Items with Index Term: process analysis

Number of items: 37.

Adham, A (2018) The political economy of work in Saudi Arabia: a comparative labour process analysis in two firms. PhD thesis, De Montfort University, UK.

Ali, K N (2004) Towards an online knowledge management system for reactive maintenance projects. PhD thesis, University of Salford, UK.

Alshawi, M and Underwood, J (1996) Improving the constructability of design solutions through an integrated system. Engineering, Construction and Architectural Management, 3(1-2), pp. 47-67. ISSN 0969-9988

Altaf, A (2022) Integrating safety, security and human factors engineering in rail infrastructure design and evaluation. PhD thesis, Bournemouth University, UK.

Anvuur, A M; Kumaraswamy, M and Fellows, R (2012) Perceptions of status and TMO workgroup cooperation: Implications for project governance. Construction Management and Economics, 30(9), pp. 719-737. ISSN 1466433X

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.

Betts, M and Wood-Harper, T (1994) Re-engineering construction: A new management research agenda. Construction Management and Economics, 12(6), pp. 551-556. ISSN 01446193

Bradley, A; Li, H; Qin, H; Xi, W; Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openbim ISO standards development. Construction Innovation, 22(4), pp. 705-726. ISSN 1471-4175

Ceric, A (2003) A framework for process-driven risk management in construction projects. PhD thesis, University of Salford, UK.

Crawford, R H (2005) Validation of the use of input-output data for embodied energy analysis of the Australian construction industry. Journal of Construction Research, 6(1), pp. 71-90. ISSN 1609-9451

Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771

Gorse, C A and Emmitt, S (2003) Investigating interpersonal communication during construction progress meetings: Challenges and opportunities. Engineering, Construction and Architectural Management, 10(4), pp. 234-244. ISSN 0969-9988

Gorse, C A and Emmitt, S (2007) Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11), pp. 1197-1213. ISSN 01446193

Gorse, C A and Emmitt, S (2009) Informal interaction in construction progress meetings. Construction Management and Economics, 27(10), pp. 983-993. ISSN 1466433X

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2000) Interaction analysis during management and design team meetings. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2001) Project performance and management and design team communication. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2002) Interaction characteristics of successful contractors' representatives. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Hussain, R S; Ruikar, K; Enoch, M P; Brien, N and Gartside, D (2017) Process mapping for road works planning and coordination. Built Environment Project and Asset Management, 7(2), pp. 157-172. ISSN 2044-124X

Irfan, M; Khalid, R A; Kaka Khel, S S U H; Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(1), pp. 154-171. ISSN 0969-9988

Jeong, K S; Kagioglou, M; Haigh, R; Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(1), pp. 62-81. ISSN 0969-9988

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988

Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988

Moradi, S; Nasirzadeh, F and Golkhoo, F (2015) A hybrid SD-DES simulation approach to model construction projects. Construction Innovation, 15(1), pp. 66-83. ISSN 1471-4175

Noia, Paula Regina da Cruz (2017) Participation and quality of the environment built in housing: Process and product in the program minha casa minha vida: Entities. PhD thesis, Universidade de São Paulo, Brazil.

Ogunbayo, O T; Odebode, A A; Oyedele, J B and Ayodele, O T (2019) The significance of real estate development process analysis to residential property investment appraisal in Abuja, Nigeria. International Journal of Construction Management, 19(3), pp. 270-279. ISSN 1562-3599

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shipworth, D (2002) A stochastic framework for embodied greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(1), pp. 16-24. ISSN 0961-3218

Singh, A; Adachi, S and Inouye, M (2011) Quality control analysis of downtime and time to repair for water supply pipes. Built Environment Project and Asset Management, 1(1), pp. 75-90. ISSN 2044-124X

Tas, E; Yaman, H and Tanacan, L (2008) A building material evaluation and selection model for the Turkish construction sector. Engineering, Construction and Architectural Management, 15(2), pp. 149-163. ISSN 0969-9988

Treloar, G J (1998) A comprehensive embodied energy analysis framework. PhD thesis, Deakin University, Australia.

Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.

Wood, G; Davis, P; Eadie, R; Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(3), pp. 197-210. ISSN 1366-4387

Zhang, C; Zhang, W; Shi, Y; Zhao, T and Zhang, Y (2025) Digital safety navigation for tower crane climbing process from a systematic perspective: Risk identification, safety information requirements, and related intelligent platform. Journal of Construction Engineering and Management, 151(8): 04025096, ISSN 0733-9364

This list was generated on Sat Aug 22 02:06:27 2026 UTC.