Items with Index Term: process control

Number of items: 45.

Bijleveld, F R and Dorée, A G (2014) Method-based learning: A case in the asphalt construction industry. Construction Management and Economics, 32(7-8), pp. 665-681. ISSN 01446193

Borer, J (2020) Object oriented design of safety critical programmable equipment systems. Journal of Engineering, Design and Technology, 18(5), pp. 1081-1089. ISSN 1726-0531

Brandli, L L; Jüngles, A E and Heineck, L F (1999) Sub-contracting policies: The case of the construction firms in brazil. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Dorée, A and Miller, S (2008) Is technology a new challenge for the field of construction management? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(4), pp. 387-399. ISSN 0969-9988

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364

Fikri Mohamed, S and Anumba, C J (2006) Potential for improving site management practices through knowledge management. Construction Innovation, 6(4), pp. 232-249. ISSN 1471-4175

Fox, S; Marsh, L and Cockerham, G (2003) Assessing the capability of construction processes to realize building designs. Construction Management and Economics, 21(1), pp. 7-10. ISSN 01446193

Glew, D; Smith, M B; Miles-Shenton, D and Gorse, C (2017) Assessing the quality of retrofits in solid wall dwellings. International Journal of Building Pathology and Adaptation, 35(5), pp. 501-518.

Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.

Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: A case study in construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 321-363. ISSN 0969-9988

Ju, C; Ning, Y and Shen, Y (2025) How do different management control configurations influence construction safety professionals' work attitudes. Engineering, Construction and Architectural Management, 32(5), pp. 2870-2889. ISSN 0969-9988

Järvenpää, A-T (2022) How to promote innovation from an organizational control perspective a case study of a public infrastructure client. PhD thesis, Luleå University of Technology, Sweden.

Klotz, L and Horman, M (2010) Counterfactual analysis of sustainable project delivery processes. Journal of Construction Engineering and Management, 136(5), pp. 595-605. ISSN 0733-9364

Känsälä, K; Rantala, S; Kauppila, O and Leviäkangas, P (2018) Acceleration sensor technology for rail track asset condition monitoring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 32-40. ISSN 17514304

Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364

Li, C; Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: Mediating and moderating. Engineering, Construction and Architectural Management, 31(2), pp. 696-715. ISSN 0969-9988

Li, Y (2021) An investigation of organizational control in design consulting projects: behavioural consequences and motivational mechanisms. PhD thesis, University of Hong Kong, Hong Kong.

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175

Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.

Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Paulson, B C (1985) Automation and robotics for construction. Journal of Construction Engineering and Management, 111(3), pp. 190-207. ISSN 0733-9364

Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Rehak, D R (1981) Computer aided engineering problems and prospects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Sampson Mamphweli, N and Leroy Meyer, E (2013) Performance monitoring system for a biomass gasifier. Journal of Engineering, Design and Technology, 11(1), pp. 7-18. ISSN 1726-0531

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sarkar, D and Dutta, G (2010) Design and application of risk adjusted cumulative sum for strength monitoring of ready mixed concrete. Journal of Construction Engineering and Management, 136(6), pp. 623-631. ISSN 0733-9364

Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.

Ssenyimba, S; Kigozi, J; Tumutegyereize, P; Muyonga, J H and Mutumba, R (2022) Design and evaluation of a refractance window lab-scale dryer. Journal of Engineering, Design and Technology, 20(6), pp. 1499-1518. ISSN 1726-0531

Teizer, J (2006) Real-time spatial modeling to detect and track resources on construction sites. PhD thesis, University of Texas at Austin, USA.

Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.

Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988

Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364

Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364

Xiong, R (2024) Human-machine adaptation in lean waste elimination for customized building manufacturing systems. PhD thesis, Carnegie Mellon University, USA.

Yan, L.; Wen, S. and Li, Q. (2026) How the two-tier cross-domain control influence contractor's design behavior: A configurational analysis. Engineering, Construction and Architectural Management, 33(3), pp. 2243-2267. ISSN 0969-9988

Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364

Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364

Zeiler, W; Vissers, D; Maaijen, R and Boxem, G (2014) Occupants' behavioural impact on energy consumption: 'Human-in-the-loop' comfort process control. Architectural Engineering and Design Management, 10(1-2), pp. 108-130. ISSN 1745-2007

Zhong, B; Hu, X; Pan, X; Chen, X and Liu, Z (2025) Construction quality hazard management with deep learning-based multimodal storage strategy-enabled blockchain. Journal of Construction Engineering and Management, 151(1): 04024184, ISSN 0733-9364

This list was generated on Sat Aug 22 02:02:04 2026 UTC.