Items with Index Term: procurement system

Number of items: 184.

Addy, M N; Addo, E T; Kwofie, T E and Yartey, J E (2023) Predicting the adoption of e-procurement in construction project delivery in Sub-Saharan Africa: An application of utaut2. Construction Innovation, 23(5), pp. 1038-1053. ISSN 1471-4175

Afolabi, A; Ibem, E; Aduwo, E and Tunji-Olayeni, P (2022) Digitizing the grey areas in the Nigerian public procurement system using e-procurement technologies. International Journal of Construction Management, 22(12), pp. 2215-2224. ISSN 1562-3599

Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Akinbo, T F; Fagbenle, O I and Amusan, L M (2024) Assessment of knowledge management barriers and improvement strategies on public-private partnership projects in Nigeria. International Journal of Construction Management, 24(9), pp. 1018-1028. ISSN 1562-3599

Al-Biqami, N M (2001) Virtual procurement system for virtual enterprises. PhD thesis, University of Nottingham, UK.

Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.

Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.

Al-Sharif, F and Kaka, A (2004) PFI/PPP topic coverage in construction journals. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(2), pp. 117-132. ISSN 1358-9180

Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alharthi, A; Soetanto, R and Edum-Fotwe, F (2014) The changing role of the public client in construction procurement. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Alhazmi, T and McCaffer, R (2000) Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184. ISSN 0733-9364

Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia. PhD thesis, University of Bristol, UK.

Alofi, A (2017) Improving the Saudi Arabia procurement system: Perception and development of the construction industry. PhD thesis, Arizona State University, USA.

Alsamarraie, M. M. and Mohd Ghazali, F. E. (2026) A novel framework for sustainable contracting process in organisational public procurement. International Journal of Construction Management, 26(8), pp. 1653-1668. ISSN 1562-3599

Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.

Ambrose, M D and Tucker, S N (2000) Procurement system evaluation for the construction industry. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Amoah, C (2017) Public procurement reforms in Ghana: impact on the growth of the local construction industry. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Asare, S O; Fobiri, G and Bondinuba, F K (2025) Enhancing fairness, transparency and accountability during tendering under Ghana's procurement system: A systematic review. Built Environment Project and Asset Management, 15(1), pp. 33-50. ISSN 2044-124X

Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.

Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193

Awodele, O A; Aghimien, D O; Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement: A veritable surviving strategy for contractors in a challenging economy. Journal of Engineering, Design and Technology, 17(2), pp. 347-361. ISSN 1726-0531

Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), pp. 1-9. ISSN 2521-0165

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.

Blayse, A M and Manley, K (2004) Key influences on construction innovation. Construction Innovation, 4(3), pp. 143-154. ISSN 1471-4175

Bong, S; Rameezdeen, R; Zuo, J; Li, R Y M and Ye, G (2015) The designer's role in workplace health and safety in the construction industry: Post-harmonized regulations in South Australia. International Journal of Construction Management, 15(4), pp. 276-287. ISSN 1562-3599

Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599

Cadman, D M (2009) Developing sustainability in the design and construction process. PhD thesis, Lancaster University, UK.

Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing. PhD thesis, Heriot-Watt University, UK.

Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180

Chan, A P C; Yung, E H K; Lam, P T I; Tam, C M and Cheung, S O (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(7), pp. 699-718. ISSN 01446193

Chang, C Y (2013) A critical review of the application of tce in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(2), pp. 99-103. ISSN 1466433X

Chang, C Y and Ive, G (2002) Rethinking the multi-attribute utility approach based procurement route selection technique. Construction Management and Economics, 20(3), pp. 275-284. ISSN 01446193

Chang, C Y and Ive, G (2007) Reversal of bargaining power in construction projects: Meaning, existence and implications. Construction Management and Economics, 25(8), pp. 845-855. ISSN 1466433X

Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531

Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client. PhD thesis, University of Central Lancashire, UK.

Davenport, D M and Smith, R (1995) International procurement systems: Assessment of required levels of client participation in construction projects. Journal of Construction Procurement, 1(1), pp. 38-49. ISSN 1358-9180

Davis, P R and Walker, D H T (2004) Relationship based procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Dowd, V G (1996) The effect of economic cycles on the development and use of alternative procurement systems in the UK construction industry during the period 1965-1995. Journal of Construction Procurement, 2(1), pp. 11-29. ISSN 1358-9180

Duffield, C F and Regan, M (2004) Public private partnership arrangement for the Spencer Street station upgrade in Victoria, Australia. Journal of Financial Management of Property and Construction, 9(3), pp. 163-178. ISSN 1366-4387

Duren, J V; Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(1), pp. 107-128. ISSN 1471-4175

El Sawalhi, N I and El Agha, O (2017) Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), pp. 75-96. ISSN 1823-6499

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364

Gamage, I S W; Osmani, M and Glass, J (2009) An investigation into the impact of procurement systems on waste generation: The contractors' perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Govender, N.; Laryea, S. and Watermeyer, R. (2026) Through the client's lens: Factors impacting project document quality in the South African construction industry. Engineering, Construction and Architectural Management, 33(15), pp. 345-361. ISSN 0969-9988

Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364

Gruneberg, S and Hughes, W P (2004) Analysing the types of procurement used in the UK: A comparison of two data sets. Journal of Financial Management of Property and Construction, 9(2), pp. 63-74. ISSN 1366-4387

Gunasekara, D M H; Indikatiya, I H P R; Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(2), pp. 406-424. ISSN 1471-4175

Gunning, J G (2003) The enhancement of quality in construction project management. PhD thesis, Ulster University, UK.

Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(3), pp. 65-80. ISSN 1366-4387

Hassouna, R (2005) Viability of applying the public private partnership (PPP) strategy to the libyan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hindle, R D and Rwelamila, P (1998) Resistance to change: Architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(2), pp. 150-158. ISSN 0969-9988

Hoezen, M; van Rutten, J; Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), pp. 1177-1186. ISSN 1466433X

Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), pp. 2089-2097. ISSN 1562-3599

Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. PhD thesis, Loughborough University, UK.

Ibem, E O; Aduwo, E B; Afolabi, A O; Oluwunmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A and Uwakonye, U O (2021) Electronic (e-) procurement adoption and users’ experience in the Nigerian construction sector. International Journal of Construction Education and Research, 17(3), pp. 258-276. ISSN 1557-8771

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),

Indikatiya, I H P R; Liyanage, M L D C J and Jayawardene, S M (2025) Managing intragroup conflicts between direct stakeholder's teams during construction stage: Case studies in Sri Lanka. Journal of Financial Management of Property and Construction, 30(3), pp. 500-517. ISSN 1366-4387

Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.

Ive, G and Chang, C Y (2007) The principle of inconsistent trinity in the selection of procurement systems. Construction Management and Economics, 25(7), pp. 677-690. ISSN 1466433X

Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(1), pp. 50-65. ISSN 2204-9029

Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988

K'Akumu, O A; Jones, B and Yang, J (2013) Factor analysis of the market environment for artisanal dimension stone in Nairobi, Kenya. Journal of Construction in Developing Countries, 18(2), pp. 15-32. ISSN 1823-6499

Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364

Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D; Parmar, D and Savicky, J (2004) Traditional low-bid procurement system versus performance information procurement system (pips) in construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.

Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364

Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(2), pp. 101-116. ISSN 1358-9180

Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(2), pp. 89-101. ISSN 1557-8771

Kashiwagi, D T and Mayo, R E (2001) Best value procurement in construction using artificial intelligence. Journal of Construction Procurement, 7(2), pp. 42-59. ISSN 1358-9180

Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, J S (2013) Factors of success in performance information procurement system and performance information risk management system. PhD thesis, Delft University of Technology, Netherlands.

Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(2), pp. 38-51. ISSN 1358-9180

Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180

Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364

Lam, K C; Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Lewis, J A; Odeyinka, H and Eadie, R (2011) Innovative construction procurement selection through an artificial intelligence approach. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), pp. 459-471. ISSN 01446193

Lin, S C J (2014) A decision making framework for procurement method selection for building maintenance projects: The case of public universities in Malaysia. PhD thesis, University of Malaya, Malaysia.

Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364

Liu, A M M; Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(3), pp. 160-169. ISSN 1745-2007

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Lu, W; Liu, A M M; Rowlinson, S and Poon, S W (2013) Sharpening competitive edge through procurement innovation: Perspectives from Chinese international construction companies. Journal of Construction Engineering and Management, 139(3), pp. 347-351. ISSN 0733-9364

Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988

Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(3), pp. 230-245. ISSN 0969-9988

Manley, K and Chen, L (2015) Collaborative learning model of infrastructure construction: A capability perspective. Construction Innovation, 15(3), pp. 355-377. ISSN 1471-4175

Marguet, N; Ross, A and Johnson, D (2009) Developing supply chain procurement systems in social housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Masterman, J W E (1994) A study of the bases upon which clients of the construction industry choose their building procurement systems. PhD thesis, University of Manchester, UK.

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.

Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531

McIntosh, G and Sloan, B (2001) The potential impact of electronic procurement and global sourcing within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Murray, M D and Langford, D A (1998) Construction procurement systems: A linkage with project organizational models. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.

Najafi, M.; Rahimian, F.; Zaki Abdelaziz, Y.; Poppe, J. and Rodriguez Trejo, S. (2026) User-side regime dynamics and design-use misalignments in circular construction transitions. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988

Ng, S T; Kong, H and Luu, C D T (2005) Capitalising experiential knowledge for guiding construction procurement selection. Construction Economics and Building, 5(1), pp. 32-40. ISSN 2204-9029

Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029

Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180

Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218

Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 0969-9988

Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Papadonikolaki, E (2017) Grasping brutal and incremental BIM innovation through institutional logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Parmar, D; Kashiwagi, D and Savicky, J (2003) Case study of the dallas independent school district’s construction value. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Perera, G; Tennakoon, T; Kulatunga, U; Jayasena, H S and Wijewickrama, M (2021) Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11(4), pp. 611-626. ISSN 2044-124X

Phua, F T T and Rowlinson, S (2003) Cultural differences as an explanatory variable for adversarial attitudes in the construction industry: The case of Hong Kong. Construction Management and Economics, 21(7), pp. 777-785. ISSN 01446193

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.

Raisbeck, P (2017) Tribes, warlords and transformers: An institutional logics model of the architectural profession. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs. PhD thesis, Auckland University of Technology, New Zealand.

Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988

Rajeh, M A; Tookey, J E and Rotimi, J O B (2015) Developing a procurement path determination chart SEM-based approach. Construction Management and Economics, 33(11-12), pp. 921-941. ISSN 01446193

Ren, Z; Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(1), pp. 56-69. ISSN 2044-124X

Rosayuru, H D R R; Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(5), pp. 769-783. ISSN 1562-3599

Rose, T; Manley, K and Widen, K (2019) Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain? Construction Innovation, 19(2), pp. 212-235. ISSN 1471-4175

Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects. PhD thesis, University of Salford, UK.

Rowlinson, S (2017) Building information modelling, integrated project delivery and all that. Construction Innovation, 17(1), pp. 45-49. ISSN 1471-4175

Rowlinson, S; Matthews, J; Phua, F; McDermott, P and Chapman, T (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Rowlinsson, S and Yates, D (2003) Ndcad: A virtual change agent for professions and procurement systems? Construction Management and Economics, 21(8), pp. 849-857. ISSN 01446193

Ruan, X (2007) Inter-organizational knowledge integration on construction projects: a social network approach. PhD thesis, Northumbria University, UK.

Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context. PhD thesis, Nottingham Trent University, UK.

She, L (2013) Trust, mistrust and distrust in alliancing. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X

Skitmore, R M and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(1), pp. 71-89. ISSN 01446193

Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531

Sphelele, K M and Amoah, C (2024) Challenges of black contractors with the South African public procurement system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Sridarran, P and Fernando, N G (2016) Change management framework to enable sustainable outsourcing of facilities management services. Built Environment Project and Asset Management, 6(3), pp. 317-331. ISSN 2044-124X

Standing, N A (1999) Value engineering and the contractor. PhD thesis, University of Leeds, UK.

Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(2), pp. 124-149. ISSN 1358-9180

Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Tabish, S Z S and Jha, K N (2011) Analyses and evaluation of irregularities in public procurement in India. Construction Management and Economics, 29(3), pp. 261-274. ISSN 1466433X

Tajul Ariffin H L and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: An initial review of literature. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.

Tookey, J E; Murray, M; Hardcastle, C and Langford, D (2001) Construction procurement routes: Re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(1), pp. 20-30. ISSN 0969-9988

Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X

Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Uduwage Don, N L S; Panuwatwanich, K and Waidyasekara, K G A S (2025) Multicriteria selection practices in public tender evaluation process: The case of Sri Lanka. Built Environment Project and Asset Management, 15(3), pp. 733-751. ISSN 2044-124X

Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.

Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Wang, H (2015) The interplay of formal and informal institutions for procurement innovation: a social network approach. PhD thesis, University of Hong Kong, Hong Kong.

Wang, Y; Liu, J; Zuo, J and Rameezdeen, R (2020) Ways to improve the project management efficiency in a centralized public procurement system: A structural equation modeling approach. Engineering, Construction and Architectural Management, 27(1), pp. 168-185. ISSN 0969-9988

Warszawski, A (1996) Strategic planning in construction companies. Journal of Construction Engineering and Management, 122(2), pp. 133-140. ISSN 0733-9364

Weisheng, L; Liu, A M M; Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(6), pp. 543-562. ISSN 0969-9988

Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193

Wondimu, P A; Klakegg, O J; Lohne, J and Lædre, O (2020) Experiences with best-value procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(5): 05020001, ISSN 0733-9364

Yong, Y C and Mustaffa, N E (2012) Analysis of factors critical to construction project success in Malaysia. Engineering, Construction and Architectural Management, 19(5), pp. 543-556. ISSN 0969-9988

Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection. PhD thesis, Auckland University of Technology, New Zealand.

Zhou, L; Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3), pp. 232-250. ISSN 1366-4387

Zhou, L and Lowe, D J (2004) Incorporating sustainable construction into PFI projects: An analysis of financial incentives and associated risks. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.