Items with Index Term: product development process
Aouad, G F; Hinks, J; Cooper, R; Sheath, D M; Kagioglou, M and Sexton, M (1998) An information technology (IT) map for a generic design and construction process protocol. Journal of Construction Procurement, 4(2), pp. 132-151. ISSN 1358-9180
Ayinla, K; Cheung, F and Tawil, R A (2019) Towards an ontology-based approach to measuring productivity for offsite manufacturing method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.
Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499
Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988
Ismail, F; Ruikar, K D; Carrillo, P and Anumba, C J (2009) Technology transfer in construction: Learning from the manufacturing industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007
Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029
Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.
Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988
Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Oliva, C A; Granja, A D and Picchi, F A (2024) Target value design: Guidelines for implementation in the real estate market in Brazil. Architectural Engineering and Design Management, 20(6), pp. 1323-1334. ISSN 1745-2007
Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.
Tzortzopoulos, P (2004) The design and implementation of product development process models in construction companies. PhD thesis, University of Salford, UK.
Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193
Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, LuleƄ University of Technology, Sweden.
Up a level