Items with Index Term: problem solving
Aghimien, E I; Aghimien, L M; Petinrin, O O and Aghimien, D O (2021) High-performance computing for computational modelling in built environment-related studies: A scientometric review. Journal of Engineering, Design and Technology, 19(5), pp. 1138-1157. ISSN 1726-0531
Ahmed, M U (2000) ‘Champions of collaboration’ in collaborative technological innovation. PhD thesis, Simon Fraser University, Canada.
Al-Bazi, A and Dawood, N (2018) Simulation-based optimisation using simulated annealing for crew allocation in the precast industry. Architectural Engineering and Design Management, 14(1-2), pp. 109-126. ISSN 1745-2007
Alameri, H (2018) A resource-based perspective of project success in public sector projects in Abu Dhabi. PhD thesis, Bournemouth University, UK.
Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.
Alsdorf, M; Koch, C and Sander, D (2006) Coaching at the building site: A feasibility study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Arciszewski, T (2014) Future of engineering education. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 46-59. ISSN 17514304
Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.
Arvanitis, D (2017) Collaboration and contract management in the context of offshore oil and gas contracts: an English law analysis. PhD thesis, City, University of London, UK.
Ashraf, H; Ejaz, M K; Memon, S A; Shen, Y; Maqsoom, A and Sunindijo, R Y (2025) Examining a two-step working model of safety knowledge in translating safety climate into safety behavior. Engineering, Construction and Architectural Management, 32(1), pp. 282-304. ISSN 0969-9988
Attia, T M (2002) The impact of communication technologies on group problem-solving performance in construction. PhD thesis, North Carolina State University, USA.
Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312
Baba, K (1990) Principal nature of management in Japanese construction industry. Journal of Construction Engineering and Management, 116(2), pp. 351-364. ISSN 0733-9364
Basma Ben, M; Lehoux, N and Blanchet, P (2024) Integration mechanisms for material suppliers in the construction supply chain: A systematic literature review. Construction Management and Economics, 42(1), pp. 70-107. ISSN 01446193
Betts, M and Liow, S R (1993) The relationship between teaching methods and educational objectives in building education. Construction Management and Economics, 11(2), pp. 131-141. ISSN 01446193
Bigelow, B F (2012) Perceived positive and negative effects of participation in student construction management competitions: A qualitative priority mixed methods study. PhD thesis, Colorado State University, USA.
Biggs, H C; Dingsdag, D P; Sheahan, V L and Stenson, N J (2005) The role of collaboration in defining and maintaining a safety culture: Australian perspectives in the construction sector. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Boyd, P; Larsen, G D and Schweber, L (2014) Perspectives on the specification of building integrated photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988
Brandon, P S and Loforte Ribeiro, F (1997) The assessment of applications for the house renovation grant system (hrgs): A multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(1), pp. 41-57. ISSN 0969-9988
Cahill, D (2000) Utilising information in architectural design drawings. PhD thesis, Heriot-Watt University, UK.
Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.
Chan, I Y S; Leung, M Y and Yuan, T (2014) Structural relationships between cultural values and coping behaviors of professionals in the stressful construction industry. Engineering, Construction and Architectural Management, 21(2), pp. 133-151. ISSN 0969-9988
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.
Charoenngam, C and Maqsood, T (2001) A qualitative approach in problem solving process tracing of construction site engineers. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Chellappa, V and Ginda, G (2023) Application of multiple-criteria decision making methods for construction safety research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 127-136. ISSN 17514304
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Counter, B J (2013) Development of innovative approaches for life extension of railway track systems. PhD thesis, University of South Wales, UK.
Cui, Z; Liu, J; Xia, B and Cheng, Y (2019) Beyond national culture difference: The role of cultural intelligence in cooperation within international construction joint ventures and insights from Chinese companies. Engineering, Construction and Architectural Management, 26(7), pp. 1476-1497. ISSN 0969-9988
Cusack, M M (1984) The use and limitations of mathematical models in the planning and control of construction projects. Construction Management and Economics, 2(3), pp. 219-224. ISSN 01446193
De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Deng, Y (2015) Mapping of BIM and GIS for interoperable geospatial data management and analysis for the built environment. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.
Ding, Z and ng, F (2010) Knowledge sharing in architectural design institutes: A multiple-case study. Construction Innovation, 10(3), pp. 267-285. ISSN 1471-4175
Doukakis, J P (2024) A case study of a mechanics of solids course in civil engineering education. PhD thesis, Rutgers The State University of New Jersey, USA.
Eaton, J R (1998) Architectural project briefing: A study of discovery, innovation and architectural problem statement. PhD thesis, University of Nottingham, UK.
El-Tayeh, A and Gil, N (2007) Using digital socialization to support geographically dispersed AEC project teams. Journal of Construction Engineering and Management, 133(6), pp. 462-473. ISSN 0733-9364
Elmahroug, M H; Tutesigensi, A and Smith, N J (2016) A problem solving approach to identifying civil engineering infrastructure projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Elmahroug, M H M (2018) Facilitating effective external stakeholder involvement in the pre-design phase of civil engineering infrastructure projects. PhD thesis, University of Leeds, UK.
Engebø, A; Klakegg, O J; Lohne, J; Bohne, R A; Fyhn, H and Lædre, O (2022) High-performance building projects: How to build trust in the team. Architectural Engineering and Design Management, 18(6), pp. 774-790. ISSN 1745-2007
Enshassi, A; Mohamed, S and Ekarriri, A (2009) Essential skills and training provisions for building project stakeholders in Palestine. Journal of Construction in Developing Countries, 14(1), pp. 31-50. ISSN 1823-6499
Fan, L C N (2001) Strategic quality management for construction organisations. DBA thesis, Brunel University, UK.
Farrow, C B (2016) Problem-solving styles in the Southeast construction industry. EdD thesis, Auburn University, USA.
Farrow, C B and Wetzel, E (2021) An active learning classroom in construction management education: Student perceptions of engagement and learning. International Journal of Construction Education and Research, 17(4), pp. 299-317. ISSN 1557-8771
Fiorineschi, L (2018) Abstraction framework to support students in learning creative conceptual design. Journal of Engineering, Design and Technology, 16(4), pp. 616-636. ISSN 1726-0531
Fong, Patrick Sik-wah (2001) Understanding knowledge creation: A study of the processes, interrelationships and contributory factors within multidisciplinary project teams. PhD thesis, University of Warwick, UK.
Gangatheepan, S (2023) Workplace-based learning: a study in BIM-enabled construction projects. PhD thesis, Birmingham City University, UK.
Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.
Gilmour, D; Simpson, E; Blackwood, D; McCallum, C and Logan, G (2016) Vocational training and knowledge development: A deeper understanding. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Godfrey Ochieng, E and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(6), pp. 527-543. ISSN 0969-9988
Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gottlieb, S C; Koch, C; Frederiksen, N and Vogelius, P (2020) Governing the common good: Collective action in institutional maintenance. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Graham, T E (2002) Infrastructure engineering evaluation and assessment using geographic information system and the analytic hierarchy process: A cross-discipline approach. DEng thesis, Morgan State University, USA.
Haliburton, J T (2016) Building information modeling and small architectural practice: An analysis of factors affecting BIM adoption. PhD thesis, Texas A&M University, USA.
Hampson, K and Kwok, T (1997) Strategic alliances in building construction: a tender evaluation tool for the public sector. Journal of Construction Procurement, 3(1), pp. 28-41. ISSN 1358-9180
Han, Y and Wade, F (2022) Mapping supply chain actors for innovative building retrofit. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Hari, S; Egbu, C O and Kumar, B (2004) Knowledge capture in small and medium enterprises in the construction industry: Challenges and opportunities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(1), pp. 20-32. ISSN 0969-9988
Henrich, G (2010) Development of a tool for diagnosing production management efficiency on construction sites. PhD thesis, University of Salford, UK.
Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.
Iliescu, S (2000) A case-based reasoning approach to the designing of building envelopes. PhD thesis, Concordia University, Canada.
Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.
Johari, S (2021) Effect of socioemotional cognitive, and technical competencies of workers on construction labor productivity. PhD thesis, Indian Institute of Technology Delhi, India.
Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.
Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.
Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.
Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364
Key, M A (2016) Regulating sustainable development: An enabling model for consistent collaboration between planning and building control services in England. DProf thesis, University of Salford, UK.
Kiatake, M and Petreche, J R D (2012) A case study on the application of the theory of inventive problem solving in architecture. Architectural Engineering and Design Management, 8(2), pp. 90-102. ISSN 1745-2007
Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Koch, C and Schultz, C S (2019) The production of defects in construction: an agency dissonance. Construction Management and Economics, 37(9), pp. 499-512. ISSN 01446193
Koehn, E and Datta, N K (2003) Quality, environmental, and health and safety management systems for construction engineering. Journal of Construction Engineering and Management, 129(5), pp. 562-569. ISSN 0733-9364
Koskela, L and Vrijhoef, R (2001) Is the current theory of construction a hindrance to innovation? Building Research & Information, 29(3), pp. 197-207. ISSN 0961-3218
Lansley, P (1994) Analysing construction organizations. Construction Management and Economics, 12(4), pp. 337-348. ISSN 01446193
Lawrence, K; Chan, P W and James, A (2016) Absorptive capacity as a basis for construction innovation: From a capabilities to a routines perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Lee, J (2005) Value analysis of Wi-Fi agent functions in construction. PhD thesis, North Carolina State University, USA.
Li, H and Love, P E D (1998) Developing a theory of construction problem solving. Construction Management and Economics, 16(6), pp. 721-727. ISSN 01446193
Liang, J (1998) System integration and database management for computer-aided design of tall building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Limsila, K and Ogunlana, S O (2008) Linking personal competencies with transformational leadership style evidence from the construction industry in Thailand. Journal of Construction in Developing Countries, 13(1), pp. 27-50. ISSN 1823-6499
Lin, P C; Lee, W Y and Lee, M Y (2009) Exploring problems and undesired effects in the construction development process: The case of a small- to medium-sized developer in Taiwan. Journal of Construction Engineering and Management, 135(7), pp. 560-569. ISSN 0733-9364
Lin, Y (2024) Integrating social network analytics into operations management. PhD thesis, University of California, Berkeley, USA.
Ling, Y Y (2002) Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), pp. 446-455. ISSN 0733-9364
Loosemore, M (1994) Problem behaviour. Construction Management and Economics, 12(6), pp. 511-520. ISSN 01446193
Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988
Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management. PhD thesis, University of Alberta, Canada.
Mao, X; Zhang, X and Abourizk, S M (2009) Enhancing value engineering process by incorporating inventive problem-solving techniques. Journal of Construction Engineering and Management, 135(5), pp. 416-424. ISSN 0733-9364
Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.
Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Mitropoulos, P and Howell, G (2001) Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering and Management, 127(3), pp. 223-231. ISSN 0733-9364
Mohamed, Y (2002) A framework for systematic improvement of construction systems. PhD thesis, University of Alberta, Canada.
Mohamed, Y and AbouRizk, S (2005) Application of the theory of inventive problem solving in tunnel construction. Journal of Construction Engineering and Management, 131(10), pp. 1099-1108. ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364
Moon, S; Choi, E and Hong, S (2016) Creation of robust design alternatives for temporary construction in value engineering. Journal of Construction Engineering and Management, 142(3): 04015086, ISSN 0733-9364
Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Naar, L; Nikolova, N and Forsythe, P (2016) Innovative construction and the role of boundary objects: A Gehry case study. Construction Management and Economics, 34(10), pp. 688-699. ISSN 01446193
Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364
Outhred, G (2007) Learning for undergraduate built environment students: Project based activities, problem solving and role: Playing for a complete experiential education. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Phua, F T T (2004) The antecedents of co-operative behaviour among project team members: An alternative perspective on an old issue. Construction Management and Economics, 22(10), pp. 1033-1045. ISSN 01446193
Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.
Preece, C N (1993) A study of the management of promotion for competitive advantage in UK construction firms. PhD thesis, Heriot-Watt University, UK.
Raisbeck, P (2010) Investigating design as research: Understanding R&D activities in Australian architectural practices. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Renev, Ivan (2019) Automation of the conceptual design process in construction industry using ideas generation techniques. PhD thesis, Lappeenranta-Lahti University of Technology, Finland.
Ribeiro, F J L T (1995) Assessment of applications for the house renovations grants system: An IT support framework. PhD thesis, University of Salford, UK.
Ribeiro, F L (1999) A case-based reasoning framework in value engineering. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Rodríguez-Labajos, L; Thomson, C S and O’Brien, G (2021) Applying constructivist grounded theory in co-production research: A case study exploring its potential and lessons for construction management research. Construction Management and Economics, 39(5), pp. 369-382. ISSN 01446193
Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364
Rooke, J; Seymour, D and Fellows, R (2003) The claims culture: A taxonomy of attitudes in the industry. Construction Management and Economics, 21(2), pp. 167-174. ISSN 01446193
Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.
Schultz, C (2012) The role of problem solving in construction management practices. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Seemann, Kurt Walter (1997) The socio-technical sustainability of shelter systems and hardware in remote indigenous Australian communities. PhD thesis, University of New South Wales, Australia.
Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988
Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.
Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988
Siebken Schultz, C (2012) Construction production failure in a structural perspective: A study of reactive and proactive problem-solving practices. PhD thesis, Chalmers University of Technology, Sweden.
Simu, K (2009) The construction site manager's impact on risk management performance. PhD thesis, Luleå University of Technology, Sweden.
Smith, J M; Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: An exploratory study. Engineering, Construction and Architectural Management, 5(4), pp. 387-398. ISSN 0969-9988
Sommer, P A (2016) The communicative accomplishment of knowledge work in the construction industry. PhD thesis, Texas A&M University, USA.
Songer, A D (1992) Toward an improved understanding of public sector design-build planning. PhD thesis, University of California, Berkeley, USA.
Sunding, L (2015) On problems, joint problem solving and change: A human behavioural approach in a construction sector context. PhD thesis, Lund University, Sweden.
Sunding, L and Ekholm, A (2014) Problems and problem attention in the construction sector: understanding the influence of human factors. Construction Economics and Building, 14(2), pp. 1-17. ISSN 2204-9029
Sverlinger, P-O M (2000) Managing knowledge in professional service organizations: Technical consultants serving the construction industry. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors. PhD thesis, University of Wisconsin - Madison, USA.
Teferra, K (2012) Developments in the theory and applications of the variability response function concept. PhD thesis, Columbia University, USA.
Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 0969-9988
Trushell, I and Egware, O (2015) Formal education and the practise of negotiation: Benefits for quantity surveyors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Tummalapudi, M (2022) Strategic factors for implementing a multiple career path construction doctoral program: A mixed methods study. PhD thesis, Colorado State University, USA.
Udeaja, C E and Tah, J H M (2001) Construction material supply chain management: Towards an agent-based technology. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ugwu, O O; Anumba, C J and Thorpe, A (2001) Ontology development for agent-based collaborative design. Engineering, Construction and Architectural Management, 8(3), pp. 211-224. ISSN 0969-9988
Valdes-Vasquez, R and Clevenger, C M (2015) Piloting collaborative learning activities in a sustainable construction class. International Journal of Construction Education and Research, 11(2), pp. 79-96. ISSN 1557-8771
Voyatzaki, M G (1996) An insight into the design process of unconventional structures. PhD thesis, University of Bath, UK.
Walker, D H T; Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(6), pp. 645-658. ISSN 1466433X
Warszawski, A; Becker, R and Navon, R (2007) Strategic planning for building research-a process oriented methodology. Journal of Construction Engineering and Management, 133(9), pp. 710-722. ISSN 0733-9364
Watts, C J (2002) In-service training for computer-aided design in building surveying. PhD thesis, De Montfort University, UK.
Weber, P A (2000) Requisite skill differences of baccalaureate graduates among three building disciplines. PhD thesis, Colorado State University, USA.
Winch, G (1998) Zephyrs of creative destruction: Understanding the management of innovation in construction. Building Research & Information, 26(5), pp. 268-279. ISSN 0961-3218
Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects. PhD thesis, Loughborough University, UK.
Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns. PhD thesis, University of California, Berkeley, USA.
Yang, J B (2004) Hybrid AI system for retaining wall selection. Construction Innovation, 4(1), pp. 33-52. ISSN 1471-4175
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Yasin, F and Egbu, C (2010) Exploitation of knowledge mapping benefits in the facilities performance evaluation process: A conceptual framework. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Yip, B; Rowlinson, S and Siu, O L (2008) Coping strategies as moderators in the relationship between role overload and burnout. Construction Management and Economics, 26(8), pp. 871-882. ISSN 01446193
Yu, W D; Lin, T C; Liu, S J and Chang, P L (2013) Is the knowledge management system truly cost effective? Case study of km-enabled engineering problem solving. Journal of Construction Engineering and Management, 139(2), pp. 216-224. ISSN 0733-9364
Zapata-Poveda, G (2012) Detailed design ethnography: Architects embedding low carbon performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029
Up a level