Items with Index Term: process modelling
Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.
Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364
Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193
Ayinla, K; Cheung, F and Skitmore, M (2022) Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production. Journal of Construction Engineering and Management, 148(1): 05021011, ISSN 0733-9364
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Bosch, A; Volker, L and Koutamanis, A (2015) BIM in the operations stage: Bottlenecks and implications for owners. Built Environment Project and Asset Management, 5(3), pp. 331-343. ISSN 2044-124X
Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.
Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364
Chen, Q; Adey, B T; Haas, C and Hall, D M (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), pp. 471-508. ISSN 1471-4175
Cooper, J (2015) Sustainable building maintenance within social housing. PhD thesis, University of Greenwich, UK.
Costa, L; Barbosa, M B A; Baldam, R D L and Coelho, T D P (2019) Challenges of process modeling in architecture and engineering to execute projects and public works. Journal of Construction Engineering and Management, 145(1): 05018015, ISSN 0733-9364
Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.
Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175
Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988
Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations. PhD thesis, University of Florida, USA.
El-Gohary, N (2008) Semantic process modelling and integration for collaborative construction and infrastructure development. PhD thesis, University of Toronto, Canada.
El-Gohary, N M and El-Diraby, T E (2010) Domain ontology for processes in infrastructure and construction. Journal of Construction Engineering and Management, 136(7), pp. 730-744. ISSN 0733-9364
Elmahroug, M H; Tutesigensi, A and Smith, N J (2016) A problem solving approach to identifying civil engineering infrastructure projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.
Fauth, J; Nørkjær Gade, P; Kaiser, S; Raj, K; Goul Pedersen, J; Olsson, P O; Nisbet, N; Mastrolembo Ventura, S; Hirvensalo, A; Granja, J; Urban, H; Rutešić, S; Verstraeten, R; Raitviir, C R; Kallinen, A R; Schranz, C; Stojanov, T and Tekavec, J (2025) Investigating building permit processes across Europe: Characteristics and patterns. Building Research & Information, 53(4), pp. 417-434. ISSN 0961-3218
Fauth, J; Pasetti Monizza, G and Malacarne, G (2023) Understanding processes on digital building permits–a case study in South tyrol. Building Research & Information, 51(5), pp. 518-532. ISSN 0961-3218
Ferreira, Sérgio Leal (2005) Proposal of IFC model extension with ies LM-63 contribution: Luminaire in building lifecycle. PhD thesis, Universidade de São Paulo, Brazil.
Gane, V (2011) Design scenarios methodology: enabling requirements-driven design spaces. PhD thesis, Stanford University, USA.
Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.
Gichuiri, J W (2001) Process modelling: An evaluation approach in support of effective management of construction project information. PhD thesis, University of Salford, UK.
Goulding, J S and Alshawi, M (2002) Generic and specific IT training: A process protocol model for construction. Construction Management and Economics, 20(6), pp. 493-505. ISSN 01446193
Goulding, J S and Alshawi, M (2004) A process-driven IT training model for construction: Core development issues. Construction Innovation, 4(4), pp. 243-254. ISSN 1471-4175
Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193
Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(3), pp. 624-648. ISSN 1726-0531
Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.
Kibwami, N and Tutesigensi, A (2015) Exploring the potential of accounting for embodied carbon emissions in building projects in Uganda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le Masurier, J W (2001) Developing the observational method as a systematic approach to uncertainty management. PhD thesis, University of Bristol, UK.
Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works. PhD thesis, Glasgow Caledonian University, UK.
Leblanc, H; Thomson, C; Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(3), pp. 232-249. ISSN 0969-9988
Lee, D E and Shi, J J (2006) Construction business automation system. Journal of Construction Engineering and Management, 132(1), pp. 88-96. ISSN 0733-9364
Lee, D-E (2004) Construction business automation system (CBAS). PhD thesis, Illinois Institute of Technology, USA.
Long, J (2004) Computer-integrated information modelling for design of building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Ma, J (2016) A data driven study on LEED credits and green building related implications in city planning. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.
Magent, C S; Korkmaz, S; Klotz, L E and Riley, D R (2009) A design process evaluation method for sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 62-74. ISSN 1745-2007
Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364
Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Murphy, M E; Perera, S and Heaney, G (2015) Innovation management model: A tool for sustained implementation of product innovation into construction projects. Construction Management and Economics, 33(3), pp. 209-232. ISSN 01446193
Ngobi, T G; Manga, M; Kibwami, N and Tutesigensi, A (2021) Construction occupational safety and health incident reporting, recording, monitoring and management in Uganda. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Pudney, Steven Grant (2010) Asset renewal decision modelling with application to the water utility industry. PhD thesis, Queensland University of Technology, Australia.
Qu, S (2010) Demolish-IT: the development of a process management tool for the demolition industry. PhD thesis, Loughborough University, UK.
Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364
Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364
Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 0969-9988
Senescu, R R (2011) Design process communication methodology. PhD thesis, Stanford University, USA.
Stamatiou, D R I; Kirytopoulos, K A; Ponis, S T; Gayialis, S and Tatsiopoulos, I (2019) A process reference model for claims management in construction supply chains: The contractors' perspective. International Journal of Construction Management, 19(5), pp. 382-400. ISSN 1562-3599
Tawfiq, O H (2007) Doing contracting differently. PhD thesis, University of Bristol, UK.
Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Site-layout modeling: How can artificial intelligence help? Journal of Construction Engineering and Management, 118(3), pp. 594-611. ISSN 0733-9364
Turk, Ž and Klinc, R (2020) A social-product-process framework for construction. Building Research & Information, 48(7), pp. 747-762. ISSN 0961-3218
Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193
Udeaja, Chika Emmanuel (2002) A decision support framework for construction material supply chain management using multi-agent systems. PhD thesis, London South Bank University, UK.
Wu, S (2004) IT tool for construction process management, process protocol toolkit. PhD thesis, University of Salford, UK.
Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193
Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.
Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(5), pp. 563-576. ISSN 01446193
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Up a level