Items with Index Term: procurement method
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X
Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Adamtey, S A (2022) An empirical study to assist owners in selecting the right procurement method for design-build projects. International Journal of Construction Education and Research, 18(1), pp. 67-84. ISSN 1557-8771
Adedokun, O; Aje, I; Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context? Journal of Financial Management of Property and Construction, 27(2), pp. 259-278. ISSN 1366-4387
Adedokun, O A; Egbelakin, T; Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in Southwestern Nigeria. Journal of Engineering, Design and Technology, 21(6), pp. 1901-1924. ISSN 1726-0531
Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304
Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.
Akintoye, A and Fitzgerald, E (1995) Design and build: A survey of architects' views. Engineering, Construction and Architectural Management, 2(1), pp. 27-44. ISSN 0969-9988
Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.
Al-Sharif, F and Kaka, A (2003) Potential of PFI/PPP as a financing source for public services projects in Saudi Arabia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.
Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.
Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708
Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.
Alkhraisha, A (2023) Approaches for enhancing the construction and demolition waste management strategy in Jordan. PhD thesis, Anglia Ruskin University, UK.
Alkilani, S Z; Jupp, J and Sawhney, A (2013) Issues of construction health and safety in developing countries: A case of Jordan. Construction Economics and Building, 13(3), pp. 141-156. ISSN 2204-9029
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Atkinson, R J; Tennakoon, M and Wedawatta, G (2023) Use of new models of construction procurement to enhance collaboration in construction projects: The UK construction industry perspective. Journal of Financial Management of Property and Construction, 28(1), pp. 45-63. ISSN 1366-4387
Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.
Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.
Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.
Botha, P S; van der Walt, J D; Scheepbouwer, E and Barutha, P J (2024) A tool for reporting the optimal timing of preconstruction services in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 240-252. ISSN 17514304
Bowen, P A; Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91-104. ISSN 0969-9988
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.
Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Challender, J; Farrell, P and Sherratt, F (2016) Effects of an economic downturn on construction partnering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 159-167. ISSN 17514304
Challender J, F P S F (2013) Collaborative procurement: An exploration of practice and trust in times of austerity. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Chan, A P; Ho, D C K and Tam, C M (2001) Design and build: Views from some major public clients in Hong Kong. Construction Economics and Building, 1(1), pp. 22-31. ISSN 2204-9029
Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180
Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364
Chan, A P L; Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.
Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193
Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364
Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.
Cheung, E; Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(3), pp. 292-308. ISSN 0969-9988
Cheung, Esther (2009) Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. PhD thesis, Queensland University of Technology, Australia.
Cheung, F Y K; Rowlinson, S; Jefferies, M and Lau, E (2005) Relationship contracting in Australia. Journal of Construction Procurement, 11(2),
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531
Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.
Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X
Dabarera, G K M; Perera, B A K S and Rodrigo, M N N (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(2), pp. 199-213. ISSN 2044-124X
Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387
Dada, M O (2012) Predictors of procurement selection: An investigation of traditional and integrated methods in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 71-85. ISSN 1823-6499
Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(1), pp. 76-94. ISSN 1366-4387
Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599
Dickens, G (2002) Teamworking, perceptions and communication within construction projects. PhD thesis, University of Nottingham, UK.
Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193
Doloi, H (2009) Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), pp. 1099-1109. ISSN 1466433X
Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X
Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165
Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029
El Sawalhi, N I and El Agha, O (2017) Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), pp. 75-96. ISSN 1823-6499
El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364
Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products. PhD thesis, University of California, Berkeley, USA.
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Emuze, F and Smallwood, J J (2014) Collaborative working in South African construction: Contractors' perspectives. Journal of Engineering, Design and Technology, 12(3), pp. 294-306.
Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.
Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364
Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Gichuiri, J W (2001) Process modelling: An evaluation approach in support of effective management of construction project information. PhD thesis, University of Salford, UK.
Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(4), pp. 341-348. ISSN 01446193
Griffith, A and Headley, J D (1998) Management of small building works. Construction Management and Economics, 16(6), pp. 703-709. ISSN 01446193
Griffith, A and Phillips, N (2001) The influence of the construction (design and management) regulations 1994 upon the procurement and management of small building works. Construction Management and Economics, 19(5), pp. 533-540. ISSN 01446193
Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession. PhD thesis, University of Birmingham, UK.
Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan. PhD thesis, University of Westminster, UK.
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Hamza, N and Greenwood, D (2007) The impact of procurement methods on delivering environmentally sensitive buildings. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: A grounded theory study. International Journal of Construction Education and Research, 18(3), pp. 270-292. ISSN 1557-8771
Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364
Hesse, A D (1991) The management of risks in the procurement of very large construction projects (Britain and New Commonwealth): Comparative change in procurement methods for very large construction projects. PhD thesis, University College London, UK.
Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387
Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.
Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), pp. 7-33. ISSN 1726-0531
Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499
Jacobs, A (2007) Will the new offence of corporate manslaughter motivate companies to prioritise safety over profit? PhD thesis, University of Birmingham, UK.
Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007
Jin, X H; Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(3), pp. 297-316. ISSN 1471-4175
Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599
Kabiri, S (2014) Role conflict and role ambiguity in construction projects. PhD thesis, University of Reading, UK.
Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988
Kaming, P F (1996) A productivity audit system for construction management in Indonesia. PhD thesis, University of Wolverhampton, UK.
Kattein, J (2009) The architecture chronicle: Diary of an architectural practice. PhD thesis, University of London, University College London, UK.
Kenley, R; London, K and Watson, J (2000) Strategic procurement in the construction industry: Mechanisms for public sector clients to encourage improved performance in Australia. Journal of Construction Procurement, 6(1), pp. 4-19. ISSN 1358-9180
Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Kissi, E; Adjei-Kumi, T; Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(3), pp. 252-268. ISSN 1366-4387
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180
Lam, E W; Chan, A P C and Chan, D W (2003) Why is design-build commonly used in the public sector? An illustration from Hong Kong. Construction Economics and Building, 3(1), pp. 53-62. ISSN 2204-9029
Lam, E W M; Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(1),
Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364
Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.
Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lam, T and Gale, K (2014) Highway maintenance: Impact of framework agreements upon project financial performance. Construction Management and Economics, 32(5), pp. 460-472. ISSN 01446193
Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X
Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Larkin, K; Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304
Lewis, J A; Odeyinka, H and Eadie, R (2011) Innovative construction procurement selection through an artificial intelligence approach. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.
Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988
Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364
Lin, S C J (2014) A decision making framework for procurement method selection for building maintenance projects: The case of public universities in Malaysia. PhD thesis, University of Malaya, Malaysia.
Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175
Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Love, P E D; Edwards, D J; Irani, Z and Sharif, A (2012) Participatory action research approach to public sector procurement selection. Journal of Construction Engineering and Management, 138(3), pp. 311-322. ISSN 0733-9364
Love, P E D; Mistry, D and Davis, P R (2010) Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), pp. 947-956. ISSN 0733-9364
Love, P E D; Skitmore, M and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), pp. 221-233. ISSN 01446193
Love, P E D; Teo, P and Morrison, J (2018) Revisiting quality failure costs in construction. Journal of Construction Engineering and Management, 144(2): 05017020, ISSN 0733-9364
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
Manoliadis, O G; Pantouvakis, J P and Christodoulou, S (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(4), pp. 373-384. ISSN 1466433X
Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.
May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988
McIntosh, G and Sloan, B (2001) The potential impact of electronic procurement and global sourcing within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs. PhD thesis, Massachusetts Institute of Technology, USA.
Montalbán-Domingo, L; Torres-Machi, C; Sanz-Benlloch, A; Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(9): 04023089, ISSN 0733-9364
Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers. PhD thesis, University of Salford, UK.
Murphy, M E; Perera, S and Heaney, G (2015) Innovation management model: A tool for sustained implementation of product innovation into construction projects. Construction Management and Economics, 33(3), pp. 209-232. ISSN 01446193
Murray, Alex (2018) Returns on public capital investment: Procurement, whole life cost and value in English schools and hospitals, from 1997-2012. PhD thesis, University College London, UK.
Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement. PhD thesis, Brunel University, UK.
Naoum, S G and Langford, D (1987) Management contracting: the client's view. Journal of Construction Engineering and Management, 113(3), pp. 369-384. ISSN 0733-9364
Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218
Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.
Obeng-Ahenkora, N. K.; Danso, H. and Kheni, N. A. (2026) Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana. Engineering, Construction and Architectural Management, 33(7), pp. 5300-5317. ISSN 0969-9988
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.
Ogunsanya, O A; Aigbavboa, C O and Thwala, D W (2023) Sustainable procurement model for publicly funded construction projects in developing nations–a structural equation modeling approach. International Journal of Construction Management, 23(3), pp. 449-461. ISSN 1562-3599
Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387
Olatunde, N A (2024) Stakeholder management strategies employed on building projects procured by private corporate organisations in south-Western Nigeria. International Journal of Building Pathology and Adaptation, 42(3), pp. 430-447. ISSN 23984708
Oliveros-Romero, J and Aibinu, A A (2023) Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: A toll road case. Built Environment Project and Asset Management, 13(4), pp. 574-589. ISSN 2044-124X
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339. ISSN 0733-9364
Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.
Perera, G; Tennakoon, T; Kulatunga, U; Jayasena, H S and Wijewickrama, M (2021) Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11(4), pp. 611-626. ISSN 2044-124X
Phillips, S; Price, A and Dainty, A (2004) Achieving best value in social housing procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(6), pp. 615-624. ISSN 1466433X
Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218
Platten, A and Gorse, C (2010) Supply chain development for major public sector projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364
Renukappa, S and Akintoye, A (2011) Potential opportunities for the UK construction industry in the water sector. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.
Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193
Sanni, A O (2016) Factors determining the success of public private partnership projects in Nigeria. Construction Economics and Building, 16(2), pp. 42-55. ISSN 2204-9029
Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X
Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
She, L (2013) Trust, mistrust and distrust in alliancing. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364
Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(2), pp. 93-101. ISSN 01446193
Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175
Silva, P M; Domingo, N and Ameer Ali, N A N (2025) An interactive pre-contract dispute avoidance toolkit for New Zealand construction industry. Construction Innovation, 25(7), pp. 268-291. ISSN 1471-4175
Silva, P M; Domingo, N and Ali, N A N A (2025) Pre-contract measures to avoid potential disputes in the New Zealand construction industry. Construction Economics and Building, 25(2), pp. 235-252. ISSN 2204-9029
Singh, E and Singh, D P (2017) Architectural profession in India: Perception towards service marketing. Journal of Engineering, Design and Technology, 15(5), pp. 574-590.
Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Songer, A D; Diekmann, J and Pecsok, R S (1997) Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(4), pp. 377-382. ISSN 01446193
Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180
Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364
Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.
Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective. PhD thesis, University of Salford, UK.
Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.
Sward, A (2006) Relations as a key resource. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531
Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana. PhD thesis, University of Salford, UK.
Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175
Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.
Toor, S U R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(2), pp. 149-167. ISSN 1471-4175
Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.
Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.
Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.
Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988
Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988
Ward, S C; Curtis, B and Chapman, C B (1991) Objectives and performance in construction projects. Construction Management and Economics, 9(4), pp. 343-353. ISSN 01446193
Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(2), pp. 153-163. ISSN 1466433X
Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
Wolbers, M; Evans, R J E; Holmes, M; Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Wondimu, P A; Klakegg, O J; Lohne, J and Lædre, O (2020) Experiences with best-value procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(5): 05020001, ISSN 0733-9364
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193
Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364
Yean, F and Ling, Y (2006) Design-build: How to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(1), pp. 12-24. ISSN 2204-9029
Yean Yng Ling, F (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(1), pp. 6-20. ISSN 0969-9988
Yong, Y C and Mustaffa, N E (2011) Clients, consultants and contractors' perception of critical success factors for construction projects in Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Yong, Y C and Mustaffa, N E (2012) Analysis of factors critical to construction project success in Malaysia. Engineering, Construction and Architectural Management, 19(5), pp. 543-556. ISSN 0969-9988
Younis, G E (2010) Minimizing construction disputes. PhD thesis, University of Salford, UK.
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Zhao, N and Ying, F (2019) Method selection: A conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(2), pp. 214-232. ISSN 2044-124X
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
de Valence, Gerard (2010) Innovation, procurement and construction industry development. Construction Economics and Building, 10(4), pp. 50-59. ISSN 2204-9029
ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387
ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175
Up a level