Items with Index Term: process management

Number of items: 55.

Abdalla, A; Li, X and Yang, F (2024) Expatriate construction professionals' performance in international construction projects: The role of cross-cultural adjustment and job burnout. Journal of Construction Engineering and Management, 150(3): 04024005, ISSN 0733-9364

Abdul Kareem, H I and Abu Bakar, A H (2013) Management procedures for realizing information technology benefits in Malaysia. International Journal of Construction Management, 13(3), pp. 1-13. ISSN 1562-3599

Abuezhayeh, S W; Ruddock, L and Shehabat, I (2022) Integration between knowledge management and business process management and its impact on the decision making process in the construction sector: A case study of Jordan. Construction Innovation, 22(4), pp. 987-1010. ISSN 1471-4175

Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.

Akinbogun, O T (2023) An integrated capacity development for artisans in the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.

Al-Obaidi, T S A (2018) A transformational organisational framework for improving Iraqi quasi-governmental construction companies' performance. PhD thesis, University of Salford, UK.

Austin, S A; Thorpe, A; Root, D; Thomson, D and Hammond, J (2007) Integrated collaborative design. Journal of Engineering, Design and Technology, 5(1), pp. 7-22. ISSN 1726-0531

Banham, G P (2009) Improving knowledge retention and use in construction project team environments: a soft systems methodology approach. PhD thesis, University of Surrey, UK.

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Camargo Júnior, Alceu Salles (2003) Simultaneous engineering: A comparison between "point-based" and "set-based" approaches. PhD thesis, Universidade de São Paulo, Brazil.

Chen, Y; Dib, H; Cox, R F; Shaurette, M and Vorvoreanu, M (2016) Structural equation model of building information modeling maturity. Journal of Construction Engineering and Management, 142(9): 04016032, ISSN 0733-9364

Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.

Corley, J and Deasley, P (2003) Factors affecting teamworking in construction service delivery projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Costa, D B and Formoso, C T (2004) A set of evaluation criteria for performance measurement systems in the construction industry. Journal of Financial Management of Property and Construction, 9(2), pp. 91-102. ISSN 1366-4387

Costa, L; Barbosa, M B A; Baldam, R D L and Coelho, T D P (2019) Challenges of process modeling in architecture and engineering to execute projects and public works. Journal of Construction Engineering and Management, 145(1): 05018015, ISSN 0733-9364

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175

De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988

Derradji, R and Hamzi, R (2020) Multi-criterion analysis based on integrated process-risk optimization. Journal of Engineering, Design and Technology, 18(5), pp. 1015-1035. ISSN 1726-0531

Devkar, G A and Kalidindi, S N (2013) External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1), pp. 58-73. ISSN 2044-124X

Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

El-Gohary, N M and El-Diraby, T E (2010) Domain ontology for processes in infrastructure and construction. Journal of Construction Engineering and Management, 136(7), pp. 730-744. ISSN 0733-9364

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Fialho, Beatriz Campos (2021) Design for smart maintenance enabled by BIM and IoT. PhD thesis, Universidade de São Paulo, Brazil.

Fuentes-Del-burgo, J; Fernández, J P R and Navarro-Astor, E (2024) Kanban applied to construction: A literature review. Construction Economics and Building, 24(4-5), pp. 43-57. ISSN 2204-9029

Getuli, V; Capone, P and Bruttini, A (2021) Planning, management and administration of hs contents with BIM and VR in construction: An implementation protocol. Engineering, Construction and Architectural Management, 28(2), pp. 603-623. ISSN 0969-9988

Ghansah, F A; Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(5), pp. 2128-2150. ISSN 0969-9988

Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hamid, M Y (2009) The feasibility of a process protocol for facilities management: An exploratory investigation in a higher education institution in the United Kingdom. PhD thesis, University of Salford, UK.

Kagioglou, M (1999) Adapting manufacturing project processes into construction: a methodology. PhD thesis, University of Salford, UK.

Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2018) Choosing by advantages incorporated framework for a user-involved design process. Architectural Engineering and Design Management, 14(3), pp. 194-217. ISSN 1745-2007

Leblanc, H; Thomson, C; Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(3), pp. 232-249. ISSN 0969-9988

Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364

Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364

Muianga, Elisa Atália Daniel (2018) Evolutionary model for IPD implementation in construction projects with little diffusion of collaborative practices. PhD thesis, Universidade Estadual de Campinas, Brazil.

Murphy, M E; Perera, S and Heaney, G (2015) Innovation management model: A tool for sustained implementation of product innovation into construction projects. Construction Management and Economics, 33(3), pp. 209-232. ISSN 01446193

Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.

Omoraka, A E (2022) A principal component analysis of supply chain management skills for the Nigerian construction industry. International Journal of Construction Management, 22(12), pp. 2413-2421. ISSN 1562-3599

Qu, S (2010) Demolish-IT: the development of a process management tool for the demolition industry. PhD thesis, Loughborough University, UK.

Ramani, P V and Lingan, L K (2022) Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(4), pp. 669-677. ISSN 1562-3599

Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.

Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.

Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(1), pp. 1-12. ISSN 1562-3599

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(3), pp. 209-221. ISSN 0969-9988

Tzortzopoulos, P (2004) The design and implementation of product development process models in construction companies. PhD thesis, University of Salford, UK.

Tzortzopoulos, P; Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: A literature synthesis. Engineering, Construction and Architectural Management, 12(5), pp. 470-486. ISSN 0969-9988

Uchehara, I; Hamma-adama, M and Moore, D (2020) Highway sustainability construction: Reducing carbon emissions using process management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

VanVactor, J D (2011) Cognizant healthcare logistics management: Ensuring resilience during crisis. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 245-255. ISSN 1759-5916

Wood, G; Davis, P; Eadie, R; Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(3), pp. 197-210. ISSN 1366-4387

Wuni, I Y and Shen, G Q (2023) Exploring the critical success determinants for supply chain management in modular integrated construction projects. Smart and Sustainable Built Environment, 12(2), pp. 258-276. ISSN 2046-6099

Yong, K T and Pheng, L S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(3), pp. 237-248. ISSN 1466433X

Zerjav, V and Ceric, A (2009) Structuring communication within construction projects: A communication breakdown structure. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.