato, T (2003) Assessment of risks in high rise building construction in Jakarta. Engineering, Construction and Architectural Management, 10(1), pp. 43-55. ISSN 0969-9988

Sanvido, V E (1984) Designing productivity management and control systems for construction projects. PhD thesis, Stanford University, USA.

Sanvido, V E and Medeiros, D J (1990) Applying computer-integrated manufacturing concepts to construction. Journal of Construction Engineering and Management, 116(2), pp. 365-379. ISSN 0733-9364

Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099

Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029

Sarhan, S and Pretlove, S (2021) Lean and sustainable construction: State of the art and future directions. Construction Economics and Building, 21(3), pp. 1-10. ISSN 2204-9029

Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218

Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599

Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599

Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175

Sarshar, M; Haigh, R; Finnemore, M; Aouad, G; Barrett, P; Baldry, D and Sexton, M (2000) Spice: A business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(3), pp. 241-250. ISSN 0969-9988

Sarshar, M; Murat Tanyer, A; Aouad, G and Underwood, J (2002) A vision for construction IT 2005 2010: Two case studies. Engineering, Construction and Architectural Management, 9(2), pp. 152-160. ISSN 0969-9988

Sarvari, H; Chan, D W M; Banaitiene, N; Norhazilan Md, N and Beer, M (2021) Barriers to development of private sector investment in water and sewage industry. Built Environment Project and Asset Management, 11(1), pp. 52-70. ISSN 2044-124X

Sathvik, S; Krishnaraj, L and Awuzie, B O (2023) An assessment of prevalence of poor sleep quality among construction workers in southern India. Built Environment Project and Asset Management, 13(2), pp. 290-305. ISSN 2044-124X

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Satterfield, J H (2020) Strategies for improving the performance of multigenerational cohorts in the construction industry. PhD thesis, Walden University, USA.

Sattineni, A (2014) A decision support framework for site safety monitoring using RFID and BIM. PhD thesis, University of Salford, UK.

Savolainen, J M; Saari, A; Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), pp. 674-691. ISSN 1726-0531

Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364

Schexnayder, C; Weber, S L and Brooks, B T (1999) Effect of truck payload weight on production. Journal of Construction Engineering and Management, 125(1), pp. 1-7. ISSN 0733-9364

Schexnayder, C J and David, S A (2002) Past and future of construction equipment: part iv. Journal of Construction Engineering and Management, 128(4), pp. 279-286. ISSN 0733-9364

Schiffer, A; Greene, M; Khalid, R; Foulds, C; Vidal, C A; Chatterjee, M; Dhar-Bhattacharjee, S; Edomah, N; Sule, O; Palit, D and Yesutanbul, A N (2022) Brokering gender empowerment in energy access in the Global South. Buildings & Cities, 3(1), pp. 619-637. ISSN 2632-6655

Scott, L and Kanjanabootra, S (2019) The productivity, performance and quality paradox: An alternative perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Scrase, J I (2001) Curbing the growth in UK commercial energy consumption. Building Research & Information, 29(1), pp. 51-61. ISSN 0961-3218

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988

Sears, M H (2020) Advanced eye tracking analysis for investigating construction craft professional interactions with 2D drawings. PhD thesis, University of Colorado at Boulder, USA.

Seethapathy, S and Henderson, J H (2017) Management of construction waste in nuclear and thermal power plant projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 19-46. ISSN 1823-6499

Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599

Senarath, J R and Fernando, N G (2017) Developing labour productivity norms for aluminium system formwork in Sri Lanka. Built Environment Project and Asset Management, 7(2), pp. 199-211. ISSN 2044-124X

Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193

Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.

Seresht, N G and RazaviAlavi, S (2021) A framework to model the spread of infectious diseases on construction sites using hybrid agent-based modelling and Monte Carlo simulation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Sergeeva, N and Radosavljevic, M (2009) The influence of individual characteristics on employee creative participation. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Seriki, O. O. and Murphy, R. (2025) Strategy-as-practice in Irish construction professional service firms. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 41-49. ISSN 1751-4304

Seymour, D and Rooke, J (1995) The culture of the industry and the culture of research. Construction Management and Economics, 13(6), pp. 511-523. ISSN 01446193

Sezer, A (2012) Environmental assessment tools and efficiency in housing and office refurbishment. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sezer, A A (2016) Construction performance measurement: Site managers in refurbishment projects. PhD thesis, Chalmers University of Technology, Sweden.

Sezer, A A and Bröchner, J (2014) The construction productivity debate and the measurement of service qualities. Construction Management and Economics, 32(6), pp. 565-574. ISSN 01446193

Sha, K and Lin, S (2001) Reforming China's construction state-owned enterprises. Building Research & Information, 29(4), pp. 270-276. ISSN 0961-3218

Sha, K; Yang, J and Song, R (2008) Competitiveness assessment system for China's construction industry. Building Research & Information, 36(1), pp. 97-109. ISSN 0961-3218

Shaddad, M Y I (1983) The influence of management on construction system productivity at the project level : A conceptual system causal research model. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shah, M; Tang, L and Hughes, W P (2012) Exploring process, productivity and structure in design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shahbazi, B; Akbarnezhad, A; Rey, D; Ahmadian Fard Fini, A and Loosemore, M (2019) Optimization of job allocation in construction organizations to maximize workers' career development opportunities. Journal of Construction Engineering and Management, 145(6): 04019036, ISSN 0733-9364

Shahbazi, Babak (2020) A mathematical optimization approach to account for career development, job security, and job satisfaction in human resource planning in construction organizations. PhD thesis, University of New South Wales, Australia.

Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.

Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.

Shahparvari, M (2023) Minimisation of rework in UK housing construction: contribution of subcontractors. PhD thesis, London South Bank University, UK.

Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988

Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364

Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X

Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.

Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X

Shang, G; Low, S P and Lim, X Y V (2023) Prospects, drivers of and barriers to artificial intelligence adoption in project management. Built Environment Project and Asset Management, 13(5), pp. 629-645. ISSN 2044-124X

Shang, G; Pheng, L S and Gina, O L T (2021) Understanding the low adoption of prefabrication prefinished volumetric construction (ppvc) among SMEs in Singapore: From a change management perspective. International Journal of Building Pathology and Adaptation, 39(5), pp. 685-701. ISSN 23984708

Shang, G; Sui Pheng, L and Jia Hui, W (2020) Drivers and barriers for multiskilling workers in the Singapore construction industry. International Journal of Construction Management, 20(4), pp. 289-304. ISSN 1562-3599

Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.

Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364

Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364

Sharma, V C and Gupta, J K (2026) Artificial intelligence in construction: Multi-stakeholder strategies for future development. International Journal of Construction Education and Research, 22(1), pp. 164-188. ISSN 1557-8771

Sharma, H; Sohani, N and Yadav, A (2023) Structural modeling of lean supply chain enablers: A hybrid AHP and ISM-MICMAC based approach. Journal of Engineering, Design and Technology, 21(6), pp. 1658-1689. ISSN 1726-0531

Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364

Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599

Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.

Shehab, T; Moselhi, O and Nasr, E (2009) Barcode-assisted system for document management of construction projects. International Journal of Construction Education and Research, 5(1), pp. 45-60. ISSN 1557-8771

Sheikhkhoshkar, M; Bril El-Haouzi, H; Aubry, A and Hamzeh, F (2023) Functionality as a key concept for integrated project planning and scheduling methods. Journal of Construction Engineering and Management, 149(7): 04023053, ISSN 0733-9364

Shen, K; Li, X; Cao, X and Zhang, Z (2022) Prefabricated construction process optimization based on rework risk. Journal of Construction Engineering and Management, 148(6): 04022031, ISSN 0733-9364

Sherafat, B; Ahn, C R; Akhavian, R; Behzadan, A H; Golparvar-Fard, M; Kim, H; Lee, Y C; Rashidi, A and Azar, E R (2020) Automated methods for activity recognition of construction workers and equipment: State-of-the-art review. Journal of Construction Engineering and Management, 146(6): 0001843, ISSN 0733-9364

Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.

Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.

Shin, S and Issa, R R A (2021) Bimasr: Framework for voice-based BIM information retrieval. Journal of Construction Engineering and Management, 147(10): 04021124, ISSN 0733-9364

Shirazi, A and Hampson, K (1998) Project manager competencies in a knowledge-based society. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.

Shohet, I M and Laufer, A (1991) What does the construction foreman do? Construction Management and Economics, 9(6), pp. 565-576. ISSN 01446193

Shooshtarian, S; Hosseini, M R; Kocaturk, T; Arnel, T and T. Garofano, N (2023) Circular economy in the Australian AEC industry: Investigation of barriers and enablers. Building Research & Information, 51(1), pp. 56-68. ISSN 0961-3218

Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.

Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599

Shurrab, M; Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(3), pp. 412-424. ISSN 0969-9988

Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), pp. 37-55. ISSN 1823-6499

Sievert Jr., R W (2000) A model for managing co -marketing alliances. PhD thesis, Northwestern University, USA.

Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.

Silva, Renata Moreira de Sa e (2023) Contributions of psychodynamics of work to health and safety management in civil construction works. PhD thesis, Universidade de Brasília, Brazil.

Silverio Fernández, M A (2019) Implementation of smart devices in the construction industry. PhD thesis, University of Wolverhampton, UK.

Silverio Rodriguez, A K (2020) Implementation of building information modelling in the Dominican Republic construction industry. PhD thesis, University of Wolverhampton, UK.

Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.

Singh, A (1990) Development of process and mix flexibility in construction. PhD thesis, Purdue University, USA.

Singhaputtangkul, N (2017) A decision support tool to mitigate decision-making problems faced by a building design team. Smart and Sustainable Built Environment, 6(1), pp. 2-18. ISSN 2046-6099

Siriwardana, C S A (2016) An integrated framework for worker planning and supervision in construction. PhD thesis, University of Calgary, Canada.

Siriwardhana, S; Moehler, R and Fang, Y (2025) Navigating epistemological shifts: Management of skills development in the construction 4.0 era. International Journal of Construction Management, 25(15), pp. 1869-1878. ISSN 1562-3599

Skibniewski, M J (1986) Engineering and economic analysis of robotics application potential in selected construction operations. PhD thesis, Carnegie Mellon University, USA.

Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway. PhD thesis, Heriot-Watt University, UK.

Skipper, C O (2004) An analysis of leadership behaviors in the construction industry: Identification of influences that develop top performing project managers and engineers. PhD thesis, Clemson University, USA.

Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.

Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599

Smallwood, J J (2002) Best practice workers' compensation insurance performance: The related issues. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Smallwood, J J (2002) The influence of health and safety (H&S) culture on H&S performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Smallwood, J J (2003) The image of contractors: A South African case study. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Smallwood, J J and Haupt, T C (2009) Construction ergonomics: Perspectives of female and male production workers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Smith, J P (2013) Trust-building in the construction project delivery process: A relational lookahead tool for managing trust. PhD thesis, Texas A&M University, USA.

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364

Smith, S D (2019) Safety first? Production pressures and the implications on safety and health. Construction Management and Economics, 37(4), pp. 238-242. ISSN 01446193

Sobotka, S P (1952) The influence of unions on wages and earnings of labor in the construction industry. PhD thesis, University of Chicago, USA.

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Soliman, E; Al-Tabtabai, H; Almusalam, A and Hussein, M (2023) Impact of COVID-19 on labor's motivational factors and construction productivity. International Journal of Construction Management, 23(15), pp. 2699-2708. ISSN 1562-3599

Soliman, E and Altabtai, H (2023) Employee motivation in construction companies in Kuwait. International Journal of Construction Management, 23(10), pp. 1665-1674. ISSN 1562-3599

Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Soltanifar, M (2020) A framework to improve the performance of public tender evaluation procedures in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Sompolgrunk, A; Banihashemi, S and Mohandes, S R (2023) Building information modelling (BIM) and the return on investment: A systematic analysis. Construction Innovation, 23(1), pp. 129-154. ISSN 1471-4175

Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.

Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364

Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364

Song, S (2017) Construction equipment travel path visualization and productivity evaluation. PhD thesis, University of Alabama, USA.

Sonkor, M S and García de Soto, B (2025) Using ChatGPT in construction projects: unveiling its cybersecurity risks through a bibliometric analysis. International Journal of Construction Management, 25(7), pp. 741-749. ISSN 1562-3599

Sonmez, R and Rowings, J E (1998) Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124(6), pp. 498-504. ISSN 0733-9364

Sookdial, V T (2014) Migrant workers' productivity in Abu Dhabi. DBA thesis, Walden University, USA.

Soto Muñoz, J; Trebilcock Kelly, M; Flores-Alés, V and Ramírez-Vielma, R (2022) Understanding the perceived productivity of office occupants in relation to workspace thermal environment. Building Research & Information, 50(1-2), pp. 152-170. ISSN 0961-3218

Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029

Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.

Squicciarini, M and Asikainen, A L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(7), pp. 671-693. ISSN 1466433X

Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364

Standing, Barry (2025) The link between internal integration and financial performance in engineering and construction companies. PhD thesis, Queensland University of Technology, Australia.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Stewart, P; Robinson, J and Low, S (2005) The business case for sustainable design: the city of Melbourne CH2 project. Construction Economics and Building, 5(2), pp. 58-70. ISSN 2204-9029

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193

Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics. PhD thesis, University of Michigan, USA.

Stretton, Alan William (1977) The building industry and employment creation in Manila, The Philippines. PhD thesis, Australian National University, Australia.

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364

Sudarsan, J S; Rajprasad, J; V. Gedam, V; A. Abhyankar, A; S. Sriram, N and Dharaskar, S (2026) Resilient and sustainable construction industry: Leveraging crisis and lean management. International Journal of Construction Management, 26(2), pp. 219-233. ISSN 1562-3599

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Sumanarathna, N; Duodu, B; Memon, S A and Rowlinson, S (2025) Exploring innovation deployment of construction contracting firms through the lens of exploratory–exploitative learning: A Hong Kong case study. Construction Innovation, 25(2), pp. 641-664. ISSN 1471-4175

Sun, H; Fan, Z; Zhou, Y and Shi, Y (2010) Empirical research on competitiveness factors: Analysis of real estate industry of Beijing and Tianjin. Engineering, Construction and Architectural Management, 17(3), pp. 240-251. ISSN 0969-9988

Sun, W (2023) A self-localized smart hardhat system for construction 4.0. PhD thesis, Columbia University, USA.

Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.

Sunding, L and Ekholm, A (2014) Problems and problem attention in the construction sector: understanding the influence of human factors. Construction Economics and Building, 14(2), pp. 1-17. ISSN 2204-9029

Sundquist, J (2004) Low innovation among building material suppliers: The natural level of the trade. Construction Economics and Building, 4(1), pp. 35-44. ISSN 2204-9029

Sundqvist, J; Larsson, B and Lindahl, G (2007) Cooperation in the building sector between building material manufacturers and contractors to develop products. Construction Economics and Building, 7(2), pp. 45-53. ISSN 2204-9029

Sunindijo, R Y and Kamardeen, I (2017) Attracting and retaining women professionals in construction: A work-stress management perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Suresh, S; Renukappa, S; Alghanmi, I; Mushatat, S and Olayinka, R (2017) Examining the satisfaction level of construction workers regarding safety management in the kingdom of Saudi Arabia. Journal of Construction in Developing Countries, 22(1), pp. 97-113. ISSN 1823-6499

Sveikauskas, L; Rowe, S; Mildenberger, J; Price, J and Young, A (2016) Productivity growth in construction. Journal of Construction Engineering and Management, 142(10): 04016045, ISSN 0733-9364

Swan, W C (2002) Construct IT: An exploratory case study of a knowledge network supported by an intermediary. PhD thesis, University of Salford, UK.

Swei, O (2018) Long-run construction cost trends: Baumol's cost disease and a disaggregate look at building material price dynamics. Journal of Construction Engineering and Management, 144(7): 04018058, ISSN 0733-9364

Sweis, G J (2000) Impact of conversion technology on productivity in masonry construction. PhD thesis, Northwestern University, USA.

Syben, G (1998) A qualifications trap in the German construction industry: Changing the production model and the consequences for the training system in the German construction industry. Construction Management and Economics, 16(5), pp. 593-601. ISSN 01446193

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.

Tai, H W; Chen, J H; Cheng, J Y; Wei, H H; Hsu, S C and Liu, H C (2021) Determining worker training time for precast component production in construction: Empirical study in Taiwan. Journal of Construction Engineering and Management, 147(1): 0001964, ISSN 0733-9364

Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Talari, N. and Tawalare, A. (2026) Unveiling the impact of current HR strategies on employee attraction, retention, and productivity in the Indian construction industry: Emerging challenges. Engineering, Construction and Architectural Management, ISSN 0969-9988

Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.

Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.

Tallant, D J (1993) Privatization in a developing economy: Lessons from the Turkish cement industry. PhD thesis, Cornell University, USA.

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tan, C Y M; Rahman, R A and Lee, Y S (2025) Modelling the well building concepts for office environments: PLS-SEM approach. Journal of Engineering, Design and Technology, 23(2), pp. 618-639. ISSN 1726-0531

Tan, T; Lu, W; Tan, G; Xue, F; Chen, K; Xu, J; Wang, J and Gao, S (2020) Construction-oriented design for manufacture and assembly guidelines. Journal of Construction Engineering and Management, 146(8): 04020085, ISSN 0733-9364

Tan, W (1996) The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(6), pp. 537-542. ISSN 01446193

Tan, W (2003) The development of construction education in Singapore. Journal of Construction Research, 4(2), pp. 207-222. ISSN 1609-9451

Tan, W and Elias, Y (2000) Learning-by-doing in Singapore construction. Journal of Construction Research, 1(2), pp. 151-158. ISSN 1609-9451

Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X

Tanko, B L; Zakka, W P and Heng, W N (2024) BIM in the Malaysian construction industry: A scientometric review and case study. Engineering, Construction and Architectural Management, 31(3), pp. 1165-1186. ISSN 0969-9988

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364

Taofeeq, D M and Adeleke, A Q (2019) Factor's influencing contractors risk attitude in the Malaysian construction industry. Journal of Construction Business and Management, 3(2), pp. 59-67. ISSN 2521-0165

Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364

Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits. PhD thesis, University of Maryland, College Park, USA.

Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364

Tavakoli, A (1983) Productivity analysis of heavy construction operations. PhD thesis, Georgia Institute of Technology, USA.

Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364

Taylor, J E; Levitt, R and Villarroel, J A (2009) Simulating learning dynamics in project networks. Journal of Construction Engineering and Management, 135(10), pp. 1009-1015. ISSN 0733-9364

Tchumtcha Wembe, P (2023) Managing stakeholders in engineering procurement construction management projects in Africa by Chinese project managers. International Journal of Construction Management, 23(2), pp. 329-337. ISSN 1562-3599

Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988

Tekin, H (2022) The impact of COVID-19 on construction labor productivity: The case of Turkey. Engineering, Construction and Architectural Management, 29(9), pp. 3775-3806. ISSN 0969-9988

Tello, L M (2017) Theorizing the state of health practices and climate in construction via fourfold structuration. PhD thesis, Arizona State University, USA.

Tennakoon, T M M P; Ranasinghe, U; Samaraweera, A; Rameezdeen, R; Gallage, S; Newman, W R; White, B J and Lim, D N T W (2025) Work-related factors affecting mental well-being of young construction workers in South Australia. Built Environment Project and Asset Management, 15(3), pp. 682-698. ISSN 2044-124X

Teo, A L E; Ofori, G; Tjandra, I and Kim, H (2017) Framework for productivity and safety enhancement system using BIM in Singapore. Engineering, Construction and Architectural Management, 24(6), pp. 1350-1371. ISSN 0969-9988

Teo, A L E; Ofori, G; Tjandra, I K and Kim, H (2016) Design for safety: Theoretical framework of the safety aspect of BIM system to determine the safety index. Construction Economics and Building, 16(4), pp. 1-18. ISSN 2204-9029

Teo, E A L; Ofori, G; Tjandra, I K and Kim, H (2015) The potential of building information modelling (BIM) for improving productivity in Singapore construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364

Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.

Thajudeen, S; Lennartsson, M and Elgh, F (2019) Challenges and critical success factors for the design phase in Swedish industrialised house building. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Thajudeen, S; Lennartsson, M and Elgh, F (2020) Identification of challenges and success factors in industrialised house building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 27-37. ISSN 17514304

Thalagala Achchi Maddumage, Kasun G (2021) Methodology to predict construction contractors' performance using non-price measures. PhD thesis, Western Sydney University, Australia.

Thiruvenghadam, T S and Prakash, A (2025) Emerging paradigms and practices in construction equipment management. Journal of Construction Engineering and Management, 151(5): 03125003, ISSN 0733-9364

Thomas, A; Davis, B; Dadi, G B and Goodrum, P M (2013) Case study on the effect of 690 mpa (100 ksi) steel reinforcement on concrete productivity in buildings. Journal of Construction Engineering and Management, 139(11): 4013025, ISSN 0733-9364

Thomas, A V and Sudhakumar, J (2013) Critical analysis of the key factors affecting construction labour productivity: An Indian perspective. International Journal of Construction Management, 13(4), pp. 103-125. ISSN 1562-3599

Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364

Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Thomas, H R; Guevara, J M and Gustenhoven, C T (1984) Improving productivity estimates by work sampling. Journal of Construction Engineering and Management, 110(2), pp. 178-188. ISSN 0733-9364

Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364

Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364

Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364

Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364

Thomas, H R; Maloney, W F; Horner, R M W; Smith, G R; Handa, V K and Sanders, S R (1990) Modeling construction labor productivity. Journal of Construction Engineering and Management, 116(4), pp. 705-726. ISSN 0733-9364

Thomas, H R; Riley, D R and Sanvido, V E (1999) Loss of labor productivity due to delivery methods and weather. Journal of Construction Engineering and Management, 125(1), pp. 39-46. ISSN 0733-9364

Thomas, H R and Sakarcan, A S (1994) Forecasting labor productivity using factor model. Journal of Construction Engineering and Management, 120(1), pp. 228-239. ISSN 0733-9364

Thomas, H R; Sanders, S R and Bilai, S (1992) Comparison of labor productivity. Journal of Construction Engineering and Management, 118(4), pp. 635-650. ISSN 0733-9364

Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364

Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364

Thomas, H R and Willenbrock, J H (1988) Managing construction research at universities. Journal of Construction Engineering and Management, 114(2), pp. 245-255. ISSN 0733-9364

Thomas, H R and Yiakoumls, I (1987) Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623-639. ISSN 0733-9364

Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364

Thomas, J; Giddings, B and Little, L (2006) An holistic evaluation of the workplace environment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Thomas, L E (2010) Evaluating design strategies, performance and occupant satisfaction: A low carbon office refurbishment. Building Research & Information, 38(6), pp. 610-624. ISSN 0961-3218

Thomas, L E (2017) Combating overheating: Mixed-mode conditioning for workplace comfort. Building Research & Information, 45(1-2), pp. 176-194. ISSN 0961-3218

Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.

Thunberg, M; Rudberg, M and Gustavsson, T K (2014) Identifying and positioning construction supply chain planning problems. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thunberg M, P F (2013) A logistics framework for improving construction supply chain performance. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.

Tischer, T E and Kuprenas, J A (2003) Bridge falsework productivity: measurement and influences. Journal of Construction Engineering and Management, 129(3), pp. 243-250. ISSN 0733-9364

Toh, S C L; Wong, S Y and Ding, C S (2026) The impact of artificial intelligence on the quantity surveying profession in sarawak, Malaysia. Journal of Engineering, Design and Technology, 24(1), pp. 171-192. ISSN 1726-0531

Tombesi, P (2006) Good thinking and poor value: On the socialization of knowledge in construction. Building Research & Information, 34(3), pp. 272-286. ISSN 0961-3218

Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tong, P and Wilhelm, H C (2022) A strategy for integrating hillside dwelling design and automated construction techniques. Smart and Sustainable Built Environment, 11(2), pp. 387-403. ISSN 2046-6099

Torres, D A; Herrera, A S A and Cano, J M G (2024) Bibliometric analysis of the journal of construction in developing countries. Journal of Construction in Developing Countries, 29(1), pp. 247-266. ISSN 1823-6499

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193

Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531

Tran, V and Tookey, J (2011) Labour productivity in the New Zealand construction industry: A thorough investigation. Construction Economics and Building, 11(1), pp. 41-60. ISSN 2204-9029

Trani, M L; Cassano, M; Minotti, M and Todaro, D (2014) Construction site BIM requirements. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Tse, R Y C and Choy, L (2005) Is it training in construction industry useful? Journal of Construction Research, 6(1), pp. 1-13. ISSN 1609-9451

Tse, R Y C and Love, P E D (2003) An economic analysis of the effect of delays on project costs. Journal of Construction Research, 4(2), pp. 155-160. ISSN 1609-9451

Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Tucker, M P; Ogungbemi, Y O and Noor, M N M (2012) The socialization of outsourced employees in facilities management: A research agenda. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tugrul Okbaz, F (2025) Evaluation of space efficiency criteria in high-rise buildings based on functions: A case study of türkiye. Architectural Engineering and Design Management, 21(1), pp. 60-77. ISSN 1745-2007

Turner, P L (2017) A realist exploration of small firm tendering for public sector contracts: a micro-foundational study of capability. PhD thesis, Manchester Metropolitan University, UK.

Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Uddin, W (2008) Airborne laser terrain mapping for expediting highway projects: Evaluation of accuracy and cost. Journal of Construction Engineering and Management, 134(6), pp. 411-420. ISSN 0733-9364

Ugulu, R; Arewa, A and Stephen, A (2019) Relationship between labour productivity and curved wall construction in high-rise building projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ugulu, R A and Allen, S (2018) Using the learning curve theory in the investigation of on-site craft gangs' blockwork construction productivity. Built Environment Project and Asset Management, 8(3), pp. 267-280. ISSN 2044-124X

Ugulu, R A; Arewa, A and Allen, S (2020) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management, 10(1), pp. 94-109. ISSN 2044-124X

Ugwu, M C (1982) Absenteeism in the construction industry: A diagnostic study. PhD thesis, University of Missouri - Columbia, USA.

Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988

Uher, T E and Ritchie, J A N (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(3), pp. 304-311. ISSN 0969-9988

Ulhaq, Irfan (2022) Investigation of knowledge management process within the Vietnamese construction industry. PhD thesis, RMIT University, Australia.

Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.

Umeokafor, N; Evangelinos, K and Windapo, A (2022) Strategies for improving complex construction health and safety regulatory environments. International Journal of Construction Management, 22(7), pp. 1333-1344. ISSN 1562-3599

Umer, M; Wetzel, E M and Powell, C (2026) Advancing toward automated material counting and localization using RFID, a boston dynamics spot robot, and a Bayesian filter algorithm. Journal of Construction Engineering and Management, 152(1): 04025213, ISSN 0733-9364

Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.

Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2017) Identification of biomechanical risk factors for the development of lower-back disorders during manual rebar tying. Journal of Construction Engineering and Management, 143(1): 04016080, ISSN 0733-9364

Unnikrishnan, S and Sudhakumar, J (2025) Identification of wastes and its causes in Indian construction industry based on lean construction practices. International Journal of Construction Management, 25(5), pp. 562-571. ISSN 1562-3599

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Unsal, H I and Taylor, J E (2011) Absorptive capacity of project networks. Journal of Construction Engineering and Management, 137(11), pp. 994-1002. ISSN 0733-9364

Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599

Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193

Valverde-Gascueña, N; Navarro-Astor, E; Fuentes-del-Burgo, J and Ruiz-Fernandez, J P (2011) Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Van Ek, M and Le Feuvre, K (2021) The perception of mental health in small to medium enterprises in the welsh construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988

Vaux, J S and Kirk, W M (2018) Relationship conflict in construction management: Performance and productivity problem. Journal of Construction Engineering and Management, 144(6): 1478, ISSN 0733-9364

Venkatesan, R; Varghese, K and Ananthanarayanan, K (2009) Motivation and demotivation cause factors for engineers in construction organisations. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Vereen, S C; Rasdorf, W and Hummer, J E (2016) Development and comparative analysis of construction industry labor productivity metrics. Journal of Construction Engineering and Management, 142(7): 4016020, ISSN 0733-9364

Vestin, A (2020) Smart manufacturing for the wooden single-family house industry. PhD thesis, Jönköping University, Sweden.

Viet-Ngu, H; Susilawati, C and Joko Purnomo, R (2024) Analysis of productivity performance of real estate and construction firms in Indonesia. Construction Management and Economics, 42(3), pp. 215-228. ISSN 01446193

Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988

Vijayenthiran, V.; Perera, B. A. K. S. and Kavirathna, A. S. (2026) Convergence of 3D printing with circular economy to improve the construction sustainability. Smart and Sustainable Built Environment, 15(3), pp. 1026-1046. ISSN 2046-6099

Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.

Vilasini, N and Neitzert, T (2012) Improving project performance through worker participation in alliance projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771

Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow. PhD thesis, University of Sussex, UK.

Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.

Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.

Vives, A; Benavides, J and Paris, A M (2010) Selecting infrastructure delivery modalities: No time for ideology or semantics. Journal of Construction Engineering and Management, 136(4), pp. 412-418. ISSN 0733-9364

Vogelius, P and Storgaard, K (2016) Cooperation in construction: The role of values. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364

Voordijk, H (2001) A cost-benefit analysis of tracking and tracing systems in road construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Vora, C; Aryal, A; Willoughby, S and Wang, C (2024) Investigating stakeholder perception and developing a decision framework for robot adoption in construction. Journal of Construction Engineering and Management, 150(4): 04024012, ISSN 0733-9364

Vorster, M C and De la Garza, J M (1990) Consequential equipment costs associated with lack of availability and downtime. Journal of Construction Engineering and Management, 116(4), pp. 656-669. ISSN 0733-9364

Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988

Wahedi, H (2016) Site practice: The role of design drawings within social communities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193

Walker, G H; Foscarin-Kosmetatou, S; Marr, S; Gillies, S and Lindsay, P (2024) Critical essay: Sociotechnical construction. Construction Management and Economics, 42(3), pp. 251-265. ISSN 01446193

Walker, S M (2017) The explanatory relationship between emotional intelligence and job satisfaction for construction industry professionals. PhD thesis, Capella University, USA.

Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks. PhD thesis, North Carolina State University, USA.

Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364

Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364

Wan, R H J; Jia, A Y and Goh, Y M (2021) Managing climatic heat stress in Singapore: State of the practice and wearables on site. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364

Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029

Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Wang, M.; Mahdiyar, A. and Mustafa Kamal, E. (2026) Risk assessment in digital twin implementation: A general cybernetic best-worst method approach. Engineering, Construction and Architectural Management, 33(7), pp. 5522-5539. ISSN 0969-9988

Wang, S.; Hu, X.; Wei, A.; Yang, W. and Cui, Q. (2026) The non-linear impact of industrial agglomeration on green total factor productivity in construction: Moderating role of construction consulting services. Engineering, Construction and Architectural Management, 33(15), pp. 458-480. ISSN 0969-9988

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, C H; Wang, M W and Huang, Y C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(3), pp. 257-267. ISSN 01446193

Wang, D (2004) The Chinese construction industry from the perspective of industrial organization. PhD thesis, Northwestern University, USA.

Wang, D; Arditi, D and Damci, A (2017) Construction project managers' motivators and human values. Journal of Construction Engineering and Management, 143(4): 04016115, ISSN 0733-9364

Wang, H (2017) Construction project performance improvement through radio frequency identification technology application on a project supply chain. PhD thesis, Purdue University, USA.

Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Wang, J; Shou, W; Wang, X and Wu, P (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. Construction Management and Economics, 34(12), pp. 859-874. ISSN 01446193

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, Mudan (2023) Digital technology adoption for improving efficiency of prefabrication construction in China: An application of laser scanning. PhD thesis, University of New South Wales, Australia.

Wang, P; Wu, P; Wang, X; Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2109-2133. ISSN 0969-9988

Wang, Q; Guo, Z; Mei, T; Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), pp. 374-411. ISSN 0969-9988

Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364

Wang, S; Hasan, M and Lu, M (2024) Global sensitivity analysis methodology for construction simulation models: Multiple linear regressions versus multilayer perceptions. Journal of Construction Engineering and Management, 150(5): 04024035, ISSN 0733-9364

Wang, S; Tang, J; Zou, Y and Zhou, Q (2020) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(4), pp. 850-871. ISSN 0969-9988

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(3), pp. 363-372. ISSN 01446193

Wang, T (2022) Motivating management: evidence from construction project teams. PhD thesis, University of Hong Kong, Hong Kong.

Wang, X (2024) Context-aware worker intent interpretation for human-robot collaboration in construction. PhD thesis, University of Wisconsin - Madison, USA.

Wang, X; Chen, Y; Liu, B; Shen, Y and Sun, H (2013) A total factor productivity measure for the construction industry and analysis of its spatial difference: A case study in China. Construction Management and Economics, 31(10), pp. 1059-1071. ISSN 1466433X

Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(1), pp. 2-6. ISSN 1471-4175

Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364

Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2009) Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the U.S. Industrial construction sector. Journal of Construction Engineering and Management, 135(10), pp. 999-1008. ISSN 0733-9364

Wang, Y and Shao, L (2018) Understanding occupancy and user behaviour through Wi-Fi-based indoor positioning. Building Research & Information, 46(7), pp. 725-737. ISSN 0961-3218

Wang, Y S and Chau, K W (1997) An evaluation of the efficiency of construction industry in Hong Kong using the DEA approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Warcup, R (2015) Successful paths to becoming a lean organization in the construction industry. PhD thesis, Utah State University, USA.

Warsame, A; Song, H S and Lind, H (2014) Quality of road construction projects in sweden between 1990 and 2010. Construction Economics and Building, 14(1), pp. 78-87. ISSN 2204-9029

Warszawski, A and Navon, R (1991) Robot for interior-finishing works. Journal of Construction Engineering and Management, 117(3), pp. 402-422. ISSN 0733-9364

Wasim, M; Vaz Serra, P and Ngo, T D (2022) Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), pp. 3014-3022. ISSN 1562-3599

Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Watson, M (2007) Concerns for skills shortages in the 21st century: A review into the construction industry, Australia. Construction Economics and Building, 7(1), pp. 45-54. ISSN 2204-9029

Weatherford, D D (1980) Responsibilities of foremen as perceived by foremen and superintendents in a selected construction company in Texas. EdD thesis, East Texas State University, USA.

Wei, Y; Choi, H and Lei, Z (2022) A generative design approach for modular construction in congested urban areas. Smart and Sustainable Built Environment, 11(4), pp. 1163-1181. ISSN 2046-6099

Weidman, J; Dickerson, D E and Koebel, C T (2015) Intervention to improve purchasing decision-maker perceptions of ventilated tools. Journal of Construction Engineering and Management, 141(6): 04015007, ISSN 0733-9364

West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.

Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.

Whitehead, R C (1995) Factors influencing labour productivity on construction sites. PhD thesis, University of Dundee, UK.

Whitmore, D; Krystallis, I; Papadonikolaki, E; Ford, J; Cleaver, M and Alexander, D (2024) Digital twins in the asset life cycle: are we there yet? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 184-192. ISSN 17514304

Wilkinson, R; Sherratt, F and Farrell, P (2015) Knowledge management on site: A case study project. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 99-109. ISSN 17514304

Williams, J.; Ibrahim, K.; Simpeh, F. and Amoah, C. (2026) Evaluating sensing technology adaptation benefits in construction: A cross-cultural view. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 124-133. ISSN 1751-4304

Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.

Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.

Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.

Winch, G (1998) The growth of self-employment in British construction. Construction Management and Economics, 16(5), pp. 531-542. ISSN 01446193

Winch, G and Carr, B (2001) Benchmarking on-site productivity in France and the UK: A CALIBRE approach. Construction Management and Economics, 19(6), pp. 577-590. ISSN 01446193

Windapo, A; Matshidze, L and Alade, K (2025) Artisan development in the AEC industry: strategies for attracting, transitioning and retaining workers. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 151-159. ISSN 17514304

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, P S P; Keough, J; Holdsworth, S and Kenny, D (2020) How may the organisations' readiness to change affect the uptake of off-site construction? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 16-26. ISSN 17514304

Wong, S S Y (2018) A review on the execution method for building information modelling projects in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 100-110. ISSN 17514304

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, Y F (2002) The occupational health and safety in Taiwan, 1987-1999. PhD thesis, University of Wales College of Cardiff, UK.

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Woo, J; Rajagopalan, P; Francis, M and Garnawat, P (2021) An indoor environmental quality assessment of office spaces at an urban Australian university. Building Research & Information, 49(8), pp. 842-858. ISSN 0961-3218

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.

Xiong, B; Newton, S and Skitmore, M (2022) Towards a conceptual model of the job performance of construction professionals: A person-environment fit perspective. International Journal of Construction Management, 22(7), pp. 1308-1322. ISSN 1562-3599

Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.

Xu, T; Tiong, R L K; Chew, D A S and Smith, N J (2005) Development model for competitive construction industry in the people's republic of China. Journal of Construction Engineering and Management, 131(7), pp. 844-853. ISSN 0733-9364

Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.

Xue, H; Zhang, S; Wu, Z and Zhang, L (2025) How to improve the smart construction technology usage behavior of construction enterprise employees? TOE framework based on configuration study. Engineering, Construction and Architectural Management, 32(2), pp. 785-804. ISSN 0969-9988

Xue, X; Shen, Q; Wang, Y and Lu, J (2008) Measuring the productivity of the construction industry in China by using DEA-based malmquist productivity indices. Journal of Construction Engineering and Management, 134(1), pp. 64-71. ISSN 0733-9364

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.

Yang, K (2018) Sensing workers' responsive behaviors for identifying safety hazards in construction. PhD thesis, University of Nebraska - Lincoln, USA.

Yang, R J; Gunarathna, C L; McDermott, V; Lingard, H; Zhao, H and Liu, C (2020) Opportunities for improving construction health and safety using real-time H&S management innovations: A socio-technical-economic perspective. International Journal of Construction Management, 20(5), pp. 534-554. ISSN 1562-3599

Yang, Y (2004) Modeling a decision support system for buildable designs. PhD thesis, National University of Singapore, Singapore.

Yang, Y and Pan, W (2021) Automated guided vehicles in modular integrated construction: potentials and future directions. Construction Innovation, 21(1), pp. 85-104. ISSN 1471-4175

Yang, Y; Shao, S and Cao, D (2025) Diffusion of BIM policies in China: An event history analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3522-3544. ISSN 0969-9988

Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.

Yasin, M F (2005) A taxonomy and analysis of the relationship between changes in material technology and construction productivity. PhD thesis, University of Kentucky, USA.

Yavuz, Z B (2012) Impacts of participant related factors on rebar supply chain performance in SMEs. PhD thesis, Middle East Technical University, Turkey.

Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.

Yirenkyi-Fianko, A B and Chileshe, N (2012) Job satisfaction of professionals within the Ghanaian construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Yisa, S B; Holt, G D and Zakeri, M (2000) Factors affecting management motivation in the Iranian construction industry: A survey of site managers. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Yiu, C Y; Lu, X H; Leung, M Y and Jin, W X (2004) A longitudinal analysis on the relationship between construction output and GDP in Hong Kong. Construction Management and Economics, 22(4), pp. 339-345. ISSN 01446193

Young, D D (2024) A qualitative investigation into adverse safety behaviors by non-English speaking construction employees. DBA thesis, National University, USA.

Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.

Yu, H; Deng, X; Zhang, N and Zhang, X (2026) Is blockchain cost-effective in construction project management? A systematic review from the perspective of transaction cost. Engineering, Construction and Architectural Management, 33(1), pp. 28-52. ISSN 0969-9988

Yu, H (2010) An integrated approach toward lean for production homebuilders. PhD thesis, University of Alberta, Canada.

Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.

Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364

Yu, R K T and Leung, M Y (2001) Investigation of construction conflict resolution in Hong Kong. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Yu, Y; Yang, X; Li, H; Luo, X; Guo, H and Fang, Q (2019) Joint-level vision-based ergonomic assessment tool for construction workers. Journal of Construction Engineering and Management, 145(5): 04019025, ISSN 0733-9364

Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: A case study. Engineering, Construction and Architectural Management, 19(6), pp. 636-646. ISSN 0969-9988

Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.

Yuventi, J; Levitt, R and Robertson, H (2013) Organizational barriers to productivity and innovation in large-scale, U.S.-based photovoltaic system construction projects. Journal of Construction Engineering and Management, 139(10): 06013003, ISSN 0733-9364

Yücel, B and Çomu, S (2025) Evaluating factors affecting construction technology start-up investments and investor behavior. Journal of Construction Engineering and Management, 151(11): 04025177, ISSN 0733-9364

Yılmaz, İ C and Tekin, H (2025) To internalize or not? Addressing key differences between Turkish migrant and native workers in construction employment. Engineering, Construction and Architectural Management, 32(7), pp. 4522-4551. ISSN 0969-9988

Zaalouk, A and Han, S (2021) Parameterized design optimization framework for worker-friendly workplaces in modular construction. Journal of Construction Engineering and Management, 147(5): 04021030, ISSN 0733-9364

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zafar, J and Chileshe, N (2018) Analysis of health and well-being practices among older construction site-based workers in South Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zakariyyah, K I; Aghimien, D O; Faremi, O J and Zakariyyah, B O (2025) Work-related musculoskeletal disorders (WRMSDS) through the lens of previous studies: Social sustainability-inhibiting features. Built Environment Project and Asset Management, 15(3), pp. 663-681. ISSN 2044-124X

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zamani, S H; Rahman, R A; Yusof, L M and Naganathan, H (2025) Well building for developing countries: Critical design criteria for residential buildings in Malaysia. Journal of Engineering, Design and Technology, 23(5), pp. 1519-1540. ISSN 1726-0531

Zaneldin, E (2000) An information model for improving design coordination in building projects. PhD thesis, University of Waterloo, Canada.

Zaneldin, E; Hegazy, T and Grierson, D (2001) Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127(4), pp. 330-336. ISSN 0733-9364

Zaw, T. T. and Santoso, D. S. (2026) Empowered to engage: The mediating role of psychological capital among Myanmar construction engineers. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.

Zayed, T M (2005) Productivity and cost assessment for continuous flight auger piles. Journal of Construction Engineering and Management, 131(6), pp. 677-688. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490-499. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193

Zayed, T M; Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(8), pp. 839-850. ISSN 01446193

Zhai, D (2010) The relationship between information technology and construction productivity. PhD thesis, University of Kentucky, USA.

Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364

Zhai, X (2010) The role of human resource practices in enhancing employees' behaviours and organisational learning in Chinese construction organisations. PhD thesis, Loughborough University, UK.

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6): 04025044, ISSN 0733-9364

Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364

Zhan, W; Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(4), pp. 863-885. ISSN 0969-9988

Zhan, W; Pan, W and Hao, G (2022) Productivity measurement and improvement for public construction projects. Journal of Construction Engineering and Management, 148(6): 04022035, ISSN 0733-9364

Zhang, B; Wang, C; Ren, X Z and Xia, B (2026) Evaluating the research and development (R&D) efficiency of the Chinese construction industry. Engineering, Construction and Architectural Management, 33(1), pp. 552-577. ISSN 0969-9988

Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364

Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.

Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364

Zhang, D; Haas, C T; Goodrum, P M; Caldas, C H and Granger, R (2012) Construction small-projects rework reduction for capital facilities. Journal of Construction Engineering and Management, 138(12), pp. 1377-1385. ISSN 0733-9364

Zhang, H; Arens, E and Pasut, W (2011) Air temperature thresholds for indoor comfort and perceived air quality. Building Research & Information, 39(2), pp. 134-144. ISSN 0961-3218

Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988

Zhang, H and Lin, Y (2023) Prediction of ergonomic risks and impacts on construction schedule through agent-based simulation. Journal of Construction Engineering and Management, 149(3): 04022181, ISSN 0733-9364

Zhang, H; Tam, C M; Li, H and Shi, J J (2006) Particle swarm optimization-supported simulation for construction operations. Journal of Construction Engineering and Management, 132(12), pp. 1267-1274. ISSN 0733-9364

Zhang, H and Wang, J Y (2008) Particle swarm optimization for construction site unequal-area layout. Journal of Construction Engineering and Management, 134(9), pp. 739-748. ISSN 0733-9364

Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364

Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364

Zhang, Peng (2015) Comparative research between the Chinese and the Australian construction industries based on productivity and industrial competitiveness. PhD thesis, RMIT University, Australia.

Zhang, W (2021) Construction productivity improvement through industrialized construction methods. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.

Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599

Zhang, Y; Lei, Z; Han, S; Bouferguene, A and Al-Hussein, M (2020) Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9): 04020116, ISSN 0733-9364

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.

Zhao, T and Dungan, J M (2014) Improved baseline method to calculate lost construction productivity. Journal of Construction Engineering and Management, 140(2): 06013006, ISSN 0733-9364

Zhao, X; Hwang, B G and Lee, H N (2016) Identifying critical leadership styles of project managers for green building projects. International Journal of Construction Management, 16(2), pp. 150-160. ISSN 1562-3599

Zhao, Y; Mourshed, M and Wright, J (2009) Factors influencing the design of spatial layouts in healthcare buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364

Zhi, M; Hua, G B; Wang, S Q and Ofori, G (2003) Total factor productivity growth accounting in the construction industry of Singapore. Construction Management and Economics, 21(7), pp. 707-718. ISSN 01446193

Zhou, H and Rezazadeh Azar, E (2019) BIM-based energy consumption assessment of the on-site construction of building structural systems. Built Environment Project and Asset Management, 9(1), pp. 2-14. ISSN 2044-124X

Zhou, T (2023) Embodied robot teleoperation in construction. PhD thesis, University of Florida, USA.

Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.

Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771

Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988

Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.

Zomer, T (2021) Institutional pressures and decoupling in projects: the case of BIM Level 2 and coercive isomorphism in the UK's construction sector. PhD thesis, University of Cambridge, UK.

Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: Large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(2), pp. 127-143. ISSN 1745-2007

Zughaibi, A M (1987) Construction productivity in Saudi Arabia: The influence of multinational labor force. PhD thesis, University of Texas at Austin, USA.

Zulkifli, A R; Ibrahim, C K I C and Belayutham, S (2018) Activation trigger for organisational BIM learning: Views from Malaysian construction stakeholders. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zuluaga, C M; Albert, A and Arroyo, P (2018) Protecting bridge maintenance workers from falls: Evaluation and selection of compatible fall protection supplementary devices. Journal of Construction Engineering and Management, 144(8): 04018073, ISSN 0733-9364

Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.

af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

af Hällström, A and Bosch-Sijtsema, P (2021) Creating collaboration: The use of collaborative space in large-scale infrastructure development. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175

de Valence, Gerard (2001) Construction deflators and measurement of output. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

olde Scholtenhuis L L, D A G (2013) Welcoming high reliability organising in construction management. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

van Heerden, A.; Flemmer, C.; Boulic, M. and McDonald, B. W. (2026) The effect of job status on stressors and stress coping strategies in the New Zealand construction sector. International Journal of Construction Education and Research, 22(2), pp. 211-232. ISSN 1557-8771

van der Linden, K A C; Kurvers, S S R; Raue, A A K and Boerstra, A A C (2007) Indoor climate guidelines in the Netherlands: Developments towards adaptive thermal comfort. Construction Innovation, 7(1), pp. 72-84. ISSN 1471-4175

Çivici, T and Ayalp, G G (2025) Modelling the critical determinants of architects' work-related stress. International Journal of Construction Management, 25(2), pp. 224-237. ISSN 1562-3599

This list was generated on Sat Aug 22 01:38:21 2026 UTC.