Items with Index Term: private sector

Number of items: 629.

Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. PhD thesis, University of Pittsburgh, USA.

Abdul-Aziz, A R (2001) Unraveling of BOT scheme: Malaysia's indah water konsortium. Journal of Construction Engineering and Management, 127(6), pp. 457-460. ISSN 0733-9364

Abdullah, A K and Alshibani, A (2022) Multi-criteria decision-making framework for selecting sustainable private partners for housing projects. Journal of Financial Management of Property and Construction, 27(1), pp. 112-140. ISSN 1366-4387

Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.

Abu-Khader, W (2023) Barriers to the adoption of digitalization in the construction industry: Perspectives of owners, contractors, and contractors. Construction Economics and Building, 23(3-4), pp. 878-106. ISSN 2204-9029

Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Aggarwal, T and Solomon, P (2020) Quantitative analysis of the development of smart cities in India. Smart and Sustainable Built Environment, 9(4), pp. 711-726. ISSN 2046-6099

Ahadzi, M and Bowles, G (2001) Public-private partnerships in UK infrastructure development: The macroeconomic perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193

Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahmed Ezzat Othman, A and Sirbadhoo, N (2009) An innovative partnership framework for sustainable development of rural areas in South Africa: The role of project management firms. Journal of Engineering, Design and Technology, 7(3), pp. 243-263. ISSN 1726-0531

Aikivuori, A (1996) Periods and demand for private sector housing refurbishment. Construction Management and Economics, 14(1), pp. 3-12. ISSN 01446193

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Akinbogun, O T (2023) An integrated capacity development for artisans in the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) Risk identification practices under PFI environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Akintoye, A and Fitzgerald, E (1995) Design and build: A survey of architects' views. Engineering, Construction and Architectural Management, 2(1), pp. 27-44. ISSN 0969-9988

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Akintoye, A and Skitmore, M (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(1), pp. 3-13. ISSN 01446193

Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(1), pp. 33-42. ISSN 01446193

Akintoye, A; Taylor, C and Fitzgerald, E (1998) Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5(1), pp. 9-21. ISSN 0969-9988

Akomea-Frimpong, Isaac (2023) Developing a holistic financial risk management framework to optimize financial performance of public-private partnership projects in Ghana. PhD thesis, Western Sydney University, Australia.

Akotia, J and Sackey, E (2018) Towards the delivery of sustainable regeneration projects' types in the UK: An exploration of the role and level of involvement of key practitioners. International Journal of Construction Management, 18(5), pp. 375-384. ISSN 1562-3599

Al Awad, O S (2015) The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Al-Gahtani, A S Z (1991) Construction claims for public and private projects in Saudi Arabia. DSc thesis, George Washington University, USA.

Al-Hammad, A; Al-Mubaiyadh, S and Mahmoud, T (1996) Public versus private sector's assessment of problems facing the building maintenance industry in Saudi Arabia. Building Research & Information, 24(4), pp. 245-254. ISSN 0961-3218

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Al-Nabhani, S (2012) Graduate recruitment in Oman's private construction industry. PhD thesis, University of Salford, UK.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Alharthi, A; Soetanto, R and Edum-Fotwe, F (2014) The changing role of the public client in construction procurement. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.

Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304

Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499

Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia. PhD thesis, University of Bristol, UK.

Alkalbani, S (2009) Exploring information and communication technology adoption and diffusion in the Omani construction industry. PhD thesis, University of Salford, UK.

Alkalbani, Saeed (2009) Exploring ICT adoption and diffusion in the Omani construction industry. PhD thesis, University of Salford, UK.

Allport, R J (2008) Improving decision-making for major urban rail projects. PhD thesis, Imperial College London, UK.

Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(1), pp. 57-64. ISSN 1562-3599

Almarri, K; Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(8), pp. 1696-1711. ISSN 0969-9988

Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X

Alnuaimi, N T; Chatha, K A and Abdallah, S (2025) Role of big data analytics and information processing capabilities in enhancing transparency and accountability in e-procurement applications. Journal of Engineering, Design and Technology, 23(5), pp. 1729-1750. ISSN 1726-0531

Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.

Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.

Alsamarraie, M M; Yousif, O S and Ghazali, F E M (2025) Procurement integrity: Best practices for PPP projects in Iraq and Malaysia. Construction Economics and Building, 25(3-4), pp. 289-310. ISSN 2204-9029

Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.

Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.

Alsulaiman, Y; Bowles, G and Ogunlana, S (2014) Evaluating risk management in independent water and power plant projects in Saudi Arabia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness. PhD thesis, Heriot-Watt University, UK.

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708

Amadi, C; Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Amaratunga, D; Malalgoda, C I and Keraminiyage, K (2018) Contextualising mainstreaming of disaster resilience concepts in the construction process. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 348-367. ISSN 1759-5916

Ameyaw, E E and Chan, A P C (2015) Risk allocation in public-private partnership water supply projects in Ghana. Construction Management and Economics, 33(3), pp. 187-208. ISSN 01446193

Amran, M (2025) Innovative technology for converting automobile tire waste bead wires into recycled steel fibers for sustainable concrete composites: Insights for the Al-Kharj Governorate construction industry. International Journal of Building Pathology and Adaptation, 43(4), pp. 665-692. ISSN 2398-4708

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza. PhD thesis, University of Sheffield, UK.

Angelidi, A (2007) Delays in construction projects in Greece: Causes, effects and project management tools. PhD thesis, University College London, UK.

Annamalai, T R and Hari, S (2016) Innovative financial intermediation and long term capital pools for infrastructure: A case study of infrastructure debt funds. Journal of Financial Management of Property and Construction, 21(3), pp. 231-252. ISSN 1366-4387

Antillon, E I; Molenaar, K R and Javernick-Will, A (2017) Evaluating the effect of contract timing on lifecycle-design innovation in public-private partnerships: Comparative case study of highway projects. Journal of Construction Engineering and Management, 143(4): 05016023, ISSN 0733-9364

Arijeloye, B T (2025) Impact of project risk allocation on PPP housing project delivery in Nigeria: Partial least square structural equation modeling approach. Journal of Engineering, Design and Technology, 23(3), pp. 812-829. ISSN 1726-0531

Arijeloye, B T; Aje, I O and Oke, A E (2024) Evaluating the key risk factors in PPP-procured mass housing projects in Nigeria: A Delphi study of industry experts. Journal of Engineering, Design and Technology, 22(1), pp. 60-76. ISSN 1726-0531

Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria. PhD thesis, Kingston University, UK.

Aritua, B; Male, S and Bower, D (2009) Defining the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 75-82. ISSN 17514312

Aritua, B; Male, S; Bower, D and Madter, N (2011) Competencies for the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 193-201. ISSN 17514304

Aritua, B; Smith, N J and Athiyo, R (2008) Private finance for the delivery of school projects in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 141-146. ISSN 17514312

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Asli, R A; Wedawatta, G; Hedges, P and Park, K (2016) Building environmental assessment scheme for residential building in Brunei. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Ateloye, A; Bowles, G and Oyegoke, A (2016) Private sector participation in Nigeria higher education infrastructure development. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Atmo, G and Duffield, C (2014) Improving investment sustainability for PPP power projects in emerging economies: Value for money framework. Built Environment Project and Asset Management, 4(4), pp. 335-351. ISSN 2044-124X

Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193

Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Babalola, A (2023) The role of the private sector in the development of Sub-Sahara Africa: why governance matters. DBA thesis, University of Manchester, UK.

Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.

Babatunde, S O; Ekundayo, D; Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: A case of Nigeria. Smart and Sustainable Built Environment, 11(1), pp. 110-125. ISSN 2046-6099

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp. 215-230. ISSN 2044-124X

Badi, S (2017) Public sustainable-energy requirements and innovation in UK PFI school projects. Construction Management and Economics, 35(4), pp. 218-238. ISSN 01446193

Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364

Bakhaty, Y and Kaluarachchi, Y (2020) Critical success factors, barriers and challenges for adopting offsite prefabrication: A systematic literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364

Basílio, M d S B (2011) Infrastructure public-private partnerships risk factors and agents' participation. PhD thesis, Universidade Tecnica de Lisboa, Portugal.

Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.

Bengtsson, S H (2017) Innovation in the construction industry: Factors, actors and the client's role. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Bishop, E (2014) The use of Department of Health standards and guidance: effects on, and benefits to, healthcare accommodation. PhD thesis, Loughborough University, UK.

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Biziorek, S; De Marco, A and Castelblanco, G (2023) Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Blomberg, D; Cotellesso, P; Sitzabee, W and Thal, A E (2014) Discovery of internal and external factors causing military construction cost premiums. Journal of Construction Engineering and Management, 140(3): 4013060, ISSN 0733-9364

Boadi, R (2020) A best practice framework for public-private partnerships (PPPs) in road projects: the case of Ghana. PhD thesis, University of Salford, UK.

Bolomope, M T; Baffour Awuah, K G; Amidu, A R and Filippova, O (2020) The challenges of access to local finance for PPP infrastructure project delivery in Nigeria. Journal of Financial Management of Property and Construction, 26(1), pp. 63-86. ISSN 1366-4387

Bosher, L (2014) Built-in resilience through disaster risk reduction: Operational issues. Building Research & Information, 42(2), pp. 240-254. ISSN 0961-3218

Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X

Bowen, P; Govender, R and Edwards, P (2018) Determinants of aids knowledge among construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Bowen, P A; Edwards, P J and Cattell, K (2012) Corruption in the South African construction industry: A thematic analysis of verbatim comments from survey participants. Construction Management and Economics, 30(10), pp. 885-901. ISSN 1466433X

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships. PhD thesis, George Washington University, USA.

Brady, T; Davies, A and Gann, D (2005) Can integrated solutions business models work in construction? Building Research & Information, 33(6), pp. 571-579. ISSN 0961-3218

Browne, M (2007) Towards a thematic approach to research within a taught postgraduate programme in construction and project management: A Northern Ireland context. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Bu, Z; Liu, J and Liu, J (2025) Impact of emotions on the behavioral strategies of PPP project stakeholders: An rdeu evolutionary game analysis. Engineering, Construction and Architectural Management, 32(4), pp. 2242-2271. ISSN 0969-9988

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.

Burrus, R T; Dumas, C F and Graham, J E (2011) Hurricane risk and coastal property owner choices. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 118-138. ISSN 1759-5916

Calzadilla, E; Awinda, K and Parkin, A (2012) An examination of the risk management process in Venezuelan construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193

Castelblanco, G; Guevara, J and De Marco, A (2024) Crisis management in public–private partnerships: Lessons from the global crises in the xxi century. Built Environment Project and Asset Management, 14(1), pp. 56-73. ISSN 2044-124X

Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2009) Drivers for adopting public private partnerships-empirical comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), pp. 1115-1124. ISSN 0733-9364

Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2010) Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of Construction Engineering and Management, 136(5), pp. 484-494. ISSN 0733-9364

Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.

Chan, K H (2012) Critical factors in minimizing lighting energy. Architectural Engineering and Design Management, 8(1), pp. 21-29. ISSN 1745-2007

Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364

Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chen, C; Lv, L; Wang, Z and Qiao, R (2023) Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects. Engineering, Construction and Architectural Management, 30(9), pp. 3876-3894. ISSN 0969-9988

Chen, J J (1997) The impact of Chinese economic reforms upon the construction industry. Building Research & Information, 25(4), pp. 239-245. ISSN 0961-3218

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, W (2019) Integration of building information modeling and internet of things for facility maintenance management. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, X (2019) Developing a third party investment partnership framework to encourage low carbon building projects in China. PhD thesis, Northumbria University, UK.

Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193

Cheng, M; Liu, L; Cheng, X and Tao, L (2024) Risk analysis of public-private partnership waste-to-energy incineration projects in China: A hybrid fuzzy DEMATEL-ISM approach. Engineering, Construction and Architectural Management, 31(11), pp. 4255-4280. ISSN 0969-9988

Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364

Cheung, E; Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(1), pp. 7-20. ISSN 1366-4387

Cheung, Esther (2009) Developing a best practice framework for implementing public private partnerships (PPP) in Hong Kong. PhD thesis, Queensland University of Technology, Australia.

Chi, Sae (2018) Developing a methodology for evaluating privately operated toll road projects using stochastic cost-benefit analysis. PhD thesis, Queensland University of Technology, Australia.

Chiang, Y H and Cheng, E W L (2009) Perception of financial institutions toward financing PFI projects in Hong Kong. Journal of Construction Engineering and Management, 135(9), pp. 833-840. ISSN 0733-9364

Chiang, Y H; Wong, F K W and Liang, S (2018) Fatal construction accidents in Hong Kong. Journal of Construction Engineering and Management, 144(3): 04017121, ISSN 0733-9364

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.

Chiu, W Y B and Ng, F F (2013) Improvement of job satisfaction and organisational commitment through work group identification: An examination of the quantity surveyors in Hong Kong. Construction Economics and Building, 13(3), pp. 80-95. ISSN 2204-9029

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.

Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.

Clark, R D (2002) Components of selected public -private partnerships to build new schools in California. EdD thesis, University of La Verne, USA.

Consoli, G G S (2006) Correctional management attitudes to private prison design and construction briefs in Australia. Journal of Construction Research, 7(1), pp. 99-109. ISSN 1609-9451

Conteh, Augustine (2023) Values of real assets: Focus on infrastructure and housing in Australia. PhD thesis, Griffith University, Australia.

Cooper, I (1997) The UK's changing research base for construction. Building Research & Information, 25(5), pp. 268-300. ISSN 0961-3218

Coram, W R (1997) The privatisaton of the property services agency. PhD thesis, University of Manchester, UK.

Dale, A; Gonzales, C and Himangshu, P (2003) Financing of private infrastructure investments in the emerging markets of Southeast Asia. Journal of Financial Management of Property and Construction, 8(2), pp. 61-78. ISSN 1366-4387

Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), pp. 17-32.

Daniel, E I; Oshodi, O S and Odediran, S (2024) An exploration of construction craftspeople apprentice training: Evidence from the UK. International Journal of Construction Education and Research, 20(2), pp. 218-240. ISSN 15578771

Danks, S; Shephard, A and Wild, A (1998) Architecture as the practice of design and the organization of practice. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Debela, G Y (2021) Assessment of government policies and regulations in the process of adopting Public-Private Partnership for infrastructure development in Ethiopia. PhD thesis, University of Birmingham, UK.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599

Delhi, V S K; Mahalingam, A and Palukuri, S (2012) Governance issues in BOT based PPP infrastructure projects in India. Built Environment Project and Asset Management, 2(2), pp. 234-249. ISSN 2044-124X

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Denny-Smith, G; Williams, M and Loosemore, M (2020) Assessing the impact of social procurement policies for indigenous people. Construction Management and Economics, 38(12), pp. 1139-1157. ISSN 01446193

Devkar, G; Palliyaguru, R and Oyegoke, A S (2020) The effects of institutional frameworks on implementation of PPP projects: A comparative perspective in Australia and India. International Journal of Construction Management, 20(6), pp. 720-736. ISSN 1562-3599

Dias, A and Ioannou, P G (1995) Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, 121(4), pp. 404-414. ISSN 0733-9364

Dias Jr., A (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects. PhD thesis, University of Michigan, USA.

Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218

Ding, Grace K C (2004) The development of a multi-criteria approach for the measurement of sustainable performance for built projects and facilities. PhD thesis, University of Technology Sydney, Australia.

Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.

Dlamini, S (2014) The relationship of the construction sector to economic growth: analysis of South African and UK construction sectors. PhD thesis, University of Reading, UK.

Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364

Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029

Dolla, T and Laishram, B (2020) Factors affecting public-private partnership preference in Indian municipal waste sector. International Journal of Construction Management, 20(6), pp. 567-584. ISSN 1562-3599

Dominguez, D (2008) Handling future uncertainty: Strategic planning for the infrastructure sector. DSc thesis, ETH Zürich, Switzerland.

Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.

Drew, D S and Skitmore, R M (1992) Competitiveness in bidding: A consultant's perspective. Construction Management and Economics, 10(3), pp. 227-247. ISSN 01446193

Du Plessis, C (2012) Towards a regenerative paradigm for the built environment. Building Research & Information, 40(1), pp. 7-22. ISSN 0961-3218

Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Dulaimi, M F; Alhashemi, M; Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(4), pp. 393-402. ISSN 1466433X

Dumbuya, B and Nirupama, N (2017) Disasters and long-term economic sustainability: A perspective on Sierra Leone. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 58-76. ISSN 1759-5916

Eadie, R; Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(1), pp. 89-104. ISSN 2044-124X

Eames, M; Dixon, T; May, T and Hunt, M (2013) City futures: Exploring urban retrofit and sustainable transitions. Building Research & Information, 41(5), pp. 504-516. ISSN 0961-3218

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Edkins, A J and Smyth, H J (2006) The imperative of trust in PPPs: Evaluations from the provision of 'full service' contracts. Journal of Construction Procurement, 12(1),

El-Itr, Z M (1992) Equal business opportunity programs in the construction industry: A framework for development and implementation. PhD thesis, Georgia Institute of Technology, USA.

El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988

Elbing, C and Devapriya, K A K (2004) Structured risk management process to achieve value for money in Public Private Partnerships. Journal of Financial Management of Property and Construction, 9(3), pp. 121-128. ISSN 1366-4387

Elgrari, O (2011) The role of technology transfer in improving manpower capability in private house building companies in Libya. PhD thesis, University of Salford, UK.

Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.

Emuze F, S T S W (2013) Perceived impact of the market on the business of regional contractors: A South African context. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Erk, E Y; Budayan, C; Koc, K and Tokdemir, O B (2023) Value creation in PPP projects undertaken in the Turkish healthcare industry. Journal of Construction Engineering and Management, 149(11): 04023108, ISSN 0733-9364

Ershadi, M.; Jefferies, M.; Davis, P. and Mojtahedi, M. (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(1), pp. 45-64. ISSN 2204-9029

Ershadi, M; Jefferies, M; Davis, P and Mojtahedi, M (2021) Comparative analysis of PMO functions between the public and private sectors: Survey of high-performing construction organizations. Journal of Construction Engineering and Management, 147(11): 04021151, ISSN 0733-9364

Etmektzoglou, Apostolos (2013) The impact of the financial crisis on industrial relations in Greek industry. DBA thesis, Nottingham Trent University, UK.

Faisal, Fahim (2016) The role of government and development partner certification in public-private partnership infrastructure project financing. PhD thesis, Queensland University of Technology, Australia.

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Fernando, N; Jayathilake, P; De Silva, M; Gunathilake, W; Devapura, N and Wise, B (2024) Built environment stakeholders and climate change adaptation: the case of Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 636-648. ISSN 1759-5916

Field, C and Davenport, D (1999) PFI policy since 1996 and the implications for small and medium sized enterprises in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Fitzpatrick, D J (1977) A technological and economic assessment of housebuilding materials. PhD thesis, University of Surrey, UK.

Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.

Foju, B A (1993) The role of facilities management (maintenance) on office worker performance in Yaounde, Cameroon. ArchDr thesis, University of Michigan, USA.

Freeman, P K (2004) Allocation of post-disaster reconstruction financing to housing. Building Research & Information, 32(5), pp. 427-437. ISSN 0961-3218

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(2), pp. 185-197. ISSN 1466433X

Gao, S; Low, S P and Nair, K (2018) Design for manufacturing and assembly (DFMA): A preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), pp. 440-456. ISSN 1745-2007

Garvin, M J (2010) Enabling development of the transportation public-private partnership market in the United States. Journal of Construction Engineering and Management, 136(4), pp. 402-411. ISSN 0733-9364

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193

Gebremeskel, M N; Kim, S Y; Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), pp. 2925-2947. ISSN 0969-9988

Geroy, L S A and Pesigan, A M (2011) Disaster risk reduction for health facilities in the Western Pacific region. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 268-277. ISSN 1759-5916

Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988

Gilmour, T; Wiesel, I; Pinnegar, S and Loosemore, M (2010) Social infrastructure partnerships: A firm rock in a storm? Journal of Financial Management of Property and Construction, 15(3), pp. 247-259. ISSN 1366-4387

Gilmour, Tony (2009) Network power: An international study of strengthening housing association capacity. PhD thesis, University of Sydney, Australia.

Girmscheid, G (2009) NPV model for evaluating the economic efficiency of municipal street maintenance by private providers. Journal of Construction Engineering and Management, 135(8), pp. 701-709. ISSN 0733-9364

Giti, D M; K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction, 25(2), pp. 293-312. ISSN 1366-4387

Glagola, C R and Sheedy, W M (2002) Partnering on defense contracts. Journal of Construction Engineering and Management, 128(2), pp. 127-138. ISSN 0733-9364

Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499

Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2018) Institutional logics and hybrid organizing in public-private partnerships. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2020) Hybrid organisations as trading zones: Responses to institutional complexity in the shaping of strategic partnerships. Construction Management and Economics, 38(7), pp. 603-622. ISSN 01446193

Grady, K (1980) The provision of public buildings in the West Riding of Yorkshire, c.1600-1840. PhD thesis, University of Leeds, UK.

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.

Griffith, A and Headley, J D (1995) Developing an effective approach to the procurement and management of small building works within large client organizations. Construction Management and Economics, 13(4), pp. 279-289. ISSN 01446193

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Gurjao, S (2010) Inclusivity: understanding the careers of women in the construction industry. PhD thesis, University of Reading, UK.

Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.

Haigh, R and Sutton, R (2012) Strategies for the effective engagement of multi-national construction enterprises in post-disaster building and infrastructure projects. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 270-282. ISSN 1759-5916

Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.

Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives. PhD thesis, University of Strathclyde, UK.

Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects. PhD thesis, University of Leeds, UK.

Hamdi, I M (1996) Multimedia applications in construction project management: An owner's perspective. PhD thesis, University of Kentucky, USA.

Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218

Haran, M; McCord, M; Hutchison, N; McGreal, S; Adair, A; Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: An international perspective. Journal of Financial Management of Property and Construction, 18(2), pp. 184-203. ISSN 1366-4387

Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(3), pp. 65-80. ISSN 1366-4387

Harris Sr., C E (2023) Public private partnerships in infrastructure: A study on performance and equity improvement. DBA thesis, National University, USA.

Hartmann, A; Davies, A and Frederiksen, L (2010) Learning to deliver service-enhanced public infrastructure: Balancing contractual and relational capabilities. Construction Management and Economics, 28(11), pp. 1165-1175. ISSN 1466433X

Hassanein, A A G and Khalifa, R A (2007) Financial and operational performance indicators applied to public and private water and wastewater utilities. Engineering, Construction and Architectural Management, 14(5), pp. 479-492. ISSN 0969-9988

Hassouna, R (2005) Viability of applying the public private partnership (PPP) strategy to the libyan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(3), pp. 203-214. ISSN 0969-9988

Haynes, W A (2002) An exploration of the nexus of the public and private sectors in the project management organizations for two boston megaprojects: The central artery/tunnel project and the Boston Harbor cleanup. PhD thesis, Northeastern University, USA.

Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service. PhD thesis, University of Edinburgh, UK.

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Heurkens, E W T M (2012) Private sector-led urban development projects: Management, partnerships and effects in the Netherlands and the UK. PhD thesis, Delft University of Technology, Netherlands.

Heywood, C; Missingham, G and Kenley, R (2002) Strategic issues for facility provision: A re-examination of the nimby phenomenon. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Holt, G D and Edwards, D J (2012) Innovation or business survival? A preliminary, qualitative study of UK construction plant supply chains. Construction Innovation, 12(1), pp. 99-122. ISSN 1471-4175

Hooper, A and Nicol, C (2000) Design practice and volume production in speculative housebuilding. Construction Management and Economics, 18(3), pp. 295-310. ISSN 01446193

Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193

Hu, Z; Chen, S and Zhang, X (2014) Value for money and its influential factors: An empirical study of PPP projects in Japan. Built Environment Project and Asset Management, 4(2), pp. 166-179. ISSN 2044-124X

Hu, Z; Li, Q; Liu, T; Wang, L and Cheng, Z (2021) Government equity investment, effective communication and public private partnership (PPP) performance: Evidence from China. Engineering, Construction and Architectural Management, 28(9), pp. 2811-2827. ISSN 0969-9988

Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.

Huang, Y-L (1995) Project and policy analysis of build-operate-transfer infrastructure development. PhD thesis, University of California, Berkeley, USA.

Ibarra, G (2016) The meaning of 'social' in Mexican social housing: A study of housing developments in Mazatlán, Mexico. PhD thesis, University of Sheffield, UK.

Ibbotson, K and Farrell, P (2019) The challenges of prioritising low carbon in public sector flood and coastal erosion risk management (FCERM) construction. International Journal of Building Pathology and Adaptation, 37(5), pp. 615-628. ISSN 23984708

Ibem, E O; Onyemaechi, P C and Ayo-Vaughan, E A (2018) Project selection and transparency factors in housing public-private partnerships in Nigeria. Construction Economics and Building, 18(2), pp. 15-40. ISSN 2204-9029

Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),

Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Idoro, G (2009) Evaluating levels of project planning and their effects on performance in the Nigerian construction industry. Construction Economics and Building, 9(2), pp. 39-50. ISSN 2204-9029

Igwe, C; Hammad, A and Nasiri, F (2022) Influence of lean construction wastes on the transformation-flow-value process of construction. International Journal of Construction Management, 22(13), pp. 2598-2604. ISSN 1562-3599

Islam, Md Mainul M (2009) Optimizing concessionary items' values for procuring privately financed infrastructure projects. PhD thesis, Griffith University, Australia.

Ismail, S (2013) Factors attracting the use of public private partnership in Malaysia. Journal of Construction in Developing Countries, 18(1), pp. 95-108. ISSN 1823-6499

Ismail, S and Azzahra, H F (2014) Rationales for public private partnership (PPP) implementation in Malaysia. Journal of Financial Management of Property and Construction, 19(3), pp. 188-201. ISSN 1366-4387

Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X

Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X

Issa, D; Emsley, M and Krikham, R (2012) Reviewing risk allocation for infrastructure pfi: Between theory and practice. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Jafari Ramiani, A; Sarvari, H; Chan, D W M; Nassereddine, H and Lotfata, A (2024) Critical success factors for private sector participation in accomplishing abandoned public sports facilities projects in Iran. International Journal of Construction Management, 24(6), pp. 586-600. ISSN 1562-3599

Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jamshed, A; Rana, I A; McMillan, J M and Birkmann, J (2019) Building community resilience in post-disaster resettlement in Pakistan. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 301-315. ISSN 1759-5916

Jandali, D and Sweis, R (2019) Factors affecting maintenance management in hospital buildings: Perceptions from the public and private sector. International Journal of Building Pathology and Adaptation, 37(1), pp. 6-21. ISSN 23984708

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.

Jayasena, N S; Chan, D W M and Kumaraswamy, M (2024) Benefits, enablers and barriers in deploying PPP when developing smart infrastructure in non-urban areas. Built Environment Project and Asset Management, 14(1), pp. 92-108. ISSN 2044-124X

Jayasena, N S; Chan, D W M; Kumaraswamy, M M and Saka, A B (2023) Applicability of public-private partnerships in smart infrastructure development: The case of Hong Kong. International Journal of Construction Management, 23(11), pp. 1932-1944. ISSN 1562-3599

Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.

Jefferies, M (2006) Critical success factors of public private sector partnerships: A case study of the sydney superdome. Engineering, Construction and Architectural Management, 13(5), pp. 451-462. ISSN 0969-9988

Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988

Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029

Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988

Jefferies M, G T B G (2013) Public private partnerships: The provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jeong, H S; Abraham, D M and Lew, J J (2004) Evaluation of an emerging market in subsurface utility engineering. Journal of Construction Engineering and Management, 130(2), pp. 225-234. ISSN 0733-9364

Jin, X H; Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(3), pp. 297-316. ISSN 1471-4175

Jin, X H and Zuo, J (2011) Critical uncertainty factors for efficient risk allocation in privately financed public infrastructure projects in Australia. International Journal of Construction Management, 11(3), pp. 19-34. ISSN 1562-3599

Jin, X-H (2009) Allocating risks in public-private partnerships using a transaction cost economic approach: A case study. Construction Economics and Building, 9(1), pp. 19-26. ISSN 2204-9029

Jintamanaskoon, S and Chan, P W (2014) Boundary making in public-private-partnerships (PPP): A historical account of the British railway industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Jowkar, M; Temeljotov-Salaj, A; Lindkvist, C M and Støre-Valen, M (2022) Sustainable building renovation in residential buildings: Barriers and potential motivations in Norwegian culture. Construction Management and Economics, 40(3), pp. 161-172. ISSN 01446193

Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.

Kadir Pakir, A H (2003) Integration: A study in the context of low cost housing projects in Malaysia with special reference to the state of penang. PhD thesis, University College London, UK.

Kaewsri, N and Tongthong, T (2011) An investigation of women engineers in non-traditional occupations in the Thai construction industry. Construction Economics and Building, 11(2), pp. 1-21. ISSN 2204-9029

Kamara, J M (2012) Integration in the project development process of a private finance initiative (PFI) project. Architectural Engineering and Design Management, 8(4), pp. 228-245. ISSN 1745-2007

Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599

Kamunda, A; Renukappa, S; Suresh, S and Jallow, H (2021) BIM in the water industry: Addressing challenges to improve the project delivery process. Engineering, Construction and Architectural Management, 28(2), pp. 510-529. ISSN 0969-9988

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Karvekar, S P (2008) Private sector participation in roads development: Planning and management issues. PhD thesis, Maharaja Sayajirao University of Baroda, India.

Kassim, S M (2006) Sustainability of private sector in solid waste collection: a case of Dar es Salaam Tanzania. PhD thesis, Loughborough University, UK.

Kavishe, N and Chileshe, N (2019) Readiness assessment of public-private partnerships implementation within Tanzanian housing projects: Challenges, strategies and approaches. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Kavishe, N and Chileshe, N (2020) Driving forces for adopting public-private partnerships in Tanzanian housing projects. International Journal of Construction Management, 20(8), pp. 912-927. ISSN 1562-3599

Kavishe, N; Chileshe, N and Jefferson, I (2019) Public-private partnerships in Tanzanian affordable housing schemes: Policy and regulatory issues, pitfalls and solutions. Built Environment Project and Asset Management, 9(2), pp. 233-247. ISSN 2044-124X

Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988

Kavishe, N; Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(4), pp. 354-369. ISSN 1562-3599

Ke, Y; Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects. Construction Economics and Building, 16(3), pp. 20-37. ISSN 2204-9029

Ke, Y; Hao, W; Ding, H and Wang, Y (2017) Factors influencing the private involvement in urban rail public-private partnership projects in China. Construction Economics and Building, 17(1), pp. 90-106. ISSN 2204-9029

Ke, Y; Ling, F Y Y; Ning, Y and Zhang, Z (2019) Managing relationships in large public projects: Comparative study of China and Singapore. Built Environment Project and Asset Management, 9(3), pp. 348-363. ISSN 2044-124X

Key, M A (2016) Regulating sustainable development: An enabling model for consistent collaboration between planning and building control services in England. DProf thesis, University of Salford, UK.

Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.

Kim, Jong Jin (2005) A study of the externalities of reconstruction projects in neighbourhood residential markets. PhD thesis, University of New South Wales, Australia.

Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364

Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531

Kukah, A S K; Owusu-Manu, D G; Badu, E; Edwards, D J and Asamoah, E (2024) Fuzzy quantitative risk allocation model (fqram) to guide decision-making on risk allocation in Ghanaian public-private partnership (PPP) power projects. Journal of Financial Management of Property and Construction, 29(1), pp. 83-114. ISSN 1366-4387

Kulevich, A E (2025) Effective strategies for mitigating bidding corruption for U.S. Infrastructure contracts. DBA thesis, Walden University, USA.

Kumaraswamy, M M and Chan, D W M (1995) Determinants of construction duration. Construction Management and Economics, 13(3), pp. 209-217. ISSN 01446193

Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(2), pp. 88-98. ISSN 1358-9180

Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364

La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193

Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Larcher, P A (2000) A model for a contractor support agency. PhD thesis, Loughborough University, UK.

Larsson, N (2003) Adapting to climate change in Canada. Building Research & Information, 31(3-4), pp. 231-239. ISSN 0961-3218

Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), pp. 1401-1425. ISSN 0969-9988

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Leino, J L (2008) Community and private sector approaches to development in Kenya. PhD thesis, University of California, Berkeley, USA.

Leiringer, R (2001) Developing an effective model to support construction companies entering the public-private partnership projects' market. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 2. Construction Management and Economics, 1(3), pp. 233-268. ISSN 01446193

Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.

Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, B; Akintoye, A; Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387

Li, B; Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Li, B; Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Li, C; Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: Mediating and moderating. Engineering, Construction and Architectural Management, 31(2), pp. 696-715. ISSN 0969-9988

Li, H; Lv, L; Zuo, J; Su, L; Wang, L and Yuan, C (2020) Dynamic reputation incentive mechanism for urban water environment treatment PPP projects. Journal of Construction Engineering and Management, 146(8): 0001879, ISSN 0733-9364

Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531

Li, H; Xu, C; Cao, Y and Zhang, C (2024) What are the influencing factors of government's trust decision-making on private sector in PPP projects: Evidence from China? Journal of Engineering, Design and Technology, 22(3), pp. 813-835. ISSN 1726-0531

Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, X; Liu, Y; Wilkinson, S and Liu, T (2019) Driving forces influencing the uptake of sustainable housing in New Zealand. Engineering, Construction and Architectural Management, 26(1), pp. 46-65. ISSN 0969-9988

Li, Y; Wang, X and Wang, Y (2017) Using bargaining game theory for risk allocation of public-private partnership projects: Insights from different alternating offer sequences of participants. Journal of Construction Engineering and Management, 143(3): 04016102, ISSN 0733-9364

Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X

Ling, F Y Y; Kumaraswamy, M M; Dulaimi, M F and Khalfan, M (2011) Public private partnerships: Overcoming pre-contract problems faced by public clients and private providers in infrastructure projects in Singapore. International Journal of Construction Management, 11(1), pp. 63-77. ISSN 1562-3599

Liu, B; Lu, X; Hu, X; Li, L and Li, Y (2022) What's wrong with the public participation of urban regeneration project in China: A study from multiple stakeholders' perspectives. Engineering, Construction and Architectural Management, 29(1), pp. 91-109. ISSN 0969-9988

Liu, G; Yang, Y; Li, K; Shrestha, A and Zhuang, T (2025) Prosperity or futility? Effects of micro-regeneration on neighborhood commercial vitality. Engineering, Construction and Architectural Management, 32(6), pp. 3779-3803. ISSN 0969-9988

Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, J and Liu, J (2024) The demand hierarchy of the government and investors in PPP projects. Engineering, Construction and Architectural Management, 31(4), pp. 1539-1555. ISSN 0969-9988

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(1), pp. 64-77. ISSN 2044-124X

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(2), pp. 192-204. ISSN 1562-3599

Liu, T; Mostafa, S; Sherif, M and Tuan Son, N (2021) Emerging themes of public-private partnership application in developing smart city projects: A conceptual framework. Built Environment Project and Asset Management, 11(1), pp. 138-156. ISSN 2044-124X

Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175

Liu, T and Wilkinson, S (2013) Can the pilot public-private partnerships project be applied in future urban rail development? A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management, 3(2), pp. 250-263. ISSN 2044-124X

Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(2), pp. 206-223. ISSN 0969-9988

Liu, Y; Wang, X; Guo, S; Shi, X and Wang, D (2024) Analyzing the optimization of subsidies for PPP urban rail transit projects: A choice between passenger demand, vehicle kilometer, or an improved efficiency-oriented framework. Journal of Construction Engineering and Management, 150(1): 04023142, ISSN 0733-9364

Liu, Y; Wang, X; Zhang, J and Guo, S (2025) How risk factors lead to the early termination of public–private partnership projects in China: A multi-case study based on social network analysis and interpretive-structure modeling. Engineering, Construction and Architectural Management, 32(2), pp. 824-846. ISSN 0969-9988

Lv, J; Lin, M; Zhou, W and Xu, M (2021) How PPP renegotiation behaviors evolve with traffic changes: Evolutionary game approach. Journal of Construction Engineering and Management, 147(5): 04021032, ISSN 0733-9364

Mabuza, P V (2016) The potential role of public-private partnerships in the South African economy: An innovative conceptual public-private partnerships model for small and medium enterprise development. DLittPhil thesis, University of South Africa, South Africa.

Mahalingam, A (2010) PPP experiences in Indian cities: Barriers, enablers, and the way forward. Journal of Construction Engineering and Management, 136(4), pp. 419-429. ISSN 0733-9364

Maiwada, Y B (2003) Private financing of infrastructure projects in Sub-Sahara Africa: a case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Maiwada, Yusuf Bashir (2003) Private financing of infrastructure projects in sub Sahara Africa: A case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.

Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Malaeb, Z and Hamzeh, F R (2022) IPD-inspired framework for measuring stakeholder integration in public-private partnerships. Construction Innovation, 22(1), pp. 160-184. ISSN 1471-4175

Malek, M S and Bhatt, V (2023) Examine the comparison of CSFs for public and private sector's stakeholders: A SEM approach towards PPP in Indian road sector. International Journal of Construction Management, 23(13), pp. 2239-2248. ISSN 1562-3599

Mallisetti, V; Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects: the Indian case. Journal of Financial Management of Property and Construction, 27(2), pp. 179-198. ISSN 1366-4387

Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X

Mani, S; Ahmadi Eftekhari, N; Hosseini, M R and Bakhshi, J (2024) Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects. Construction Innovation, 24(2), pp. 425-445. ISSN 1471-4175

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(4), pp. 511-532. ISSN 0969-9988

Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.

Marques, R C and Berg, S (2011) Risks, contracts, and private-sector participation in infrastructure. Journal of Construction Engineering and Management, 137(11), pp. 925-932. ISSN 0733-9364

Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007

Marwah, H (2011) Investing in ghosts: Building and construction in Nigeria's oil boom and bust c1960-2000. PhD thesis, University of Oxford, UK.

Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy. PhD thesis, University of Newcastle upon Tyne, UK.

Matshidze, L B (2021) Developing a Public Private Partnerships (PPP) framework for implementing road maintenance projects in South African rural communities. PhD thesis, Heriot-Watt University, UK.

Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364

McDermott, V and Holdsworth, S (2017) Fringe benefits? Planning, building and the development of community in a neo-liberal landscape. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

McDermott, V; Zhang, R P; Hopkins, A and Hayes, J (2018) Constructing safety: Investigating senior executive long-term incentive plans and safety objectives in the construction sector. Construction Management and Economics, 36(5), pp. 276-290. ISSN 01446193

McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193

McErlane, A; Heaney, G; Haran, M and McClements, S (2016) The application of stakeholder theory to UK PPP stakeholders. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

McGee, S; Frittman, J; Ahn, S J and Murray, S (2016) Implications of cascading effects for the Hyogo Framework. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 144-157. ISSN 1759-5916

McGeorge, D; Eng, C S and Plenty, T (1998) A public sector approach to risk management as part of a total asset management strategy. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.

Md Lasa, Y; Ahmad, N and Takim, R (2015) Critical success factors in obtaining project financing for private finance initiative projects in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mello, Simone Gueresi de (2023) Urban transformation in pieces: Financing, regulation, and implementation tricks of social interest housing in the consortium urban operations of the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Mestizo Reyes, Rubén D (2018) Political risk and success factors in public-private partnerships at the subnational level: The case of road infrastructure concessions. DBA thesis, Pontificia Universidad Catolica del Peru, Peru.

Mihov, M (2020) Making it fit: The role of institutional work in the transplantation of the anglo-saxon public-private partnership model to Germany. PhD thesis, King's College London, UK.

Miles, D W J (1997) The development of intermediate construction enterprises. PhD thesis, Loughborough University, UK.

Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs. PhD thesis, Massachusetts Institute of Technology, USA.

Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(5), pp. 669-677. ISSN 01446193

Mishra, S (2009) Transportation infrastructure investment decision making under uncertainty and risk. PhD thesis, Wayne State University, USA.

Mladenovic, G; Vajdic, N; Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders' performance objectives. Built Environment Project and Asset Management, 3(2), pp. 228-249. ISSN 2044-124X

Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.

Mootanah, D P (1998) The effective management of risk in concession projects. Journal of Financial Management of Property and Construction, 3(2), pp. 27-40. ISSN 1366-4387

Muleya, F; Zulu, S and Nanchengwa, P C (2020) Investigating the role of the public private partnership act on private sector participation in PPP projects: A case of Zambia. International Journal of Construction Management, 20(6), pp. 598-612. ISSN 1562-3599

Murguia, D; Soetanto, R; Szczygiel, M; Goodier, C I and Kavuri, A (2026) Construction 4.0 implementation for performance improvement: An innovation management perspective. Construction Innovation, 26(3), pp. 843-870. ISSN 1471-4175

Murguia, D; Demian, P and Soetanto, R (2017) A systemic BIM innovation model in the construction supply chain. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.

Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.

Nagogo, U B (2022) A strategy for stakeholder engagement in public private partnership urban infrastructure provision in Nigeria. PhD thesis, University of Salford, UK.

Naing, M and Nitivattananon, V (2020) Analysis of the housing market with the roles of private house-builders on the middle-income group segment in Yangon, Myanmar. Journal of Construction in Developing Countries, 25(1), pp. 83-108. ISSN 1823-6499

Ng, C W (2024) Enhancing the performance of the adoption of building information modelling (BIM) and common data environment (CDE) using risk management and performance contract techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry. DSc thesis, George Washington University, USA.

Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X

Nhat, M N; Lewis, J; Beer, M and Boussabaine, A (2014) A pilot-study investigating the assessment and allocation of risks in public-private partnership transportation projects in Vietnam. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ninan, J; Mantha, B R K and Kesavan, B (2025) Human-centred cybersecurity for critical infrastructure: The case of the Florida water plant hack. Engineering, Construction and Architectural Management, 32(13), pp. 547-569. ISSN 0969-9988

Nissanka, S C; Malalgoda, C I; Amaratunga, D and Haigh, R (2024) Role of the built environment stakeholders in climate change adaptation. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 649-667. ISSN 1759-5916

Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.

Oei, F J and Ogunlana, S O (2006) Assessment of the development role of a statutory body from a customer perspective: A relationship marketing approach. Journal of Construction in Developing Countries, 11(2), pp. 31-52. ISSN 1823-6499

Ogbeifun, E (2011) Training artisans on-site. Construction Economics and Building, 11(3), pp. 83-91. ISSN 2204-9029

Ohemeng, F A (1998) Rehabilitation versus demolition and redevelopment: A value-based decision framework for private commercial properties. PhD thesis, University of Salford, UK.

Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.

Okwilagwe, O (2017) Collaboration processes in partnership working: local regeneration in Nigeria. PhD thesis, Bournemouth University, UK.

Olagunju, O A (2014) The development of a framework for sustainable housing delivery in Lagos, Nigeria. PhD thesis, University of Wolverhampton, UK.

Oliver, M (2013) Evaluation of the planning and implementation of NHS Local Improvement Finance Trust (LIFT) in East London. PhD thesis, University of East London, UK.

Olugboyega, O (2024) Diverse forms of greed and self-interest that contribute to corruption among construction stakeholders. Journal of Construction Engineering and Management, 150(9): 04024113, ISSN 0733-9364

Omotayo, M (2020) Developing public-private partnership (PPP) in Nigerian railway corporation: The governance challenge. PhD thesis, University of Manchester, UK.

Ongel, B; Tanyer, A M and Dikmen, I (2024) A network-based model for the assessment of success in PPP healthcare projects. International Journal of Construction Management, 24(8), pp. 875-887. ISSN 1562-3599

Opawole, A; Kajimo-Shakantu, K; Alao, O O and Ogbaje, C P (2019) Risk factors associated with procuring university hostel facilities through build-operate-transfer model. Journal of Engineering, Design and Technology, 17(1), pp. 136-154. ISSN 1726-0531

Osei-Kyei, R and Chan, A P C (2017) Factors attracting private sector investments in public-private partnerships in developing countries: A survey of international experts. Journal of Financial Management of Property and Construction, 22(1), pp. 92-111. ISSN 1366-4387

Osei-Kyei, R; Chan, A P C; Dansoh, A; Ofori-Kuragu, J K and Owusu, E K (2018) Motivations for adopting unsolicited proposals for public-private partnership project implementation: A survey of international experts. Journal of Financial Management of Property and Construction, 23(2), pp. 221-238. ISSN 1366-4387

Oshin-Martin, M (2014) Managing beyond the contract: Communicating and connecting to build sustainable collaborative relationships in international public-private partnerships. DM thesis, University of Maryland University College, USA.

Oshoniyi, A O (2014) Ethnicity and hiring: Phenomenological study of employees' perception in housing construction industry, Lagos state, Nigeria. DM thesis, University of Phoenix, USA.

Othman, A A E and Mahmoud, N A (2022) Public-private partnerships as an approach for alleviating risks associated with adaptive reuse of heritage buildings in Egypt. International Journal of Construction Management, 22(9), pp. 1713-1735. ISSN 1562-3599

Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects. PhD thesis, University of the West of England, Bristol, UK.

Owusu-Manu, D G; Adjei, T K; Sackey, D M; Edwards, D J and Hosseini, R M (2021) Mainstreaming sustainable development goals in Ghana’s energy sector within the framework of public–private partnerships: Challenges, opportunities and strategies. Journal of Engineering, Design and Technology, 19(3), pp. 605-624. ISSN 1726-0531

Owusu-Manu, D-G; Edwards, D J; Kutin-Mensah, E K; Kilby, A; Parn, E and Love, P E (2017) The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 166-180.

Oyedele, J B (2012) Captial markets and the delivery vehicles for international infrastructure investments. PhD thesis, University of Ulster, UK.

Oyemomi, B; Hare, B and Tong, M (2016) Exploring human resource incentivisation for public sector construction project delivery in Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Patil, N A and Laishram, B (2016) Public‒private partnerships from sustainability perspective: a critical analysis of the Indian case. International Journal of Construction Management, 16(2), pp. 161-174. ISSN 1562-3599

Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 195-202. ISSN 0969-9988

Payne, S L (2009) The institutional capacity of the UK speculative housebuilding industry – responding to the brownfield development policy agenda. PhD thesis, University of Glasgow, UK.

Peterman, A (2013) The roles within: Building energy conservation in the United States through alliance networks and other voluntary strategies. PhD thesis, Stanford University, USA.

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Pongpeng, J and Liston, J (2003) Constractor ability criteria: A view from the Thai construction industry. Construction Management and Economics, 21(3), pp. 267-282. ISSN 01446193

Poon, C S; Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(2), pp. 88-98. ISSN 0969-9988

Pornchokchai, S and Perera, R (2003) Housing market in Bangkok after the financial crisis of 1997: Lessons learned from the perspective of housing developers. Journal of Financial Management of Property and Construction, 8(3), pp. 167-178. ISSN 1366-4387

Pramudya, A A and Wibowo, A (2022) Ranking risks of BOT toll road investment projects in Indonesia using fuzzy interpretive structural modelling. Construction Economics and Building, 22(4), pp. 59-80. ISSN 2204-9029

Pritchard, C R (1999) Access to construction work and resources in Zimbabwe: An institutional analysis of the development of the construction industry. PhD thesis, London South Bank University, UK.

Prochorskaite, A (2016) An investigation of the 'soft' features of sustainable and healthy housing design: exploring stakeholder preferences and their provision in new housing developments. PhD thesis, Liverpool John Moores University, UK.

Pulhez, Magaly Marques (2014) The management arrangement: State, engineering companies and architects in the daily management of the housing policy in São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Qi, J (2011) Integration of construction worker fall safety in design through the use of building information modeling. PhD thesis, University of Florida, USA.

Raimi, T (2017) Achieving customer satisfaction in a private housing organisation in Nigeria. PhD thesis, University of Liverpool, UK.

Rajan, T; Siddharth, R and Mukund, S P (2010) PPPs in road renovation and maintenance: A case study of the East Coast Road project. Journal of Financial Management of Property and Construction, 15(1), pp. 21-40. ISSN 1366-4387

Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364

Ramli, A H (2014) Relationships between safety climate factors and occupational safety and health level of awareness in Malaysian government agencies. PhD thesis, University of Malaya, Malaysia.

Ranasinghe, Rajeshkumar (2023) Identifying factors that influence adoption, deployment and optimisation of project management methodologies within the Australian local government sector. PhD thesis, RMIT University, Australia.

Rasdorf, W; Grasso, B and Bridgers, M (2010) Public versus private perceptions on hiring an external program manager. Journal of Construction Engineering and Management, 136(2), pp. 219-226. ISSN 0733-9364

Rasheed, N; Shahzad, W M and Rotimi, J O B (2024) Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand. Construction Economics and Building, 24(4-5), pp. 142-159. ISSN 2204-9029

Rashid, M J; Chowdhooree, I; Aziz, T and Hossain, M (2024) Determining the climate adaptive capacity of urban actors: A case study of Mongla port-town in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 617-635. ISSN 1759-5916

Regan, M; Smith, J and Love, P E D (2011) Impact of the capital market collapse on public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 137(1), pp. 6-16. ISSN 0733-9364

Reid, S and Loosemore, M (2017) Motivations and barriers to social procurement in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Revolinsky, J A (2000) An analysis model of sequencing of computer systems for the construction manager: A study of automation impacts on the construction industry. PhD thesis, Texas A&M University, USA.

Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.

Robert, O K; Dansoh, A and Ofori-Kuragu, J K (2014) Reasons for adopting public-private partnership (PPP) for construction projects in Ghana. International Journal of Construction Management, 14(4), pp. 227-238. ISSN 1562-3599

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X

Rohman, M A (2022) Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), pp. 239-258. ISSN 1366-4387

Rohman, M A and Wiguna, I P A (2021) Evaluation of road design performance in delivering community project social benefits in Indonesian PPP. International Journal of Construction Management, 21(11), pp. 1130-1142. ISSN 1562-3599

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle. PhD thesis, University of Salford, UK.

Rosander, L and Kadefors, A (2019) From project to policy: Implementing a collaborative procurement strategy in a public client organisation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Roumboutsos, A and Chiara, N (2010) A strategic partnering framework analysis methodology for public-private partnerships. Journal of Financial Management of Property and Construction, 15(3), pp. 235-246. ISSN 1366-4387

Rutter, D and Gidado, K (2004) Value for money and facilities performance: A systems approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Rwelamila, P D and Phungula, M G (2009) Managing the complexity of public private partnerships initiatives: How mature are South African public institutions? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Saad, I M H and Hancher, D E (1998) Multimedia for construction project management: Project navigator. Journal of Construction Engineering and Management, 124(1), pp. 82-89. ISSN 0733-9364

Sabow, H (2011) The impact of organisational culture on the dimensions of pay satisfaction in private and public construction firms in Libya. PhD thesis, University of Salford, UK.

Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.

Salama M, A T (2013) Imposing green building regulations in Dubai. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.

Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499

Sanni, A O (2016) Factors determining the success of public private partnership projects in Nigeria. Construction Economics and Building, 16(2), pp. 42-55. ISSN 2204-9029

Santoso, D S; Joewono, T B; Wibowo, A; Sinaga, H P A and Santosa, W (2012) Public-private partnerships for tollway construction and operation: Risk assessment and allocation from the perspective of investors. Journal of Construction in Developing Countries, 17(2), pp. 45-66. ISSN 1823-6499

Sarvari, H; Chan, D W M; Banaitiene, N; Norhazilan Md, N and Beer, M (2021) Barriers to development of private sector investment in water and sewage industry. Built Environment Project and Asset Management, 11(1), pp. 52-70. ISSN 2044-124X

Sarvari, H; Nassereddine, H; Chan, D W M; Amirkhani, M and Md Noor, N (2021) Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran. Construction Innovation, 21(4), pp. 592-607. ISSN 1471-4175

Seneviratne, K; Perera, S; Ginigaddara, B; Jin, X; Tang, L and Osei Kyei, R (2024) Good practices in COVID-19 risk reduction adopted by Australian construction enterprises. Built Environment Project and Asset Management, 14(3), pp. 449-469. ISSN 2044-124X

Shah, M A; Kumar, S; Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(2), pp. 250-273. ISSN 1366-4387

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988

Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364

Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193

Shari, Z and Soebarto, V (2014) Investigating sustainable practices in the Malaysian office building developments. Construction Innovation, 14(1), pp. 17-37. ISSN 1471-4175

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.

Sharma, R (1998) Organizational role stress:focus on executives of construction industry. PhD thesis, Indian Institute of Technology Delhi, India.

Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X

Sheibani, G and Havard, T (2005) The government role in housing in libya during the period 1970: 2000. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sheng, X (2018) Public-private partnership in the development of infrastructure under the 'Belt and Road' initiative. PhD thesis, University of Oxford, UK.

Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193

Shrestha, Asheem (2015) Risk allocation in public private partnerships: A principal agent approach. PhD thesis, University of Melbourne, Australia.

Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.

Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.

Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599

Simpeh, E K and Smallwood, J J (2020) An integrated model for predicting the probability of adoption of green building in South Africa. Journal of Engineering, Design and Technology, 18(6), pp. 1927-1950. ISSN 1726-0531

Sing, C P; Love, P E D and Tarn, C M (2012) Multiplier model for forecasting manpower demand. Journal of Construction Engineering and Management, 138(10), pp. 1161-1168. ISSN 0733-9364

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Slater, K R and Robinson, J B (2023) Transformational climate actions by cities. Buildings & Cities, 4(1), pp. 74-82. ISSN 2632-6655

Soetanto, R; Hermawan, F; Milne, A; Hatmoko, J U D; As'ad, S and He, C (2020) Developing sustainable arrangements for "proactive" disaster risk financing in Java, Indonesia. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 435-451. ISSN 1759-5916

Sohail, M and Cavill, S (2008) Accountability to prevent corruption in construction projects. Journal of Construction Engineering and Management, 134(9), pp. 729-738. ISSN 0733-9364

Sohail, M and Maslyukivska, O (2009) Learning from water sector reforms in Europe and Asia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 107-116. ISSN 17514312

Song, D; Song, J; Yuan, H and Fan, Y (2021) An evolutionary game analysis of user-pay public-private partnership projects. Engineering, Construction and Architectural Management, 28(7), pp. 2042-2062. ISSN 0969-9988

Song, J; Song, D and Zhang, D (2015) Modeling the concession period and subsidy for BOT waste-to-energy incineration projects. Journal of Construction Engineering and Management, 141(10): 04015033, ISSN 0733-9364

Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Sospeter, N G; Rwelamila, P D; Nchimbi, M and Masoud, M (2014) Review of theory and practice literature on women entrepreneurship in the Tanzanian construction industry: Establishing the missing link. Journal of Construction in Developing Countries, 19(2), pp. 75-85. ISSN 1823-6499

Sporrong, J (2014) Selecting architectural and engineering consultants: Municipal practices in Sweden. PhD thesis, Chalmers University of Technology, Sweden.

Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.

Su, L; Cao, Y; Li, H and Zhang, C (2024) Water environment treatment ppp projects optimal payment mechanism based on multi-stage dynamic programming model. Engineering, Construction and Architectural Management, 31(2), pp. 866-890. ISSN 0969-9988

Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.

Subramaniyan, A S (2020) Engineering procurement and construction companies in India: Which factors drive their willingness to pay. PhD thesis, Chitkara University, Punjab, India.

Sun, H; Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(7), pp. 1406-1423. ISSN 0969-9988

Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364

Sundaraj, G and Eaton, D (2011) The anticipated robustness factors in a PFI project environment from the granting authority s perspective. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sundararajan, S K and Tseng, C L (2017) Managing project performance risks under uncertainty: Using a dynamic capital structure approach in infrastructure project financing. Journal of Construction Engineering and Management, 143(8): 04017046, ISSN 0733-9364

Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029

Swenarton, M (2009) Research shortcomings in housing. Building Research & Information, 37(1), pp. 101-105. ISSN 0961-3218

Tan, W (2009) Restructuring public-private partnership in student housing. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 83-88. ISSN 17514312

Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka. PhD thesis, University of the West of England, Bristol, UK.

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tangrungruengyoo, K (2018) The impact of environmental impact assessment on new housing development: a case study of Bangkok, Thailand. PhD thesis, King's College London, UK.

Tariq, S and Zhang, X (2021) Critical analysis of the private sector roles in water PPP failures. Journal of Construction Engineering and Management, 147(4): 04021015, ISSN 0733-9364

Tariq, S and Zhang, X (2022) A critical analysis of water PPP failures in Sub-Saharan Africa. Engineering, Construction and Architectural Management, 29(8), pp. 3157-3180. ISSN 0969-9988

Tariq, S; Zhang, X and Leung, R H M (2019) An analytical review of failed water public-private partnerships in developing countries. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 60-69. ISSN 17514304

Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana. PhD thesis, University of Salford, UK.

Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tennant, S and Fernie, S (2012) The commercial currency of construction framework agreements. Building Research & Information, 40(2), pp. 209-220. ISSN 0961-3218

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175

Thomas, H R; Smith, G R and Wright, D E (1991) Legal aspects of oral change orders. Journal of Construction Engineering and Management, 117(1), pp. 148-162. ISSN 0733-9364

Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.

Thompson, B P (2009) Investigation of system dynamics applied to building simulation for anti-terrorism resource allocation. PhD thesis, University of Wisconsin - Madison, USA.

Tian, Y (2022) Financing infrastructure through blockchain tokenization. PhD thesis, University of Florida, USA.

Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.

Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193

Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Toma, H M; El-Sayed, S; Ibrahim, A H and Badawy, M (2025) Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts. International Journal of Construction Management, 25(7), pp. 750-759. ISSN 1562-3599

Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(4), pp. 421-443. ISSN 0969-9988

Traynor, E H (1980) The application of factor analysis in the design of a cost control system. Construction Papers, 1(1), pp. 29-43. ISSN 0144-8587

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(6), pp. 1155-1169. ISSN 0969-9988

Tse, R Y C and Raftery, J (2001) Infrastructure policy and economic growth: Case of Hong Kong. Construction Economics and Building, 1(1), pp. 66-79. ISSN 2204-9029

Tserng, H P; Russell, J S; Hsu, C W and Lin, C (2012) Analyzing the role of national PPP units in promoting PPPs: Using new institutional economics and a case study. Journal of Construction Engineering and Management, 138(2), pp. 242-249. ISSN 0733-9364

Tshehla, M F and Mukudu, E (2020) Addressing constraints for effective project finance for infrastructure projects in emerging economies: The case of Zimbabwe. Journal of Construction Business and Management, 4(1), pp. 48-59. ISSN 2521-0165

Tucker, R C; Liyanage, C; Robinson, S J; Montebon, D R; Gotangco Gonzales, C K; Olpoc, J C; Patacsil, L B; Tantanee, S; Buranajarukorn, P; Apichayaku, O S; Weerasinghe, R N and Dissanayake, R (2025) Understanding university enterprise collaboration for disaster resilience in South-East Asia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 104-128. ISSN 1759-5908

Tupe, S N (2009) Issues in financing of power projects during the period of economic reforms in India. PhD thesis, Indian Institute of Technology, Bombay, India.

Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X

Umeokafor, N (2018) An investigation into public and private clients' attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(6), pp. 798-815. ISSN 0969-9988

Usher, D (1990) Privatisation, partnerships and the building industry. PhD thesis, University of Bristol, UK.

Ustadi, A M A (2013) The prospects of introducing the private finance initiative in the UAE construction industry. PhD thesis, British University in Dubai, UAE.

Van Der Heijden, J (2010) Privatisation of building code enforcement: A comparative study of regimes in Australia and Canada. International Journal of Law in the Built Environment, 2(1), pp. 60-75. ISSN 1756-1450

Van Ek, M and Le Feuvre, K (2021) The perception of mental health in small to medium enterprises in the welsh construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Van der Heijden, J J (2009) Building regulatory enforcement regimes: Comparative analysis of private sector involvement in the enforcement of public building regulations. PhD thesis, Delft University of Technology, Netherlands.

Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193

Verma, M (2012) Public private partnerships in road transport infrastructure in India: A governance perspective. PhD thesis, University of Manchester, UK.

Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.

Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.

Vernali, R J (1992) The case of the California contractors state license board: A palette of conflict resolution strategies for the 1990s. DPA thesis, Golden Gate University, USA.

Vives, A; Benavides, J and Paris, A M (2010) Selecting infrastructure delivery modalities: No time for ideology or semantics. Journal of Construction Engineering and Management, 136(4), pp. 412-418. ISSN 0733-9364

Vo, H. M. and Yang, J. B. (2026) Incorporating stakeholder perception into risk assessment model: An empirical study of highway construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5244-5274. ISSN 0969-9988

Waara, F (2008) Mitigating contractual hazards in public procurement: A study of Swedish local authorities. Construction Management and Economics, 26(2), pp. 137-145. ISSN 1466433X

Wade, F and Visscher, H (2021) Retrofit at scale: Accelerating capabilities for domestic building stocks. Buildings & Cities, 2(1), pp. 800-811. ISSN 2632-6655

Walker, A. and Kalinowski, M. (1994) An anatomy of a Hong Kong project - organization, environment and leadership. Construction Management and Economics, 12(3), pp. 191-202. ISSN 0144-6193

Walker, A and Kalinowski, M (1994) An anatomy of a Hong Kong project: organization, environment and leadership. Construction Management and Economics, 12(3), pp. 191-202. ISSN 01446193

Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wamuziri, S (2023) Legislative framework for public-private partnerships in the Sultanate of Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 150-156. ISSN 17514304

Wang, B; Cui, Q and Zhang, S (2021) Noncompete provision design for transportation PPP projects. Journal of Construction Engineering and Management, 147(2): 04020159, ISSN 0733-9364

Wang, K; Ke, Y; Liu, T and Sankaran, S (2022) Social sustainability in public-private partnership projects: Case study of the Northern beaches hospital in sydney. Engineering, Construction and Architectural Management, 29(6), pp. 2437-2460. ISSN 0969-9988

Wang, X; Tang, L; Guo, S and Gao, Y (2025) Configurations of factors affecting the equity structure in PPP projects: A resource-dependent perspective. Construction Management and Economics, 43(7), pp. 483-501. ISSN 0144-6193

Wang, X; Wang, B; Xu, Y and Shi, L (2021) A chance constrained programming method to determine optimal capital structure for privatized infrastructure. Construction Management and Economics, 39(7), pp. 579-594. ISSN 01446193

Warcup, R (2015) Successful paths to becoming a lean organization in the construction industry. PhD thesis, Utah State University, USA.

Warsame, A; Song, H S and Lind, H (2014) Quality of road construction projects in sweden between 1990 and 2010. Construction Economics and Building, 14(1), pp. 78-87. ISSN 2204-9029

Wells, J (2001) Construction and capital formation in less developed economies: Unravelling the informal sector in an African city. Construction Management and Economics, 19(3), pp. 267-274. ISSN 01446193

Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364

Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(2), pp. 228-243. ISSN 2044-124X

Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), pp. 101-119. ISSN 1823-6499

Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364

Widén, K and Hansson, B (2007) Diffusion characteristics of private sector financed innovation in Sweden. Construction Management and Economics, 25(5), pp. 467-475. ISSN 1466433X

Wild, A (2001) The Phillips Report on building: 1950. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Williams, A (2019) Developing metadata and methodologies to support assessment of the social value of buildings and communities in future smart cities. EngD thesis, University of Hertfordshire, UK.

Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Wong, A K D; Wong, F K W and Nadeem, A (2010) Attributes of building information modelling implementations in various countries. Architectural Engineering and Design Management, 6(4), pp. 288-302. ISSN 1745-2007

Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364

Xu, Y; Chan, A P C and Yeung, J F Y (2010) Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136(8), pp. 894-903. ISSN 0733-9364

Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.

Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364

Ye, S and Tiong, R L K (2003) Effects of tariff design in risk management of privately financed infrastructure projects. Journal of Construction Engineering and Management, 129(6), pp. 610-618. ISSN 0733-9364

Ye, S and Tiong, R L K (2003) Tariff adjustment frameworks for privately financed infrastructure projects. Construction Management and Economics, 21(4), pp. 409-419. ISSN 01446193

Ye, X; Shi, S; Chong, H Y; Fu, X; Liu, L and He, Q (2018) Empirical analysis of firms' willingness to participate in infrastructure PPP projects. Journal of Construction Engineering and Management, 144(1): 04017092, ISSN 0733-9364

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yitmen, I and Alibaba, H Z (2005) An investigation of self-sustaining finance systems for property development in North Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yousef, R A (2015) Toward effective construction safety: Application of morphological analysis to the Arabian Gulf region. PhD thesis, University of Texas at Dallas, USA.

Yıldırım, A; Genç, O and Aydınlı, S (2026) An examination of the perceptions of occupational work ethics among construction professionals working in the public and private sectors: A factor analysis (fa) and hypothesis testing approach. International Journal of Construction Management, 26(4), pp. 604-620. ISSN 1562-3599

Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988

Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zhang, H; Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(9), pp. 2643-2659. ISSN 0969-9988

Zhang, J; Zou, W and Kumaraswamy, M (2015) Developing public private people partnership (4P) for post disaster infrastructure procurement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 468-484. ISSN 1759-5916

Zhang, X (2004) Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management, 130(2), pp. 235-244. ISSN 0733-9364

Zhang, X (2004) Improving concessionaire selection protocols in public/ private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670-679. ISSN 0733-9364

Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364

Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364

Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364

Zhang, X (2006) Factor analysis of public clients' best-value objective in public-privately partnered infrastructure projects. Journal of Construction Engineering and Management, 132(9), pp. 956-965. ISSN 0733-9364

Zhang, X (2006) Public clients' best value perspectives of public private partnerships in infrastructure development. Journal of Construction Engineering and Management, 132(2), pp. 107-114. ISSN 0733-9364

Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhang, X and Tariq, S (2020) Failure mechanisms in international water PPP projects: A public sector perspective. Journal of Construction Engineering and Management, 146(6): 04020055, ISSN 0733-9364

Zhang, X Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Zhang, X Q and Kumaraswamy, M M (2001) Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management, 127(2), pp. 154-162. ISSN 0733-9364

Zhang, Y; Yuan, J; Zhao, J; Cheng, L and Li, Q (2022) Hybrid dynamic pricing model for transport PPP projects during the residual concession period. Journal of Construction Engineering and Management, 148(2): 04021200, ISSN 0733-9364

Zhao, J; Thurairajah, N; Greenwood, D; Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: A procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(8), pp. 3583-3601. ISSN 0969-9988

Zheng, S and Tiong, R L K (2010) First public-private-partnership application in taiwan's wastewater treatment sector: Case study of the nanzih BOT wastewater treatment project. Journal of Construction Engineering and Management, 136(8), pp. 913-922. ISSN 0733-9364

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, Y; Yang, Y and Yang, J B (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(3), pp. 554-574. ISSN 0969-9988

Zhu, F; Sun, M; Wang, L; Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects: A case of China. Engineering, Construction and Architectural Management, 26(6), pp. 907-926. ISSN 0969-9988

Zhu, J; Chen, J; Jin, W and Li, Q (2025) Developing incentive mechanisms for long-term and short-term technological innovation in major engineering projects using principal-agent theory. Engineering, Construction and Architectural Management, 32(3), pp. 1947-1969. ISSN 0969-9988

Zhu, J; Shi, Q; Zhang, C; Yuan, J; Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public-private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(2), pp. 789-811. ISSN 0969-9988

Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.

Zin, Z M I; Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(5), pp. 508-520. ISSN 2044-124X

Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.

Zou, W and Kumaraswamy, M (2009) Game theory based understanding of dynamic relationships between public and private sectors in PPPs. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

de Castro e Silva Neto, D (2019) Contributions to the governance and renegotiation processes of public-private partnerships in Brazil. PhD thesis, Universidade de Aveiro, Portugal.

van den Hurk, M (2015) What's the deal? Standardizing contracts for public-private partnerships. PhD thesis, Universiteit Antwerpen, Belgium.

Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364

This list was generated on Sat Aug 22 02:10:17 2026 UTC.